ML12284A366: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 09/26/2012
| issue date = 09/26/2012
| title = 2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-1 Replacement
| title = 2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-1 Replacement
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Nelson J
| addressee name = Nelson J
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:TQ-AA-151-F10 Revision 0 Page 1 of 1 SRRS: 3D.105 Scenario Outline Station: Dresden Generating Station Scenario No.:
{{#Wiki_filter:TQ-AA-151-F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generating Station             Scenario No.: ILT-N-1         Class ID: 11-1 (2012-301)
ILT-N-1       Class ID:
Evaluators                                        Operators            / crew position
Evaluators Operators / crew position 11-1 (2012-301)         /   ATC     /   BOP Initial Conditions:
                                                                                        / ATC
/  CRS    Initial Power  
                                                                                        / BOP
= Full Power Turnover:   Maintain load per TSO direction.
                                                                                        / CRS Initial Conditions: Initial Power = Full Power Turnover:             Maintain load per TSO direction.
Event No. Malf. No. Event Type* Event Description 1 NONE C BOP TBCCW - Pump, Swap Due To Degrading Pump 2 B02 C / T ATC RPS - MG Set, Trips / Re
Event          Malf.              Event                                    Event No.           No.               Type*                                 Description 1           NONE             C       BOP   TBCCW - Pump, Swap Due To Degrading Pump 2           B02             C/T     ATC   RPS - MG Set, Trips / Re-energize From Reserve Power 3         ICTUBLK           C/T     BOP   ISO COND - System, Tube Leak TURBINE AUX - Loss Of All Turbine Seal Oil, With Failure 4            K50              C      BOP Of ESOP To Start SER1633 5                             C       ATC   MPT - TR 2 High Temperature Requiring Load Drop E230 6       RLMRFPB             I       ATC   FW - FWLC Controller, FW Flow Indication Fails Upscale 7           I21             M     TEAM   Manual Scram - Steam Leak in the Drywell.
-energize From Reserve Power 3 ICTUBLK C / T BOP ISO COND - System, Tube Leak 4 K50 C BOP TURBINE AUX  
I21                             EMERGENCY DEPRESSURIZE - On Exceeding Primary 8            K23              M      TEAM    Containment Pressure Due To Steam Leak inside the K40                            Drywell And Partial Loss of Ability to Spray the Drywell
- Loss Of All Turbine Seal Oil, With Failure Of ESOP To Start 5 SER1633 E230 C ATC MPT - TR 2 High Temperature Requiring Load Drop 6 RLMRFPB I ATC FW - FWLC Controller, FW Flow Indication Fails Upscale 7 I21 M TEAM Manual Scram  
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec SRRS: 3D.105}}
- Steam Leak in the Drywell.
8 I21                   K23                    K40 M TEAM EMERGENCY DEPRESSURIZE  
- On Exceeding Primary Containment Pressure Due To Steam Leak inside the Drywell And Partial Loss of Ability to Spray the Drywell
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec}}

Latest revision as of 22:27, 11 November 2019

2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-1 Replacement
ML12284A366
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: David Reeser
Operations Branch III
To: Nelson J
Exelon Generation Co
Shared Package
ML11354A121 List:
References
Download: ML12284A366 (1)


Text

TQ-AA-151-F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generating Station Scenario No.: ILT-N-1 Class ID: 11-1 (2012-301)

Evaluators Operators / crew position

/ ATC

/ BOP

/ CRS Initial Conditions: Initial Power = Full Power Turnover: Maintain load per TSO direction.

Event Malf. Event Event No. No. Type* Description 1 NONE C BOP TBCCW - Pump, Swap Due To Degrading Pump 2 B02 C/T ATC RPS - MG Set, Trips / Re-energize From Reserve Power 3 ICTUBLK C/T BOP ISO COND - System, Tube Leak TURBINE AUX - Loss Of All Turbine Seal Oil, With Failure 4 K50 C BOP Of ESOP To Start SER1633 5 C ATC MPT - TR 2 High Temperature Requiring Load Drop E230 6 RLMRFPB I ATC FW - FWLC Controller, FW Flow Indication Fails Upscale 7 I21 M TEAM Manual Scram - Steam Leak in the Drywell.

I21 EMERGENCY DEPRESSURIZE - On Exceeding Primary 8 K23 M TEAM Containment Pressure Due To Steam Leak inside the K40 Drywell And Partial Loss of Ability to Spray the Drywell

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec SRRS: 3D.105