IR 05000362/2011006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/08/2012
| issue date = 06/08/2012
| title = NRC Integrated Inspection Report 05000362-11-006 Cancellation
| title = NRC Integrated Inspection Report 05000362-11-006 Cancellation
| author name = Lantz R E
| author name = Lantz R
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Dietrich P
| addressee name = Dietrich P
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:June 8, 2012
[[Issue date::June 8, 2012]]


Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674
==SUBJECT:==
-0128
SAN ONOFRE NUCLEAR GENERATING STATION  
 
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION  
- NRC INTEGRATED INSPECTION REPORT 05000362/201 1006
- NRC INTEGRATED INSPECTION REPORT 05000362/201 1006


Line 30: Line 27:
NRC Inspection Report 05000362/201 1006 has been cancelled; therefore, no inspection report will be issued.
NRC Inspection Report 05000362/201 1006 has been cancelled; therefore, no inspection report will be issued.


Sincerely,/RA/ Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects
Sincerely,
/RA/ Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects


Docket Nos.
Docket Nos.
: 50-361, 50-362 License Nos.
: 50-361, 50-362 License Nos.
: NPF-10, NPF-15 U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511  
: NPF-10, NPF-15 U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511-2- Electronic Distribution
-2- Electronic Distribution
: Regional Administrator (Elmo.Collins@nrc.gov
: Regional Administrator (Elmo.Collins@nrc.gov
) Deputy Regional Administrator (Art.Howell@nrc.gov)
) Deputy Regional Administrator (Art.Howell@nrc.gov)
Line 51: Line 48:


Yes No Sensitive Yes No Sens. Type Initials RL RI:DRP/D BC:DRP/D JReynoso RLantz /RA via Email/
Yes No Sensitive Yes No Sens. Type Initials RL RI:DRP/D BC:DRP/D JReynoso RLantz /RA via Email/
  /RA/ 6/8/12 6/8/12 OFFICIAL RECORD COPY  T=Telephone E=E
  /RA/ 6/8/12 6/8/12 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
-mail F=Fax
}}
}}

Revision as of 18:27, 28 June 2019

NRC Integrated Inspection Report 05000362-11-006 Cancellation
ML12160A107
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/08/2012
From: Ryan Lantz
NRC/RGN-IV/DRP/RPB-D
To: Peter Dietrich
Southern California Edison Co
References
IR-11-006
Download: ML12160A107 (2)


Text

June 8, 2012

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION

- NRC INTEGRATED INSPECTION REPORT 05000362/201 1006

Dear Mr. Dietrich:

NRC Inspection Report 05000362/201 1006 has been cancelled; therefore, no inspection report will be issued.

Sincerely,

/RA/ Ryan E. Lantz, Chief Project Branch D Division of Reactor Projects

Docket Nos.

50-361, 50-362 License Nos.
NPF-10, NPF-15 U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511-2- Electronic Distribution
Regional Administrator (Elmo.Collins@nrc.gov

) Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov

) Senior Project Engineer (Nick.Taylor@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov

) Technical Support Assistant (Loretta.Williams@nrc.gov)

File located:

S:\DRP\DRPDIR\_SONGS SUNSI Rev Compl.

Yes No ADAMS Yes No Reviewer Initials RL Publicly Avail.

Yes No Sensitive Yes No Sens. Type Initials RL RI:DRP/D BC:DRP/D JReynoso RLantz /RA via Email/

/RA/ 6/8/12 6/8/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax