ML22173A259

From kanterella
Jump to navigation Jump to search
Bwd 2020 Ile Proposed Operating Test Submittal Letter
ML22173A259
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/16/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML19121A243 List:
References
Download: ML22173A259 (2)


Text

Exelon Generation,,

December 16, 2019 BW190114 U. S. Nuclear Regulatory Commission Regional Administrator, Region Ill 2443 Warrenville Road, Suite 21 O Lisle, IL 60532-4352 Braidwood Station, Units 1 and 2 Exelon Generation Company, LLC Braidwood Station 35100South Route 53, Suite 84 Braceville, IL 6040Nl619 www.exeloncoro.com 10 CFR 55.40(b)

Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials that Braidwood Station is submitting in support of the Initial License Examination scheduled for May 18, 2020 through May 29, 2020 at Braidwood Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Job Performance Measures and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors", Revision 11. Please note that reference materials are attached to each individual item.

Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021, Revision 11, "Operator Licensing Examination Standards for Power Reactors."

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NU REG 1021, Revision 11, Section ES-201, "Initial Operator Licensing Examination Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.

Should you have any questions concerning this letter, please contact Mr. Kevin Lueshen, Regulatory Assurance Manager, at (815)417-2800. For questions concerning examination materials, please contact Dane Brunswick at (815)458-7867.

Respectfully,

/)w,JA~

Marri Marchionda-Palmer Site Vice President Braidwood Station RECEIVED DEC 1 7 2019

U. S. Nuclear Regulatory Commission December 16, 2019 Page 2

Enclosures:

(Hand deliver to RandalBaker, Chief Examiner, Region Ill)

Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Examination Outline Quality Checklist (Form ES-201-2)

Operating Test Quality Checklist (Form ES-301-3)

Simulator Scenario Quality Checklist (Form ES-301-4)

Transient and Event Checklist (Form ES-301-5)

Competencies Checklist (Form ES-301-6)

Examination Security Agreements (Form ES-201-3) cc:

(without attachments)

Chief, NRG Operator Licensing Branch NRG Senior Resident Inspector-Braidwood Station N RC Document Control Desk RECEIVED DEC 17 2019