ML13154A276
Jump to navigation
Jump to search
| ML13154A276 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 03/06/2013 |
| From: | Todd Fish Operations Branch I |
| To: | Kelly M Exelon Generation Co |
| Jackson D | |
| Shared Package | |
| ML12318A009 | List: |
| References | |
| TAC U01867 | |
| Download: ML13154A276 (2) | |
Text
To:
Todd Fish, NRC Chief Examiner From:
Mike Kelly, Peach Bottom Regulatory Exam Author
Subject:
Revisions to Peach Bottom Operating Exam Materials for the March 2013 Initial NRC License Examination Date:
March 6, 2013 The following materials were revised based on comments from the NRC Examination Team during the on-site exam preparation held February 11-13,2013.
A.
Administrative IPMs:
- 2. Modified critical versus non-critical steps for 1 SRO Conduct of Operations JPM and 1 SRO Emergency Plan JPM.
- 5. Made additional editorial changes to various JPMs based on NRC examiner comments.
B.
Control Room JPMs:
- 1. Modified critical versus non-critical steps for 3 JPMs.
- 2. Added time-compression cues to one JPM.
- 3. Made editorial changes to various JPMs based on NRC examiner comments.
C.
In-plant JPMs:
- 1. Changed one JPM performance unit to support geographic diversity.
- 2. Modified critical versus non-critical steps for 1 JPM.
- 3. Re-classified 1 JPM as alternate-path.
- 4. Made editorial changes to various JPMs based on NRC examiner comments.
- 1
D.
Simulator scenarios:
- 1. Scenario 1
- a. Minor changes to Simulator Operator instructions.
- h. Minor scripting modifications.
- c. Changed sequence of some events.
- 2. Scenario 2
- a. Minor scripting modifications
- h. Added 'C' event #6 for PRO.
- c. Added 'C' event #9 for URO.
- d. Modified Simulator Setup and Simulator Operator instructions to support new events.
- 3. Scenario 3:
- a. Minor changes to Simulator Operator instructions.
- h. Minor scripting modifications.
- 2