Transmittal of Draft Safety Evaluation for Proposed Amendment Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report
ML13079A190
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/22/2013
From: Richard Ennis
Plant Licensing Branch 1
To: Pacilio M
Exelon Nuclear
Ennis R
Shared Package
ml13079a145 List:
References
TAC ME8535, TAC ME8536
Download: ML13079A190 (3)


Text

OFFICIAL USE ONLY PROPRIE!TARY INFORMATION

\.\:.P-R REGu, _ UNITED STATES

~"v "'I"0., NUCLEAR REGULATORY COMMISSION

~ ~0 WASHINGTON, D.C. 20555-0001

'it

~

~ ~

March 22,2013

~ ~

        • 1< ~o Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 TRANSMITTAL OF DRAFT SAFETY EVALUATION FOR PROPOSED AMENDMENT RE: RELOCATION OF PRESSURE AND TEMPERATURE LIMIT CURVES TO THE PRESSURE AND TEMPERATURE LIMITS REPORT (TAC NOS. ME8535 AND ME8536)

Dear Mr. Pacilio:

By application dated April 27, 2012, as supplemented by letter dated October 15, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.

ML121230354 and ML12290A113, respectively), Exelon Generation Company, LLC (Exelon, the licensee), requested changes to the Technical Specifications (TSs) and Facility Operating Licenses for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would: (1) adopt a new methodology for preparation of the reactor coolant system pressure-temperature (P-T) limits, (2) relocate the P-T limits in the TSs to a new licensee controlled document, the Pressure and Temperature Limits Report (PTLR), and (3) modify the TSs to add references to the PTLR.

Enclosed is the draft Safety Evaluation (SE) that the Nuclear Regulatory Commission (NRC) staff has prepared to support the proposed license amendment. Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have made a preliminary determination that the enclosed draft SE does not contain proprietary information. However, since the NRC's review was based largely on review of proprietary information, the NRC staff requests that the licensee confirm that the draft SE does not contain any information that is considered proprietary. If you believe that any information is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. The NRC staff requests that the licensee provide comments regarding the proprietary content in the draft SE within 5 business days from the date of this letter. The response timeframe was discussed with Mr. Tom Loomis of your staff on March 18,2013.

Since the NRC review is not yet complete, this letter and the enclosure do not conveyor represent an NRC staff position regarding the licensee's request. Should the amendment be approved, the NRC staff will issue a publicly available, nonproprietary version of the SE.

Enclosure transmitted herewith contains sensitive unclassified Information.

When separated from enclosure, this transmittal document is decontrol/ed.

OFFICIAL USE! ONLY PROPRIE!TARY INFORMATION

OFFICIAL USE ONLY PROPRIETARY INFORMATION M. Pacifio -2 If you have any questions regarding this matter. I may be reached at 301-415-1420.

Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Draft SE cc w/o encl: Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION

OFFICIAL USE: ONLY PROPRIE:TARY INFORMATION M. Pacilio - 2 If you have any questions regarding this matter, I may be reached at 301-415-1420.

Sincerely,

/ra!

Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Draft SE cc w/o encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsOgcMailCenter Resource LPL1-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl1-2 Resource RidsRgn1 MailCenter Resource RidsNrrLAABaxter Resource RidsNrrPMPeachBottom Resource ADAMS Accession Nos.:

Package: ML13079A145 Cover letter: ML13079A190 Draft SE: ML13079A206 (non-publicly available) *via email OFFICE LPL1-2/PM LPL 1-2/LA* LPL 1-2/BC NAME REnnis ABaxter MKhanna DATE 3/21/13 03/21/13 3122113 OFFICIAL RECORD COpy OFFICIAL USI! ONLY PROPRIE:TARY INFORMATION