ML051800162

From kanterella
Jump to navigation Jump to search

Technical Specification Page 3.4-10 RCS Ld Instrumentation (Tac No. MC7216, MC7217)
ML051800162
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/28/2005
From:
NRC/NRR/DLPM/LPD2
To:
Carolina Power & Light Co
Mozafari B,NRR/DLPM, 415-2020
Shared Package
ML051790286 List:
References
TAC MC7216, TAC MC7217
Download: ML051800162 (1)


Text

RCS Leakage Detection Instrumentation 3.4.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required primary B.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphere primary containment radioactivity monitoring atmosphere.

system Inoperable.

AND B.2 Restore required primary 30 days containment atmosphere radioactivity monitoring system to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or B not met. AND OR C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> All required leakage detection systems inoperable.

Brunswick Unit 2 3.4-10 Amendment No. 265 1