ML22173A228

From kanterella
Jump to navigation Jump to search
Bwd 2020 Ile ES-201-1 Rev 11-Final
ML22173A228
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/17/2020
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML19121A238 List:
References
Download: ML22173A228 (1)


Text

ES-201 Facility:

Date of Examination:

Developed:

Written:

Facility:

NRC:

//

Operating:

Facility:

NRC:

Days from Exam Target Date*

Chief Examiner's Initials

-240 09/25/2019 RDB 9/6/2019

-210 10/25/2019 RDB 10/11/2019

-210 10/25/2019 RDB 10/11/2019

-210 N/A N/A

-210 10/29/2019 RDB 10/21/2019 (Mod. 11/22/19)

-195 11/08/2019 RDB 10/29/2019

-150 12/24/2019 RDB 12/18/2019

-136 01/07/2020 RDB 1/6/2020

-75 03/10/2020 RDB OP Test-12/16/2019 Written-2/24/2020

-75 N/A N/A

-60 03/23/2020 RDB 3/9/2020

-50 03/24/2020 RDB 3/12/2020

-35 03/27/2020 RDB 3/26/2020

-35 05/11/2020 RDB 5/11/2020

-30 05/01/2020 RDB 4/20/2020

-14 05/18/2020 RDB 5/14/2020

-7 05/25/2020 RDB 5/14/2020

-7 05/25/2020 RDB 5/20/2020

-7 05/25/2020 RDB 5/14/2020

-7 05/25/2020 RDB 5/14/2020

-7 05/25/2020 RDB 5/21/2020 Exam Date:

06/01/2020

2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
5. Corporate notification letter sent (C.2.e).
6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).

Task Description (Reference)

1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).

Form ES-201-1 6/01/2020 - 6/09/2020 BRAIDWOOD STATION UNITS 1 & 2 Examination Preparation Checklist

7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h; C.3.d-e).
9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);

supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).

10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g).
11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).
12. Written exam and operating test reviews completed (C.3.f).

13b. The NRC and the facility licensee conduct exam preparatory week.

14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).

13a. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g).

17. Request facility licensee management feedback on the examination (C.2.l).
18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).
19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
  • Target dates are based on facility prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case by case basis in coordination with the facility licensee.