MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final 2024-05-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24149A3122024-05-0707 May 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24149A2932024-05-0707 May 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24149A3852024-04-19019 April 2024 Ile Form 1.3-1 Exam Security Agreement ML24149A3862024-04-19019 April 2024 Ile Form 2.1-1 Examination Preparation Checklist BW240018, Ile Post-Exam Submittal Letter2024-04-0505 April 2024 Ile Post-Exam Submittal Letter ML24149A3472024-03-14014 March 2024 Ile Proposed Exam Submittal Letter ML24149A3442024-03-14014 March 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24149A3452024-03-14014 March 2024 Ile Form 2.3-4 Written Exam Quality Checklist ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 ML24149A2562023-10-27027 October 2023 Ile Proposed Outline Submittal Letter ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1812022-04-0505 April 2022 Ile ES-401-9 Written Examination Review Worksheet ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1762022-04-0505 April 2022 Ile ES-301-7 Operating Test Review Worksheet ML22199A1792022-04-0505 April 2022 Ile ES-401-4 Rejected KAs ML22199A1842022-04-0505 April 2022 Outline Recommendations-Submittal Comments BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1912022-03-18018 March 2022 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22199A1852022-03-18018 March 2022 Ile Administered RO and SRO Admin Topics JPMs-FINAL ML22199A1872022-03-18018 March 2022 Ile Administered Sim and Inplant System JPMs-FINAL ML22199A1892022-03-18018 March 2022 Ile Administered Simulator Scenarios-FINAL ML22199A1902022-03-18018 March 2022 Ile Administered Written Examination-FINAL ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2692022-02-22022 February 2022 Ile ES-301-2 Sim and Inplant System JPM Outlines ML22199A2702022-02-22022 February 2022 Ile ES-401-2 and ES-401-3 Written Exam Outlines-Final ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2632022-02-22022 February 2022 Ile ES-301-1 Admin Topics Outlines ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2712022-02-22022 February 2022 Ile ES-D-1s Simulator Scenario Outlines ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2392022-02-18018 February 2022 Ile Proposed Simulator Scenarios-FINAL ML22199A2402022-02-18018 February 2022 Ile Proposed Written Examination-FINAL ML22199A2362022-02-18018 February 2022 Ile Proposed RO and SRO Admin Topic JPMs-FINAL ML22199A2382022-02-18018 February 2022 Ile Proposed Sim and Inplant System JPMs-FINAL ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final 2024-05-07
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Braidwood Date of Examination:
5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:
19-1 NRC Control Room Systems:
- 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. SIM-101: Perform an Emergency Boration (CVCS)
APE024 AA1.17 - 3.9 / 3.9 A, D, S 1
- b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S
2
- c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
- d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S
- e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
- f.
SIM-600: Unload and Shutdown 1A D/G (ED/G) 064 A4.07 - 3.4 / 3.4 D, S 6
- g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
- h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i.
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2
- j.
IP-400S: Locally Start 2B AF Pump (AFW)
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S
- k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)
APE058 AA1.03 - 3.1 / 3.3 D, E 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Braidwood Date of Examination:
5/18/20 Exam Level: RO SRO-I SRO-U Operating Test Number:
19-1 NRC Control Room Systems:
- 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
- a. SIM-101: Perform an Emergency Boration (CVCS)
APE024 AA1.17 - 3.9 / 3.9 A, D, S 1
- b. SIM-224: Align Ventilation Systems for Emergency Operation (ESFAS) 013 A4.01 - 4.5 / 4.8 A, D, EN, P, S
2
- c. SIM-410P: Place 1A RH Train in Shutdown Cooling (RHRS) 005 A4.01 - 3.6 / 3.4 D, L, S 4P
- d. SIM-402Sa: Start a Turbine Driven FW Pump (MFW) 059 A4.01 - 3.1 / 3.1 A, M, S 4S
- e. SIM-512: Swap Containment Chillers (CCS) 022 A4.02 - 3.2 / 3.1 N, S 5
- g. SIM-702: Perform a Calorimetric Surveillance (NIS) 015 A1.01 - 3.5 / 3.8 A, D, P, S 7
- h. SIM-801: Respond to an RCP Thermal Barrier Leak (CCWS) 008 A4.01 - 3.3 / 3.1 A, D, S 8
In-Plant Systems: 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
- i.
IP-206: Locally Reset Phase A (ESFAS) 013 A4.02 - 4.3 / 4.4 A, D, E 2
- j.
IP-400S: Locally Start 2B AF Pump (AFW)
EPEE05 EA1.1 - 4.1 / 4.0 D, E, R 4S
- k. IP-601: Locally Recover from a Loss of DC Bus 211 (DC)
APE058 AA1.03 - 3.1 / 3.3 D, E 6
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1