| | issue date = 12/19/1995 | | | issue date = 12/19/1995 |
| | title = Requests Approval for Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping | | | title = Requests Approval for Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping |
| | author name = PARRISH J V | | | author name = Parrish J |
| | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| | addressee name = | | | addressee name = |
Line 13: |
Line 13: |
| | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE |
| | page count = 6 | | | page count = 6 |
| | | project = |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:'ATEGORY j.REGULATO INFORMATION DISTRIBUTION STEM (RIDS)ACCEcSI6N,.NBR:9512280247 DOC.DATE: 95/12/19 NOTARIZED: | | {{#Wiki_filter:'ATEGORY j. |
| NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V. | | REGULATO INFORMATION DISTRIBUTION STEM (RIDS) |
| Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | | ACCEcSI6N,.NBR:9512280247 DOC.DATE: 95/12/19 NOTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Requests approval for use alternative to ASME Boiler&Pressure Vessel Code requirements for exam of longitudinal welds in Class 1 a 2 piping.DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal: | | Requests approval for use alternative to ASME Boiler & |
| Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES: RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORDiJ INTERNAL: A~C S+." I LE=-CENTER~il NRR/DE/EMCB NUDOCS-ABSTRACT RES/DET/EMMEB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1 1 1 1 6 0 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD4-2 PD AEOD/SPD/RAB | | Pressure Vessel Code requirements for exam of longitudinal welds in Class 1 a 2 piping. |
| .NRR/DE/ECGB NRR/DE/EMEB OGC/HDS3 RES/DSIR/EIB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 1-1 NOTE TO ALL"RIDS" RECIPIENTS:
| | DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: |
| PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL'4 i"<~'"P e ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968 | | TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES: |
| ~(509)372-5000 December 19, 1995 G02-95-282 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555 Gentlemen: | | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLIFFORDiJ 1 1 INTERNAL: A~C S 6 0 AEOD/SPD/RAB 1 1 |
| | +." I LE=-CENTER~il 1 1 . NRR/DE/ECGB 1 1 NRR/DE/EMCB 1 1 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DET/EMMEB 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 -1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS: |
| | PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! |
| | TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL '4 |
| | |
| | i |
| | "<~'"P e |
| | |
| | ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 December 19, 1995 G02-95-282 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen: |
|
| |
|
| ==Subject:== | | ==Subject:== |
| WNP-2 OPERATING LICENSE NPF-21, ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI REQUEST FOR APPROVAL TO USE CODE CASE N-524 In accordance with 10 CFR 50.55a(a)(3), the Supply System requests approval for WNP-2 to use an alternative to the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code, requirements for examination of longitudinal welds in Class 1 and 2 piping.The requested alternative is delineated in ASME Code Case N-524,"Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping" which was approved by the ASME committee on August 9, 1993, but has not yet been incorporated into Regulatory Guide 1.147,"Inservice Inspection Code Case Acceptability ASME Section XI Division 1." The basis for this request is provided in the Attachment. | | WNP-2 OPERATING LICENSE NPF-21, ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI REQUEST FOR APPROVAL TO USE CODE CASE N-524 In accordance with 10 CFR 50.55a(a)(3), the Supply System requests approval for WNP-2 to use an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, requirements for examination of longitudinal welds in Class 1 and 2 piping. The requested alternative is delineated in ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping" which was approved by the ASME committee on August 9, 1993, but has not yet been incorporated into Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability ASME Section XI Division 1." The basis for this request is provided in the Attachment. |
| The Supply System considers this request to use ASME Code Case N-524 to be a regulatory burden reduction item for WNP-2 with anticipated savings in excess of$20,000 for the remaining refueling outages in the current 10-year in-service inspection interval.Approval of ASME Code Case N-524 for use at WNP-2 is requested by April 10, 1996 in order to support the upcoming refuel outage.The outage is presently scheduled to begin on April 13, 1996.Please refer any questions regarding this submittal to Mr.Dave Swank at (509)377-4563.Sincerely, arrish.(Mail Drop 1023)ice President, Nuclear Operations DPR/lm Attachment 95i2280247 95i2iq PDR ADQCK"$500039'7 P'PDR ATTACHMENT ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI REQUEST FOR APPROVAL TO USE CODE CASE N-524 In accordance with 10 CFR 50.55a(a)(3), the Supply System requests approval for WNP-2 to use an alternative to the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code requirements for examination of longitudinal welds in Class 1 and 2 piping.The requested alternative is delineated in ASME Code Case N-524,"Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping" which was approved by the ASME Code committee on August 9, 1993.Code Case N-524 has not yet been incorporated into Regulatory Guide 1.147.Code Case N-524 allows alternative requirements for surface and volumetric examination of longitudinal piping welds specified in Table IWB-2500-1 (Category B-J)and IWC-2500-1 (Category C-F)of ASME Section XI.The alternative requirements of this Code Case limit the surface and volumetric examination requirements of longitudinal welds to the area or volume contained within the examination requirements of the intersecting circumferential weld.The alternative requirements of this Code Case have been reviewed by The Supply System and determined that the use of this Code Case would provide an acceptable level of quality and safety for the following reasons:~Longitudinal welds are not produced in the field or fabrication shops as is the case of a circumferential weld.Longitudinal piping welds for Class 1 and 2 applications were made by the piping manufacturer under controlled conditions which produced higher quality welds and more uniform residual stress patterns.These welds were examined in accordance with the appropriate ASTM or ASME specifications with additional nondestructive examination requirements imposed by the purchasing specifications. | | The Supply System considers this request to use ASME Code Case N-524 to be a regulatory burden reduction item for WNP-2 with anticipated savings in excess of $ 20,000 for the remaining refueling outages in the current 10-year in-service inspection interval. Approval of ASME Code Case N-524 for use at WNP-2 is requested by April 10, 1996 in order to support the upcoming refuel outage. The outage is presently scheduled to begin on April 13, 1996. |
| The manufacturing controls specified by the appropriate ASTM or ASME specifications along with the additional examinations imposed by the purchasing specification provides assurance of the structural integrity of the longitudinal weld at the time the piping is manufactured. | | Please refer any questions regarding this submittal to Mr. Dave Swank at (509) 377-4563. |
| ~Inservice inspections have provided assurance of the structural integrity of the longitudinal welds during the service life of the plant to date.Based on results of these inservice inspections, WNP-2 has not experienced degradation that would warrant continued examination beyond the intersection area or volume bounded by this Code Case.If any degradation associated with a longitudinal weld were to occur, it is expected that it would be located at the intersection with a circumferential weld.The inspection of this intersection is within the scope of this Code Case.Based on the above, the continual examination of longitudinal welds as currently required by the 1989 Edition of ASME Code, Section XI is not technically warranted. | | Sincerely, arrish. (Mail Drop 1023) ice President, Nuclear Operations DPR/lm Attachment 95i2280247 95i2iq 500039'7 PDR ADQCK"$' |
| The ASME Code committee has recognized this fact, and for this reason approved alternative requirements outlined in Code Case N-524. | | P PDR |
| Attachment Page 2 of 2 In addition to the above, there is a significant accumulation of personnel radiation exposure associated with the examination of longitudinal welds.The personnel radiation exposure associated with the examination of longitudinal welds are dependent on the time it would take to remove and reinstall insulation and interferences, prepare the weld for examination, and perform the examinations. | | |
| Based on the current examination scope for the upcoming outage, exposure savings of approximately 2 person-rem for the reactor recirculation and residual heat removal systems could result from the approval to use the alternative requirements of Code Case N-524.Therefore, the continued imposition of the ASME Code, Section XI examination requirements for longitudinal welds constitutes a hardship to WNP-2 without a compensating increase in quality and safety.The approval to use the alternative provisions of ASME Code Case N-524,"Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping," is requested for the remainder of the second ten-year inservice inspection interval. | | ATTACHMENT ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI REQUEST FOR APPROVAL TO USE CODE CASE N-524 In accordance with 10 CFR 50.55a(a)(3), the Supply System requests approval for WNP-2 to use an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements for examination of longitudinal welds in Class 1 and 2 piping. The requested alternative is delineated in ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping" which was approved by the ASME Code committee on August 9, 1993. Code Case N-524 has not yet been incorporated into Regulatory Guide 1. 147. |
| ~>.-e}} | | Code Case N-524 allows alternative requirements for surface and volumetric examination of longitudinal piping welds specified in Table IWB-2500-1 (Category B-J) and IWC-2500-1 (Category C-F) of ASME Section XI. The alternative requirements of this Code Case limit the surface and volumetric examination requirements of longitudinal welds to the area or volume contained within the examination requirements of the intersecting circumferential weld. The alternative requirements of this Code Case have been reviewed by The Supply System and determined that the use of this Code Case would provide an acceptable level of quality and safety for the following reasons: |
| | ~ Longitudinal welds are not produced in the field or fabrication shops as is the case of a circumferential weld. Longitudinal piping welds for Class 1 and 2 applications were made by the piping manufacturer under controlled conditions which produced higher quality welds and more uniform residual stress patterns. These welds were examined in accordance with the appropriate ASTM or ASME specifications with additional nondestructive examination requirements imposed by the purchasing specifications. The manufacturing controls specified by the appropriate ASTM or ASME specifications along with the additional examinations imposed by the purchasing specification provides assurance of the structural integrity of the longitudinal weld at the time the piping is manufactured. |
| | ~ Inservice inspections have provided assurance of the structural integrity of the longitudinal welds during the service life of the plant to date. Based on results of these inservice inspections, WNP-2 has not experienced degradation that would warrant continued examination beyond the intersection area or volume bounded by this Code Case. If any degradation associated with a longitudinal weld were to occur, it is expected that it would be located at the intersection with a circumferential weld. The inspection of this intersection is within the scope of this Code Case. |
| | Based on the above, the continual examination of longitudinal welds as currently required by the 1989 Edition of ASME Code, Section XI is not technically warranted. The ASME Code committee has recognized this fact, and for this reason approved alternative requirements outlined in Code Case N-524. |
| | |
| | Attachment Page 2 of 2 In addition to the above, there is a significant accumulation of personnel radiation exposure associated with the examination of longitudinal welds. The personnel radiation exposure associated with the examination of longitudinal welds are dependent on the time it would take to remove and reinstall insulation and interferences, prepare the weld for examination, and perform the examinations. Based on the current examination scope for the upcoming outage, exposure savings of approximately 2 person-rem for the reactor recirculation and residual heat removal systems could result from the approval to use the alternative requirements of Code Case N-524. Therefore, the continued imposition of the ASME Code, Section XI examination requirements for longitudinal welds constitutes a hardship to WNP-2 without a compensating increase in quality and safety. |
| | The approval to use the alternative provisions of ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping," is requested for the remainder of the second ten-year inservice inspection interval. |
| | |
| | ~ > .-e}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] |
Text
'ATEGORY j.
REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACCEcSI6N,.NBR:9512280247 DOC.DATE: 95/12/19 NOTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Requests approval for use alternative to ASME Boiler &
Pressure Vessel Code requirements for exam of longitudinal welds in Class 1 a 2 piping.
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 CLIFFORDiJ 1 1 INTERNAL: A~C S 6 0 AEOD/SPD/RAB 1 1
+." I LE=-CENTER~il 1 1 . NRR/DE/ECGB 1 1 NRR/DE/EMCB 1 1 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DET/EMMEB 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 -1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL '4
i
"<~'"P e
ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 December 19, 1995 G02-95-282 Docket No. 50-397 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
WNP-2 OPERATING LICENSE NPF-21, ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI REQUEST FOR APPROVAL TO USE CODE CASE N-524 In accordance with 10 CFR 50.55a(a)(3), the Supply System requests approval for WNP-2 to use an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, requirements for examination of longitudinal welds in Class 1 and 2 piping. The requested alternative is delineated in ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping" which was approved by the ASME committee on August 9, 1993, but has not yet been incorporated into Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability ASME Section XI Division 1." The basis for this request is provided in the Attachment.
The Supply System considers this request to use ASME Code Case N-524 to be a regulatory burden reduction item for WNP-2 with anticipated savings in excess of $ 20,000 for the remaining refueling outages in the current 10-year in-service inspection interval. Approval of ASME Code Case N-524 for use at WNP-2 is requested by April 10, 1996 in order to support the upcoming refuel outage. The outage is presently scheduled to begin on April 13, 1996.
Please refer any questions regarding this submittal to Mr. Dave Swank at (509) 377-4563.
Sincerely, arrish. (Mail Drop 1023) ice President, Nuclear Operations DPR/lm Attachment 95i2280247 95i2iq 500039'7 PDR ADQCK"$'
P PDR
ATTACHMENT ASME BOILER AND PRESSURE VESSEL CODE, SECTION XI REQUEST FOR APPROVAL TO USE CODE CASE N-524 In accordance with 10 CFR 50.55a(a)(3), the Supply System requests approval for WNP-2 to use an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requirements for examination of longitudinal welds in Class 1 and 2 piping. The requested alternative is delineated in ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping" which was approved by the ASME Code committee on August 9, 1993. Code Case N-524 has not yet been incorporated into Regulatory Guide 1. 147.
Code Case N-524 allows alternative requirements for surface and volumetric examination of longitudinal piping welds specified in Table IWB-2500-1 (Category B-J) and IWC-2500-1 (Category C-F) of ASME Section XI. The alternative requirements of this Code Case limit the surface and volumetric examination requirements of longitudinal welds to the area or volume contained within the examination requirements of the intersecting circumferential weld. The alternative requirements of this Code Case have been reviewed by The Supply System and determined that the use of this Code Case would provide an acceptable level of quality and safety for the following reasons:
~ Longitudinal welds are not produced in the field or fabrication shops as is the case of a circumferential weld. Longitudinal piping welds for Class 1 and 2 applications were made by the piping manufacturer under controlled conditions which produced higher quality welds and more uniform residual stress patterns. These welds were examined in accordance with the appropriate ASTM or ASME specifications with additional nondestructive examination requirements imposed by the purchasing specifications. The manufacturing controls specified by the appropriate ASTM or ASME specifications along with the additional examinations imposed by the purchasing specification provides assurance of the structural integrity of the longitudinal weld at the time the piping is manufactured.
~ Inservice inspections have provided assurance of the structural integrity of the longitudinal welds during the service life of the plant to date. Based on results of these inservice inspections, WNP-2 has not experienced degradation that would warrant continued examination beyond the intersection area or volume bounded by this Code Case. If any degradation associated with a longitudinal weld were to occur, it is expected that it would be located at the intersection with a circumferential weld. The inspection of this intersection is within the scope of this Code Case.
Based on the above, the continual examination of longitudinal welds as currently required by the 1989 Edition of ASME Code,Section XI is not technically warranted. The ASME Code committee has recognized this fact, and for this reason approved alternative requirements outlined in Code Case N-524.
Attachment Page 2 of 2 In addition to the above, there is a significant accumulation of personnel radiation exposure associated with the examination of longitudinal welds. The personnel radiation exposure associated with the examination of longitudinal welds are dependent on the time it would take to remove and reinstall insulation and interferences, prepare the weld for examination, and perform the examinations. Based on the current examination scope for the upcoming outage, exposure savings of approximately 2 person-rem for the reactor recirculation and residual heat removal systems could result from the approval to use the alternative requirements of Code Case N-524. Therefore, the continued imposition of the ASME Code,Section XI examination requirements for longitudinal welds constitutes a hardship to WNP-2 without a compensating increase in quality and safety.
The approval to use the alternative provisions of ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping," is requested for the remainder of the second ten-year inservice inspection interval.
~ > .-e