|
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| | [[Issue date::August 18, 2006]] |
| | |
| | John S. Keenan, Senior Vice President of Generation and Chief Nuclear Officer Mail Code B32 Pacific Gas and Electric Company P.O. Box 770000 San Francisco, CA 94177-0001 |
| | |
| | ==Dear Mr. Keenan:== |
| | SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT - NRC INSPECTIONREPORT 05000275/2005005 and 05000323/2005005Please insert the enclosure to this letter as replacement for page 42 of NRC Inspection Report05000275/2005005 and 05000323/2005005. A problem identification and resolution crosscutting aspect was incorrectly referenced in Section 4OA2.7 for Noncited Violation 05000275/2005-05-01, Failure to Adequately Assess and Manage Risk Associatedwith Startup Transformer 1-1 Maintenance. Section 1R14 of the report appropriately characterizes the cause of the finding as related to the crosscutting aspect of human performance in that maintenance personnel failed to follow procedures. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's documentsystem (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Sincerely,/RA/William B. Jones, ChiefProject Branch B Division of Reactor ProjectsDockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Pacific Gas and Electric Company- 2 - |
| | |
| | ===Enclosure:=== |
| | Page 42 of NRC Inspection Report 05000275/2005005 and 05000323/2005005cc w/enclosure:Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant |
| | |
| | P.O. Box 56 Avila Beach, CA 93424James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant |
| | |
| | P.O. Box 56 Avila Beach, CA 93424Sierra Club San Lucia ChapterATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406Nancy CulverSan Luis Obispo Mothers for Peace |
| | |
| | P.O. Box 164 Pismo Beach, CA 93448ChairmanSan Luis Obispo County Board of Supervisors County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408Truman Burns\Robert KinosianCalifornia Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298Diablo Canyon Independent Safety CommitteeRobert R. Wellington, Esq.Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Pacific Gas and Electric Company- 3 -Director, Radiological Health BranchState Department of Health Services P.O. Box 997414 (MS 7610) |
| | Sacramento, CA 95899-7414Richard F. Locke, Esq.Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120City EditorThe Tribune 3825 South Higuera Street |
| | |
| | P.O. Box 112 San Luis Obispo, CA 93406-0112James D. Boyd, CommissionerCalifornia Energy Commission 1516 Ninth Street (MS 34) |
| | Sacramento, CA 95814Jennifer TangField Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Pacific Gas and Electric Company- 4 -Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (TWJ)Branch Chief, DRP/B (WBJ)Senior Project Engineer, DRP/E (FLB2)Team Leader, DRP/TSS (RLN1)RITS Coordinator (KEG)DRS STA (DAP)V. Dricks, PAO (VLD)J. Lamb, OEDO RIV Coordinator (JGL1)ROPreports DC Site Secretary (AWC1)SUNSI Review Completed: _wbj__ ADAMS: Yes G No Initials: __wbj____ Publicly Available G Non-Publicly Available G Sensitive Non-SensitiveR:\_REACTORS\_DC\2005\DC2005-05RP-TWJ Errata.wpdRIV:SRI:DRP/BC:DRP/BTWJackson;dfWBJones T - WBJones /RA/8/18/068/18/06OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| | -42-Enclosure .7PI&R Crosscutting AspectsSection 2OS1 identified a problem identification and resolution crosscutting aspect forthe failure of radiation protection personnel to post a radiation area and the violation wassimilar to a violation previously identified in NRC Inspection Report 050000275; 323/2002004.Section 4OA2.2 identified a problem identification and resolution crosscutting aspect forthe failure of PG&E to adequately evaluate and implement timely corrective actions to ECCS check valve back-leakage.4OA3Event Follow-up (71153) .1(Closed) Licensee Event Report 05000323/2005001-00, TS 3.4.10 Not Met DuringPressurizer Safety Valve Surveillance Testing Due to Random Lift SpreadOn January 27, 2005, during scheduled testing of Unit 2 pressurizer safety valves,PG&E identified two of three pressurizer safety valves outside the TS 3.4.10 lift setting of >2460 and <2510 psig.In NRC Inspection Report 05000275; 323/2005003, an NRC-identified, Green NCV of10 CFR Part 50, Criterion XVI, was identified for this issue. PG&E documented the problem in Nonconformance Report N0002197. No new information that would change the disposition of this issue was provided in this LER. This LER is closed.4OA5Other .1TI 2515/160 - Pressurizer Penetration Nozzles and Steam Space Piping Connections inU.S. Pressurized Water Reactors a. Inspection ScopeThe inspectors reviewed PG&E's actions regarding the inspection and repair associatedwith Alloy 82/182/600 material that may have been used in pressurizer penetration nozzles, steam space piping connections, heads, and shells. Specifically, the inspectors reviewed PG&E's response to NRC Bulletin 2004-01, "Inspection of Alloy 82/182/600Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors." PG&E documented in their response to the bulletin that no Alloy 82/182/600 material was used in the construction or welds of the Unit 1 pressurizer. PG&E did not commit to, or perform, any nondestruction examination methods for the Unit 1 pressurizer. PG&E did perform a boric acid walkdown of the pressurizer, and the inspectors performed an independent boric acid inspection of pressurizer.The activities required in TI 2515/160 for Diablo Canyon Power Plant Unit 1 have beencompleted. This temporary instruction is closed for Unit 1. |
| }} | | }} |
Revision as of 10:24, 11 November 2018
|
---|
Category:Inspection Report
MONTHYEARIR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 IR 05000275/20244032024-03-12012 March 2024 Cyber Security Inspection Report 05000275/2024403 and 05000323/2024403 (Cover Letter) IR 05000275/20230062024-02-28028 February 2024 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023006 and 05000323/2023006) IR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20230022023-08-14014 August 2023 Quarterly Integrated Inspection Report 05000275/2023002 and 05000323/2023002- August 7, 2023 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 IR 05000275/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000275/2023402, and 05000323/2023402 IR 05000275/20233012023-07-25025 July 2023 NRC Initial Operator Licensing Examination Approval 05000275/2023301, 05000323/2023301 IR 05000275/20230102023-05-11011 May 2023 NRC Inspection Report 05000275 2023010 and 05000323 2023010 IR 05000275/20230012023-05-0909 May 2023 Integrated Inspection Report 05000275/2023001 and 05000323/2023001 IR 05000275/20234032023-03-10010 March 2023 NRC Security Baseline Inspection Report 05000275/2023403, 05000323/2023403 (Full Report) IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) IR 05000275/20220042023-02-0202 February 2023 Integrated Inspection Report 05000275/2022004 and 05000323/2022004 IR 05000275/20220102023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000275/2022010 and 05000323/2022010 IR 05000275/20224022022-10-26026 October 2022 Security Baseline Inspection Report 05000275/2022402 and 05000323/ 2022402 IR 05000275/20220032022-10-24024 October 2022 Integrated Inspection Report 05000275/2022003 and 05000323/2022003 and Exercise of Enforcement Discretion IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) IR 05000275/20220022022-08-10010 August 2022 Integrated Inspection Report 05000275/2022002 and 05000323/2022002 IR 05000275/20220112022-08-0909 August 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2022011 and 05000323/2022011 IR 05000275/20224012022-08-0303 August 2022 NRC Security Inspection Report 05000275/2022401, 05000323/2022401 ML22143A8812022-05-26026 May 2022 Revised Integrated Inspection Report 05000275/2022001 and 05000323/2022001 ML22118A9362022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000275/20220012022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000323/20214202022-03-31031 March 2022 Security Inspection Report 05000275 and 05000323/2021420 IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) IR 05000275/20210042022-02-0303 February 2022 Integrated Inspection Report 05000275/2021004 and 05000323/2021004 IR 05000275/20214042022-01-13013 January 2022 Public - Security Baseline Inspection Report 05000275/2021404 and 05000323/2021404 IR 05000275/20210032021-11-0303 November 2021 Integrated Inspection Report 05000275/2021003 and 05000323/2021003 IR 05000275/20210112021-09-10010 September 2021 Design Basis Assurance Inspection (Programs) Report 05000275/2021011 and 05000323/2021011 IR 05000275/20214052021-08-0505 August 2021 Security Baseline Inspection Report 05000275/2021405 and 05000323/2021405 IR 07200026/20214012021-08-0303 August 2021 Diablo Canon Nuclear Power Plant, Security Baseline Inspection Report 07200026/2021401 IR 05000275/20210022021-08-0202 August 2021 Integrated Inspection Report 05000275/2021002 and 05000323/2021002 IR 05000275/20210122021-07-28028 July 2021 Temporary Instruction 2515/194 Report 05000275/2021012 and 05000323/2021012 IR 05000275/20214012021-07-0101 July 2021 Security Baseline Inspection Report 05000275/2021401 and 05000323/2021401 IR 05000275/20210012021-05-0707 May 2021 DC IR 2021-001-drk, Diablo Canyon Power Plant Units 1 & 2 - Integrated Inspection Report 05000275/2021001, 05000323/2021001, & Independent Spent Fuel Storage Installation Inspection Report 07200026/2021001 DCL-21-036, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage2021-04-22022 April 2021 One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage ML21102A0702021-04-12012 April 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000275/2021011 and 05000323/2021011) and Initial Request for Information IR 05000275/20214032021-03-31031 March 2021 Cyber Security Inspection Report 05000275/2021403 and 05000323/2021403 IR 05000275/20210102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000275/2021010 and 05000323/2021010 IR 05000275/20200062021-03-0303 March 2021 DC 2020 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 & 2 (Report 05000275/2020006 & 05000323/2020006) IR 05000275/20200042021-01-26026 January 2021 Integrated Inspection Report 05000275/2020004 and 05000323/2020004 2024-08-06
[Table view] Category:Letter
MONTHYEARDCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Plants, Units 1 and 2 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24065A1312024-03-20020 March 2024 ISFSI Renewal RAI Transmittal Letter IR 05000275/20244032024-03-12012 March 2024 Cyber Security Inspection Report 05000275/2024403 and 05000323/2024403 (Cover Letter) ML24065A3662024-03-0404 March 2024 Notification of Site Inspection for License Renewal and Request for Information Inspection (05000323/2024011) ML24071A1742024-03-0404 March 2024 Email - (External_Sender) Shutdown Petition to NRC Commissioners DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20230062024-02-28028 February 2024 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023006 and 05000323/2023006) ML24056A0022024-02-27027 February 2024 – License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring ML24058A2552024-02-22022 February 2024 Formal Acceptance from Sy Chumash Re Regarding Consultation on the DC NPP ML24058A2562024-02-22022 February 2024 Santa Ynez Band or Chumash Tribe - Consultation Request Diablo Canyon NPP Units 1 and 2 2024-08-08
[Table view] |
Text
August 18, 2006
John S. Keenan, Senior Vice President of Generation and Chief Nuclear Officer Mail Code B32 Pacific Gas and Electric Company P.O. Box 770000 San Francisco, CA 94177-0001
Dear Mr. Keenan:
SUBJECT: ERRATA FOR DIABLO CANYON POWER PLANT - NRC INSPECTIONREPORT 05000275/2005005 and 05000323/2005005Please insert the enclosure to this letter as replacement for page 42 of NRC Inspection Report05000275/2005005 and 05000323/2005005. A problem identification and resolution crosscutting aspect was incorrectly referenced in Section 4OA2.7 for Noncited Violation 05000275/2005-05-01, Failure to Adequately Assess and Manage Risk Associatedwith Startup Transformer 1-1 Maintenance. Section 1R14 of the report appropriately characterizes the cause of the finding as related to the crosscutting aspect of human performance in that maintenance personnel failed to follow procedures. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's documentsystem (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/William B. Jones, ChiefProject Branch B Division of Reactor ProjectsDockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Pacific Gas and Electric Company- 2 -
Enclosure:
Page 42 of NRC Inspection Report 05000275/2005005 and 05000323/2005005cc w/enclosure:Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant
P.O. Box 56 Avila Beach, CA 93424James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant
P.O. Box 56 Avila Beach, CA 93424Sierra Club San Lucia ChapterATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406Nancy CulverSan Luis Obispo Mothers for Peace
P.O. Box 164 Pismo Beach, CA 93448ChairmanSan Luis Obispo County Board of Supervisors County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408Truman Burns\Robert KinosianCalifornia Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298Diablo Canyon Independent Safety CommitteeRobert R. Wellington, Esq.Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Pacific Gas and Electric Company- 3 -Director, Radiological Health BranchState Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414Richard F. Locke, Esq.Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120City EditorThe Tribune 3825 South Higuera Street
P.O. Box 112 San Luis Obispo, CA 93406-0112James D. Boyd, CommissionerCalifornia Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814Jennifer TangField Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111 Pacific Gas and Electric Company- 4 -Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (TWJ)Branch Chief, DRP/B (WBJ)Senior Project Engineer, DRP/E (FLB2)Team Leader, DRP/TSS (RLN1)RITS Coordinator (KEG)DRS STA (DAP)V. Dricks, PAO (VLD)J. Lamb, OEDO RIV Coordinator (JGL1)ROPreports DC Site Secretary (AWC1)SUNSI Review Completed: _wbj__ ADAMS: Yes G No Initials: __wbj____ Publicly Available G Non-Publicly Available G Sensitive Non-SensitiveR:\_REACTORS\_DC\2005\DC2005-05RP-TWJ Errata.wpdRIV:SRI:DRP/BC:DRP/BTWJackson;dfWBJones T - WBJones /RA/8/18/068/18/06OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
-42-Enclosure .7PI&R Crosscutting AspectsSection 2OS1 identified a problem identification and resolution crosscutting aspect forthe failure of radiation protection personnel to post a radiation area and the violation wassimilar to a violation previously identified in NRC Inspection Report 050000275; 323/2002004.Section 4OA2.2 identified a problem identification and resolution crosscutting aspect forthe failure of PG&E to adequately evaluate and implement timely corrective actions to ECCS check valve back-leakage.4OA3Event Follow-up (71153) .1(Closed) Licensee Event Report 05000323/2005001-00, TS 3.4.10 Not Met DuringPressurizer Safety Valve Surveillance Testing Due to Random Lift SpreadOn January 27, 2005, during scheduled testing of Unit 2 pressurizer safety valves,PG&E identified two of three pressurizer safety valves outside the TS 3.4.10 lift setting of >2460 and <2510 psig.In NRC Inspection Report 05000275; 323/2005003, an NRC-identified, Green NCV of10 CFR Part 50, Criterion XVI, was identified for this issue. PG&E documented the problem in Nonconformance Report N0002197. No new information that would change the disposition of this issue was provided in this LER. This LER is closed.4OA5Other .1TI 2515/160 - Pressurizer Penetration Nozzles and Steam Space Piping Connections inU.S. Pressurized Water Reactors a. Inspection ScopeThe inspectors reviewed PG&E's actions regarding the inspection and repair associatedwith Alloy 82/182/600 material that may have been used in pressurizer penetration nozzles, steam space piping connections, heads, and shells. Specifically, the inspectors reviewed PG&E's response to NRC Bulletin 2004-01, "Inspection of Alloy 82/182/600Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors." PG&E documented in their response to the bulletin that no Alloy 82/182/600 material was used in the construction or welds of the Unit 1 pressurizer. PG&E did not commit to, or perform, any nondestruction examination methods for the Unit 1 pressurizer. PG&E did perform a boric acid walkdown of the pressurizer, and the inspectors performed an independent boric acid inspection of pressurizer.The activities required in TI 2515/160 for Diablo Canyon Power Plant Unit 1 have beencompleted. This temporary instruction is closed for Unit 1.