December 14, 2022
Joseph Sullivan
Site Vice President
Entergy Operations, Inc.
N-TSB-58
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT:
ARKANSAS NUCLEAR ONE- ACKNOWLEDGMENT OF RESPONSE TO NRC
INSPECTION REPORT 05000313/2022011 AND 05000368/2022011 AND NOTICE
OF VIOLATION
Dear Joseph Sullivan:
On November 9, 2022, the U.S. Nuclear Regulatory Commission (NRC) cited Entergy Operations,
Inc. for the failure to manage the effects of aging on the buried unit 1 and unit 2 service water
supply piping at Arkansas Nuclear One as required by regulatory requirements and documented
as violation 05000313,05000368/2022011-01, Failure to Perform Required Thickness
Measurements as Required by Design to Manage the Effects of Aging. The Notice of Violation,
enclosed with Inspection Report 05000313/2022011 AND 05000368/2022011 (Agencywide
Documents Access and Management System Accession No. ML22301A153), required you to
respond in writing within 30 days.
We have reviewed your response (ML22342B267, dated December 8, 2022) and find that it meets
the requirements of the Code of Federal Regulations (10 CFR) 2.201. We have no further
questions at this time and will review the implementation of your corrective actions during a future
inspection to determine whether full compliance has been achieved and maintained.
In accordance with 10 CFR 2.390 of the NRC's "Agencys Rules of Practice and Procedure," a copy
of this letter will be made available electronically for public inspection in the NRC Public
J. Sullivan
2
Document Room or from the NRCs Agencywide Documents Access and Management System,
which is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
Nick Taylor, Chief
Engineering Branch 2
Division of Operating Reactor Safety
cc: Distribution via LISTSERV
Signed by Taylor, Nicholas
on 12/14/22
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: NPO
Yes No
Publicly Available
Sensitive
OFFICE
DORS/EB2
DORS/BC
ORA/ACES
DORS/EB2
NAME
JDrake
JDixon
JGroom
NTaylor
SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE
12/12/2022
12/13/2022
12/13/2022
12/14/2022