ML070440430: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:YRC Inspector Paul Kaufman Suresh Chaudhary Shani Lewis John Richmond Dante Johnson Tim O'Hara Region I Inspection 9/18 -9/22 and 10/2 - 1016 2006 Interview Schedule ToDic - BWR FW Nozzle - BWR Stress Corrosion Cracking - HPCI - HPCI Walkdown - Structural Monitoring - Masonary Walls - Structures - Fire Protection - Fire Water - - Non-EQ Instrum. Circuits - Non-EQ Inacc. Med Volt Cables Non-EQ Insul. Cable
{{#Wiki_filter:Region I Inspection 9/18 -9/22 and 10/2 - 1016 2006 Interview Schedule YRC Inspector    ToDic                                     Pilgrim Team                    Date / Time    Location Paul Kaufman          - BWR F W Nozzle                       - PaceMlerisNoods           9/19 @ 8:30 AM Ray Paces Office
& Conn. - Heat Exch. Monitoring - Walkdown RBCCW+HXs - Inst. Air Quality - - Oil Analysis - Diesel Fuel Monitoring - Flow Accelerated Corrosion - One-Time Inspection - Water Chem Control - System Walkdown - Selective Leaching - Standby Gas - IS1 Inspection - Walkdown Torus Area - Cont. Leak Rate Testing - RBCCW Periodic Surv.
                      - BWR Stress Corrosion Cracking        - Pace/ MilerisNoods        9/19 @ 10 AM   Ray Paces Office
& Prev. Maint.
                      - HPCI                                  - Mulcahy/ IVY              9/19 @ 11 AM   3c
Pilgrim Team - PaceMlerisNoods - Pace/ MilerisNoods - Mulcahy - Mulcahy/ IVY - Kalb/Lach - Kalbbch - Burke/ Landryfivy - Burkebndryfivy - Dad Daverio/ Cox - Dasl Daverio/
                      - HPCI Walkdown                        - Mulcahy                    9/21 @ 9 AM   Plant Suresh Chaudhary    - Structural Monitoring                    -  Kalb/Lach                9/19 @ 9 AM   3c
Cox - Dasl Daveriol Cox - Kalbhch - Lane/ Choquette/Cox - Lane/Choquette/Chan - Choquette/Chan - Rydmanl ChanAvy - Selig/Woods/Cox - Carroll/Cox - Collis/Ivv Bechen/Mogolesko/Cox Woods/Sullivan/Ivy Smalley/Cox/Loomis S u I I i van/Cox W oods/S malle y/Iv y Mulcah y/Iv y PardeeAVi IliamsMeard PardeeKal b Pardee/Willi amsmeard Date / Time 9/19 @ 8:30 AM 9/19 @ 10 AM 9/19 @ 11 AM 9/21 @ 9 AM 9/19 @ 9 AM 9/19 @ 1OAM 9/19 @ 11 AM 9/19 @ 1 PM 9/19 @ 1 PM 10/3 @ 9 AM 1013 0 9 AM 10/3 @ 9 AM 9/19 @ 9 AM 9/19 @ 1OAM 9/21 @ 10AM 9/20 @ 9 AM 9/21 @ 9 AM 9/20 @ 1 PM 9/20 @ 2 PM 9/19 @ 1 PM 9/20 @ 1 PM 1012 @ 1 PM 10/3 @ 10 AM 9/21 @ 11 AM 9/21 02 PM 9/19 0 9 AM 9/19 0 2 PM 9/19 @ 11 AM Location Ray Pace's Office Ray Pace's Office 3c Plant 3c 3c 3c 3E 3E 3E 3E 3E GET Room GET Room Plant GET Room GET Room GET Room GET Room GET Room GET Room GET Room Plant GET Room GET Room Lic. Area Plant Lic. Area Renion I Inspection 9/18 -9/22 and 1012 - 10/6 2006 Interview Schedule - Buried Pipe and Tanks - Service Water Integrity - Service Water Glen Meyer - a(2) NS- spatial interaction and supports - SBODieseI - Bechen/Lach/Cox - GaedtkeKox - GaedtkeKox - Chan/Ivy - Collis/Ivv 9/21 @ 9 AM 9/20 @ 9 AM 3E 3E 9/20 @ 10 AM 9/19 @ 1 PM 3E GET Room 9/20 @ 2 PM GET Room}}
                    -  Masonary Walls                          -  Kalbhch                  9/19 @ 1 O A M 3c
                    - Structures                              -  Kalbbch                  9/19 @ 11 AM   3c Shani Lewis        -  Fire Protection                        -  Burke/ Landryfivy        9/19 @ 1 PM   3E
                    -  Fire Water                              -  Burkebndryfivy            9/19 @ 1 PM   3E
                    -  Non-EQ Inacc. Med Volt Cables          -  Dad Daverio/ Cox          10/3 @ 9 AM   3E
                    -  Non-EQ Instrum. Circuits                -  Dasl Daverio/ Cox          1013 0 9 AM   3E
                    -  Non-EQ Insul. Cable & Conn.            -  Dasl Daveriol Cox          10/3 @ 9 AM   3E John Richmond      - Heat Exch. Monitoring                    -  Lane/ Choquette/Cox      9/19 @ 9 AM   GET Room
                    -  RBCCW                                  -  Lane/Choquette/Chan      9/19 @ 1 O A M GET Room
                    -  Walkdown RBCCW+HXs                      -  Choquette/Chan            9/21 @ 10AM   Plant
                    -  Inst. Air Quality                      -  Rydmanl ChanAvy          9/20 @ 9 AM   GET Room
                    - Periodic Surv. & Prev. Maint.            -  Selig/Woods/Cox          9/21 @ 9 AM   GET Room
                    - Oil Analysis                            -  Carroll/Cox              9/20 @ 1 PM   GET Room
                    - Diesel Fuel Monitoring                  -  Collis/Ivv                9/20 @ 2 PM   GET Room Dante Johnson      - Flow Accelerated Corrosion                  Bechen/Mogolesko/Cox      9/19 @ 1 PM   GET Room
                    - One-Time Inspection                        Woods/Sullivan/Ivy        9/20 @ 1 PM   GET Room
                    - Water Chem Control                          Smalley/Cox/Loomis        1012 @ 1 PM   GET Room
                    - System Walkdown                            Su I I i van/Cox          10/3 @ 10 AM Plant
                    - Selective Leaching                          Woods/Smalley/Ivy        9/21 @ 11 AM   GET Room
                    -  Standby Gas                              Mulcahy/Ivy              9/21 0 2 PM   GET Room Tim OHara          - IS1 Inspection                              PardeeAViIliamsMeard      9/19 0 9 AM   Lic. Area
                    - Walkdown Torus Area                        PardeeKalb                9/19 0 2 PM   Plant
                    - Cont. Leak Rate Testing                    Pardee/Williamsmeard      9/19 @ 11 AM Lic. Area
 
Renion I Inspection 9/18 -9/22 and 1012 - 10/6 2006 Interview Schedule
          - Buried Pipe and Tanks                 -   Bechen/Lach/Cox           9/21 @ 9 AM 3E
          - Service Water Integrity              -  GaedtkeKox                9/20 @ 9 AM 3E
          - Service Water                        -  GaedtkeKox                9/20 @ 10 AM 3E Glen Meyer - a(2) NS- spatial interaction and      -  Chan/Ivy                  9/19 @ 1 PM GET Room supports
          - SBODieseI                            -  Collis/Ivv                9/20 @ 2 PM GET Room}}

Latest revision as of 10:29, 23 November 2019

Interview Schedule - Region 1 Inspection
ML070440430
Person / Time
Site: Pilgrim
Issue date: 10/06/2006
From:
Division of Nuclear Materials Safety I
To:
References
Download: ML070440430 (2)


Text

Region I Inspection 9/18 -9/22 and 10/2 - 1016 2006 Interview Schedule YRC Inspector ToDic Pilgrim Team Date / Time Location Paul Kaufman - BWR F W Nozzle - PaceMlerisNoods 9/19 @ 8:30 AM Ray Paces Office

- BWR Stress Corrosion Cracking - Pace/ MilerisNoods 9/19 @ 10 AM Ray Paces Office

- HPCI - Mulcahy/ IVY 9/19 @ 11 AM 3c

- HPCI Walkdown - Mulcahy 9/21 @ 9 AM Plant Suresh Chaudhary - Structural Monitoring - Kalb/Lach 9/19 @ 9 AM 3c

- Masonary Walls - Kalbhch 9/19 @ 1 O A M 3c

- Structures - Kalbbch 9/19 @ 11 AM 3c Shani Lewis - Fire Protection - Burke/ Landryfivy 9/19 @ 1 PM 3E

- Fire Water - Burkebndryfivy 9/19 @ 1 PM 3E

- Non-EQ Inacc. Med Volt Cables - Dad Daverio/ Cox 10/3 @ 9 AM 3E

- Non-EQ Instrum. Circuits - Dasl Daverio/ Cox 1013 0 9 AM 3E

- Non-EQ Insul. Cable & Conn. - Dasl Daveriol Cox 10/3 @ 9 AM 3E John Richmond - Heat Exch. Monitoring - Lane/ Choquette/Cox 9/19 @ 9 AM GET Room

- RBCCW - Lane/Choquette/Chan 9/19 @ 1 O A M GET Room

- Walkdown RBCCW+HXs - Choquette/Chan 9/21 @ 10AM Plant

- Inst. Air Quality - Rydmanl ChanAvy 9/20 @ 9 AM GET Room

- Periodic Surv. & Prev. Maint. - Selig/Woods/Cox 9/21 @ 9 AM GET Room

- Oil Analysis - Carroll/Cox 9/20 @ 1 PM GET Room

- Diesel Fuel Monitoring - Collis/Ivv 9/20 @ 2 PM GET Room Dante Johnson - Flow Accelerated Corrosion Bechen/Mogolesko/Cox 9/19 @ 1 PM GET Room

- One-Time Inspection Woods/Sullivan/Ivy 9/20 @ 1 PM GET Room

- Water Chem Control Smalley/Cox/Loomis 1012 @ 1 PM GET Room

- System Walkdown Su I I i van/Cox 10/3 @ 10 AM Plant

- Selective Leaching Woods/Smalley/Ivy 9/21 @ 11 AM GET Room

- Standby Gas Mulcahy/Ivy 9/21 0 2 PM GET Room Tim OHara - IS1 Inspection PardeeAViIliamsMeard 9/19 0 9 AM Lic. Area

- Walkdown Torus Area PardeeKalb 9/19 0 2 PM Plant

- Cont. Leak Rate Testing Pardee/Williamsmeard 9/19 @ 11 AM Lic. Area

Renion I Inspection 9/18 -9/22 and 1012 - 10/6 2006 Interview Schedule

- Buried Pipe and Tanks - Bechen/Lach/Cox 9/21 @ 9 AM 3E

- Service Water Integrity - GaedtkeKox 9/20 @ 9 AM 3E

- Service Water - GaedtkeKox 9/20 @ 10 AM 3E Glen Meyer - a(2) NS- spatial interaction and - Chan/Ivy 9/19 @ 1 PM GET Room supports

- SBODieseI - Collis/Ivv 9/20 @ 2 PM GET Room