SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves LCO 3.1.8 Each SDV vent and drain valve shall be OPERABLE.
APPLICABILITY:
MODES I and 2.
ACTIONS NOTES
- 1.
Separate Condition entry Is allowed for each SDV vent and drain line.
- 2.
An Isolated line may be unisolated under administrative control to allow draining and venting of the SDV.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more SDV vent or A.1 Isolate the associated line.
7 days drain lines with one valve Inoperable.
B. One or more SDV vent or BE1 Isolate the associated line.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> drain lines with both valves Inoperable.
C. Required Action and C.1 Be In MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.