UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. William R. Gideon Site Vice President Brunswick Steam Electric Plant 8470 River Road, SE M/C BNP001 Southport, NC 28461 February 29, 2016

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - CORRECTION TO SIGNATURE FOR LICENSE AMENDMENT NOS. 268 AND 296 REGARDING EMERGENCY ACTION LEVEL SCHEME UPGRADE (CAC NOS. MF5766 AND MF5767)

Dear Mr. Gideon:

On January 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 268 and 296 to Renewed Facility Operating License Nos. DPR-71 and DPR-62, respectively, for the Brunswick Steam Electric Plant, Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML15344A153). These amendments were in response to your application dated January 30, 2015, as supplemented by letter dated November 23, 2015. These amendments revised the emergency action level scheme for both units based on Nuclear Energy Institute (NEI) 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," dated November 2012. NEI 99-01, Revision 6, was endorsed by the NRC by letter dated March 28, 2013.

After issuance of the amendments, we found that the approval signature authority was incorrect.

Thus, we have obtained the proper signature on the license amendments. We ask that you please refer to the revised enclosures 1 and 2 provided with this letter.

We regret any inconvenience this may have caused. If you have any questions, please contact me at (301) 415-8480 or Andrew.Hon@nrc.gov.

Docket Nos. 50-324 and 50-325

Enclosures:

Corrected License Amendments cc: Listserv Sincerely, 1/-._

Andrew L. Hon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY PROGRESS. INC.

DOCKET NO. 50-325 BRUNSWICK STEAM ELECTRIC PLANT. UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 268 Renewed License No. DPR-71

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duke Energy Progress, Inc., dated January 30, 2015, as supplemented by letter dated November 23, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-71 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 268, are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 180 days from the date of issuance.

Attachment:

Changes to the Renewed Facility Operating License D~e:February 29, 2016 FOR THE NUCLEAR REGULA TORY COMMISSION (c)

Transition License Conditions

1. Before achieving full compliance with 10 CFR 50.481, as specified by 2. Below, risk-informed changes to the licensee's fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. Above.
2. The licensee shall implement the modifications to its facility, as described in Table S-1, "Plant Modifications Committed," of Duke letter BSEP 14-0122, dated November 20, 2014, to complete the transition to full compliance with 10 CFR 50.481 by the startup of the second refueling outage for each unit after issuance of the safety evaluation. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
3. The licensee shall complete all implementation items, except item 9, listed in LAR Attachment S, Table S-2, "Implementation Items," of Duke letter BSEP 14-0122, dated November 20, 2014, within 180 days after NRC approval unless the 1801h day falls within an outage window; then, in that case, completion of the implementation items, except item 9, shall occur no later than 60 days after startup from that particular outage. The licensee shall complete implementation of LAR Attachment S, Table S-2, Item 9, within 180 days after the startup of the second refueling outage for each unit after issuance of the safety evaluation.

B. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 268, are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of Renewed License No. DPR-71 Amendment No. 268

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 DUKE ENERGY PROGRESS, INC.

DOCKET NO. 50-324 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 296 Renewed License No. DPR-62

1.

The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duke Energy Progress, Inc., dated January 30, 2015, as supplemented by letter dated November 23, 2015, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 1 O CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-62 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 296, are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 180 days from the date of issuance.

Attachment:

Changes to the Renewed Facility Operating License D~ed:February 29, 2016 William M. Dean, Director Office of Nuclear Reactor Regulation (c)

Transition License Conditions

1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. below, risk-informed changes to the licensee's fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
2. The licensee shall implement the modifications to its facility, as described in Table S-1, "Plant Modifications Committed," of Duke letter BSEP 14-0122, dated November 20, 2014, to complete the transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage for each unit after issuance of the safety evaluation. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
3. The licensee shall complete all implementation items, except Item 9, listed in LAR Attachment S, Table S-2, "Implementation Items," of Duke letter BSEP 14-0122, dated November 20, 2014, within 180 days after NRC approval unless the 180th day falls within an outage window; then, in that case, completion of the implementation items, except item 9, shall occur no later than 60 days after startup from that particular outage. The licensee shall complete implementation of LAR Attachment S, Table S-2, Item 9, within 180 days after the startup of the second refueling outage for each unit after issuance of the safety evaluation.
1. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 296, are hereby incorporated in the license. Duke Energy Progress, Inc. shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 233 to Renewed Facility Operating License DPR-62, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 233. For SRs that existed prior to Amendment 233, Renewed License No. DPR-62 Amendment No. 296

ML16049A228 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DORL/LPL2-2/BC NAME AH on BClayton BBeasley (LRonewicz for)

DATE 2/18/2016 2/18/2016 2/19/2016 RidsNrrDorlDpr LRonewicz, NRR RidsNrrPMBrunswick RidsNrrDorl DORL/D NRR/D ABoland WDean 2/22/2016 2/29/2016