IR 05000293/2003008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{IR-Nav| site = 05000293 | year = 2003 | report number = 008 | url = https://www.nrc.gov/reactors/operating/oversight/reports/pilg_2003008.pdf }}
{{Adams
| number = ML032520004
| issue date = 09/08/2003
| title = IR 05000293-03-008, on 07/24/03, for, Pilgrim Nuclear Power Station, Plymouth, Ma; Temporary Instruction 2515/148, Rev. 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures.
| author name = Lanning W
| author affiliation = NRC/RGN-I/DRS
| addressee name = Balduzzi M
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| license number = DPR-035
| contact person =
| document report number = IR-03-008
| document type = Inspection Report, Letter
| page count = 4
}}
 
{{IR-Nav| site = 05000293 | year = 2003 | report number = 008 }}
 
=Text=
{{#Wiki_filter:ber 8, 2003
 
==SUBJECT:==
INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 2, AT THE PILGRIM NUCLEAR POWER STATION INSPECTION REPORT NO. 05000293/2003008
 
==Dear Mr. Balduzzi:==
On July 24, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Pilgrim Nuclear Power Station, in accordance with Temporary Instruction 2515/148, Revision 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on July 24, 2003, with Mr. Peter Dietrich, Plant Manager, Mr. Reginald Rose, Manager of Security, and other members of your staff.
 
This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Entergy Nuclear Operations, Inc., (Entergy) effectively implemented the interim compensatory measures (ICMs) at the Pilgrim Nuclear Power Station (Pilgrim) imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program. Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
Mr. Michael Balduzzi  2 Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that Entergy had effectively implemented the specifications of the Order Modifying License issued February 25, 2002 at the Pilgrim Nuclear Power Station (Pilgrim).
 
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
Sincerely,
/RA by R. V. Crlenjak Acting for/
Wayne D. Lanning, Director Division of Reactor Safety Docket Nos. 50-293 License Nos. DPR-35 Enclosure: NRC Inspection Report No. 05000293/2003008 (CONTAINS (SGI))
w/Attachment: Supplemental Information cc w/o encl; w/o SGI:
G. Taylor, Chief Executive Officer M. Kansler, President, Entergy Nuclear Operations, Inc.
 
J. Herron, Senior Vice President and Chief Operating Officer W. Riggs, Director, Nuclear Assessment Group D. Pace, Vice President, Engineering R. Edington, Vice President, Operations Support J. Kelly, Director, Nuclear Safety Assurance C. Faison, Manager, Licensing Director of Oversight, Entergy Nuclear Operations, Inc.
 
D. Tarantino, Nuclear Information Manager B. S. Ford, Manager, Licensing S. Brennion, Superintendent Regulatory and Industry Affairs J. Fulton, Assistant General Counsel
 
Mr. Michael Balduzzi  3 cc w/o encl; w/o SGI: (Contd)
S. Lousteau, Treasury Department R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Chairman, Citizens Urging Responsible Energy S. McGrail, Director, Commonwealth of Massachusetts, SLO Designee Electric Power Division Commonwealth of Massachusetts, Secretary of Public Safety R. Shadis, New England Coalition Staff
 
Mr. Michael Balduzzi  4 Distribution w/o encl w/o SGI:
H. Miller, RA/J. Wiggins, DRA J. Jolicoeur, RI EDO Coordinator C. Anderson, DRP F. Arner, DRP J. Bobiak, DRP J. Clifford, NRR T. Tate, PM, NRR R. Pulsifer, Backup PM, NRR Region I Docket Room (with concurrences)
W. Lanning, DRS R. Crlenjak, DRS J. White, DRS D. Silk, DRS T. Walker, ORA Distribution w/encl w/SGI:
P. Frechette, DRS A. Dimitriadis, DRS W. Raymond - NRC Senior Resident Inspector R. Rose, Manager of Security, Pilgrim B. Westreich, NSIR E. McNeil, NSIR DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032520004.wpd After declaring this document An Official Agency Record it will be released to the Public.
 
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS  RI/DRS  RI/DRS  RI/DRS  RI/DRS NAME ADimitriadis  DSilk  TWalker  PFrechette  JWhite DATE 09/04/03  09/04/03  09/04/03  09/04/03  09/04/03 OFFICE RI/DRP  NSIR/DNS  RI/DRS NAME CAnderson  BWestreich (via WLanning (RVC telecon)  for)
DATE 09/04/03  09/03/03  09/08/03 OFFICIAL RECORD COPY
}}

Latest revision as of 07:03, 21 March 2020

IR 05000293-03-008, on 07/24/03, for, Pilgrim Nuclear Power Station, Plymouth, Ma; Temporary Instruction 2515/148, Rev. 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures.
ML032520004
Person / Time
Site: Pilgrim
Issue date: 09/08/2003
From: Lanning W
Division of Reactor Safety I
To: Balduzzi M
Entergy Nuclear Operations
References
IR-03-008
Download: ML032520004 (4)


Text

ber 8, 2003

SUBJECT:

INSPECTION OF NUCLEAR REACTOR SAFEGUARDS INTERIM COMPENSATORY MEASURES, TEMPORARY INSTRUCTION 2515/148, REVISION 2, AT THE PILGRIM NUCLEAR POWER STATION INSPECTION REPORT NO. 05000293/2003008

Dear Mr. Balduzzi:

On July 24, 2003, the U.S. Nuclear Regulatory Commission (USNRC) completed a special inspection at the Pilgrim Nuclear Power Station, in accordance with Temporary Instruction 2515/148, Revision 2, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. The enclosed report documents the inspection findings which were discussed on July 24, 2003, with Mr. Peter Dietrich, Plant Manager, Mr. Reginald Rose, Manager of Security, and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety and to compliance with the Commissions rules and regulations, and with the conditions of your license. The specific purpose of this inspection was to verify that Entergy Nuclear Operations, Inc., (Entergy) effectively implemented the interim compensatory measures (ICMs) at the Pilgrim Nuclear Power Station (Pilgrim) imposed by the Order Modifying License issued February 25, 2002; and that the ICMs were successfully incorporated into your site physical protection strategy and security program. Additionally, the objective of the inspection was to ensure that relevant procedures were developed and implemented, and that interface agreements with offsite organizations were developed and coordinated, as required. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Mr. Michael Balduzzi 2 Based on the results of this inspection, no findings of significance were identified. The inspection team verified and confirmed that Entergy had effectively implemented the specifications of the Order Modifying License issued February 25, 2002 at the Pilgrim Nuclear Power Station (Pilgrim).

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter, without enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by R. V. Crlenjak Acting for/

Wayne D. Lanning, Director Division of Reactor Safety Docket Nos. 50-293 License Nos. DPR-35 Enclosure: NRC Inspection Report No. 05000293/2003008 (CONTAINS (SGI))

w/Attachment: Supplemental Information cc w/o encl; w/o SGI:

G. Taylor, Chief Executive Officer M. Kansler, President, Entergy Nuclear Operations, Inc.

J. Herron, Senior Vice President and Chief Operating Officer W. Riggs, Director, Nuclear Assessment Group D. Pace, Vice President, Engineering R. Edington, Vice President, Operations Support J. Kelly, Director, Nuclear Safety Assurance C. Faison, Manager, Licensing Director of Oversight, Entergy Nuclear Operations, Inc.

D. Tarantino, Nuclear Information Manager B. S. Ford, Manager, Licensing S. Brennion, Superintendent Regulatory and Industry Affairs J. Fulton, Assistant General Counsel

Mr. Michael Balduzzi 3 cc w/o encl; w/o SGI: (Contd)

S. Lousteau, Treasury Department R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Chairman, Citizens Urging Responsible Energy S. McGrail, Director, Commonwealth of Massachusetts, SLO Designee Electric Power Division Commonwealth of Massachusetts, Secretary of Public Safety R. Shadis, New England Coalition Staff

Mr. Michael Balduzzi 4 Distribution w/o encl w/o SGI:

H. Miller, RA/J. Wiggins, DRA J. Jolicoeur, RI EDO Coordinator C. Anderson, DRP F. Arner, DRP J. Bobiak, DRP J. Clifford, NRR T. Tate, PM, NRR R. Pulsifer, Backup PM, NRR Region I Docket Room (with concurrences)

W. Lanning, DRS R. Crlenjak, DRS J. White, DRS D. Silk, DRS T. Walker, ORA Distribution w/encl w/SGI:

P. Frechette, DRS A. Dimitriadis, DRS W. Raymond - NRC Senior Resident Inspector R. Rose, Manager of Security, Pilgrim B. Westreich, NSIR E. McNeil, NSIR DOCUMENT NAME: C:\ORPCheckout\FileNET\ML032520004.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS RI/DRS RI/DRS RI/DRS RI/DRS NAME ADimitriadis DSilk TWalker PFrechette JWhite DATE 09/04/03 09/04/03 09/04/03 09/04/03 09/04/03 OFFICE RI/DRP NSIR/DNS RI/DRS NAME CAnderson BWestreich (via WLanning (RVC telecon) for)

DATE 09/04/03 09/03/03 09/08/03 OFFICIAL RECORD COPY