{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:ust 10, 2011


==REGION III==
==SUBJECT:==
2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 10, 2011 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville
BRAIDWOOD STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000456/2011301(DRS);
, IL 60555 SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000456/2011 301(DRS); 05000 457/20 11 301(DRS)
05000457/2011301(DRS)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On July 12, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Braidwood Station, Units 1 and 2. The enclosed report documents the results of those examination s. Preliminary observations noted during the examination process were discussed on Ju ly 1, 2011, with Mr. M. Kanavos and other members of your staff
On July 12, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Braidwood Station, Units 1 and 2. The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on July 1, 2011, with Mr. M. Kanavos and other members of your staff. An exit meeting was conducted via telephone on August 4, 2011, between Mr. G. Dudek, Training Director, of your staff and Mr. B. Palagi, Senior Licensing Examiner, to review the proposed final grading of the written examination for the license applicants.
. An exit meeting was conducted via telephone on August 4, 2011 , between Mr.
 
G. Dudek, Training Director, of your staff and Mr.


B. Palagi , Senior Licensing Examiner, to review the proposed final grading of the written examination for the license applicants.
The NRC examiners administered an initial license examination operating test during the weeks of June 20, 2011 through June 30, 2011. The written examination was administered by Braidwood Station training department personnel on July 1, 2011. Eight Senior Reactor Operator and seven Reactor Operator applicants were administered license examinations.


The NRC examiners administered an initial license examination operating test during the week s of June 20, 2011 through June 30, 2011. The written examination was administered by Braidwood Station training department personnel on Ju ly 1, 2011. Eight Senior Reactor Operator and seven Reactor Operator applicants were administered license examinations. The results of the examinations were finalized on August 4, 2011
The results of the examinations were finalized on August 4, 2011. Fifteen applicants passed all sections of their respective examinations and eight were issued Senior Operator licenses and seven were issued Operator licenses.
. Fifteen applicants passed all sections of their respective examinations and eight were issued Senior Operator licenses and seven were issued Operator licenses.


The written examination and other related written examination documentation will be withheld from public disclosure for 24 months. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The written examination and other related written examination documentation will be withheld from public disclosure for 24 months. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Line 40: Line 36:
Sincerely,
Sincerely,
/RA by Raymond Keith Walton Acting for/
/RA by Raymond Keith Walton Acting for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77


Hironori Peterson
===Enclosures:===
, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure s: 1. Operator Licensing Examination Report 05000456/2011301(DRS); 05000 457/2011301(DRS)  
1. Operator Licensing Examination Report 05000456/2011301(DRS);
 
05000457/2011301(DRS)
===w/Attachment:===
w/Attachment: Supplemental Information 2. Simulation Facility Report
Supplemental Information 2. Simulation Facility Report


REGION III==
REGION III==
Docket No:
Docket No: 50-456; 50-457 License No: DPR-72; DPR-77 Report No: 05000456/2011301(DRS); 05000457/2011301(DRS)
50-456; 50-457 License N o: DPR-72; DPR-77 Report No:
Licensee: Exelon Generation Company, LLC Facility: Braidwood Station, Units 1 and 2 Location: Braidwood, Illinois Dates: June 20, 2011, through June 30, 2011 Inspectors: Bruce Palagi, Chief Examiner Charles Phillips, Senior Operations Engineer David Reeser, Operations Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
05000 456/20 11301(DRS); 05000 457/20 11301(DRS) Licensee: Exelon Generation Company, LLC Facilit y: Braidwood Station , Units 1 and 2 Location: Braidwood, Illinois Dates: June 20, 2011 , through June 30, 2011 Inspectors:
Bruce Palagi, Chief Examiner Charles Phillips, Senior Operations Engineer David Reeser, Operations Engineer Approved by:
Hironori Peterson, Chief Operations Branch Division of Reactor Safety 1 Enclosure 1


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
ER 0 5000 456/20 11301(DRS);  
ER 05000456/2011301(DRS); 05000457/2011301(DRS); 06/20/2011-06/30/2011;


0 50 00 457/20 11301(DRS); 0 6/20/2011-06/30/2011; Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2
Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Initial License Examination Report.
; Initial License Examination Report.


The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG
The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,
-1021, AOperator Licensing Examination Standards for Power Reactors,@ Revision 9
AOperator Licensing Examination Standards for Power Reactors,@ Revision 9 - Supplement 1.
- Supplement 1
. Examination SummaryFifteen applicants passed all sections of their respective examinations and eight were issued Senior Operator licenses and seven were issued Operator licenses.  (Section 4OA5.1)


4OA5
Examination Summary:
Fifteen applicants passed all sections of their respective examinations and eight were issued Senior Operator licenses and seven were issued Operator licenses. (Section 4OA5.1)


=REPORT DETAILS=
=REPORT DETAILS=


===.1 Other===
{{a|4OA5}}
a. Initial Licensing Examinations The NRC examiners and members of the facility licensee's staff used the guidance prescribed in NUREG
==4OA5 Other==
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9
-Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensee's staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of May 31, 2011, with the assistance of members of the facility licensee's staff. During the week of June 20, 2011, the examiners audited two license application s for accuracy. The NRC examiners, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 20, 2011 through June 30, 2011. The facility licensee administered the written examination on Ju ly 1, 2011. Examination Scope b.
: (1) Findings The NRC examiners determined that the written examination, as submitted by the licensee, was within the range of acceptability expected for a proposed examination.


Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement. All changes made to the submitted examination, were made in accordance with NUREG
===.1 Initial Licensing Examinations===
-1021, "Operator Licensing Examination Standards for Power Reactors," and documented on Form ES-401-9, "Written Examination Review Worksheet
," which will be available in 24 months electronically in the NRC Public Document Room or from the Publicly Available Records System component of NRC's document system (ADAMS).


Written Examination On June 2 8, 2011, the licensee submitted documentation noting that there were no post examination comment s for consideration by the NRC examiners when grading the written examination. The final as-administered examination and answer key
====a. Examination Scope====
, will be available in 24 months electronically in the NRC Public Document Room or from ADAMS. The NRC examiners graded the written examination on Ju ly 26, 2011, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
The NRC examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9-Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of May 31, 2011, with the assistance of members of the facility licensees staff. During the week of June 20, 2011, the examiners audited two license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 20, 2011 through June 30, 2011. The facility licensee administered the written examination on July 1, 2011.
: (2) The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.


Operating Test Changes made to the operating test
====b. Findings====
, documented in a document titled, AOperating Test Comments,@ as well as the final as administered dynamic simulator scenarios and JPMs, are available electronically in the NRC Public Document Room or from the Publicly Available Records System component of NRC's document system (ADAMS).
: (1) Written Examination The NRC examiners determined that the written examination, as submitted by the licensee, was within the range of acceptability expected for a proposed examination.


The NRC examiners completed grading of the operating test on July 28 , 2011.
Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement. All changes made to the submitted examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet, which will be available in 24 months electronically in the NRC Public Document Room or from the Publicly Available Records System component of NRC's document system (ADAMS).
: (3) Eight applicants at the Senior Reactor Operator (SRO) level and seven applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. All fifteen applicants passed all sections of their respective examinations and were issued their respective operating licenses.


Examination Results
On June 28, 2011, the licensee submitted documentation noting that there were no post examination comments for consideration by the NRC examiners when grading the written examination. The final as-administered examination and answer key, will be available in 24 months electronically in the NRC Public Document Room or from ADAMS.


===.2 a. Examination Security===
The NRC examiners graded the written examination on July 26, 2011, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.
: (2) Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.


The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, AIntegrity of Examinations and Tests.
Changes made to the operating test, documented in a document titled, AOperating Test Comments,@ as well as the final as administered dynamic simulator scenarios and JPMs, are available electronically in the NRC Public Document Room or from the Publicly Available Records System component of NRC's document system (ADAMS).


The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors
The NRC examiners completed grading of the operating test on July 28, 2011.
,@ to determine acceptability of the licensee
: (3) Examination Results Eight applicants at the Senior Reactor Operator (SRO) level and seven applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. All fifteen applicants passed all sections of their respective examinations and were issued their respective operating licenses.
=s examination security activities.


Scope b. No findings of significance were discovered.
===.2 Examination Security===
 
====a. Scope====
The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, AIntegrity of Examinations and Tests.@ The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,@ to determine acceptability of the licensee=s examination security activities.
 
====b. Findings====
No findings of significance were discovered.


Findings
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings==
==4OA6 Meetings==


===.1 The chief examiner presented the examination team's preliminary observations and findings on===
===.1 Debrief===


July 1, 2011, to Mark Kanavos, Plant Manager, and other members of the Braidwood Station Operations and Training Department staff.
The chief examiner presented the examination team's preliminary observations and findings on July 1, 2011, to Mark Kanavos, Plant Manager, and other members of the Braidwood Station Operations and Training Department staff. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.


The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.
===.2 Exit Meeting===


Debrief
The chief examiner conducted an exit meeting on August 4, 2011, with Gary Dudek, Training Director, via telephone.


===.2 The chief examiner conducted an exit meeting on August 4, 2011===
ATTACHMENT:


, with Gary Dudek , Training Director, via telephone.
=SUPPLEMENTAL INFORMATION=


Exit Meeting ATTACHMENT: 
==KEY POINTS OF CONTACT==


=SUPPLEMENTAL INFORMATION=
Licensee
 
Attachment
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
: [[contact::M. Kanavos]], Plant Manager
: [[contact::M. Kanavos]], Plant Manager
Licensee
: [[contact::G. Dudek]], Training Director
: [[contact::G. Dudek]], Training Director
: [[contact::D. Stiles]], Operations Training Manager
: [[contact::D. Stiles]], Operations Training Manager
: [[contact::B. Keller]], Operations Supervisor  
: [[contact::B. Keller]], Operations Supervisor
: [[contact::B. Kempen]], Examination Author  
: [[contact::B. Kempen]], Examination Author
: [[contact::S. Russell]], Corporate Operations Training
: [[contact::S. Russell]], Corporate Operations Training
: [[contact::J. Smit]], Operations Exam Facility Representative
: [[contact::J. Smit]], Operations Exam Facility Representative
: [[contact::D. Burton]], Simulator Coordinator  
: [[contact::D. Burton]], Simulator Coordinator
: [[contact::B. Palagi ]], Chief Examiner
NRC
NRC
: [[contact::B. Palagi]], Chief Examiner
: [[contact::C. Phillips ]], Examiner  
: [[contact::C. Phillips]], Examiner
: [[contact::R. Reeser ]], Examiner ITEMS OPENED, CLOSED, AND DISCUSSED
: [[contact::R. Reeser]], Examiner
None Opened, Closed, and Discussed
 
LIST OF DOCUMENTS
==ITEMS OPENED, CLOSED, AND DISCUSSED==
REVIEWED None  LIST OF ACRONYMS USE
 
D ADAMS Agency-Wide Document Access and Management System
===Opened, Closed, and Discussed===
CFR Code of Federal Regulations
DRS Division of Reactor Safety
JPM Job Performance Measures
NRC U. S. Nuclear Regulatory Commission
RO Reactor Operator
SRO Senior Reactor Operator


Enclosure 2
None
SIMULATION FACILITY REPORT Facility Licensee:
 
Braidwood Station, Units 1 and 2
==LIST OF DOCUMENTS REVIEWED==
Facility Docket No:
50-456; 50-4 5 7 Operating Tests Administered:
6/20/2011 - 6/30/2011 The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non
-compliance with
CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations.
No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION
None None
M. Pacilio
    -2-  In accordance with 10
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component
of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,  /RA by Raymond Keith Walton Acting for/


Hironori Peterson, Chief Operations Branch
Division of Reactor Safety
Docket Nos. 50
-456; 50-457 License Nos. NPF
-72; NPF-77
s: 1. Operator Licensing Examination Report 05000456/2011301(DRS);
05000457/2011301(DRS)
w/Attachment:  Supplemental Information
2. Simulation Facility Report
cc w/encls:
Distribution via ListServ
DISTRIBUTION
: RidsNrrDorlLpl3
-2 Resource
Daniel Merzke
RidsNrrPMBraidwood Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
DRPIII DRSIII Carole Ariano
Linda Linn
Patricia Buckley
Tammy Tomczak
ROPreports Resource
DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress
\BRA 2011 301 DRS OL.docx  Publicly Available
Non-Publicly Available
Sensitive          Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII      NAME CZoia for BPalagi:co
RKWalton for HPeterson  DATE 08/09 /11 08/10/11  OFFICIAL RECORD COPY
}}
}}

Revision as of 17:07, 12 November 2019

Er 05000456-11-301(DRS), 05000457-11-301(DRS), on 06/20/2011-06/30/2011, Exelon Generation Company, LLC, Braidwood Station, Units 1 and 2, Initial License Examination Report
ML11224A166
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/10/2011
From: Hironori Peterson
Operations Branch III
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
50-456/11-301, 50-457/11-301 ER-11-301
Download: ML11224A166 (9)


Text

ust 10, 2011

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 NRC INITIAL LICENSE EXAMINATION REPORT 05000456/2011301(DRS);

05000457/2011301(DRS)

Dear Mr. Pacilio:

On July 12, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing examination process for license applicants employed at your Braidwood Station, Units 1 and 2. The enclosed report documents the results of those examinations. Preliminary observations noted during the examination process were discussed on July 1, 2011, with Mr. M. Kanavos and other members of your staff. An exit meeting was conducted via telephone on August 4, 2011, between Mr. G. Dudek, Training Director, of your staff and Mr. B. Palagi, Senior Licensing Examiner, to review the proposed final grading of the written examination for the license applicants.

The NRC examiners administered an initial license examination operating test during the weeks of June 20, 2011 through June 30, 2011. The written examination was administered by Braidwood Station training department personnel on July 1, 2011. Eight Senior Reactor Operator and seven Reactor Operator applicants were administered license examinations.

The results of the examinations were finalized on August 4, 2011. Fifteen applicants passed all sections of their respective examinations and eight were issued Senior Operator licenses and seven were issued Operator licenses.

The written examination and other related written examination documentation will be withheld from public disclosure for 24 months. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Raymond Keith Walton Acting for/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77

Enclosures:

1. Operator Licensing Examination Report 05000456/2011301(DRS);

05000457/2011301(DRS)

w/Attachment: Supplemental Information 2. Simulation Facility Report

REGION III==

Docket No: 50-456; 50-457 License No: DPR-72; DPR-77 Report No: 05000456/2011301(DRS); 05000457/2011301(DRS)

Licensee: Exelon Generation Company, LLC Facility: Braidwood Station, Units 1 and 2 Location: Braidwood, Illinois Dates: June 20, 2011, through June 30, 2011 Inspectors: Bruce Palagi, Chief Examiner Charles Phillips, Senior Operations Engineer David Reeser, Operations Engineer Approved by: Hironori Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1

SUMMARY OF FINDINGS

ER 05000456/2011301(DRS); 05000457/2011301(DRS); 06/20/2011-06/30/2011;

Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Initial License Examination Report.

The announced initial operator licensing examination was conducted by regional Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG-1021,

AOperator Licensing Examination Standards for Power Reactors,@ Revision 9 - Supplement 1.

Examination Summary:

Fifteen applicants passed all sections of their respective examinations and eight were issued Senior Operator licenses and seven were issued Operator licenses. (Section 4OA5.1)

REPORT DETAILS

4OA5 Other

.1 Initial Licensing Examinations

a. Examination Scope

The NRC examiners and members of the facility licensees staff used the guidance prescribed in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9-Supplement 1, to develop, validate, administer, and grade the written examination and operating test. Members of the facility licensees staff prepared the outline and developed the written examination and operating test. The NRC examiners validated the proposed examination during the week of May 31, 2011, with the assistance of members of the facility licensees staff. During the week of June 20, 2011, the examiners audited two license applications for accuracy. The NRC examiners, with the assistance of members of the facility licensees staff, administered the operating test, consisting of job performance measures and dynamic simulator scenarios, during the period of June 20, 2011 through June 30, 2011. The facility licensee administered the written examination on July 1, 2011.

b. Findings

(1) Written Examination The NRC examiners determined that the written examination, as submitted by the licensee, was within the range of acceptability expected for a proposed examination.

Less than 20 percent of the proposed examination questions were determined to be unsatisfactory and required modification or replacement. All changes made to the submitted examination, were made in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, and documented on Form ES-401-9, Written Examination Review Worksheet, which will be available in 24 months electronically in the NRC Public Document Room or from the Publicly Available Records System component of NRC's document system (ADAMS).

On June 28, 2011, the licensee submitted documentation noting that there were no post examination comments for consideration by the NRC examiners when grading the written examination. The final as-administered examination and answer key, will be available in 24 months electronically in the NRC Public Document Room or from ADAMS.

The NRC examiners graded the written examination on July 26, 2011, and conducted a review of each missed question to determine the accuracy and validity of the examination questions.

(2) Operating Test The NRC examiners determined that the operating test, as originally submitted by the licensee, was within the range of acceptability expected for a proposed examination.

Changes made to the operating test, documented in a document titled, AOperating Test Comments,@ as well as the final as administered dynamic simulator scenarios and JPMs, are available electronically in the NRC Public Document Room or from the Publicly Available Records System component of NRC's document system (ADAMS).

The NRC examiners completed grading of the operating test on July 28, 2011.

(3) Examination Results Eight applicants at the Senior Reactor Operator (SRO) level and seven applicants at the Reactor Operator (RO) level were administered written examinations and operating tests. All fifteen applicants passed all sections of their respective examinations and were issued their respective operating licenses.

.2 Examination Security

a. Scope

The NRC examiners reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with 10 CFR 55.49, AIntegrity of Examinations and Tests.@ The examiners used the guidelines provided in NUREG 1021, "Operator Licensing Examination Standards for Power Reactors,@ to determine acceptability of the licensee=s examination security activities.

b. Findings

No findings of significance were discovered.

4OA6 Meetings

.1 Debrief

The chief examiner presented the examination team's preliminary observations and findings on July 1, 2011, to Mark Kanavos, Plant Manager, and other members of the Braidwood Station Operations and Training Department staff. The chief examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary. No proprietary or sensitive information was identified during the examination or debrief/exit meetings.

.2 Exit Meeting

The chief examiner conducted an exit meeting on August 4, 2011, with Gary Dudek, Training Director, via telephone.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

M. Kanavos, Plant Manager
G. Dudek, Training Director
D. Stiles, Operations Training Manager
B. Keller, Operations Supervisor
B. Kempen, Examination Author
S. Russell, Corporate Operations Training
J. Smit, Operations Exam Facility Representative
D. Burton, Simulator Coordinator

NRC

B. Palagi, Chief Examiner
C. Phillips, Examiner
R. Reeser, Examiner

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

LIST OF DOCUMENTS REVIEWED