{{#Wiki_filter:*** | {{#Wiki_filter:March 21, 2019 | ||
Mr. Richard L. Anderson, Site Vice President | |||
Arkansas Nuclear One | |||
Entergy Operations, Inc. | |||
N-TSB-58 | |||
1448 S.R. 333 | |||
Russellville, AR 72802-0967 | |||
SUBJECT: ARKANSAS NUCLEAR ONE UNIT 1 - NOTIFICATION OF INSPECTION (NRC | |||
INSPECTION REPORT 05000313/2019003 AND REQUEST FOR | |||
INFORMATION | |||
Dear Mr. Anderson: | |||
During the week of July 8, 2019, two inspectors from the Nuclear Regulatory | |||
Commissions (NRC) Region IV office will perform the baseline biennial requalification | |||
inspection at Arkansas Nuclear One Unit 1, using NRC Inspection Procedure 71111.11B, | |||
Licensed Operator Requalification Program. | |||
Experience has shown that this inspection is a resource intensive inspection both for the NRC | |||
inspectors and your staff. In order to minimize the impact to your onsite resources and to | |||
ensure a productive inspection, we have enclosed a request for documents needed for this | |||
inspection. These documents have been divided into three groups: | |||
* The first group (Section A of the enclosure) identifies information to be provided prior to | |||
the inspection to ensure that the inspectors are adequately prepared. | |||
* The second group (Section B of the enclosure) identifies the information the inspectors | |||
will need upon arrival at the site. | |||
* The third group (Section C of this enclosure) identifies the items which are necessary to | |||
close out the inspection and are usually sent a few weeks after the team has left the site. | |||
It is important that all of these documents are up to date and complete in order to minimize the | |||
number of additional documents requested during the preparation and/or the onsite portions of | |||
the inspection. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Mr. R. Martin of your training organization. | |||
Our inspection dates are subject to change based on your updated schedule of examination | |||
activities. If there are any questions about this inspection or the material requested, please | |||
contact the lead inspector Mahdi Hayes at (817) 200-1508, Mahdi.Hayes@nrc.gov. | |||
R. Anderson 2 | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, control | |||
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control | |||
number. | |||
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter | |||
and its enclosure will be available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRCs | |||
document system (ADAMS). ADAMS is accessible from the NRC web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA John Kirkland Acting for/ | |||
Gregory E. Werner, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-313 | |||
License: DPR-51 | |||
Enclosure: | |||
Biennial Requalification Inspection | |||
Request for Information | |||
Initial Request for Information | |||
Biennial Requalification Inspection | |||
Arkansas Nuclear One Unit 1 | |||
Inspection Report: 05000313/2019003 | |||
Inspection Dates: July 8 to July 12, 2019 | |||
Inspection Procedure: IP 71111.11B, Licensed Operator Requalification | |||
Program | |||
Lead Inspector: Mahdi Hayes, Operations Engineer | |||
A. The following information is requested in order to support inspection preparation | |||
activities. These items are listed by section as they appear in the inspection module | |||
(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format | |||
on CD/DVD in order to arrive at the Region IV office no later than June 13, 2019. | |||
* CD/DVD to: US Nuclear Regulatory Commission, Region IV | |||
ATTN: Mahdi Hayes | |||
1600 E. Lamar Blvd | |||
Arlington, TX 76011 | |||
General Requests: | |||
* List of licensed operators (SRO & RO) by crew (operating & staff) | |||
* Training and Operations Department organization charts (with qualified LOR | |||
evaluators identified) | |||
* Procedures that identify process for revising and maintaining LO continuing training | |||
program up to date | |||
* List of outstanding LOR program changes | |||
* List of plant events and industry operating experience incorporated into LOR | |||
program since last BRQ | |||
* Audits and/or self-assessment reports addressing the licensed operator | |||
requalification training program | |||
* Last 2 years of simulator review committee (or equivalent) meeting minutes | |||
* Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes | |||
* A summary report of all condition reports related to operator actions/errors in the | |||
control room | |||
Enclosure | |||
* Any revised requalification training that was based on licensed operator performance | |||
issues | |||
03.04a: Biennial Requalification Written Examinations | |||
* The current and approved biennial written examination schedule | |||
* The current requalification cycle written examination results for both SRO & RO that | |||
have already been administered up to the week prior to the inspection team arrival | |||
onsite. | |||
* All written examinations that have been approved for administration up to and | |||
including the week before the inspection team is onsite. This will need to have | |||
adequate password protection or double envelope protection if mailed via regular | |||
mail per NUREG-1021. | |||
* The current requalification cycle examination methodology (sample plan) | |||
03.04b: Annual Requalification Operating Tests | |||
* The schedule for the operating tests (JPMs & scenarios) to be given the week of | |||
July 8, 2019 (week team is onsite) | |||
* The operating tests (JPMs & scenarios) (password protected and provide separately | |||
via telephone at later date) to be given the week of July 8, 2019 | |||
* Current requalification cycle operating tests (SRO & RO) and results up to the week | |||
prior to the inspection team arrival onsite | |||
* All 2018 NRC required annual operating tests | |||
* Current requalification cycle operating test methodology (sample plan) | |||
03.04c: Administration of an Annual Requalification Operating Test | |||
* All procedures used to administer the annual operating test | |||
* All procedures used to assess operator performance | |||
* All procedures that describe conduct of simulator training | |||
* All procedures used to test, operate, and maintain the simulator | |||
03.04d: Requalification Examination Security | |||
* Submit any tracking tools that you use as a means to prevent excessive overlap on | |||
the written examinations and also meet the intent of sampling all required topics on a | |||
periodic basis. | |||
* Submit any tracking tools that you use as a means to prevent excessive overlap on | |||
the operating tests and also meet the intent of sampling all required malfunctions | |||
(including major events, instrument/component malfunctions, TS calls, etc.) on a | |||
periodic basis. | |||
2 | |||
/ | * All procedures that describe examination security, including procedures used to | ||
develop the examinations that include guidelines on overlap between examinations | |||
in current exam cycle tests and prior year examinations | |||
* List of all condition reports since the last biennial requalification inspection related to | |||
examination security and overlap | |||
03.04e: Remedial Training and Re-Examinations | |||
* List of remedial training conducted or planned since last requalification exam | |||
(includes training provided to operators to enable passing requalification exam and | |||
training provided to correct generic or individual weaknesses observed during | |||
previous requalification exam cycle) | |||
* Remediation plans (lesson plans, reference materials, and attendance | |||
documentation) | |||
03.04f: Operator License Conditions | |||
* All procedures and program documentation for maintaining active operator licenses, | |||
tracking training attendance, and ensuring medical fitness of licensed operators | |||
* All procedures and associated documentation that supports reactivation of any | |||
SRO/RO license (operating or staff crew) since the last biennial inspection | |||
03.04g: Control Room Simulator | |||
* All simulator management and configuration procedures if not already provided | |||
* Simulator discrepancy report summary list for all open discrepancy reports and | |||
summary list for those items closed between June 2018 and May 2019 | |||
* Primary parameters tested in order to verify core physics parameters (such as | |||
moderator temperature coefficient, integral rod worth). The applicable reference | |||
graphs from the plant physics data book (electronic or other means as available) | |||
should also be included as well as the test procedures used and the acceptance | |||
criteria with results. | |||
* All simulator modification packages that are on hold, delayed, or not completed in the | |||
last 2 years | |||
* A list of simulator modification packages completed in the last 2 year window | |||
3 | |||
B. The following information is requested in order to support the onsite inspection | |||
activities. Requested materials should be available to the inspection team, either | |||
electronically or hardcopy, upon site arrival on July 8, 2019. | |||
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written | |||
Exam and Annual Requalification Operating Tests Quality | |||
* All operating tests (JPMs & scenarios) to be given in all subsequent weeks after | |||
onsite week, if available | |||
* All results up to the day the team leaves the site | |||
03.04f: Conformance with Operator License Conditions | |||
* Access to licensed operators records (operating and staff crews) | |||
* Access to licensed operators training attendance records | |||
* Access to licensed operators medical records | |||
03.04g: Control Room Simulator Performance | |||
* Simulator discrepancies from July 10, 2018, to July 7, 2019. This should include all | |||
open and closed simulator discrepancy reports, including the | |||
documentation/justification for closure. | |||
* Acceptance test documentation, including hardware and software model revisions at | |||
the time of acceptance (as available) | |||
* Documentation that validates current models, including the thermal-hydraulics and | |||
neutronics models, to the actual plant | |||
* All current model deficiencies, including FSAR vs Design differences in the simulator | |||
(any documentation on this) | |||
* Summary list of modifications from July 10, 2018, to July 7, 2019 | |||
* Plant modifications (both hardware and software) completed on the simulator by due | |||
date from July 10, 2018, to July 7, 2019 | |||
* Simulator differences Lesson plan used in training (current to July 7, 2019) | |||
* The complete book of all simulator annual performance test packages (usually in a | |||
single book but may be electronic or in single test packages), complete with all | |||
transient tests, steady state tests, and malfunction tests. This should also include | |||
the test procedures for each test, the acceptance criteria, and results. For each | |||
transient test, the reference chart should be included or an equivalent subject matter | |||
expert review versus the simulator results with a write-up for any differences beyond | |||
the ANSI standard requirements. | |||
* All test packages used to verify core physics parameters (such as moderator | |||
temperature coefficient and integral rod worth). The applicable reference graphs | |||
4 | |||
from the plant physics data book (electronic or other means as available) should also | |||
be included as well as the test procedures used and the acceptance criteria with | |||
results. | |||
* All simulator tests, configuration management, and related documents available in | |||
the room for inspectors to review. This includes training needs analysis packages, | |||
simulator review committee meeting minutes, etc. | |||
* Current copy of ANSI 3.5 standard you are committed to for simulator testing | |||
C. Arkansas Nuclear One is required to send the final results summary (see Table 1 | |||
below) and any remaining exams and operating tests that have not been reviewed to | |||
the regional office lead inspector for this inspection for final review and comparison | |||
against the Significance Determination Tools in order to communicate the exit results | |||
for the inspection. | |||
TABLE 1: EXAMINATION RESULTS | |||
1. Total number of licensed operators. | |||
2. Number of licensed operators administered a requalification | |||
examination required by 10 CFR 55.59(a). | |||
3. Number of individual licensed operators who failed any portion of a | |||
requalification examination (written, JPM, or individual simulator | |||
scenario failures). | |||
4. Divide line 3 by line 2 to obtain the individual requalification | |||
examination failure rate. Line 3/Line 2. % | |||
5. Number of crews administered simulator scenarios as part of a | |||
requalification examination required by 10 CFR 55.59(a). | |||
6. Number of crews who performed unsatisfactorily on the | |||
simulator scenarios. | |||
7. Divide line 6 by line 5 to obtain the crew simulator scenario | |||
failure rate. Line 6/Line 5. % | |||
5 | |||
ML19080A037 | |||
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: MOH Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE OE:DRS/OB BC:DRS/OB | |||
NAME MHayes GWerner | |||
SIGNATURE /RA/ /RA JCK for/ | |||
DATE 03/12/2019 03/21/2019 | |||
/RA/ /RA JCK for/ 03/12/2019 03/21/2019 | |||
}} | }} |
Revision as of 22:42, 19 October 2019
ML19080A037 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 03/21/2019 |
From: | Greg Werner Operations Branch IV |
To: | Richard Anderson Entergy Operations |
Werner G | |
References | |
IR 2019003 | |
Download: ML19080A037 (8) | |
See also: IR 05000313/2019003
Text
March 21, 2019
Mr. Richard L. Anderson, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
N-TSB-58
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE UNIT 1 - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000313/2019003 AND REQUEST FOR
INFORMATION
Dear Mr. Anderson:
During the week of July 8, 2019, two inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Arkansas Nuclear One Unit 1, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups:
- The first group (Section A of the enclosure) identifies information to be provided prior to
the inspection to ensure that the inspectors are adequately prepared.
- The second group (Section B of the enclosure) identifies the information the inspectors
will need upon arrival at the site.
- The third group (Section C of this enclosure) identifies the items which are necessary to
close out the inspection and are usually sent a few weeks after the team has left the site.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. R. Martin of your training organization.
Our inspection dates are subject to change based on your updated schedule of examination
activities. If there are any questions about this inspection or the material requested, please
contact the lead inspector Mahdi Hayes at (817) 200-1508, Mahdi.Hayes@nrc.gov.
R. Anderson 2
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA John Kirkland Acting for/
Gregory E. Werner, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-313
License: DPR-51
Enclosure:
Biennial Requalification Inspection
Request for Information
Initial Request for Information
Biennial Requalification Inspection
Arkansas Nuclear One Unit 1
Inspection Report: 05000313/2019003
Inspection Dates: July 8 to July 12, 2019
Inspection Procedure: IP 71111.11B, Licensed Operator Requalification
Program
Lead Inspector: Mahdi Hayes, Operations Engineer
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format
on CD/DVD in order to arrive at the Region IV office no later than June 13, 2019.
- CD/DVD to: US Nuclear Regulatory Commission, Region IV
ATTN: Mahdi Hayes
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
- Training and Operations Department organization charts (with qualified LOR
evaluators identified)
- Procedures that identify process for revising and maintaining LO continuing training
program up to date
- List of outstanding LOR program changes
- List of plant events and industry operating experience incorporated into LOR
program since last BRQ
- Audits and/or self-assessment reports addressing the licensed operator
requalification training program
- Last 2 years of simulator review committee (or equivalent) meeting minutes
- Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
- A summary report of all condition reports related to operator actions/errors in the
control room
Enclosure
- Any revised requalification training that was based on licensed operator performance
issues
03.04a: Biennial Requalification Written Examinations
- The current and approved biennial written examination schedule
have already been administered up to the week prior to the inspection team arrival
onsite.
- All written examinations that have been approved for administration up to and
including the week before the inspection team is onsite. This will need to have
adequate password protection or double envelope protection if mailed via regular
mail per NUREG-1021.
- The current requalification cycle examination methodology (sample plan)
03.04b: Annual Requalification Operating Tests
- The schedule for the operating tests (JPMs & scenarios) to be given the week of
July 8, 2019 (week team is onsite)
- The operating tests (JPMs & scenarios) (password protected and provide separately
via telephone at later date) to be given the week of July 8, 2019
prior to the inspection team arrival onsite
- All 2018 NRC required annual operating tests
- Current requalification cycle operating test methodology (sample plan)
03.04c: Administration of an Annual Requalification Operating Test
- All procedures used to administer the annual operating test
- All procedures used to assess operator performance
- All procedures that describe conduct of simulator training
- All procedures used to test, operate, and maintain the simulator
03.04d: Requalification Examination Security
- Submit any tracking tools that you use as a means to prevent excessive overlap on
the written examinations and also meet the intent of sampling all required topics on a
periodic basis.
- Submit any tracking tools that you use as a means to prevent excessive overlap on
the operating tests and also meet the intent of sampling all required malfunctions
(including major events, instrument/component malfunctions, TS calls, etc.) on a
periodic basis.
2
- All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations
- List of all condition reports since the last biennial requalification inspection related to
examination security and overlap
03.04e: Remedial Training and Re-Examinations
- List of remedial training conducted or planned since last requalification exam
(includes training provided to operators to enable passing requalification exam and
training provided to correct generic or individual weaknesses observed during
previous requalification exam cycle)
- Remediation plans (lesson plans, reference materials, and attendance
documentation)
03.04f: Operator License Conditions
- All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
- All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
03.04g: Control Room Simulator
- All simulator management and configuration procedures if not already provided
- Simulator discrepancy report summary list for all open discrepancy reports and
summary list for those items closed between June 2018 and May 2019
- Primary parameters tested in order to verify core physics parameters (such as
moderator temperature coefficient, integral rod worth). The applicable reference
graphs from the plant physics data book (electronic or other means as available)
should also be included as well as the test procedures used and the acceptance
criteria with results.
- All simulator modification packages that are on hold, delayed, or not completed in the
last 2 years
- A list of simulator modification packages completed in the last 2 year window
3
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on July 8, 2019.
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
Exam and Annual Requalification Operating Tests Quality
- All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
onsite week, if available
- All results up to the day the team leaves the site
03.04f: Conformance with Operator License Conditions
- Access to licensed operators records (operating and staff crews)
- Access to licensed operators training attendance records
- Access to licensed operators medical records
03.04g: Control Room Simulator Performance
- Simulator discrepancies from July 10, 2018, to July 7, 2019. This should include all
open and closed simulator discrepancy reports, including the
documentation/justification for closure.
- Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
- Documentation that validates current models, including the thermal-hydraulics and
neutronics models, to the actual plant
- All current model deficiencies, including FSAR vs Design differences in the simulator
(any documentation on this)
- Summary list of modifications from July 10, 2018, to July 7, 2019
- Plant modifications (both hardware and software) completed on the simulator by due
date from July 10, 2018, to July 7, 2019
- Simulator differences Lesson plan used in training (current to July 7, 2019)
- The complete book of all simulator annual performance test packages (usually in a
single book but may be electronic or in single test packages), complete with all
transient tests, steady state tests, and malfunction tests. This should also include
the test procedures for each test, the acceptance criteria, and results. For each
transient test, the reference chart should be included or an equivalent subject matter
expert review versus the simulator results with a write-up for any differences beyond
the ANSI standard requirements.
- All test packages used to verify core physics parameters (such as moderator
temperature coefficient and integral rod worth). The applicable reference graphs
4
from the plant physics data book (electronic or other means as available) should also
be included as well as the test procedures used and the acceptance criteria with
results.
- All simulator tests, configuration management, and related documents available in
the room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
- Current copy of ANSI 3.5 standard you are committed to for simulator testing
C. Arkansas Nuclear One is required to send the final results summary (see Table 1
below) and any remaining exams and operating tests that have not been reviewed to
the regional office lead inspector for this inspection for final review and comparison
against the Significance Determination Tools in order to communicate the exit results
for the inspection.
TABLE 1: EXAMINATION RESULTS
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification
examination required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator
scenario failures).
4. Divide line 3 by line 2 to obtain the individual requalification
examination failure rate. Line 3/Line 2. %
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a).
6. Number of crews who performed unsatisfactorily on the
simulator scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario
failure rate. Line 6/Line 5. %
5
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: MOH Yes No Publicly Available Sensitive NRC-002
OFFICE OE:DRS/OB BC:DRS/OB
NAME MHayes GWerner
SIGNATURE /RA/ /RA JCK for/
DATE 03/12/2019 03/21/2019