Supplemental Information to Update Pilgrim Station Decommissioning Annual Funding and Schedule Status Update
ML21117A402
Person / Time
Site: Pilgrim
Issue date: 04/27/2021
From: Sterdis A
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
HDI‐PIL‐21‐052
Download: ML21117A402 (4)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDIPIL21052 Page1of2 10 CFR 50.82 April 27, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed License No. DPR-35 NRC Docket Nos. 50-293 and 72-1044

Subject:

Supplemental Information to Update Pilgrim Station Decommissioning Annual Funding and Schedule Status Update

Reference:

[1]

Letter from Holtec Decommissioning International, LLC to U.S. Nuclear Regulatory Commission - Holtec Decommissioning International Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations, dated March 31, 2021 (ML21090A336)

[2]

Letter, Holtec Decommissioning International, LLC to US NRC, Notification of Revised Post-Shutdown Decommissioning Activities Report and Revised Site-Specific Decommissioning Cost Estimate for Pilgrim Nuclear Power Station, November 16, 2018 (ML18320A040)

[3}

Letter, Holtec Decommissioning International, LLC to US NRC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations, March 31, 2020 (ML20091M858)

On March 31, 2021, Holtec Decommissioning International, LLC (HDI) submitted the annual status of decommissioning funding, status of funding for managing irradiated fuel, and the financial assurance report for Oyster Creek Nuclear Generating Station (Oyster Creek) and Pilgrim Nuclear Power Station (Pilgrim) (Reference 1). The annual decommissioning funding assurance report for Pilgrim Station is provided in Enclosure 2 to Reference 1. Figure 1 to, provides a waterfall chart which depicts the overall Pilgrim Decommissioning Schedule Timeline.

HDI has identified an error in the Pilgrim Station Decommissioning Schedule Timeline (Figure 1, to Reference 1). Specifically, HDI has confirmed that the schedules for the decom-missioning activities to prepare and submit the License Termination Plan (LTP) and NRC review and approval of the LTP, need to be revised to reflect the HDI planned schedule. The revision provided in this letter aligns the HDI schedule with the NRC regulations and guidance for the Li-cense Termination process. to this letter provides the revised Figure 1 Pilgrim Station Decommissioning Schedule Timeline depicting the specific changes.

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDIPIL21052 Page2of2 The identified site schedule change was reviewed and evaluated against 10 CFR 50.82 criteria for implementing changes to the initial Post Shutdown Decommission Activities Report (PSDAR)

(References 2) as revised previously in the March 2020 and March 2021 annual decommissioning updates (References 1 and 3). The schedule change was determined to be consistent with the actions and schedule described in the PSDAR and does not significantly increase the Pilgrim decommissioning schedule and cost estimate.

There are no regulatory commitments contained within this letter.

If you should require any further information, please contact me at (856) 797-0900 x 3813..

Sincerely, Andrea L. Sterdis Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC Attachment - Revised Figure 1 Pilgrim Station Decommissioning Schedule Timeline (Pilgrim Decommissioning - Waterfall Chart) cc:

USNRC Regional Administrator, Region I USNRC Project Manager, NMSS - Pilgrim Nuclear Power Station Commonwealth of Massachusetts, Executive Office of Environmental Affairs Commonwealth of Massachusetts, Department of Public Health Commonwealth of Massachusetts, Department of Environmental Protection Commonwealth of Massachusetts, Director, Massachusetts Emergency Management Agency Digitally signed by Andrea Sterdis DN: cn=Andrea Sterdis, c=US, o=Holtec Decommissioning International, ou=HDI, email=a.sterdis@holtec.com Date: 2021.04.27 14:14:10 -04'00' Andrea Sterdis

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 toHDIPIL20052 Page1of2 HDI-PIL-21-052 Revised Figure 1 Pilgrim Station Decommissioning Schedule Timeline (Pilgrim Decommissioning - Waterfall Chart)

SITE RESTORATION PilgrimDecommissioningWaterfallChart J

2020 2021 2022 2024 2025 2023 F

M A

M J

J A

S O

N D

J A

S O

N D

J F

M A

M J

J A

S O

N D

J F

M A

M J

J A

S O

N D

J F

M A

M J

J A

S O

N D

YEAR MONTH CLOSE DATE 08/26/2019 J

M 2019 PARTIAL SITE RELEASE 09/24/2027 COMPLETE FUEL SHIPMENT 12/31/2062 FINAL SITE SURVEY 06/03/2063 FINAL LICENSE TERMINATION 09/07/2063 D&D (DECON, ABATEMENT AND DISMANTLEMENT)

J F

M A

M J

J A

S O

N D

J F

M A

M J

J A

S O

N D

J F

M A

M J

J A

S O

N D

REACTOR SEGMENTATION CHARACTERIZATION, INVESTIGATION & LTP ISFSI SITE RESTORATION FSS NRC REVIEW REACTOR INTERNALS SEGMENTATION VESSEL & MISC.

HARDWARE SEGMENTATION FUEL WET STORAGE FUEL POOL TO PAD - PH2 D&D (DECON, ABATEMENT AND DISMANTLEMENT)

WASTE MANAGEMENT NRC REVIEW LTP 2026 2028 TO 2063 J

F M

A M

J J

A S

O N

D 2028 - 2061 2063 SITE CHARACTERIZATION FUEL DRY ONLY STORAGE WASTE MANAGEMENT PREPARE LTP FSS REPORT 2027 2062 FUEL POOL TO PAD - PH1 FUEL ON PAD 11/15/2021 SUBMIT LTP 09/23/2024 SHUTDOWN START 05/31/2019 ZIRCONIUM FIRE ELIMINATED 03/31/2019