BSEP 07-0082, Submittal of Technical Specification Bases Revisions
| ML072330074 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/14/2007 |
| From: | Ivey R Progress Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BSEP 07-0082 | |
| Download: ML072330074 (21) | |
Text
Progress Energy AUG 1 42007 SERIAL: BSEP 07-0082 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324/License Nos. DPR-71 and DPR-62 Submittal of Technical Specification Bases Revisions Ladies and Gentlemen:
In accordance with Technical Specification (TS) 5.5.10 for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2, Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., is submitting Revision 51 to the BSEP, Unit I TS Bases and Revision 49 to the BSEP, Unit 2 TS Bases.
No regulatory cormitments are contained in this letter. Please refer any questions regarding this submittal to Ms. Annette HI Pope, Supervisor - Licensing/Regulatory Programs, at (910) 457-2184.
Sincerely, Randy C. Ivey Manager - Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Brunswick Nuclear Plant PO Box 10429 Southport, NC 28461
Document Control Desk BSEP 07-0082 / Page 2 WRM/wrm
Enclosures:
- 1. Summary of Revisions to Technical Specification Bases
- 2. Page Replacement Instructions
- 3. Unit 1 Technical Specification Bases Replacement Pages
- 4. Unit 2 Technical Specification Bases Replacement Pages cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Joseph D. Austin, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Mr. Stewart N. Bailey (Mail Stop OWFN 8B1) 11555 Rockville Pike Rockville, MD 20852-2738 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Ms. Beverly 0. Hall, Section Chief Radiation Protection Section, Division of Environmental Health North Carolina Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7221
BSEP 07-0082 Page 1 of I Summary of Revisions to Technical Specification (TS) Bases Affected Revision' Unit Date Implemented Title/Description 51 1
July 25, 2007
Title:
Correction to the Main Diesel Fuel Oil 49 2
Storage Tank Volume Equation
==
Description:==
Revision 51 for Unit I and 49 for Unit 2 incorporated a correction to the equation in the bases for Surveillance Requirement (SR) 3.8.3.1 for calculating fuel oil inventory.
Revision 51 for Unit I incorporated change package TSB-2007-04.
Revision 49 for Unit 2 incorporated change package TSB-2007-04.
BSEP 07-0082 Page 1 of 2 Page Replacement Instructions -Unit
- 1 Remove insert Umtl1 Bases Book. 1 Title Page, Revision 50 Title Page, Revision 51 LOEP-1, Revision 50 LOEP-1, Revision 51 Unitl-Bases Book 2 LOEP-1, Revision 49 LOEP-1, Revision 51 LOEP-4, Revision 31 LOEP-3, Revision 51 B 3.8.3-5, Revision 31 B 3.8.3-5, Revision 51
BSEP 07-0082 Page 2 of 2 Page Replacement Instructions - Unit 2 Remove Insert Unit 2 - Bases Book I Title Page, Revision 48 Title Page, Revision 49 LOEP-1, Revision 48 LOEP-1, Revision 49 Unit 2 - Bases Book 2 LOEP-1, Revision 46 LOEP-1, Revision 49 LOEP-4, Revision 30 LOEP-4, Revision 49 B 3.8.3-5, Revision 30 B 3.8.3-5, Revision 49
BSEP 07-0082 Unit 1 Technical Specification Bases Replacement Pages
Unit 1 - Bases Book 1 Replacement Pages
Technical Specification Bases Brunswick Steam Electric Plant, Unit No. 1 Renewed Facility Operating License DPR-71 Revision 51 SProgress Energy
LIST OF EFFECTIVE PAGES - BASES Page No.
Title Page Revision No.
51 List of Effective Pages - Book 1 LOEP-1 LOEP-2 LOEP-3 LOEP-4 ii B 2.1.1-1 B 2.1.1-2 B 2.1.1-3 B 2.1.1-4 B 2.1.1-5 B 2.1.2-1 B 2.1.2-2 B 2.1.2-3 B 3.0-1 B 3.0-2 B 3.0-3 B 3.0-4 B 3.0-5 B 3.0-6 B 3.0-7 B 3.0-8 B 3.0-9 B 3.0-10 B 3.0-11 B 3.0-12 B 3.0-13 B 3.0-14 B 3.0-15 B 3.0-16 B 3.0-17 B 3.0-18 B 3.1.1-1 B 3.1.1-2 B 3.1.1-3 B 3.1.1-4 51 36 44 45 50 31 31 31 31 31 31 31 31 31 50 31 31 31 41 41 41 41 41 50 50 50 50 50 50 50 50 50 31 31 31 31 Page No.
B 3.1.1-5 B 3.1.1-6 B 3.1.2-1 B 3.1.2-2 B 3.1.2-3 B 3.1.2-4 B 3.1.2-5 B 3.1.3-1 B 3.1.3-2 B 3.1.3-3 B 3.1.3-4 B 3.1.3-5 B 3.1.3-6 B 3.1.3-7 B 3.1.3-8 B 3.1.3-9 B 3.1.4-1 B 3.1.4-2 B 3.1.4-3 B 3.1.4-4 B 3.1.4-5 B 3.1.4-6 B 3.1.4-7 B 3.1.5-1 B 3.1.5-2 B 3.1.5-3 B 3.1.5-4 B 3.1.5-5 B 3.1.6-1 B 3.1.6-2 B 3.1.6-3 B 3.1.6-4 B 3.1.6-5 B 3.1.7-1 B 3.1.7-2 B 3.1.7-3 B 3.1.7-4 B 3.1.7-5 B 3.1.7-6 B 3.1.8-1 B 3.1.8-2 B 3.1.8-3 B 3.1.8-4 B 3.1.8-5 Revision No.
31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 42 31 31 31 31 31 31 31 31 31 31 31 31 34 31 31 31 31 34 31 37 37 31 31 I
I (continued)
Brunswick Unit 1 LOEP-1 Revision 51 1
Unit 1 - Bases Book 2 Replacement Pages
LIST OF EFFECTIVE PAGES - BASES Page No.
Revision No.
Page No.
Revision No.
List of Effective Pages - Book 2 B 3.4.7-5 41 B 3.4.8-1 31 LOEP-1 51 B 3.4.8-2 31 LOEP-2 47 B 3.4.8-3 31 LOEP-3 48 B 3.4.8-4 31 LOEP-4 51 B 3.4.8-5 31 LOEP-5 31 B 3.4.9-1 31 B 3.4.9-2 38 i
31 B 3.4.9-3 38 ii 31 B 3.4.9-4 31 B 3.4.9-5 38 B 3.4.1-1 31 B 3.4.9-6 38 B 3.4.1-2 31 B 3.4.9-7 31 B 3.4.1-3 31 B 3.4.9-8 31 B 3.4.1-4 31 B 3.4.9-9 38 B 3.4.1-5 31 B 3.4.10-1 31 B 3.4.1-6 31 B 3.4.10-2 31 B 3.4.2-1 31 B 3.4.2-2 31 B 3.5.1-1 31 B 3.4.2-3 31 B 3.5.1-2 31 B 3.4.2-4 31 B 3.5.1-3 31 B 3.4.3-1 31 B 3.5.1-4 36 B 3.4.3-2 31 B 3.5.1-5 36 B 3.4.3-3 31 B 3.5.1-6 41 B 3.4.3-4 31 B 3.5.1-7 31 B 3.4.4-1 31 B 3.5.1-8 31 B 3.4.4-2 31 B 3.5.1-9 31 B 3.4.4-3 31 B 3.5.1-10 31 B 3.4.4-4 31 B 3.5.1-11 31 B 3.4.4-5 31 B 3.5.1-12 31 B 3.4.5-1 31 B 3.5.1-13 31 B 3.4.5-2 31 B 3.5.1-14 44 B 3.4.5-3 43 B 3.5.1-15 44 B 3.4.5-4 41 B 3.5.1-16 31 B 3.4.6-1 41 B 3.5.1-17 31 B 3.4.6-2 41 B 3.5.2-1 31 B 3.4.6-3 41 B 3.5.2-2 31 B 3.4.7-1 31 B 3.5.2-3 31 B 3.4.7-2 31 B 3.5.2-4 31 B 3.4.7-3 41 B 3.5.2-5 31 B 3.4.7-4 41 B 3.5.2-6 31 B 3.5.3-1 31 B 3.5.3-2 41 (continued)
Brunswick Unit 1 LOEP-1 Revision 51 1
LIST OF EFFECTIVE PAGES - BASES (continued)
Page No.
B 3.8.2-6 B 3.8.2-7 B 3.8.3-1 B 3.8.3-2 B 3.8.3-3 B 3.8.3-4 B 3.8.3-5 B 3.8.3-6 B 3.8.3-7 B 3.8.3-8 B 3.8.4-1 B 3.8.4-2 B 3.8.4-3 B 3.8.4-4 B 3.8.4-5 B 3.8.4-6 B 3.8.4-7 B 3.8.4-8 B 3.8.4-9 B 3.8.4-10 B 3.8.4-11 B 3.8.5-1 B 3.8.5-2 B 3.8.5-3 B 3.8.5-4 B 3.8.5-5 B 3.8.6-1 B 3.8.6-2 B 3.8.6-3 B 3.8.6-4 B 3.8.6-5 B 3.8.6-6 B 3.8.6-7 B 3.8.7-1 B 3.8.7-2 B 3.8.7-3 B 3.8.7-4 B 3.8.7-5 B 3.8.7-6 B 3.8.7-7 B 3.8.7-8 Revision No.
31 31 31 31 31 31 51 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 Page No.
B 3.8.7-9 B 3.8.7-10 B 3.8.7-11 B 3.8.7-12 B 3.8.7-13 B 3.8.7-14 B 3.8.7-15 B 3.8.8-1 B 3.8.8-2 B 3.8.8-3 B 3.8.8-4 B 3.8.8-5 B 3.9.1-1 B 3.9.1-2 B 3.9.1-3 B 3.9.1-4 B 3.9.2-1 B 3.9.2-2 B 3.9.2-3 B 3.9.2-4 B 3.9.3-1 B 3.9.3-2 B 3.9.3-3 B 3.9.4-1 B 3.9.4-2 B 3.9.4-3 B 3.9.4-4 B 3.9.5-1 B 3.9.5-2 B 3.9.5-3 B 3.9.6-1 B 3.9.6-2 B 3.9.6-3 B 3.9.7-1 B 3.9.7-2 B 3.9.7-3 B 3.9.7-4 B 3.9.8-1 B 3.9.8-2 B 3.9.8-3 B 3.9.8-4 Revision No.
31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 I
(continued)
Brunswick Unit 1 LOEP-4 Revision 51 1
Diesel Fuel Oil B 3.8.3 BASES ACTIONS D.1 (continued)
With a Required Action and associated Completion Time of Condition A, B, or C not met, or the stored diesel fuel oil not within limits for reasons other than addressed by Conditions A, B, or C, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate inventory of fuel oil in the storage tanks to support each DG's operation for approximately 7 days at rated load. The approximate 7 day period is sufficient time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsite location. For the purposes of this SR, the verification of the main fuel oil storage tank fuel oil volume is performed on a per DG basis. This per DG volume is obtained using the following equation:
MVOL - UVOL where MVOL measured fuel oil volume of the main fuel oil storage tank, UvoL
=
unusable fuel oil volume of the main fuel oil storage tank, and NDG
=
number of DGs required to be OPERABLE.
The results from this equation must be > 20,850 gallons in order to satisfy the acceptance criteria of SR 3.8.3.1.b.
The 31 day Frequency is adequate to ensure that a sufficient supply of fuel oil is available, since low level alarms are provided and unit operators would be aware of any large uses of fuel oil during this period.
(continued)
Brunswick Unit 1 B 3.8.3-5 Revision No. 51 I
BSEP 07-0082 Unit 2 Technical Specification Bases Replacement Pages
Unit 2 - Bases Book 1 Replacement Pages
Technical Specification Bases Brunswick Steam Electric Plant, Unit No. 2 Renewed Facility Operating License DPR-62 Revision 49 9 Progress Energy
LIST OF EFFECTIVE PAGES - BASES Page No.
Revision No.
Title Page 49 List of Effective Pages - Book 1 LOEP-1 49 LOEP-2 47 LOEP-3 42 LOEP-4 43 i
48 ii 30 B 2.1.1-1 30 B 2.1.1-2 30 B 2.1.1-3 30 B 2.1.1-4 30 B 2.1.1-5 30 B 2.1.2-1 30 B 2.1.2-2 30 B 2.1.2-3 30 B 3.0-1 48 B 3.0-2 30 B 3.0-3 30 B 3.0-4 30 B 3.0-5 39 B 3.0-6 39 B 3.0-7 39 B 3.0-8 39 B 3.0-9 39 B 3.0-10 48 B 3.0-11 48 B 3.0-12 48 B 3.0-13 48 B 3.0-14 48 B 3.0-15 48 B 3.0-16 48 B 3.0-17 48 B 3.0-18 48 B 3.1.1-1 30 B 3.1.1-2 30 B 3.1.1-3 30 B 3.1.1-4 30 Page No.
B 3.1.1-5 B 3.1.1-6 B 3.1.2-1 B 3.1.2-2 B 3.1.2-3 B 3.1.2-4 B 3.1.2-5 B 3.1.3-1 B 3.1.3-2 B 3.1.3-3 B 3.1.3-4 B 3.1.3-5 B 3.1.3-6 B 3.1.3-7 B 3.1.3-8 B 3.1.3-9 B 3.1.4-1 B 3.1.4-2 B 3.1.4-3 B 3.1.4-4 B 3.1.4-5 B 3.1.4-6 B 3.1.4-7 B 3.1.5-1 B 3.1.5-2 B 3.1.5-3 B 3.1.5-4 B 3.1.5-5 B 3.1.6-1 B 3.1.6-2 B 3.1.6-3 B 3.1.6-4 B 3.1.6-5 B 3.1.7-1 B 3.1.7-2 B 3.1.7-3 B 3.1.7-4 B 3.1.7-5 B 3.1.7-6 B 3.1.8-1 B 3.1.8-2 B 3.1.8-3 B 3.1.8-4 B 3.1.8-5 Revision No.
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 40 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 34 34 30 30 (continued)
Brunswick Unit 2 LOEP-1 Revision 49 1
Unit 2 - Bases Book 2 Replacement Pages
LIST OF EFFECTIVE PAGES - BASES Page No.
Revision No.
Title Page N/A List of Effective Pages - Book 2 LOEP-1 49 LOEP-2 45 LOEP-3 46 LOEP-4 49 LOEP-5 30 i
30 ii 30 B 3.4.1-1 30 B 3.4.1-2 30 B 3.4.1-3 30 B 3.4.1-4 30 B 3.4.1-5 30 B 3.4.1-6 30 B 3.4.2-1 30 B 3.4.2-2 30 B 3.4.2-3 30 B 3.4.2-4 30 B 3.4.3-1 30 B 3.4.3-2 30 B 3.4.3-3 30 B 3.4.3-4 30 B 3.4.4-1 30 B 3.4.4-2 30 B 3.4.4-3 30 B 3.4.4-4 30 B 3.4.4-5 30 B 3.4.5-1 30 B 3.4.5-2 30 B 3.4.5-3 41 B 3.4.5-4 39 B 3.4.6-1 39 B 3.4.6-2 39 B 3.4.6-3 39 B 3.4.7-1 30 B 3.4.7-2 30 B 3.4.7-3 39 Page No.
B 3.4.7-4 B 3.4.7-5 B 3.4.8-1 B 3.4.8-2 B 3.4.8-3 B 3.4.8-4 B 3.4.8-5 B 3.4.9-1 B 3.4.9-2 B 3.4.9-3 B 3.4.9-4 B 3.4.9-5 B 3.4.9-6 B 3.4.9-7 B 3.4.9-8 B 3.4.9-9 B 3.4.10-1 B 3.4.10-2 B 3.5.1-1 B 3.5.1-2 B 3.5.1-3 B 3.5.1-4 B 3.5.1-5 B 3.5.1-6 B 3.5.1-7 B 3.5.1-8 B 3.5.1-9 B 3.5.1-10 B 3.5.1-11 B 3.5.1-12 B 3.5.1-13 B 3.5.1-14 B 3.5.1-15 B 3.5.1-16 B 3.5.1-17 B 3.5.2-1 B 3.5.2-2 B 3.5.2-3 B 3.5.2-4 B 3.5.2-5 B 3.5.2-6 B 3.5.3-1 B 3.5.3-2 Revision No.
39 39 30 30 30 30 30 30 35 35 30 35 35 30 30 35 30 30 30 30 30 33 33 39 30 30 30 30 30 30 30 42 42 30 30 30 30 30 30 30 30 30 39 (continued)
Brunswick Unit 2 LOEP-1 Revision 49 1
LIST OF EFFECTIVE PAGES - BASES (continued)
Page No.
B 3.8.2-6 B 3.8.2-7 B 3.8.3-1 B 3.8.3-2 B 3.8.3-3 B 3.8.3-4 B 3.8.3-5 B 3.8.3-6 B 3.8.3-7 B 3.8.3-8 B 3.8.4-1 B 3.8.4-2 B 3.8.4-3 B 3.8.4-4 B 3.8.4-5 B 3.8.4-6 B 3.8.4-7 B 3.8.4-8 B 3.8.4-9 B 3.8.4-10 B 3.8.4-11 B 3.8.5-1 B 3.8.5-2 B 3.8.5-3 B 3.8.5-4 B 3.8.5-5 B 3.8.6-1 B 3.8.6-2 B 3.8.6-3 B 3.8.6-4 B 3.8.6-5 B 3.8.6-6 B 3.8.6-7 B 3.8.7-1 B 3.8.7-2 B 3.8.7-3 B 3.8.7-4 B 3.8.7-5 B 3.8.7-6 B 3.8.7-7 B 3.8.7-8 Revision No.
30 30 30 30 30 30 49 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 Page No.
B 3.8.7-9 B 3.8.7-10 B 3.8.7-11 B 3.8.7-12 B 3.8.7-13 B 3.8.7-14 B 3.8.7-15 B 3.8.8-1 B 3.8.8-2 B 3.8.8-3 B 3.8.8-4 B 3.8.8-5 B 3.9.1-1 B 3.9.1-2 B 3.9.1-3 B 3.9.1-4 B 3.9.2-1 B 3.9.2-2 B 3.9.2-3 B 3.9.2-4 B 3.9.3-1 B 3.9.3-2 B 3.9.3-3 B 3.9.4-1 B 3.9.4-2 B 3.9.4-3 B 3.9.4-4 B 3.9.5-1 B 3.9.5-2 B 3.9.5-3 B 3.9.6-1 B 3.9.6-2 B 3.9.6-3 B 3.9.7-1 B 3.9.7-2 B 3.9.7-3 B 3.9.7-4 B 3.9.8-1 B 3.9.8-2 B 3.9.8-3 B 3.9.8-4 Revision No.
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 I
(continued)
Brunswick Unit 2 LOEP-4 Revision 49 1
Diesel Fuel Oil B 3.8.3 BASES ACTIONS D.1 (continued)
With a Required Action and associated Completion Time of Condition A, B, or C not met, or the stored diesel fuel oil not within limits for reasons other than addressed by Conditions A, B, or C, the associated DG may be incapable of performing its intended function and must be immediately declared inoperable.
SURVEILLANCE SR 3.8.3.1 REQUIREMENTS This SR provides verification that there is an adequate inventory of fuel oil in the storage tanks to support each DG's operation for approximately 7 days at rated load. The approximate 7 day period is sufficient time to place the unit in a safe shutdown condition and to bring in replenishment fuel from an offsite location. For the purposes of this SR, the verification of the main fuel oil storage tank fuel oil volume is performed on a per DG basis. This per DG volume is obtained using the following equation:
M VOL U VOL]
-vL N-Uvo NDG where MvoL measured fuel oil volume of the main fuel oil storage tank, UvoL
=
unusable fuel oil volume of the main fuel oil storage tank, and NDG
=
number of DGs required to be OPERABLE.
The results from this equation must be > 20,850 gallons in order to satisfy the acceptance criteria of SR 3.8.3.1.b.
The 31 day Frequency is adequate to ensure that a sufficient supply of fuel oil is available, since low level alarms are provided and unit operators would be aware of any large uses of fuel oil during this period.
(continued)
Brunswick Unit 2 B 3.8.3-5 Revision No. 49 I