ML101310501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML101310501
| number = ML101310501
| issue date = 05/11/2010
| issue date = 05/11/2010
| title = Arkansas Nuclear One, Units 1 & 2 - Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000313-10-006; 05000368-10-006) and Request for Information
| title = Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000313-10-006; 05000368-10-006) and Request for Information
| author name = O'Keefe N F
| author name = O'Keefe N
| author affiliation = NRC/RGN-IV/DRS/EB-2
| author affiliation = NRC/RGN-IV/DRS/EB-2
| addressee name = Walsh K
| addressee name = Walsh K
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000313/2010006]]
See also: [[see also::IR 05000313/2010006]]


=Text=
=Text=
{{#Wiki_filter:May 11, 2010  
{{#Wiki_filter:UNITED STATES
  Kevin Walsh, Vice President, Operations Entergy Operations, Inc.  
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802  
                                                    R E GI ON I V
SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION REPORT 05000313/2010006; 05000368/2010006) AND REQUEST FOR INFORMATION  
                                        612 EAST LAMAR BLVD , SU I TE 400
Dear Mr. Walsh:  
                                          AR LI N GTON , TEXAS 76011-4125
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
                                              May 11, 2010
Region IV staff will conduct a triennial fire protection baseline inspection at your Arkansas Nuclear One, Units 1 and 2 in August, 2010. The inspection team will be comprised of reactor inspectors from the NRC Region IV office. The team will conduct the inspection in accordance with the baseline Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition Period (Triennial)."
Kevin Walsh, Vice President, Operations
Entergy Operations, Inc.
Arkansas Nuclear One
1448 S.R. 333
Russellville, AR 72802
SUBJECT:         ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF AN NRC
                TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
                REPORT 05000313/2010006; 05000368/2010006) AND REQUEST FOR
                INFORMATION
Dear Mr. Walsh:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Region IV staff will conduct a triennial fire protection baseline inspection at your Arkansas
Nuclear One, Units 1 and 2 in August, 2010. The inspection team will be comprised of reactor
inspectors from the NRC Region IV office. The team will conduct the inspection in accordance
with the baseline Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition
Period (Triennial)."
The schedule for the inspection is as follows:
        *        Information gathering visit:      July 27-29, 2010
        *        Onsite inspection:                August 9-13, 2010
                                                    August 23-27, 2010
The purposes of the information gathering visit are to obtain information and documentation
needed to support the inspection, to become familiar with the fire protection programs, fire
protection features, post-fire safe shutdown capabilities and plant layout, mitigating strategies to
address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of February
25, 2002/10 CFR 50.54(hh)(2). Four inspectors will participate in the information gathering visit
to select the fire areas for evaluation, identify additional documents needed to support the
inspection, obtain unescorted access, and meet with the key personnel who will support the
inspection. The fire area selection will require a walkdown of candidate fire areas in company
with key personnel from your staff. The enclosure to this letter provides an initial list of the
documents the team will need for their review. We request that your staff transmit copies of the
documents listed in the enclosure to the NRC Region IV office for team use in preparation for
the inspection. Please send this information so that it will arrive in our office in Arlington, Texas,
by the dates listed in the enclosure.


The schedule for the inspection is as follows:
Entergy Operations, Inc.                       -2-
* Information gathering visit:  July 27-29, 2010
During the information gathering visit, the team will also discuss the following inspection support
administrative details: office space size and location; specific documents requested to be made
* Onsite inspection:  August 9-13, 2010    August 23-27, 2010
available to the team in their office spaces; arrangements for reactor site access; and the
The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the fire protection programs, fire
availability of knowledgeable plant engineering and licensing organization personnel to serve as
protection features, post-fire safe shutdown capabilities and plant layout, mitigating strategies to address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2).
points of contact during the inspection.
  Four inspectors will participate in the information gathering visit to select the fire areas for evaluation, identify additional documents needed to support the inspection, obtain unescorted access, and meet with the key personnel who will support the inspection.  The fire area selection will require a walkdown of candidate fire areas in company with key personnel from your staff.  The enclosure to this letter provides an initial list of the
We request that during the onsite inspection weeks, you ensure that copies of analyses,
documents the team will need for their review.  We request that your staff transmit copies of the documents listed in the enclosure to the NRC Region IV office for team use in preparation for the inspection.  Please send this information so that it will arrive in our office in Arlington, Texas, by the dates listed in the enclosure.
evaluations, or documentation regarding the implementation and maintenance of the fire
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
protection program, including post-fire safe shutdown capability, be readily accessible to the
Entergy Operations, Inc.   - 2 -  
team for their review. Of specific interest for the fire protection portion of the inspection are
During the information gathering visit, the team will also discuss the following inspection support administrative details: office space size and location; specific documents requested to be made available to the team in their office spaces; arrangements for reactor site access; and the availability of knowledgeable plant engineering and licensing organization personnel to serve as points of contact during the inspection.
those documents that establish that your fire protection program satisfies the NRC regulatory
We request that during the onsite inspection weeks, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of the fire protection program, including post-fire safe shutdown capability, be readily accessible to the  
requirements and conforms to applicable NRC and industry fire protection guidance. For the
team for their review. Of specific interest
B.5.b portion of the inspection, those documents implementing your mitigating strategies and
for the fire protection portion of the inspection are those documents that establish that your fire protection program satisfies the NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance.
demonstrating the management of your commitments for the strategies are of specific interest.
  For the B.5.b portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest.
Also, please ensure the availability of appropriate personnel knowledgeable of: (1) plant
    Also, please ensure the availability of appropriate personnel knowledgeable of: (1) plant systems required to achieve and maintain safe shutdown conditions from inside and outside the  
systems required to achieve and maintain safe shutdown conditions from inside and outside the
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant fire protection systems, and (4) the fire protection program and its implementation.
control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
fire protection systems, and (4) the fire protection program and its implementation.
requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
requirements were approved by the Office of Management and Budget, control number 3150-
Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection or the inspection team's information or logistical needs, please contact Sam Graves, the team lead inspector, in the Region IV office at (817) 860-8102, or by email, samuel.graves@nrc.gov.       Sincerely,
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
/RA/       N. O'Keefe, Chief       Engineering Branch 2  
request for information or an information collection requirement unless the requesting document
      Division of Reactor Safety  
displays a currently valid Office of Management and Budget control number.
Docket:   50-313 50-368
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
Entergy Operations, Inc.  - 3 -
enclosure will be available electronically for public inspection in the NRC Public Document
License:  DPR-51 NPF-6  Enclosure:  Triennial Fire Protection 
Room or from the Publicly Available Records (PARS) component of NRCs document system
  Inspection Documentation Request List
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
Senior Vice President  & Chief Operating Officer Entergy Operations, Inc.
rm/adams.html (the Public Electronic Reading Room).
P.O. Box 31995 Jackson, MS  39286-1995
Your cooperation and support during this inspection will be appreciated. If you have questions
Thomas Palmisano Vice President, Oversight Entergy Operations, Inc. P.O. Box 31995
concerning this inspection or the inspection team's information or logistical needs, please
Jackson, MS  39286-1995
contact Sam Graves, the team lead inspector, in the Region IV office at (817) 860-8102, or by
David Bice Acting Manager, Licensing Arkansas Nuclear One
email, samuel.graves@nrc.gov.
1448 SR 333 Russellville, AR  72802
                                              Sincerely,
Joseph A. Aluise Associate General Counsel - Nuclear
                                                /RA/
Entergy Services, Inc 639 Loyola Avenue New Orleans, LA  70113
                                              N. OKeefe, Chief
Senior Manager, Nuclear Safety & Licensing
                                              Engineering Branch 2
Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
                                              Division of Reactor Safety
Chief, Radiation Control Section
Docket: 50-313
Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR  72205-3867
          50-368
Jim E. Gibson County Judge of Pope County 100 West Main Street
Russellville, AR  72801
   
Entergy Operations, Inc.  - 4 -
  Arkansas Department of Health Radiation Control Section 4815 West Markham Street, Slot 30
Little Rock, AR  72205-3867
David E. Maxwell, Director Arkansas Department of Emergency  Management, Bldg. 9501
Camp Joseph T. Robinson North Little Rock, AR 72199
Chief, Technological Hazards    Branch FEMA Region VI 800 North Loop 288
Federal Regional Center Denton, TX  76209 
Entergy Operations, Inc.  - 5 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Jeffrey.Josey@nrc.gov)
Resident Inspector (Jeff.Rotton@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov) ANO Administrative Assistant (Vicki.High@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Kaly.Kalyanam@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource


   
Entergy Operations, Inc.                  -3-
   
License: DPR-51
    File located:  R:\REACTORS\ANO2010006 RFI - STG  MLXX SUNSI Rev Compl. Yes  No ADAMS Yes  No Reviewer Initials STG Publicly Avail  Yes No Sensitive  Yes  No Sens. Type Initials STG RIV:DRS/EB2 C:DRS/ EB 2
           NPF-6
  SGraves NOkeefe/GAP for  /RA/ /RA/    05/10/2010 05/11/2010    OFFICIAL RECORD COPY  T=Telephone           E=E-mail        F=Fax
Enclosure: Triennial Fire Protection
 
  Inspection Documentation Request List
  - 1 - Enclosure ENCLOSURE 
Senior Vice President
Triennial Fire Protection Inspection Documentation Request  
  & Chief Operating Officer
   
Entergy Operations, Inc.
Please provide the following documentation (items 1 - 4) prior to the onsite information-gathering visit, preferably no later than July 19, 2010. Where practical, please provide copies electronically.
P.O. Box 31995
Jackson, MS 39286-1995
Thomas Palmisano
Vice President, Oversight
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
David Bice
Acting Manager, Licensing
Arkansas Nuclear One
1448 SR 333
Russellville, AR 72802
Joseph A. Aluise
Associate General Counsel - Nuclear
Entergy Services, Inc
639 Loyola Avenue
New Orleans, LA 70113
Senior Manager, Nuclear Safety & Licensing
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Chief, Radiation Control Section
Arkansas Department of Health
4815 West Markham Street, Slot 30
Little Rock, AR 72205-3867
Jim E. Gibson
County Judge of Pope County
100 West Main Street
Russellville, AR 72801


1. The current version of your fire protection program and fire hazards analysis.  
Entergy Operations, Inc.         -4-
  2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate acceptable plant response.
Arkansas Department of Health
3. Copies of the licensing basis documents for fire protection (safety evaluation reports, pertinent sections of the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire protection/fire safe shutdown, etc.).  
Radiation Control Section
4. The fire probabilistic risk assessment or portions of the plant's individual plant examination for external events report addressing fire events.  
4815 West Markham Street, Slot 30
Please provide the following documentation (items 5 - 46) during the information-gathering visit or by July 29, 2010, in order to support inspection preparation. Whenever practical, please provide copies electronically. However, drawings should be provided as paper copies of sufficient size that all details are legible.
Little Rock, AR 72205-3867
5. Plant layout and equipment drawings for the selected fire areas (these areas will be selected during the information gathering trip) that identify: (a) the physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire zone delineation; and (c) the locations of fire protection equipment, such as
David E. Maxwell, Director
detection, suppression, and post-fire emergency lighting units; and (d) fire area boundaries.
Arkansas Department of Emergency
6. Fire protection program implementing procedures (e.g., administrative controls, operator response procedures for fires, fire fighting procedures, etc.).  
  Management, Bldg. 9501
7. Operating procedures used for achieving and maintaining hot and cold shutdown conditions from the control room in the event of a fire outside the control room (III.G.2 areas). 8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas) capability with or without control room evacuation.  
Camp Joseph T. Robinson
9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the information-gathering trip). 
North Little Rock, AR 72199
 
Chief, Technological Hazards
  - 2 - Enclosure 10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the event of a fire (safe shutdown equipment lists).  
  Branch
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for normal and alternate shutdown.  Please provide one copy of the piping and instrumentation (flow) diagrams for these systems of a size sufficient to read all details.  These should include the systems used for reactor coolant system (RCS) makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems.  
FEMA Region VI
12. A listing, with descriptions, of design change packages which were determined to impact fire protection and post-fire safe shutdowns, performed in the last 3 years.  
800 North Loop 288
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
Federal Regional Center
14. A listing of open and closed Condition Reports initiated in the last 3 years, which relate to the fire protection program or equipment. Include Corrective Action Process document number, date, and subject.
Denton, TX 76209
15. A listing of the applicable codes and standards (with the versions) related to the design of plant fire protection features and evaluations of any code deviations.  Copies of these  
 
codes should be available for review.
Entergy Operations, Inc.                    -5-
16. Drawings of the portions of the emergency lighting system which support fire response. 
Electronic distribution by RIV:
17. Procedures used to remove smoke from safety-related areas and the engineering studies or calculations which support the design basis.
Regional Administrator (Elmo.Collins@nrc.gov)
18. Drawings of communication systems credited in the license basis for firefighting and plant operations during fires where control room is occupied and/or evacuated.
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.  
DRP Director (Dwight.Chamberlain@nrc.gov)
20. A listing of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps and suppression systems.  
DRP Deputy Director (Anton.Vegel@nrc.gov)
21. Maintenance rule performance criteria and a summary of the last 3 years' performance history for fire protection program systems or functions monitored within the  
DRS Director (Roy.Caniano@nrc.gov)
maintenance rule program.  
DRS Deputy Director (Troy.Pruett@nrc.gov)
22. A copy of fire protection program requirements (e.g., limiting conditions for operation, surveillance test requirements) covered by technical specifications, technical requirements manual, updated final safety analysis report, or similar documents.  
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
23. Copies of internal and external self-assessments, audits, peer-assessments or similar reviews related to post-fire safe shutdown capability or the fire protection program completed since December 3, 2007.
Resident Inspector (Jeffrey.Josey@nrc.gov)
 
Resident Inspector (Jeff.Rotton@nrc.gov)
  - 3 - Enclosure 24. A list of manual actions taken outside the control room which are credited to mitigate the consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should group actions by the initiating fire area or zone and indicate where the action must take place. 25. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design basis documents that describe the purpose/function/operating characteristics of the safe shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and reactivity control, including the essential support systems).  
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
26. Two copies of one-line diagrams of the electrical distribution system. These should depict how power gets from the switchyard to the engineered safety feature loads (480V and 4160V). Also, include the vital DC distribution system one-line diagrams.
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant, giving location and the key equipment being protected. 
ANO Administrative Assistant (Vicki.High@nrc.gov)
28. A list of repairs (and the procedure that controls the actions) needed to:  a) reach and/or maintain hot shutdown and b) reach and/or maintain cold shutdown.  
Public Affairs Officer (Victor.Dricks@nrc.gov)
29. A list of high to low pressure interface valves.
Public Affairs Officer (Lara.Uselding@nrc.gov)
30. A copy of procedures governing the training and operation of the fire brigade.  
Project Manager (Kaly.Kalyanam@nrc.gov)
31. Organization charts of site personnel down to the level of fire protection staff personnel.
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
32. A contact list of key site personnel who will be supporting this inspection, giving location of their office and phone number onsite.  
RITS Coordinator (Marisa.Herrera@nrc.gov)
33. The team would like to observe an unannounced fire brigade drill in the plant, if possible, during the week of August 23, 2010.  Please put us in contact, during the onsite
Regional Counsel (Karla.Fuller@nrc.gov)
information gathering trip, with the appropriate personnel for planning drills.  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
34. The team would like to perform a walkthrough of the procedure for control room evacuation due to fire with qualified operators in the plant during the week of August 9, 2010.  Please put us in contact, during the onsite information gathering trip, with the appropriate personnel for planning the walkthrough.  
OEMail Resource
File located: R:\REACTORS\ANO2010006 RFI - STG                        MLXX
The following documents involve B.5.b mitigating strategies.
  SUNSI Rev Compl. ;Yes              No ADAMS      ;Yes No      Reviewer Initials  STG
35. A copy of the license condition that incorporated the requirements issued to address the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
Publicly Avail            Yes ;No    Sensitive  Yes ; No    Sens. Type Initials STG
36. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2).
RIV:DRS/EB2              C:DRS/ EB 2
 
SGraves                  NOkeefe/GAP for
  - 4 - Enclosure 37. A list of procedures/guidelines which were revised or generated to implement the mitigation strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.  
/RA/                    /RA/
38. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy.  
05/10/2010              05/11/2010
39. A list of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.  
OFFICIAL RECORD COPY                                T=Telephone      E=E-mail      F=Fax
40. Copies of piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies. These could be the type used for training.  
 
41. A list of modification packages and simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.  
                                              ENCLOSURE
42. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.  
                  Triennial Fire Protection Inspection Documentation Request
43. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals to the NRC and the safety evaluation report.  
Please provide the following documentation (items 1 - 4) prior to the onsite
44. A copy of site general arrangement drawing(s) that show the majority of buildings/areas referenced in B.5.b documents.  
information-gathering visit, preferably no later than July 19, 2010. Where practical, please
45. Training records/ training matrix/ lesson plans related to B.5.b.  
provide copies electronically.
46. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.
    1. The current version of your fire protection program and fire hazards analysis.
    2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate
        acceptable plant response.
    3. Copies of the licensing basis documents for fire protection (safety evaluation reports,
        pertinent sections of the final safety analysis report, exemptions, deviations, letters
        to/from the NRC regarding fire protection/fire safe shutdown, etc.).
    4. The fire probabilistic risk assessment or portions of the plants individual plant
        examination for external events report addressing fire events.
    Please provide the following documentation (items 5 - 46) during the information-gathering
    visit or by July 29, 2010, in order to support inspection preparation. Whenever practical,
    please provide copies electronically. However, drawings should be provided as paper
    copies of sufficient size that all details are legible.
    5. Plant layout and equipment drawings for the selected fire areas (these areas will be
        selected during the information gathering trip) that identify: (a) the physical plant
        locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or
        fire zone delineation; and (c) the locations of fire protection equipment, such as
        detection, suppression, and post-fire emergency lighting units; and (d) fire area
        boundaries.
    6. Fire protection program implementing procedures (e.g., administrative controls, operator
        response procedures for fires, fire fighting procedures, etc.).
    7. Operating procedures used for achieving and maintaining hot and cold shutdown
        conditions from the control room in the event of a fire outside the control room (III.G.2
        areas).
    8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)
        capability with or without control room evacuation.
    9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the
        information-gathering trip).
                                              -1-                                  Enclosure
 
10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the
    event of a fire (safe shutdown equipment lists).
11. Piping and instrumentation (flow) diagrams showing the components used to achieve
    and maintain hot standby and cold shutdown for normal and alternate shutdown. Please
    provide one copy of the piping and instrumentation (flow) diagrams for these systems of
    a size sufficient to read all details. These should include the systems used for reactor
    coolant system (RCS) makeup, RCS pressure control, decay heat removal, and
    reactivity control, including the essential support systems.
12. A listing, with descriptions, of design change packages which were determined to impact
    fire protection and post-fire safe shutdowns, performed in the last 3 years.
13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.
14. A listing of open and closed Condition Reports initiated in the last 3 years, which relate
    to the fire protection program or equipment. Include Corrective Action Process
    document number, date, and subject.
15. A listing of the applicable codes and standards (with the versions) related to the design
    of plant fire protection features and evaluations of any code deviations. Copies of these
    codes should be available for review.
16. Drawings of the portions of the emergency lighting system which support fire response.
17. Procedures used to remove smoke from safety-related areas and the engineering
    studies or calculations which support the design basis.
18. Drawings of communication systems credited in the license basis for firefighting and
    plant operations during fires where control room is occupied and/or evacuated.
19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
20. A listing of maintenance and surveillance testing procedures for alternative shutdown
    capability and fire barriers, detectors, pumps and suppression systems.
21. Maintenance rule performance criteria and a summary of the last 3 years performance
    history for fire protection program systems or functions monitored within the
    maintenance rule program.
22. A copy of fire protection program requirements (e.g., limiting conditions for operation,
    surveillance test requirements) covered by technical specifications, technical
    requirements manual, updated final safety analysis report, or similar documents.
23. Copies of internal and external self-assessments, audits, peer-assessments or similar
    reviews related to post-fire safe shutdown capability or the fire protection program
    completed since December 3, 2007.
                                          -2-                                Enclosure
 
24. A list of manual actions taken outside the control room which are credited to mitigate the
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
    group actions by the initiating fire area or zone and indicate where the action must take
    place.
25. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design
    basis documents that describe the purpose/function/operating characteristics of the safe
    shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and
    reactivity control, including the essential support systems).
26. Two copies of one-line diagrams of the electrical distribution system. These should
    depict how power gets from the switchyard to the engineered safety feature loads (480V
    and 4160V). Also, include the vital DC distribution system one-line diagrams.
27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
    giving location and the key equipment being protected.
28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or
    maintain hot shutdown and b) reach and/or maintain cold shutdown.
29. A list of high to low pressure interface valves.
30. A copy of procedures governing the training and operation of the fire brigade.
31. Organization charts of site personnel down to the level of fire protection staff personnel.
32. A contact list of key site personnel who will be supporting this inspection, giving location
    of their office and phone number onsite.
33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
    during the week of August 23, 2010. Please put us in contact, during the onsite
    information gathering trip, with the appropriate personnel for planning drills.
34. The team would like to perform a walkthrough of the procedure for control room
    evacuation due to fire with qualified operators in the plant during the week of August 9,
    2010. Please put us in contact, during the onsite information gathering trip, with the
    appropriate personnel for planning the walkthrough.
The following documents involve B.5.b mitigating strategies.
35. A copy of the license condition that incorporated the requirements issued to address the
    requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002,
    and 10 CFR 50.54(hh)(2).
36. A list of all modifications to regulatory commitments made to meet the requirements of
    Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently
    imposed license conditions, and 10 CFR 50.54(hh)(2).
                                          -3-                                Enclosure
 
37. A list of procedures/guidelines which were revised or generated to implement the
    mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),
    severe accident management guidelines (SAMGs), emergency operating procedures
    (EOPs), abnormal operating procedures (AOPs), etc.
38. A matrix that shows the correlation between the mitigation strategies identified in
    Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are
    used to implement each strategy.
39. A list of engineering evaluations/calculations that were used to verify engineering bases
    for the mitigation strategies.
40. Copies of piping and instrumentation diagram (P&ID) or simplified flow diagrams for
    systems relied upon in the mitigation strategies. These could be the type used for
    training.
41. A list of modification packages and simplified drawings/descriptions of modifications that
    were made to plant systems to implement the mitigation strategies.
42. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.)
    required to be used to implement the mitigation strategies.
43. A list of B.5.b strategies, if any, which have implementing details that differ from that
    documented in the submittals to the NRC and the safety evaluation report.
44. A copy of site general arrangement drawing(s) that show the majority of buildings/areas
    referenced in B.5.b documents.
45. Training records/ training matrix/ lesson plans related to B.5.b.
46. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)
    required to implement any mitigating strategies.
                                          -4-                                  Enclosure
}}
}}

Latest revision as of 19:26, 13 November 2019

Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000313-10-006; 05000368-10-006) and Request for Information
ML101310501
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/11/2010
From: O'Keefe N
NRC/RGN-IV/DRS/EB-2
To: Walsh K
Entergy Operations
References
IR-10-006
Download: ML101310501 (9)


See also: IR 05000313/2010006

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

May 11, 2010

Kevin Walsh, Vice President, Operations

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S.R. 333

Russellville, AR 72802

SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF AN NRC

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000313/2010006; 05000368/2010006) AND REQUEST FOR

INFORMATION

Dear Mr. Walsh:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your Arkansas

Nuclear One, Units 1 and 2 in August, 2010. The inspection team will be comprised of reactor

inspectors from the NRC Region IV office. The team will conduct the inspection in accordance

with the baseline Inspection Procedure 71111.05TTP, "Fire Protection-NFPA 805 Transition

Period (Triennial)."

The schedule for the inspection is as follows:

  • Information gathering visit: July 27-29, 2010
  • Onsite inspection: August 9-13, 2010

August 23-27, 2010

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the fire protection programs, fire

protection features, post-fire safe shutdown capabilities and plant layout, mitigating strategies to

address Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, of February

25, 2002/10 CFR 50.54(hh)(2). Four inspectors will participate in the information gathering visit

to select the fire areas for evaluation, identify additional documents needed to support the

inspection, obtain unescorted access, and meet with the key personnel who will support the

inspection. The fire area selection will require a walkdown of candidate fire areas in company

with key personnel from your staff. The enclosure to this letter provides an initial list of the

documents the team will need for their review. We request that your staff transmit copies of the

documents listed in the enclosure to the NRC Region IV office for team use in preparation for

the inspection. Please send this information so that it will arrive in our office in Arlington, Texas,

by the dates listed in the enclosure.

Entergy Operations, Inc. -2-

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location; specific documents requested to be made

available to the team in their office spaces; arrangements for reactor site access; and the

availability of knowledgeable plant engineering and licensing organization personnel to serve as

points of contact during the inspection.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents that establish that your fire protection program satisfies the NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For the

B.5.b portion of the inspection, those documents implementing your mitigating strategies and

demonstrating the management of your commitments for the strategies are of specific interest.

Also, please ensure the availability of appropriate personnel knowledgeable of: (1) plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, (2) the electrical aspects of the post-fire safe shutdown analyses, (3) reactor plant

fire protection systems, and (4) the fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact Sam Graves, the team lead inspector, in the Region IV office at (817) 860-8102, or by

email, samuel.graves@nrc.gov.

Sincerely,

/RA/

N. OKeefe, Chief

Engineering Branch 2

Division of Reactor Safety

Docket: 50-313

50-368

Entergy Operations, Inc. -3-

License: DPR-51

NPF-6

Enclosure: Triennial Fire Protection

Inspection Documentation Request List

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Thomas Palmisano

Vice President, Oversight

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

David Bice

Acting Manager, Licensing

Arkansas Nuclear One

1448 SR 333

Russellville, AR 72802

Joseph A. Aluise

Associate General Counsel - Nuclear

Entergy Services, Inc

639 Loyola Avenue

New Orleans, LA 70113

Senior Manager, Nuclear Safety & Licensing

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Chief, Radiation Control Section

Arkansas Department of Health

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Jim E. Gibson

County Judge of Pope County

100 West Main Street

Russellville, AR 72801

Entergy Operations, Inc. -4-

Arkansas Department of Health

Radiation Control Section

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

David E. Maxwell, Director

Arkansas Department of Emergency

Management, Bldg. 9501

Camp Joseph T. Robinson

North Little Rock, AR 72199

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Entergy Operations, Inc. -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Jeffrey.Josey@nrc.gov)

Resident Inspector (Jeff.Rotton@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

ANO Administrative Assistant (Vicki.High@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

File located: R:\REACTORS\ANO2010006 RFI - STG MLXX

SUNSI Rev Compl. ;Yes No ADAMS ;Yes No Reviewer Initials STG

Publicly Avail Yes ;No Sensitive Yes ; No Sens. Type Initials STG

RIV:DRS/EB2 C:DRS/ EB 2

SGraves NOkeefe/GAP for

/RA/ /RA/

05/10/2010 05/11/2010

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ENCLOSURE

Triennial Fire Protection Inspection Documentation Request

Please provide the following documentation (items 1 - 4) prior to the onsite

information-gathering visit, preferably no later than July 19, 2010. Where practical, please

provide copies electronically.

1. The current version of your fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Copies of the licensing basis documents for fire protection (safety evaluation reports,

pertinent sections of the final safety analysis report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4. The fire probabilistic risk assessment or portions of the plants individual plant

examination for external events report addressing fire events.

Please provide the following documentation (items 5 - 46) during the information-gathering

visit or by July 29, 2010, in order to support inspection preparation. Whenever practical,

please provide copies electronically. However, drawings should be provided as paper

copies of sufficient size that all details are legible.

5. Plant layout and equipment drawings for the selected fire areas (these areas will be

selected during the information gathering trip) that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or

fire zone delineation; and (c) the locations of fire protection equipment, such as

detection, suppression, and post-fire emergency lighting units; and (d) fire area

boundaries.

6. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

7. Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

8. Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

9. Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

-1- Enclosure

10. A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

11. Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for normal and alternate shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of

a size sufficient to read all details. These should include the systems used for reactor

coolant system (RCS) makeup, RCS pressure control, decay heat removal, and

reactivity control, including the essential support systems.

12. A listing, with descriptions, of design change packages which were determined to impact

fire protection and post-fire safe shutdowns, performed in the last 3 years.

13. Copies of Generic Letter 86-10 evaluations performed in the last 3 years.

14. A listing of open and closed Condition Reports initiated in the last 3 years, which relate

to the fire protection program or equipment. Include Corrective Action Process

document number, date, and subject.

15. A listing of the applicable codes and standards (with the versions) related to the design

of plant fire protection features and evaluations of any code deviations. Copies of these

codes should be available for review.

16. Drawings of the portions of the emergency lighting system which support fire response.

17. Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

18. Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

19. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

20. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

21. Maintenance rule performance criteria and a summary of the last 3 years performance

history for fire protection program systems or functions monitored within the

maintenance rule program.

22. A copy of fire protection program requirements (e.g., limiting conditions for operation,

surveillance test requirements) covered by technical specifications, technical

requirements manual, updated final safety analysis report, or similar documents.

23. Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed since December 3, 2007.

-2- Enclosure

24. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

25. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and

reactivity control, including the essential support systems).

26. Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to the engineered safety feature loads (480V

and 4160V). Also, include the vital DC distribution system one-line diagrams.

27. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

28. A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown and b) reach and/or maintain cold shutdown.

29. A list of high to low pressure interface valves.

30. A copy of procedures governing the training and operation of the fire brigade.

31. Organization charts of site personnel down to the level of fire protection staff personnel.

32. A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

33. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of August 23, 2010. Please put us in contact, during the onsite

information gathering trip, with the appropriate personnel for planning drills.

34. The team would like to perform a walkthrough of the procedure for control room

evacuation due to fire with qualified operators in the plant during the week of August 9,

2010. Please put us in contact, during the onsite information gathering trip, with the

appropriate personnel for planning the walkthrough.

The following documents involve B.5.b mitigating strategies.

35. A copy of the license condition that incorporated the requirements issued to address the

requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002,

and 10 CFR 50.54(hh)(2).

36. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently

imposed license conditions, and 10 CFR 50.54(hh)(2).

-3- Enclosure

37. A list of procedures/guidelines which were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),

severe accident management guidelines (SAMGs), emergency operating procedures

(EOPs), abnormal operating procedures (AOPs), etc.

38. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are

used to implement each strategy.

39. A list of engineering evaluations/calculations that were used to verify engineering bases

for the mitigation strategies.

40. Copies of piping and instrumentation diagram (P&ID) or simplified flow diagrams for

systems relied upon in the mitigation strategies. These could be the type used for

training.

41. A list of modification packages and simplified drawings/descriptions of modifications that

were made to plant systems to implement the mitigation strategies.

42. Copies of procedure(s) used to inventory equipment (hoses, fittings, pumps, etc.)

required to be used to implement the mitigation strategies.

43. A list of B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals to the NRC and the safety evaluation report.

44. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

45. Training records/ training matrix/ lesson plans related to B.5.b.

46. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)

required to implement any mitigating strategies.

-4- Enclosure