{{#Wiki_filter:August 22, 2012 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: | {{#Wiki_filter:August 22, 2012 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /RA/ | ||
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME8535 AND ME8536) | PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. | ||
The attached draft request for additional information (RAI) was transmitted on August 22, 2012, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the | ME8535 AND ME8536) | ||
The attached draft request for additional information (RAI) was transmitted on August 22, 2012, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated April 27, 2012. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits; (2) relocate the P-T limits in the technical specifications (TSs) to a new licensee-controlled document, the Pressure and Temperature Limits Report (PTLR); and (3) modify the TSs to add references to the PTLR. | |||
licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated April 27, 2012. The proposed amendment would: | PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY. | ||
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request. | The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request. | ||
Docket Nos. 50-277 and 50-278 | |||
Docket Nos. 50-277 and 50-278 | |||
==Attachment:== | ==Attachment:== | ||
Draft RAI | Draft RAI | ||
August 22, 2012 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: | August 22, 2012 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /RA/ | ||
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==SUBJECT:== | ==SUBJECT:== | ||
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. ME8535 AND ME8536) | PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. | ||
The attached draft request for additional information (RAI) was transmitted on August 22, 2012, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated April 27, 2012. The proposed amendment would: | ME8535 AND ME8536) | ||
PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY. The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request. | The attached draft request for additional information (RAI) was transmitted on August 22, 2012, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated April 27, 2012. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits; (2) relocate the P-T limits in the technical specifications (TSs) to a new licensee-controlled document, the Pressure and Temperature Limits Report (PTLR); and (3) modify the TSs to add references to the PTLR. | ||
Docket Nos. 50-277 and 50-278 | PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY. | ||
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request. | |||
Docket Nos. 50-277 and 50-278 | |||
==Attachment:== | ==Attachment:== | ||
Draft RAI | Draft RAI DISTRIBUTION PUBLIC DWidrevitz, NRR/EVIB LPL1-2 R/F BParks, NRR/SRXB RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMPeachBottom Resource ACCESSION NO.: ML12236A154 OFFICE LPL1-2/PM NAME REnnis DATE 8/22/12 OFFICIAL RECORD COPY | ||
DISTRIBUTION PUBLIC DWidrevitz, NRR/EVIB LPL1-2 R/F BParks, NRR/SRXB RidsNrrDorlLpl1-2 Resource | |||
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT RELOCATION OF PRESSURE AND TEMPERATURE LIMIT CURVES TO THE PRESSURE AND TEMPERATURE LIMITS REPORT PEACH BOTTOM ATOMIC POWER STATION - UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter to the Nuclear Regulatory Commission (NRC) dated April 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121230354), Exelon Generation Company, LLC (Exelon, the licensee), submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits; (2) relocate the P-T limits in the technical specifications (TSs) to a new licensee-controlled document, the Pressure and Temperature Limits Report (PTLR); and (3) modify the TSs to add references to the PTLR. PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY. | |||
The NRC staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal. | The NRC staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal. | ||
: 1. Section 1.0 of Attachment 1 to the | : 1. Section 1.0 of Attachment 1 to the licensees application dated April 27, 2012, states that relocation of the P-T limit curves to the PTLR is consistent with the guidance provided in NRC-approved GE Hitachi Nuclear Energy Licensing Topical Report NEDC-33178P-A, Revision 1 (ADAMS Accession No. ML092370486). Equations 4-2 and 4-3 in Section 4.3.2.1.1 of NEDC-33178P-A are used to determine if the generic Pressure Test | ||
R / | - Non-Beltline, Curve A is applicable. The equations are as follows: | ||
R / t1/2 = 138 / 81/2 = 49 inch1/2 Equation 4-2 R / t1/2 Equation 4-3 As discussed in Section 4.3.2.1.1 of NEDC-33178P-A, if the plant-specific result of Equation 4-3 is greater than that of the generic value from Equation 4-2, the user is directed to perform a plant-specific evaluation. The NRC staff conducted the comparison and found that the PBAPS-provided geometry information results in a value greater than the generic value. Justify the use of the Section 4.3.2.1.1 curve or submit a plant-specific evaluation. | |||
R / | : 2. 10 CFR Part 50, Appendix G, Paragraph IV.A states that, the pressure-retaining components of the reactor coolant pressure boundary [RCPB] that are made of ferritic materials must meet the requirements of the [American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code], supplemented by the additional requirements | ||
: 2. 10 CFR Part 50, Appendix G, Paragraph IV.A states that, | |||
Attachment | Attachment set forth below. These requirements include paragraph IV.A.2, Pressure-Temperature Limits and Minimum Temperature Requirements. Therefore, 10 CFR Part 50, Appendix G requires that P-T limits be developed for the ferritic materials in the reactor vessel (RV) beltline (neutron fluence 1 x 1017 n/cm2, E > 1 MeV), as well as ferritic materials not in the RV beltline (neutron fluence < 1 x 1017 n/cm2, E > 1 MeV). Further, 10 CFR Part 50, Appendix G requires that all RCPB components must meet the ASME Code, Section III requirements. The relevant ASME Code, Section III requirement that will affect the P-T limits is the lowest service temperature requirement for all RCPB components specified in Section III, NB-2332(b). | ||
The P-T limit calculations for ferritic RCPB components that are not RV beltline shell materials may define P-T curves that are more limiting than those calculated for the RV beltline shell materials due to the following factors: | The P-T limit calculations for ferritic RCPB components that are not RV beltline shell materials may define P-T curves that are more limiting than those calculated for the RV beltline shell materials due to the following factors: | ||
a) RV nozzles, penetrations, and other discontinuities have complex geometries that may exhibit significantly higher stresses than those for the RV beltline shell region. These higher stresses can potentially result in more restrictive P-T limits, even if the reference temperature ( | a) RV nozzles, penetrations, and other discontinuities have complex geometries that may exhibit significantly higher stresses than those for the RV beltline shell region. These higher stresses can potentially result in more restrictive P-T limits, even if the reference temperature (RTNDT) for these components is not as high as that of RV beltline shell materials that have simpler geometries. | ||
b) Ferritic RCPB components that are not part of the RV may have initial RTNDT values, which may define a more restrictive lowest operating temperature in the | b) Ferritic RCPB components that are not part of the RV may have initial RTNDT values, which may define a more restrictive lowest operating temperature in the P -T limits than those for the RV beltline shell materials. | ||
Consequently, please describe how the P-T limit curves submitted for PBAPS, Units 2 and 3 and the methodology used to develop these curves, considered all RV materials (beltline and non-beltline) and the lowest service temperature of all ferritic RCPB materials, consistent with the requirements of 10 CFR Part 50, Appendix G.}} | Consequently, please describe how the P-T limit curves submitted for PBAPS, Units 2 and 3 and the methodology used to develop these curves, considered all RV materials (beltline and non-beltline) and the lowest service temperature of all ferritic RCPB materials, consistent with the requirements of 10 CFR Part 50, Appendix G.}} |
Revision as of 23:26, 11 November 2019
ML12236A154 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 08/22/2012 |
From: | Richard Ennis Plant Licensing Branch 1 |
To: | Meena Khanna Plant Licensing Branch 1 |
Ennis R | |
References | |
TAC ME8535, TAC ME8536 | |
Download: ML12236A154 (4) | |
Text
August 22, 2012 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /RA/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.
ME8535 AND ME8536)
The attached draft request for additional information (RAI) was transmitted on August 22, 2012, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated April 27, 2012. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits; (2) relocate the P-T limits in the technical specifications (TSs) to a new licensee-controlled document, the Pressure and Temperature Limits Report (PTLR); and (3) modify the TSs to add references to the PTLR.
PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY.
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
Docket Nos. 50-277 and 50-278
Attachment:
Draft RAI
August 22, 2012 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /RA/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.
ME8535 AND ME8536)
The attached draft request for additional information (RAI) was transmitted on August 22, 2012, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated April 27, 2012. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits; (2) relocate the P-T limits in the technical specifications (TSs) to a new licensee-controlled document, the Pressure and Temperature Limits Report (PTLR); and (3) modify the TSs to add references to the PTLR.
PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY.
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
Docket Nos. 50-277 and 50-278
Attachment:
Draft RAI DISTRIBUTION PUBLIC DWidrevitz, NRR/EVIB LPL1-2 R/F BParks, NRR/SRXB RidsNrrDorlLpl1-2 Resource RidsNrrDorlDpr Resource RidsNrrPMPeachBottom Resource ACCESSION NO.: ML12236A154 OFFICE LPL1-2/PM NAME REnnis DATE 8/22/12 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT RELOCATION OF PRESSURE AND TEMPERATURE LIMIT CURVES TO THE PRESSURE AND TEMPERATURE LIMITS REPORT PEACH BOTTOM ATOMIC POWER STATION - UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter to the Nuclear Regulatory Commission (NRC) dated April 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121230354), Exelon Generation Company, LLC (Exelon, the licensee), submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits; (2) relocate the P-T limits in the technical specifications (TSs) to a new licensee-controlled document, the Pressure and Temperature Limits Report (PTLR); and (3) modify the TSs to add references to the PTLR. PBAPS, Units 2 and 3, are currently licensed to P-T limits that are applicable up to 32 effective full power years (EFPY). The PTLR would include P-T limits applicable to both 32 EFPY and 54 EFPY.
The NRC staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal.
- 1. Section 1.0 of Attachment 1 to the licensees application dated April 27, 2012, states that relocation of the P-T limit curves to the PTLR is consistent with the guidance provided in NRC-approved GE Hitachi Nuclear Energy Licensing Topical Report NEDC-33178P-A, Revision 1 (ADAMS Accession No. ML092370486). Equations 4-2 and 4-3 in Section 4.3.2.1.1 of NEDC-33178P-A are used to determine if the generic Pressure Test
- Non-Beltline, Curve A is applicable. The equations are as follows:
R / t1/2 = 138 / 81/2 = 49 inch1/2 Equation 4-2 R / t1/2 Equation 4-3 As discussed in Section 4.3.2.1.1 of NEDC-33178P-A, if the plant-specific result of Equation 4-3 is greater than that of the generic value from Equation 4-2, the user is directed to perform a plant-specific evaluation. The NRC staff conducted the comparison and found that the PBAPS-provided geometry information results in a value greater than the generic value. Justify the use of the Section 4.3.2.1.1 curve or submit a plant-specific evaluation.
- 2. 10 CFR Part 50, Appendix G, Paragraph IV.A states that, the pressure-retaining components of the reactor coolant pressure boundary [RCPB] that are made of ferritic materials must meet the requirements of the [American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code], supplemented by the additional requirements
Attachment set forth below. These requirements include paragraph IV.A.2, Pressure-Temperature Limits and Minimum Temperature Requirements. Therefore, 10 CFR Part 50, Appendix G requires that P-T limits be developed for the ferritic materials in the reactor vessel (RV) beltline (neutron fluence 1 x 1017 n/cm2, E > 1 MeV), as well as ferritic materials not in the RV beltline (neutron fluence < 1 x 1017 n/cm2, E > 1 MeV). Further, 10 CFR Part 50, Appendix G requires that all RCPB components must meet the ASME Code,Section III requirements. The relevant ASME Code,Section III requirement that will affect the P-T limits is the lowest service temperature requirement for all RCPB components specified in Section III, NB-2332(b).
The P-T limit calculations for ferritic RCPB components that are not RV beltline shell materials may define P-T curves that are more limiting than those calculated for the RV beltline shell materials due to the following factors:
a) RV nozzles, penetrations, and other discontinuities have complex geometries that may exhibit significantly higher stresses than those for the RV beltline shell region. These higher stresses can potentially result in more restrictive P-T limits, even if the reference temperature (RTNDT) for these components is not as high as that of RV beltline shell materials that have simpler geometries.
b) Ferritic RCPB components that are not part of the RV may have initial RTNDT values, which may define a more restrictive lowest operating temperature in the P -T limits than those for the RV beltline shell materials.
Consequently, please describe how the P-T limit curves submitted for PBAPS, Units 2 and 3 and the methodology used to develop these curves, considered all RV materials (beltline and non-beltline) and the lowest service temperature of all ferritic RCPB materials, consistent with the requirements of 10 CFR Part 50, Appendix G.