Letter Sequence Approval |
---|
TAC:ME6698, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation (Approved, Closed) TAC:ME6699, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000324/20240032024-11-13013 November 2024 Integrated Inspection Report 05000324/2024003 and 05000325/2024003 IR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24218A0862024-09-0909 September 2024 NRC to NMFS, Designation of Duke Energy Progress LLC as the Non-Federal Representative for Brunswick Steam Electric Plant, Units 1 and 2 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24242A0322024-08-29029 August 2024 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, 10 CFR 54.37 Update, Technical Requirements Manuals, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Change IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 ML24036A0962024-02-0202 February 2024 Operator Licensing Examination Approval 050003242024301 and 050003252024301 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 – Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21281A1382021-12-14014 December 2021 Issuance of Amendment Nos. 306 and 334 to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21155A2132021-08-26026 August 2021 Plant ML21067A2242021-04-30030 April 2021 Issuance of Amendment Nos. 305 and 333 to Revise License Conditions to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20309A7842021-03-18018 March 2021 Issuance of Amendment Nos. 304 and 332 Revise Technical Specification 3.4.7 and 3.4.8 to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem ML20342A3472021-03-0404 March 2021 Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20253A3212021-01-26026 January 2021 Issuance of Amendment Nos. 302 and 330 Revise Technical Specification 3.6.3.1 to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20269A3052020-09-29029 September 2020 Issuance of Amendment Nos. 301 and 329 to Revise Technical Specifications to Adopt TSTF-564 (EPID L-2020-LLA-0043) (Non-Proprietary) ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML19346C7922020-02-0606 February 2020 Issuance of Amendments Nos. 298 and 326 to Modify Technical Specification to Extend Containment Leakage Test Intervals ML19316B0572020-01-0808 January 2020 Issuance of Amendment Nos. 297 and 325 to Modify Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.11 Safety Relief Valves ML19281A3302019-11-21021 November 2019 Issuance of Amendment Nos. 296 and 324 to Adopt Technical Specification Task Force Traveler TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification ML19268A0542019-10-31031 October 2019 Units 1 and 2 - Issuance of Amendment Nos. 295 and 323 to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19254E0762019-10-25025 October 2019 Issuance of Amendment Nos. 294 and 322 to Revise Technical Specification 3.7.4 for Control Room Air Conditioning Subsystems ML19233A0732019-09-23023 September 2019 Issuance of Amendment Nos. 293 and 321 to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19149A4712019-09-17017 September 2019 Issuance of Amendment Nos. 292 and 320, Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML19018A2062019-05-0606 May 2019 Issuance of Amendment Nos. 290 and 318 to Revise Note on Brunswick TS 3.8.3 for One-Time Extension of Main Fuel Oil Storage Tank Completion Time ML19035A0062019-04-22022 April 2019 Issuance of Amendment Nos. 289 and 317 to Relocate the Pressure-Temperature Limits in the Technical Specifications to the Pressure-Temperature Limits Report ML18291B3222019-01-0909 January 2019 Issuance of Amendment Nos. 288 and 316 to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 ML18264A2602019-01-0707 January 2019 Issuance of Amendment Nos. 287 and 315 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML18243A2982018-09-27027 September 2018 Issuance of Amendment to Modify DC Sources Technical Specification Surveillance Requirement 3.8.4.5 ML18172A2582018-09-18018 September 2018 Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+) ML18106B1692018-07-0606 July 2018 Issuance of Amendment Nos. 284 and 312 Regarding Request to Allow Performance-Based Fire Protection Alternative for Thermal Insulation Material ML18137A1432018-05-23023 May 2018 Correction to Issuance of Amendment Nos. 283 and 311 to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) ML18039A4442018-04-13013 April 2018 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2 ML17328B0722017-11-26026 November 2017 Issuance of Amendments for Technical Specification 3.8.1, AC Sources - Operating One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements Emergency Situation ML17186A2192017-09-0606 September 2017 Issuance of Amendments to Adopt TSTF-529, REV-4, Clarify Use and Application Rules (CAC Nos. MF8819-MF8820) ML17180A5962017-08-29029 August 2017 Issuance of Amendments to Adopt TSTF-423 Technical Specifications End States, NEDC-32988-A ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17130A7802017-07-12012 July 2017 Issuance of Amendments Regarding Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML17096A1292017-05-24024 May 2017 Issuance of Amendments Regarding Request to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML17055A6472017-05-0808 May 2017 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16343A2462017-04-11011 April 2017 Issuance of Amendments Regarding Reactor Protection System Electrical Protection Assembly Electric Power Monitoring Surveillance Requirements ML17059D1462017-03-10010 March 2017 Issuance of Amendments to Revise Technical Specification Section 2.1.1.2, Safety Limit Minimum Critical Power Ratio ML16217A1182016-09-13013 September 2016 Steam Electric Plants, Shearon Harris Nuclear Power Plant,Unit 1 -Issuance of Amendments 271, 299, 152 and 246 Re Change in Corporate Form of Duke Energy Progress, Inc ML16174A0722016-06-27027 June 2016 Correction to License Pages Issuance of Amendments Regarding Adoption of TSTF-523 (Cac Nos. MF6413 Through MF6422) ML16085A1132016-04-29029 April 2016 1 & 2; Shearon Harris Nuclear Power Plant 1; Catawba Nuclear Station 1 & 2; Mcguire Nuclear Station 1 & 2; and Oconee Nuclear Station 1, 2, & 3: Issuance of Amendments Regarding Adoption of TSTF-523 (CAC Nos. MF6413-MF6422) ML16049A2282016-02-29029 February 2016 Correction to Signature for License Amendment Nos. 268 and 296 Regarding Emergency Action Level Scheme Upgrade ML16019A0292016-02-0909 February 2016 Issuance of Amendments Regarding the Adoption of Topical Report ANP-10298P-A, Revision 1 ML15344A1532016-01-0808 January 2016 Issuance of Amendments Regarding Emergency Action Level Scheme Upgrade ML15161A1212015-07-31031 July 2015 Issuance of Conforming Amendments Regarding Direct Transfer of Renewed Facility Operating Licenses to Duke Energy Progress, Inc., (TAC Nos. MF5505, MF5506 & MF550 ML14310A8082015-01-28028 January 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(C) 2024-06-05
[Table view] Category:Safety Evaluation
MONTHYEARML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21343A2002021-12-20020 December 2021 Authorization and Safety Evaluation for Alternative from Certain Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code of Buried Service Water Piping (EPID L-2021-LLR-0014) (Non-Proprieta ML21281A1382021-12-14014 December 2021 Issuance of Amendment Nos. 306 and 334 to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications ML21155A2132021-08-26026 August 2021 Plant ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21067A2242021-04-30030 April 2021 Issuance of Amendment Nos. 305 and 333 to Revise License Conditions to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20309A7842021-03-18018 March 2021 Issuance of Amendment Nos. 304 and 332 Revise Technical Specification 3.4.7 and 3.4.8 to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem ML20342A3472021-03-0404 March 2021 Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20253A3212021-01-26026 January 2021 Issuance of Amendment Nos. 302 and 330 Revise Technical Specification 3.6.3.1 to Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20310A4102020-12-18018 December 2020 Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20269A3052020-09-29029 September 2020 Issuance of Amendment Nos. 301 and 329 to Revise Technical Specifications to Adopt TSTF-564 (EPID L-2020-LLA-0043) (Non-Proprietary) ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20073F1862020-03-0606 March 2020 Issuance of Amendment Nos. 299 and 327 to Revise Technical Specification 5.6.5b to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2018-LLA-0273) (Redacted) ML19346C7922020-02-0606 February 2020 Issuance of Amendments Nos. 298 and 326 to Modify Technical Specification to Extend Containment Leakage Test Intervals ML19316B0572020-01-0808 January 2020 Issuance of Amendment Nos. 297 and 325 to Modify Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.11 Safety Relief Valves ML19284C8332019-11-21021 November 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19281A3302019-11-21021 November 2019 Issuance of Amendment Nos. 296 and 324 to Adopt Technical Specification Task Force Traveler TSTF-269-A, Revision 2, Allow Administrative Means of Position Verification ML19268A0542019-10-31031 October 2019 Units 1 and 2 - Issuance of Amendment Nos. 295 and 323 to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19254E0762019-10-25025 October 2019 Issuance of Amendment Nos. 294 and 322 to Revise Technical Specification 3.7.4 for Control Room Air Conditioning Subsystems ML19233A0732019-09-23023 September 2019 Issuance of Amendment Nos. 293 and 321 to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19149A4712019-09-17017 September 2019 Issuance of Amendment Nos. 292 and 320, Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML19018A2062019-05-0606 May 2019 Issuance of Amendment Nos. 290 and 318 to Revise Note on Brunswick TS 3.8.3 for One-Time Extension of Main Fuel Oil Storage Tank Completion Time ML19035A0062019-04-22022 April 2019 Issuance of Amendment Nos. 289 and 317 to Relocate the Pressure-Temperature Limits in the Technical Specifications to the Pressure-Temperature Limits Report ML18291B3222019-01-0909 January 2019 Issuance of Amendment Nos. 288 and 316 to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 ML18264A2602019-01-0707 January 2019 Issuance of Amendment Nos. 287 and 315 to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML18243A2982018-09-27027 September 2018 Issuance of Amendment to Modify DC Sources Technical Specification Surveillance Requirement 3.8.4.5 ML18172A2582018-09-18018 September 2018 Non-Proprietary, Issuance of Amendment Regarding Core Flow Operating Range Expansion (Mellla+) ML18197A4302018-08-0909 August 2018 Relief Request ISI-10 to Regarding Alternate Repair of Feedwater Nozzle Dissimilar Metal Welds ML18106B1692018-07-0606 July 2018 Issuance of Amendment Nos. 284 and 312 Regarding Request to Allow Performance-Based Fire Protection Alternative for Thermal Insulation Material ML18124A3052018-05-0909 May 2018 Alternative for ISI-09 Regarding Reactor Pressure Vessel Shell Welds Fourth Ten-Year Inservice Inspection Interval ML18122A2032018-05-0707 May 2018 Relief from the Requirements of the ASME Code, Section XI, ISI-11 Regarding System Leakage Test of Class 1 Piping ML18117A1912018-05-0404 May 2018 Proposed Alternative to Defer Inspection of Reactor Vessel Instrumentation Nozzle 2B11-RPV-N11B Until the First Period in the 5th 10-Year ISI Interval ML18039A4442018-04-13013 April 2018 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2 ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads 2024-07-12
[Table view] Category:Technical Specification
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0110, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-03-25025 March 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-11-0101 November 2021 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-04-0101 April 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20342A3472021-03-0404 March 2021 Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR2020-03-0909 March 2020 Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0157, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2019-03-26026 March 2019 Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time ML18298A0782018-12-0303 December 2018 2nd Correction to Issuance of Amendments to Adopt Technical Specifications Task Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-08-14014 August 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16252A2202016-08-29029 August 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing BSEP 16-0067, Technical Specification Bases, Rev 882016-08-0303 August 2016 Technical Specification Bases, Rev 88 ML16224A2832016-08-0303 August 2016 Technical Specification Bases, Rev 88 BSEP 16-0047, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program2016-06-29029 June 2016 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML12237A0532012-08-14014 August 2012 Technical Specification Bases, Brunswick Steam Electric Plant, Unit 1 - Renewed Facility Operating License DPR-71, Revision 80 BSEP 12-0090, Technical Specification Bases, Brunswick Steam Electric Plant, Unit 2 - Renewed Facility Operating License DPR-62, Revision 762012-08-14014 August 2012 Technical Specification Bases, Brunswick Steam Electric Plant, Unit 2 - Renewed Facility Operating License DPR-62, Revision 76 ML11270A3712011-12-21021 December 2011 Issuance of Amendments Regarding Adoption of TSTF-514 BSEP 10-0057, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report BSEP 10-0052, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report ML0832204692008-10-30030 October 2008 Renewed Facility Operating License, Technical Specification Bases, Revision 60 BSEP 08-0145, Renewed Facility Operating License, Technical Specification Bases, Revision 572008-10-30030 October 2008 Renewed Facility Operating License, Technical Specification Bases, Revision 57 ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 BSEP 08-0082, Request for License Amendment - Adoption of TSTF-475, Revision 1 - Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-06-19019 June 2008 Request for License Amendment - Adoption of TSTF-475, Revision 1 - Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0727101412007-09-27027 September 2007 Tech Spec Pages for Amendments 242 and 270 Related to Main Fuel Oil Storage Tank BSEP 07-0082, Submittal of Technical Specification Bases Revisions2007-08-14014 August 2007 Submittal of Technical Specification Bases Revisions BSEP 07-0080, Request for License Amendment Re Technical Specification 3.3.1.2, Source Range Monitor (SRM) Instrumentation2007-08-13013 August 2007 Request for License Amendment Re Technical Specification 3.3.1.2, Source Range Monitor (SRM) Instrumentation BSEP-07-0064, Request for License Amendments, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program2007-08-0606 August 2007 Request for License Amendments, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program BSEP 07-0058, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-07-17017 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process BSEP 07-0048, Submittal of Technical Specification Bases Revisions2007-05-28028 May 2007 Submittal of Technical Specification Bases Revisions BSEP 06-0129, Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel2007-01-22022 January 2007 Request for License Amendments Regarding Linear Heat Generation Rate and Core Operating Limits Report References for Areva Np Fuel BSEP 06-0101, Submittal of Technical Specification Bases Revisions2006-09-14014 September 2006 Submittal of Technical Specification Bases Revisions BSEP 06-0044, Submittal of Technical Specification Bases Revisions2006-04-13013 April 2006 Submittal of Technical Specification Bases Revisions BSEP 05-0109, Submittal of Technical Specification Bases Revisions2005-08-16016 August 2005 Submittal of Technical Specification Bases Revisions BSEP 05-0094, Request for License Amendments - Appendix J Leakage Rate Testing Instrumentation Accuracy, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program2005-08-11011 August 2005 Request for License Amendments - Appendix J Leakage Rate Testing Instrumentation Accuracy, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program BSEP 05-0102, Request for License Amendment Revised Main Steam Isolation Valve Leakage Limit2005-08-11011 August 2005 Request for License Amendment Revised Main Steam Isolation Valve Leakage Limit ML0518001552005-06-28028 June 2005 Technical Specification Page 3.4-10 Re RCS Ld Instrumentation (Tac No. MC7216, MC7217) ML0518001622005-06-28028 June 2005 Technical Specification Page 3.4-10 RCS Ld Instrumentation (Tac No. MC7216, MC7217) BSEP 05-0082, Submittal of Technical Specification Bases Changes2005-06-22022 June 2005 Submittal of Technical Specification Bases Changes 2023-02-16
[Table view] Category:Amendment
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0110, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-03-25025 March 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML20342A3472021-03-0404 March 2021 Issuance of Amendment Nos. 303 and 331 Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description ML18298A0782018-12-0303 December 2018 2nd Correction to Issuance of Amendments to Adopt Technical Specifications Task Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control RA-18-0079, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-08-14014 August 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 ML16252A2202016-08-29029 August 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML11270A3712011-12-21021 December 2011 Issuance of Amendments Regarding Adoption of TSTF-514 BSEP 10-0052, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report BSEP 10-0057, Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report2010-04-29029 April 2010 Request for License Amendments - Addition of Analytical Methodology Topical Report to Technical Specification 5.6.5, Core Operating Limits Report ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 BSEP 08-0082, Request for License Amendment - Adoption of TSTF-475, Revision 1 - Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process2008-06-19019 June 2008 Request for License Amendment - Adoption of TSTF-475, Revision 1 - Revision of Control Rod Notch Surveillance Test Frequency and a Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process ML0727101412007-09-27027 September 2007 Tech Spec Pages for Amendments 242 and 270 Related to Main Fuel Oil Storage Tank BSEP 07-0080, Request for License Amendment Re Technical Specification 3.3.1.2, Source Range Monitor (SRM) Instrumentation2007-08-13013 August 2007 Request for License Amendment Re Technical Specification 3.3.1.2, Source Range Monitor (SRM) Instrumentation BSEP-07-0064, Request for License Amendments, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program2007-08-0606 August 2007 Request for License Amendments, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program BSEP 05-0102, Request for License Amendment Revised Main Steam Isolation Valve Leakage Limit2005-08-11011 August 2005 Request for License Amendment Revised Main Steam Isolation Valve Leakage Limit BSEP 05-0094, Request for License Amendments - Appendix J Leakage Rate Testing Instrumentation Accuracy, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program2005-08-11011 August 2005 Request for License Amendments - Appendix J Leakage Rate Testing Instrumentation Accuracy, Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program ML0518001552005-06-28028 June 2005 Technical Specification Page 3.4-10 Re RCS Ld Instrumentation (Tac No. MC7216, MC7217) ML0518001622005-06-28028 June 2005 Technical Specification Page 3.4-10 RCS Ld Instrumentation (Tac No. MC7216, MC7217) ML0414003262004-05-17017 May 2004 Enclosure 1, Amendments No. 232 & 259 ML0409000422004-03-26026 March 2004 Issuance of Amendment No. 231, Minimum Critical Power Ratio Safety Limit BSEP 03-0150, Request for License Amendments Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process2003-12-15015 December 2003 Request for License Amendments Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process BSEP 02-0159, Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements2002-11-13013 November 2002 Application for Technical Specification Change Regarding Elimination of Post Accident Sampling System Requirements ML0232602052002-11-0707 November 2002 Request for License Amendment Regarding TS 2.1.1.2, Reactor Core Safety Limits Minimum Critical Power Ratio Safety Limit BSEP 02-0124, Application for Amendment to Licenses DPR-71 & DPR-62 to Revise Technical Specifications Section 3.1.7 to Reflect Modifications as Result of Transition to GE14 Fuel Design2002-07-24024 July 2002 Application for Amendment to Licenses DPR-71 & DPR-62 to Revise Technical Specifications Section 3.1.7 to Reflect Modifications as Result of Transition to GE14 Fuel Design ML0208807632002-03-22022 March 2002 Technical Specification Page (Paper Copy) ML0208106382002-03-19019 March 2002 Technical Specification Pages - Amendment 219 and 245 ML0208002542002-03-14014 March 2002 Technical Specification Pages (Paper) ML0207400562002-03-0808 March 2002 Technical Specifications Pages for Amendment Nos. 217 & 243, Brunswick, Units 1 & 2 ML0207004862002-03-0606 March 2002 Technical Specification Pages for Amendment No. 216 for Brunswick, Unit 1 ML0206706842002-03-0606 March 2002 Issuance of Amendment, Allows One-Time Interval Increase for Type a, Integrated Leakage Rate Test for No More than 3 Years, 2 Months 2023-02-16
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 21, 2011 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461 SUB..BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2-ISSUANCE OF AMENDMENTS REGARDING ADOPTION OF TSTF-514 (TAC NOS.ME6698 AND ME6699)
Dear Mr. Annacone:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 260 to Renewed Facility Operating License No. DPR-71 and Amendment No. 288 to Renewed Facility Operating License No. DPR-62 for Brunswick Steam Electric Plant (BSEP), Units 1 and 2, respectively.
The amendments are in response to your application dated July 12, 2011. The amendments revise BSEP Technical Specifications (TS) 3.4.5, "RCS Leakage Detection Instrumentation;'
consistent with the NRC approved Technical Specification Task Force (TSTF) Standard Technical Specification (STS) Change Traveler TSTF-514, "Revise BWR [Boiling Water Reactor] Operability Requirements and Actions for RCS [Reactor Coolant System] Leakage Instrumentation;'
Revision 3. The availability of this TS improvement was announced in the Federal Register on December 17, 2010 (75 FR 79048) as part of the consolidated line item improvement process. A copy of the related safety evaluation is also enclosed.
A notice of issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, IRA by EBrown fori Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosures:
- 1. Amendment No. 260 to License No. DPR-71 2. Amendment No. 288 to License No. DPR-62 3. Safety Evaluation cc w/encls: Distribution via Listserv UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 260 Renewed License No. DPR-71 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment filed by Carolina Power & Light Company (the licensee), dated July 12, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR) Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
-2 Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and Paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-71 is hereby amended to read as follows: Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 260 are hereby incorporated in the license. Carolina Power I &Light Company shall operate the facility in accordance with the Technical Specifications. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days. FOR THE NUCLEAR REGULATORY COMMISSION Douglas A. Broaddus, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance:
I:Jeceober 21, 2011 ATTACHMENT TO LICENSE AMENDMENT NO. RENEWED FACILITY OPERATING LICENSE NO. DOCKET NO. Replace Page 4 of Renewed Operating License DPR-71 with the attached Page 4. Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove Page Insert Page 3.4-10 3.4-10 Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 260, are hereby incorporated in the license. Carolina Power &Light Company shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203. Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification
4.0.2 shall
apply. Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b Effective July 1, 1982, through July 8, 1982, Action statement "a' of Technical Specification 3.8.1.1 shall read as follows: ACTION: With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining AA sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.aA within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Deleted by Amendment No. 206. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 2;' and "Safeguards Contingency Plan, Revision 2;' submitted by letter dated May 17,2006, and "Guard Training and Qualification Plan, Revision 0;' submitted by letter dated September 30,2004. Renewed License No. DPR-71 Amendment No. 260
RCS Leakage Detection Instrumentation 3.4.5 A CTIONS (continued)
COMPLETION CONDITION REQUIRED ACTION TIME B. Required primary B.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphere primary radioactivity system AND 30 days containment atmosphere radioactivity monitoring system to OPERABLE status. B.2 Restore required primary C.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Only applicable when the primary primary containment containment atmosphere atmosphere.
gaseous radiation monitor is the only OPERABLE monitor. AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C.2 Monitor RCS LEAKAGE by administrative monitoring C. Drywell floor drain sump AND 7 days sump monitoring system to OPERABLE status. C.3 Restore drywell floor drain 12 associated Completion of Condition A. B. or C 0.1 Be in MODE 3.D. Required Action and 0.2 Bein MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR All required detection Brunswick Unit 1 3.4-10 Amendment No. 260 I UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-324 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 AMENDMENT TO RENf:WED FACILITY OPERATING LICENSE Amendment No. 288 Renewed License No. DPR-62 The Nuclear Regulatory Commission (the Commission) has found that: The application for amendment filed by Carolina Power & Light Company (the licensee), dated July 12, 2011, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR) Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment; and Paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-62 is hereby amended to read as follows: Technical Specifications The Technical Specifications contained in Appendix A. as revised through Amendment No. 288 ,are hereby incorporated in the license. Carolina Power &Light Company shall operate the facility in accordance with the Technical Specifications. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days. FOR THE NUCLEAR REGULATORY COMMISSION Douglas A. Broaddus, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Operating License and Technical Specifications Date of Issuance:
.Decenber 21, 2011 ATTACHMENT TO LICENSE AMENDMENT NO. RENEWED FACILITY OPERATING LICENSE NO. DOCKET NO. Replace Page 3 of Renewed Operating License DPR-62 with the attached Page 3. Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change. Remove Page Insert Page 3.4-10 3.4-10 as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical of physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) Pursuant to the Act and 10 CFR Parts 30 and 70 to posses, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No.2 (6) Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 288, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance.
with the Technical Specifications.
Renewed License No. DPR-62 Amendment No. 288 RCS Leakage Detection Instrumentation 3.4.5 A CTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. Required primary containment atmosphere radioactivity monitoring system inoperable.
B.1 AND Analyze grab samples of primary containment atmosphere.
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 8.2 Restore required primary containment atmosphere radioactivity monitoring system to OPERABLE status. 30 days Only applicable when the primary containment atmosphere gaseous radiation monitor is the only OPERABLE monitor. -----_.......
C. Drywell floor drain sump monitoring system inoperable.
C.1 AND C.2 AND C.3 Analyze grab samples of primary containment atmosphere.
Monitor ReS LEAKAGE by administrative means. Restore drywell floor drain sump monitoring system to OPERABLE status. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 7 days D. Required Action and associated Completion Time of Condition A, B, or C not met. D.1 AND Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR All required leakage detection systems inoperable.
D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Brunswick Unit 2 3.4-10 Amendment No 288 I UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 260 AND 288 TO RENEWED FACILITY OPERATING LICENSES NOS. DPR-71 AND DPR-62 CAROLINA POWER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324
1.0 INTRODUCTION
By letter dated July 12, 2011 (Agencywide Documents Access and Management System Accession No. ML 11208B626), Carolina Power & Light Company (the licensee), proposed changes to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2. The proposed changes revise TS 3.4.5, "RCS [Reactor Coolant System] Leakage Detection Instrumentation;'
and include TS Bases changes that summarize and clarify the purpose of the TS and the specified safety function of the leakage detection monitors.
The licensee stated that the license amendment request is consistent with Nuclear Regulatory Commission (NRC)-approved Revision 3 to Technical Specification Task Force (TSTF) Standard Technical Specification (STS) Change Traveler TSTF-514, "Revise BWR [Boiling Water Reactor] Operability Requirements and Actions for RCS Leakage Instrumentation:'
The availability of this TS improvement was announced in the Federal Register on December 17, 2010 (75 FR 79048) as part of the consolidated line item improvement process.
2.0 REGULATORY EVALUATION
The NRCs regulatory requirements related to the content of the TS are contained in Title 10 of the Code of Federal Regulations (10 CFR), Section 50.36. Paragraph (c)(2)(i) of 10 CFR 50.36 states that limiting conditions for operation (LCOs) are the lowest functional capability or performance levels of equipment required for safe operation of the facility.
Paragraph (c)(2)(ii) of 10 CFR 50.36 lists four criteria for determining whether particular items are required to be included in the TS LCOs. Criterion 1 applies to installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary (RCPB). As described in the Federal Register notice associated with this regulation (60 FR 36953, July 19, 1995), the scope of TS includes two general classes of technical matters: (1) those related to prevention of accidents, and (2) those related to mitigation of the consequences of accidents.
Criterion 1 addresses systems and process variables that alert the operator to a situation when accident initiation is more likely, and supports the first of these two general classes of technical matters which are included in TS. As specified in Paragraph (c)(2)(i) of 10 CFR 50.36, when an LCO of a nuclear reactor is not met, the licensee Enclosure
-shall shut down the reactor or follow any remedial action permitted by the TSs until the can be The NRC's guidance for the format and content of BWR TS can be found in Revision 3.0, "Standard Technical Specifications General Electric Plants, BWR/4." STS 3.4.6 "RCS Leakage Detection Instrumentation," in NUREG-1433, contains the specific to the RCS leakage detection instrumentation for The Bases for STS 3.4.6 contained in NUREG-1433, Revision 3.0, provide information, the applicable safety analyses, a description of the LCO, the applicability for RCS leakage detection instrumentation TS, and describe the Actions and Requirements.
The TS Bases provide the purpose or reason for the TS which are derived the analyses and evaluation included in the safety analysis report, and for these the RCS leakage detection instrumentation design assumptions and licensing basis for As stated in NRC Information Notice (IN) 2005-24, "Nonconservatism in Leakage Sensitivity," the reactor coolant activity assumptions for primary atmosphere gaseous radioactivity monitors may be non-conservative.
This means the may not be able to detect a 1 gallon per minute (gpm) leak within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> under all operating The issue described in IN 2005-24 has raised questions regarding operability requirements primary containment/drywell atmosphere gaseous radioactivity monitors.
Revision 3, revises the TS Bases to summarize the proposed TS changes and more describe the contents of the facility design basis related to operability of the RCS detection instrumentation.
Part of the TS Bases changes revises the specified safety function the RCS leakage detection monitors to specify the required instrument sensitivity level. addition, TSTF-514, Revision 3, includes a new TS Condition for RCS leakage instrumentation to establish Required Actions for operation during conditions of monitoring sensitivity because the gaseous radioactivity instrumentation is the only The regulation at 10 CFR Part 50, Appendix A, General Design Criterion (GDC)-30, "Quality Reactor Coolant Pressure Boundary," requires means for detecting and, to the extent identifying the location of the source of RCS leakage. Regulatory Guide (RG) 1.45, Revision "Reactor Coolant Pressure Boundary Leakage Detection Systems," May 1973, acceptable methods of implementing the GDC-30 requirements with regard to the selection leakage detection systems for the RG 1.45, Revision 0, Regulatory Position C.2, states that "Leakage to the primary containment from unidentified sources should be collected and the flow rate monitored with accuracy of one gallon per minute (gpm) or RG 1.45, Revision 0, Regulatory Position C.3 At least three separate detection methods should be employed and two of these methods should be (1) sump level and flow monitoring and (2) airborne
-3 particulate radioactivity monitoring.
The third method may be selected from the following: monitoring of condensate flow rate from air coolers [or] monitoring of airborne gaseous radioactivity.
Humidity, temperature, or pressure monitoring of the containment atmosphere should be considered as alarms or indirect indication of leakage to the containment.
RG 1.45, Revision 0, Regulatory Position C.5 states, "The sensitivity and response time of each leakage detection system in regulatory position 3 above employed for unidentified leakage should be adequate to detect a leakage rate, or its equivalent, of one gpm in less than one hour." RG 1.45, Revision 0, states, "In analyzing the sensitivity of leak detection systems using airborne particulate or gaseous radioactivity, a realistic primary coolant radioactivity concentration assumption should be used. The expected values used in the plant environmental report would be acceptable." The appropriate sensitivity of a plant's primary containment/drywell atmosphere gaseous radioactivity monitors is dependent on the design assumptions and the plant-specific licensing basis as described in the plant's final safety analysis report (FSAR). The NRC staff's approval of the use of expected primary coolant radioactivity concentration values used in the environmental report creates a potential licensing conflict when a licensee is able to achieve and maintain primary coolant radioactivity concentration values lower than the value assumed in the environmental report. RG 1.45, Revision 1, "Guidance on Monitoring and Responding to Reactor Coolant System Leakage," was issued in May 2008. RG 1.45, Revision 1, describes methods for implementing the GDC 30 requirements that are different from those in RG 1.45, Revision 0, and was developed and issued to support new reactor licensing.
Revision 1 allows that having two TS leakage detection methods capable of detecting a one gpm leak within one hour provides adequate leakage detection capability from a safety perspective.
It recommends that other potential indicators (including the gaseous radiation monitors) be maintained even though they may not have the same detection capability.
These indicators, in effect, provide additional defense-in-depth.
The licensee states: The BSEP design was reviewed for construction under the "General Design Criteria for Nuclear Power Plant Construction" issued for comment by the Atomic Energy Commission in July 1967 and is committed to meet the intent of the General Design Criteria (GDC), published in the Federal Register on May 21, 1971, as Appendix A to 10 CFR Part 50. Criterion 30, "Quality of reactor coolant pressure boundary," requires that means be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage. BSEP is currently committed to Regulatory Guide (RG) 1.45, "Reactor Coolant Pressure Boundary Leakage Detection Systems," Revision 0, May 1973. Section 5.2.5, "Detection of Leakage Through Reactor Coolant System Boundary," of the BSEP Updated Final Safety Analysis Report (UFSAR) provides details associated with the leakage detection systems in use at BSEP.
-BSEP UFSAR Section 3.1.2.4.1, "Criterion 30 -Quality of reactor coolant Pressure Boundary" states: Criterion Components which are part of the RCPB shall be designed, fabricated, erected, and tested to the highest quality standards practical.
Means shall be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage. Compliance ASME [American Society of Mechanical Engineers]
and ANSI [American Nuclear Standard Institute]
Codes are used as the established and accepted criteria for design, fabrication, and operation of components of the RCPB. The RCPB was designed and fabricated to meet the following codes: Reactor vessel: 1965 ASME Boiler and Pressure Vessel Code,Section III, Nuclear Vessels, Subsection A with Addenda to Summer 1967 Pumps: As required by CP&L's specifications Valves: ANSI B16.5 for design Piping: ANSI B31.1.0-1967, Code for Pressure Piping, Power Piping. CP&L has also provided for compliance with ANSI B31.7.0 (with minor exceptions; for example, third party inspection is not performed) although this was not then an AEC requirement The pressure boundary devices are listed in Section 3.2.2 along with the appropriate codes and standards governing their design. The components of the RCPB are discussed in Chapter 5. BSEP UFSAR, Section 5.2.5, provides a description of the leakage detection devices associated with the reactor coolant pressure boundary.
BSEP UFSAR, Section 5.2.5.2.4.1, "Detection of Leakage Inside Drywell," states: Since the systems within the drywell share a common area, their leakage detection systems are necessarily common. Each of the leakage detection systems inside the drywell is designed with a capability to detect leakage less than established leakage rate limits. Leaks within the primary containment are detected by: Monitoring pressure and temperature in the drywell Monitoring the flow in the equipment drain and the floor drain sumps Monitoring the cooling water temperature to and from the primary containment atmosphere coolers Monitoring the reactor water level
-Note that BSEP is not committed to RG 1.45, Revision 1. 3.0 TECHNICAL EVALUATION In adopting the changes to TS included in TSTF-514, Revision 3, the licensee proposed to revise TS 3.4.5, "RCS Leakage Detection Instrumentation," Conditions and Required Actions. The licensee proposed adding new Condition C to TS 3.4.5. New Condition C would be applicable when the primary containment atmosphere gaseous radioactivity monitoring system is the only operable RCS leakage detection monitor. This new Condition is necessary because improved fuel integrity and the resulting lower primary coolant radioactivity concentration affect the response of a plant's primary containment atmosphere gaseous radioactivity monitor to a greater extent than the response of other RCS leakage detection monitors to leakage radioactivity.
The proposed Required Actions for new Condition C require the licensee to analyze grab samples of the primary containment atmosphere once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, restore the drywell floor drain sump monitoring system to Operable status within 7 days, and monitor RCS leakage by administrative means once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Administrative means of monitoring RCS leakage include trending parameters that may indicate an increase in RCS leakage. There are diverse alternative methods from which appropriate indicators for identifying RCS leakage may be selected based on plant conditions.
CP&L will utilize the following methods considering the current plant conditions and historical or expected sources of unidentified leakage, as their TS administrative means: drywell pressure, drywell temperature, reactor building closed cooling water system cooling water temperature to and from the primary containment atmosphere coolers, and reactor water level. The NRC staff determined that the proposed Condition C is more restrictive than the current requirement, because there is no current TS Condition for the plant condition of the primary containment atmosphere gaseous radioactivity monitoring system being the only operable RCS leakage detection monitor. The associated proposed Actions and Completion Times are adequate because monitoring the RCS by administrative means, coupled with primary containment atmospheric grab samples, are sufficient to alert the operating staff to an unexpected increase in unidentified leakage. The primary containment atmospheric grab samples provide a method of detecting particulate and gaseous radioactive material in the drywell atmosphere.
However, taking frequent grab samples will ensure there is no significant loss of monitoring capability during the Required Action Completion Time. The 12-hour interval is reasonable given the availability of the primary containment atmospheric gaseous radiation monitor. Allowing 7 days to restore another RCS leakage monitor to operable status is reasonable given the diverse methods employed in the Required Actions to detect an RCS leak and the low probability of a large RCS leak during this period. Proposed Condition C is conservative relative to the STS, sufficiently alerts the operating staff, provides a comparable ability to detect RCS leakage, and provides time intervals that are reasonable.
Therefore, the NRC staff determined that proposed Condition C provides an adequate assurance of safety when judged against current regulatory standards.
The licensee proposed minor changes to ensure continuity of the TS format. The licensee changes the current "Condition C," including its associated "Required Action" and "Completion
-6 Time" to "Condition D" when inserting new Condition C. The NRC staff determined that these changes are editorial, and therefore acceptable.
In adopting TSTF-514, Revision 3, the licensee proposed changes that would revise the Bases for TS 3.4.5 to reflect the proposed TS changes and more accurately describe the contents of the facility design basis related to operability of the RCS leakage detection instrumentation and reflect the proposed TS changes. The regulation at 10 CFR 50.36(a)(1) requires a summary statement of the TS Bases or reasons for such specifications be included with the application.
The proposed TS Bases changes related to operability of the RCS leakage detection instrumentation are acceptable because they are consistent with the design basis of the facility and provide: background information, applicable safety analyses, a description of the limiting condition for operation, and the applicability for the RCS leakage detection instrumentation TS. These instruments satisfy Criterion 1 of 10 CFR 50.36(c)(2)(ii) in that they are installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the RCPB. The NRC staff evaluated the licensee's proposed changes against the applicable regulatory requirements listed in Section 2 of this safety evaluation.
The NRC staff also compared the proposed changes to the changes made to the STS by TSTF-514, Revision 3. The NRC staff determined that all the proposed changes afford adequate assurance of safety when judged against current regulatory standards.
Therefore, the NRC staff finds the proposed changes acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the State of North Carolina official was notified of the proposed issuance of the amendments.
The State Official had no comments.
5.0 ENVIRONMENTAL
CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (September 6, 2011; 76 FR 55127). The amendment also relates to changes in the format of the license or permit or otherwise makes editorial, corrective or minor revisions, including the updating of NRC-approved references.
Accordingly the amendment meets the eligibility criteria for categorical exclusion setforth in 10 CFR 51.22(c}(9) and 10 CFR 51.22(c)(10).
Pursuantto 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by
-7 operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
Melana Singletary Date: December 21,2011 December 21,2011 Mr. Michael J. Annacone, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Box 10429 Southport, North Carolina 28461 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 -ISSUANCE OF AMENDMENTS REGARDING ADOPTION OF TSTF-514 (TAC NOS.ME6698 AND ME6699)
Dear Mr. Annacone:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 260 to Renewed Facility Operating License No. DPR-71 and Amendment No. 288 to Renewed Facility Operating License No. DPR-62 for Brunswick Steam Electric Plant (BSEP), Units 1 and 2, respectively.
The amendments are in response to your application dated July 12, 2011. The amendments revise BSEP Technical Specifications (TS) 3.4.5, "RCS Leakage Detection Instrumentation," consistent with the NRC approved Technical Specification Task Force (TSTF) Standard Technical Specification (STS) Change Traveler TSTF-514, "Revise BWR [Boiling Water Reactor] Operability Requirements and Actions for RCS [Reactor Coolant System] Leakage Instrumentation," Revision 3. The availability of this TS improvement was announced in the Federal Register on December 17, 2010 (75 FR 79048) as part of the consolidated line item improvement process. A copy of the related safety evaluation is also enclosed.
A notice of issuance will be included in the Commission's biweekly Federal Register notice. Sincerely, IRA by EBrown fori Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosures:
- 1. Amendment No. 260 to License No. DPR-71 2. Amendment No. 288 to License No. DPR-62 3. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION: