~Enteigy Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 September 20, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 RESPONSE TO REQUEST FOR INFORMATION: OPERATOR LICENSING EXAMINATION DATA LETTER NUMBER:
2.06.085
Dear Sir or Madam:
On August 14, 2006, the NRC issued Regulatory Issue Summary (RIS) 2006-1 5, "Preparation and Sche~duling of Operator Licensing Examinations."
This RIS. requbst6d iniform~ation from licensees regarding proposed licensed operator examinations schedules and estima.ted'hnt'mber of applicants in order to assist the NRC in planning resources. Accordingly," enclosed is the requested inform-ation on the.completed NRC Form 536.
There are no commitments contained in this letter.
Please feel free to contact me at (508) 830-8403, if there are any questions regarding this subject.
Sincerely, Bryan S. Ford Licensing Manager MJG/dl
Enclosure:
Completed NRC Form 536 cc:-"
Mr. Samuel J. Collins Regional Administrator, Regiooi.'
U.*S.' Nucle-ar Regulatoryo Com,miss ion 475 Allendale Road King of.Prussia, PA 19406,.
Senior, Resident Inspector P, ilgriim Nu*clear Power Station 0
ý
Enclosure to ENO Letter 2.06.085
-~-Completed NRC Form 536 (1 page)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005)
Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOlNtPrivacy Services Branch
_5F53). U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet EXAMNATON ATAe-mail to infocollects@nrc.gov. and to the Desk Officer, Office of Information EXAMIATIONDATAand Regulatory Affairs. NEQB-110202. (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to Impose an information collection does not display a curr ently valid 0MB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACILITY NRC REGION Pilgrim Nuclear Power Station Entergy One A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10
_- ESTIMATED NUMBER OF LICENSEE-PREPARED7-1 0
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CYO08 CY 09 CY 10 NUMBER OF REACTOR 3
0 6
0 OPERATORS NUMBER OF SENIOR REACTOR 3
0 5
0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR0000 OPERATORS - UPGRADE0000 NUMBER OF SENIOR REACTOR 000 OPERATORS - LIMITED0000
-PROPOSED
-DATES..-.-.--*----
PRI MARY DATE 02/26/2007 02/02/2009 ALTERNATE DATE 02/19/2007 01/26/2009 1C.' PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PRPOEDCY 07 I:
.CY 08 NUBR MARCH JUNE SEPTEMBER DECEMBER MARCH' JUNE SPEBRDCME ESTIMATED1SETMEJDC BR NUMBER OF; 0
0 110 000
- CANDIDATES--
NRC FORM 536 (8-2005)
PRINTED ON RECYCLED PAPER