Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations.
ML092310144
Person / Time
Site: Pilgrim
Issue date: 08/12/2009
From: Jeffery Lynch
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-09-011
Download: ML092310144 (3)


Text

'" Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 12, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Response to RIS 2009-11 "Preparation and Scheduling of Operator Licensing Examinations" LETTER NUMBER: 2.09.046

Dear Sir or Madam:

On July 16, 2009, the NRC issued Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations."

This RIS requested information from licensees regarding proposed licensed operator examinations schedules and estimated number of applicants in order to assist the NRC in planning resources. Accordingly, the requested information is provided in the enclosed NRC Form 536.

There are no commitments contained in this letter.

Please contact me at (508) 830-8403, if there are any questions regarding this subject.

Sincerely, Joseph R. Lynch Manager, Licensing MJG/mg

Enclosure:

Completed NRC Form 536 cc: Mr. Samuel J. Collins Senior Resident Inspector Regional Administrator, Region I Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 woos "M

Enclosure to ENO Letter 2.09.046 Completed NRC Form 536 (1 page)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EX(AMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Entergy, Pilgrim Nuclear Power Station One A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 10 CY 11 Cy 12 Cy 13 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 10 CY 11 CY 12 Cy 13 NUMBER OF REACTOR 0 8 0 4 OPERATORS NUMBER OF SENIOR REACTOR 0 3 0 7 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011 01/21/2013 ALTERNATE DATE 01/24/2011 01/28/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 CY 11 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 11 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER