MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 ML19277G9232019-06-19019 June 2019 2019 Braidwood Ile Forms ES-301-6 Rev 1 2023-08-25
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19275H2952019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-1 ML19275H4122019-06-19019 June 2019 2019 Braidwood Ile Form ES-403-1 ML19275H3712019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-3 ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 2023-08-25
[Table view] |
Text
ES-201 Examination Outline Quality Checklist Form ES-201-2 NOTE: This ES-201-2 is for the NRC-developed Examination Outlines Facility: Braidwood Station, Units 1 and 2 Date of Examination: February 28 - March 4, 2022 Initials Item Task Description a b* c#
- 1. a. Verify that the outline(s) fit(s) the appropriate model in accordance with ES-401 or ES-401N. JR/LR N/A RDB W b. Assess whether the outline was systematically and randomly prepared in accordance with JR/LR R N/A RDB Section D.1 of ES-401 or ES-401N and whether all K/A categories are appropriately sampled.
I T
- c. Assess whether the outline overemphasizes any systems, evolutions, or generic topics. JR/LR N/A RDB T
E N d. Assess whether the justifications for deselected or rejected K/A statements are appropriate. JR/LR N/A RDB
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of JR/LR N/A RDB normal evolutions, instrument and component failures, technical specifications, and major S transients.
I M b. Assess whether there are enough scenario sets (and spares) to test the projected number and JR/LR N/A RDB U mix of applicants in accordance with the expected crew composition and rotation schedule L without compromising exam integrity, and ensure that each applicant can be tested using at A least one new or significantly modified scenario, that no scenarios are duplicated from the T applicants audit test(s), and that scenarios will not be repeated on subsequent days.
O
- c. To the extent possible, assess whether the outline(s) conforms with the qualitative and JR/LR N/A RDB R
quantitative criteria specified on Form ES-301-4 and described in Appendix D and in Section D.5, Specific Instructions for the Simulator Operating Test, of ES-301 (including overlap).
- 3. a. Verify that the systems walkthrough outline meets the criteria specified on Form ES-301-2: JR/LR N/A RDB (1) The outline(s) contains the required number of control room and in-plant tasks distributed W among the safety functions as specified on the form.
A (2) Task repetition from the last two NRC examinations is within the limits specified on the form.
L (3) No tasks are duplicated from the applicants audit test(s).
K (4) The number of new or modified tasks meets or exceeds the minimums specified on the form.
T (5) The number of alternate-path, low-power, emergency, and radiologically controlled area H tasks meets the criteria on the form.
R O b. Verify that the administrative outline meets the criteria specified on Form ES-301-1: JR/LR N/A RDB U (1) The tasks are distributed among the topics as specified on the form.
G (2) At least one task is new or significantly modified.
H (3) No more than one task is repeated from the last two NRC licensing examinations.
- c. Determine whether there are enough different outlines to test the projected number and mix of JR/LR N/A RDB applicants and ensure that no items are duplicated on subsequent days.
- 4. a. Assess whether plant-specific priorities (including probabilistic risk assessment and individual JR/LR N/A RDB plant examination insights) are covered in the appropriate exam sections.
G E b. Assess whether the 10 CFR 55.41, 55.43, and 55.45 sampling is appropriate. JR/LR N/A RDB N
- c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5. JR/LR N/A RDB E
R d. Check for duplication and overlap among exam sections and the last two NRC exams. JR/LR N/A RDB A
L e. Check the entire exam for balance of coverage. JR/LR N/A RDB
- f. Assess whether the exam fits the appropriate job level (RO or SRO). JR/LR N/A RDB Printed Name/Signature Date John Robbins / 2/22/2022
- a. Authors Lionel Rodriguez / 2/22/2022
- b. Facility Reviewer (*) N/A N/A
- c. NRC Chief Examiner (#) Randal D. Baker / Digitally signed by Randal D. Baker Date: 2022.02.22 07:58:03 -06'00'
- d. NRC Supervisor Patricia J. Pelke / Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2022.02.22 16:04:53 -06'00'
- Not applicable for NRC-prepared examination outlines.
- The independent NRC reviewer initials items in column c; the chief examiners concurrence is required.