{{#Wiki_filter:0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 51030 Rep Org: AZZ/NLI NUCLEAR LOGISTICS, INC Supplier:
{{#Wiki_filter:0512612016                   U.S. Nuclear Regulatory Commission Operations Center Event Report                           Pagel Part 21 (PAR)                                                                                       Event#         51030 Rep Org: AZZ/NLI NUCLEAR LOGISTICS, INC                           Notification Date I Time: 05/01/2015 13:32         (EDT)
ALLEN BRADLEY Notification Date I Time: 05/01/2015 13:32 (EDT) Event Date I Time: 04/30/2015 (CDT) Last Modification:
Supplier: ALLEN BRADLEY                                                  Event Date I Time: 04/30/2015               (CDT)
04/08/2016 Region: 4 Docket#:
Last Modification: 04/08/2016 Region: 4                                                     Docket#:
City: FORT WORTH Agreement State: Yes County: License #: State: TX NRC Notified by: TRACY BOLT Notifications:
City: FORT WORTH                                 Agreement State:             Yes County:                                                     License #:
MEL GRAY HQ Ops Officer:
State: TX NRC Notified by:   TRACY BOLT                             Notifications: MEL GRAY                               R1DO HQ Ops Officer:   DANIEL MILLS                                             FRANK EHRHARDT                       R2DO Emergency Class:       NON EMERGENCY                                           ROBERT ORLIKOWSKI                   R3DO 10 CFR Section:                                                             GEOFFREY MILLER                       R4DO 21.21(d)(3)(i)       DEFECTS AND NONCOMPLIANCE                               PART 21/50.55 REACTORS               EMAIL POTENTIALLY UNQUALIFIED COMPONENT IN CERTAIN ALLEN BRADLEY TIMING RELAYS The following is an excerpt from a document received from the licensee via email:
DANIEL MILLS FRANK EHRHARDT Emergency Class: NON EMERGENCY ROBERT ORLIKOWSKI 10 CFR Section:
"Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC "Pursuant to 10 CFR 21.21 (d)(3)(ii}, AZZ/N LI is providing written notification of the identification of a potential failure to comply.
GEOFFREY MILLER 21.21(d)(3)(i)
"On the basis of our evaluation, it is determined that AZZ/NLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTORS POTENTIALLY UNQUALIFIED COMPONENT IN CERTAIN ALLEN BRADLEY TIMING RELAYS The following is an excerpt from a document received from the licensee via email: "Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC "Pursuant to 10 CFR 21.21 ( d)(3)(ii},
"The specific part which fails to comply or contains a defect:
AZZ/N LI is providing written notification of the identification of a potential failure to comply. R1DO R2DO R3DO R4DO EMAIL "On the basis of our evaluation, it is determined that AZZ/NLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.  
"As of 2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration. Therefore, NLI qualification/dedication of the relays after 2009 have not included additional testing for the new CPLD component.
"The specific part which fails to comply or contains a defect: "As of 2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device).
"The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.
This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley.
"Between 2009-2010 Allen Bradley made a design change without changing the part number of the commercial
There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.
 
Therefore, NLI qualification/dedication of the relays after 2009 have not included additional testing for the new CPLD component.  
0512612016                     U.S. Nuclear Regulatory Commission Operations Center Event Report                         Page 2 relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are 'solid state', which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance of NEI 01-01."
"The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants. "Between 2009-2010 Allen Bradley made a design change without changing the part number of the commercial 0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are 'solid state', which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance of NEI 01-01." Potentially affected plants include Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project, and St. Lucie. ***UPDATE FROM TRACY BOLT TO JOHN SHOEMAKER AT 1744 EDT ON 4/8/16 * *
Potentially affected plants include Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project, and St. Lucie.
* AZZ/NLI Nuclear Logistics provided additional information regarding Part 21 Report No: P21-04302015, Rev. 1. Notified R1DO (Rogge),
***UPDATE FROM TRACY BOLT TO JOHN SHOEMAKER AT 1744 EDT ON 4/8/16 * *
R2DO (Nease),
* AZZ/NLI Nuclear Logistics provided additional information regarding Part 21 Report No: P21-04302015, Rev. 1.
R3DO(Skokowski),
Notified R1DO (Rogge), R2DO (Nease), R3DO(Skokowski), R4DO (Kellar), and PART 21/50.55 REACTORS via email.
R4DO (Kellar),
  ***UPDATE FROM LES TAGGART TO BETHANY CECERE AT 0951 EDT ON 5/26/16 * *
and PART 21/50.55 REACTORS via email. ***UPDATE FROM LES TAGGART TO BETHANY CECERE AT 0951 EDT ON 5/26/16 * *
* AZZ/NLI Nuclear Logistics provided Revision 2 to Part 21 Report No: P21-04302015 to correct the referenced EPRI TR-102323 Rev. 3 to Rev. 4 and change 'timing' contacts to 'instantaneous' contacts as shown below:
* AZZ/NLI Nuclear Logistics provided Revision 2 to Part 21 Report No: P21-04302015 to correct the referenced EPRI TR-102323 Rev. 3 to Rev. 4 and change 'timing' contacts to 'instantaneous' contacts as shown below: "(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action. "The relays that are currently in stock at NLI have been. placed on hold until after the units have been determined to be qualified for the specific application.
  "(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
NU has completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable:
  "The relays that are currently in stock at NLI have been. placed on hold until after the units have been determined to be qualified for the specific application. NU has completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE101, CE102, RE101, RE102, RS101, RS103, CS101, CS114, CS115 and CS116.
CE101, CE102, RE101, RE102, RS101, RS103, CS101, CS114, CS115 and CS116. "The results were satisfactory with exception of the following condition:
  "The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the ferrite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CS114."
During Conducted Susceptibility CS114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the ferrite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CS114." Notified R1 DO (Lilliendahl),
Notified R1 DO (Lilliendahl), R2DO (Guthrie), R3DO(Kunowski), R4DO (Werner), and PART 21/50.55 REACTORS via email.
R2DO (Guthrie),
 
R3DO(Kunowski),
F*
R4DO (Werner),
0512612016 08:51                                                               P.0011007 NL I' Date: May 26, 2016 To:
and PART 21/50.55 REACTORS via email. ********************************************************************************************************************************
FAX (301) 816.. 5151 Docwnent Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 From:
F* 0512612016 08:51 Date: May 26, 2016 To: FAX (301) 816 .. 5151 Docwnent Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 From: Les Taggart Quality Assurance Program Mgr. AZZINLI Nuclear Logistics 7410 Pebble Drive Fort Worth, Texas 76118 UPDATE -Report of potential lOCFR Part 21, Allen Bradley Timing Relay Model 700RTC Report No: P21-04_302015, Rev. 2 Previous NRC Event number 51030 Previous Accession No: ML15134A016 Total pages including this page: 1 NUCLEAR LOGISTICS INC:. P.0011007 NL IŽ www.au.com 741 o Pebble Drive
Les Taggart Quality Assurance Program Mgr.
AZZINLI Nuclear Logistics 7410 Pebble Drive Fort Worth, Texas 76118 UPDATE - Report of potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC Report No: P21-04_302015, Rev. 2 Previous NRC Event number 51030 Previous Accession No: ML15134A016 Total pages including this page: 1 NUCLEAR LOGISTICS INC:.                                                           www.au.com 741 o Pebble Drive
* Fort Worth, *Texas 761 *IS
* Fort Worth, *Texas 761 *IS
* 800.448.4124 Pho11e
* 800.448.4124 Pho11e
* s*17 .590.0494 Fox 05/26/2016 08:51 Date: May 25, 2016 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Part 21 Report No: P21-04302015, Rev. 2  
* s*17 .590.0494 Fox
 
05/26/2016     08:51                                                                                         P.002/007 N LI' Date: May 25, 2016 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Part 21 Report No: P21-04302015, Rev. 2


==Subject:==
==Subject:==
Update- Report ofpotential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC - NRC Event Number 51030, Accession Number MLl S134AO 16 Revision 2, corrections:
: 1. Page 5 (vii), znd paragraph: changed EPRI TR-102323 Rev. 3 to Rev. 4.
: 2. Page 5 (vii), 3rd paragraph: changed 'timing~ contacts to 'instantaneous' contacts.
Pursuant to 10CFR 21.21 (d) (3) (ii), AZZINLI is providing written notification of the identification of a potential failure to comply.
On the basis of our evaluation. it is determined that AZZINLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
The following information is required per 10CFR 21.21 (d) (4).
(i) Name and address of the individual or individuals informing the Commission.
Tracy Bolt, Director of Quality Assurance Nuclear Logistics, Inc 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility, activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
The specific part which fails to comply or contains a defect:
As of2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.
The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.
Page 1 of6 NUCLEAR LOGISTICS INC.                                                                                        www.e1:z;z:.co111 74'1 D Pebble Drive
* Fort Worth. Texas 76*11        a
* 800.448.4124 Phone
* 8"17 .590.0484 Fax
05/26/2016  08:51                                                                                              P.003/007 (iii) Identification of the firm constructing or supplying the baste component which fails to comply or contains a defect.
NLI procured the commercial grade relays, dedicated, qualified and supplied the subject relays as Safety Related.
(iv)  Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
Between 2009-2010, Allen Bradley made a design change without changing the part number of the commercial relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are "solid state'\ which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance ofNEI 01-01. See Figures l and 2 below:
Figure 1- Original qualified design (prior to 2009).
Relays supplied prior to 2009 are not affected by this issue.
Part 21 Report No: P2lw04302015, Rev. 2 Page2 of6
05/26/2016 08:52                                                                                            P.004/007 Figure 2 - New design circuit board and CPLD that replaced the original component.
(v)  The date on which the information of such defect or failure to comply was obtained.
On April 27, 2015, enough information was gathered from the evaluations being perfonned to detennine the reportability of the failure to comply that is the root cause for the event.
Part 21 Report No: P21-04302015, Rev. 2 Page 3 of6


Update-Report ofpotential lOCFR Part 21, Allen Bradley Timing Relay Model 700RTC -NRC Event Number 51030, Accession Number MLl S 134AO 16 Revision 2, corrections:
05/26/2016     08:52                                                             (FAX)                 P.005/007 (vi)   In th~ case of a basic component which contains a def~t or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be snpplled for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part.
: 1. Page 5 (vii), znd paragraph:
Relays that have been procured and dedicated from 2009 to present are identified below.
changed EPRI TR-102323 Rev. 3 to Rev. 4. 2. Page 5 (vii), 3rd paragraph:
Plant Name             Purchase order                             Serial Number Browns Ferrv           72923-1                 29760-001-00003 Ginna Station          6617899                  51475"001-00001 and -00002, 526S6Kl-Ol-0001 Grand Gulf              10304816                34182-001-00001 Grand Gulf              10400205                56319-001-00001 39228-001-00001 thru -00017, .39228-001-00158 thru Invensys              4540216542                39228-001-00166, 39228-001-00170 thru 39228-001-00177 39407-001-00001 thru -00008, 39407-002-00001 thru-KHNP                  Yl2-0292-010              00005 LunR1I1en              8749411E007CO            38486-001-00001 and -00002, 38486-002-00001 Millstone              45735761                  31998Kl-Ol-0001 Millstone              45735761                  31391-001-00001 Nine Mile Point        530734                  63245-001-00001 thru-00018 North Anna            70239037                  55133-001-00001 & -00002 39602-001-00001 and -00002, 39602-002-00001 thru -
changed contacts to 'instantaneous' contacts.
70239037                  00003 North Anna 40033-001-00001and40033-001-00002, 40033-002-00001 North Anna            70239037                  thru -00003 33846-001-00001 thru -00009, 33846-001-00011 thru OPPb Ft Calhoun        155213 33846-001-00015, 33846-002-00002 & -00003 QPPD Ft Calhoun        163495                  35941-001-00001 thru -00004 OPPD Ft Calhoun        164936                  35891Kl-01-0001 thru -0005 OPPD Ft Calhoun        164936                  36888-001-00001, -00003 thru -00005 OPPD Ft Calhoun        164936                  36888K2-01-0001 OPPD Ft Calhoun        177878                  39194-001"00001 thru -00006 OPPD Ft Calhoun                                  40743-001-00001thru-00003,40743-002-00001 182681 OPPD Ft Calhoun        187625                  51477~001-00001  thru ~00004 Perry Station          45354401                  33357-001-00001 thru -00003 River Bend Station      10349942                38585-001-00001 thru -00004 River Bend Station      10362573                40077-001-00001 River Bend Station      10378904                ~1627-001-00001 South Texas Project    134783                  33750-001-00001 & -00002 Part 21 Report No: .P21-04302015, Rev. 2 Page4 of6
P.002/007 N LIŽ Pursuant to lOCFR 21.21 (d) (3) (ii), AZZINLI is providing written notification of the identification of a potential failure to comply. On the basis of our evaluation.
 
it is determined that AZZINLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
05/26/2016   08:52                                                                                               P.006/007 South Texas Project     147962                     37204-001-00001 thru-00006 South Texas Project     154172                     51592-001-00001 thru -00004 South Texas Froject     171193                     57894-001-00001 thru-00006 Bechtel PO: 25486-974-St Lucie                                            38549-001-00002 thru-00005 FPA-EMR0-00001 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organl:u.tion respollllible for the action; and the length of time that has been or wUl be taken to complete the action.
The following information is required per lOCFR 21.21 (d) (4). (i) Name and address of the individual or individuals informing the Commission.
The relays that are currently in stock at NLI have been placed on hold until after the units have been detennined to be qualified for the specific application. NLI has *completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE 10 l, I
Tracy Bolt, Director of Quality Assurance Nuclear Logistics, Inc 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility,
CE102, RElOl, llEI02, RSIOI, RS103, CS101, CS114, CSllS and CS116.
: activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect. The specific part which fails to comply or contains a defect: As of2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device).
The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS 114 onto the power lines, with the timing circuit in operation, the instantaneous I
This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley.
contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the fettite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility   and   successfully passed the required test per CSl 14.
There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.
In addition to the EMC testing that was performed, the Verification and Validation I Dedication activities for the digital device was also completed, The results of the dedication activity are contained in NLI Verification and Validation/Dedication report VVR-700RTC-01, Rev. 1. The results of the V&V/dedication activity are satisfactory. The firmware version verified is the only version that has been released since the change was implemented.
The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants. Page 1 of6 NUCLEAR LOGISTICS INC. www.e1:z;z:.co111 74'1 D Pebble Drive
Part 21 Report No:   P21-0430201S~      Rev. 2 Page 5 of6
* Fort Worth. Texas 76*11 a
 
* 800.448.4124 Phone
0512612016   08:52                                                                                             P.0071007 (viii) Any advice related to the defect or failure to comply about the faeUlty, activity; or basic component that has beent is beingt or wiU be given to purchasers or licensees.
* 8"17 .590.0484 Fax 05/26/2016 08:51 P.003/007 (iii) Identification of the firm constructing or supplying the baste component which fails to comply or contains a defect. NLI procured the commercial grade relays, dedicated, qualified and supplied the subject relays as Safety Related.
(iv) Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply. Between 2009-2010, Allen Bradley made a design change without changing the part number of the commercial relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are "solid state'\ which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance ofNEI 01-01. See Figures l and 2 below:
* Figure 1-Original qualified design (prior to 2009). Relays supplied prior to 2009 are not affected by this issue. Part 21 Report No: P2lw04302015, Rev. 2 Page2 of6 05/26/2016 08:52 P.004/007 Figure 2 -New design circuit board and CPLD that replaced the original component.
(v) The date on which the information of such defect or failure to comply was obtained.
On April 27, 2015, enough information was gathered from the evaluations being perfonned to detennine the reportability of the failure to comply that is the root cause for the event. Part 21 Report No: P21-04302015, Rev. 2 Page 3 of6 05/26/2016 08:52 (FAX) P.005/007 (vi) In case of a basic component which contains a
or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be snpplled for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part. Relays that have been procured and dedicated from 2009 to present are identified below. Plant Name Purchase order Browns Ferrv 72923-1 Ginna Station 6617899 Grand Gulf 10304816 Grand Gulf 10400205 Invensys 4540216542 KHNP Yl2-0292-010 LunR1I1en 8749411E007CO Millstone 45735761 Millstone 45735761 Nine Mile Point 530734 North Anna 70239037 North Anna 70239037 North Anna 70239037 OPPb Ft Calhoun 155213 QPPD Ft Calhoun 163495 OPPD Ft Calhoun 164936 OPPD Ft Calhoun 164936 OPPD Ft Calhoun 164936 OPPD Ft Calhoun 177878 OPPD Ft Calhoun 182681 OPPD Ft Calhoun 187625 Perry Station 45354401 River Bend Station 10349942 River Bend Station 10362573 River Bend Station 10378904 South Texas Project 134783 Serial Number 29760-001-00003 51475"001-00001 and -00002, 526S6Kl-Ol-0001 34182-001-00001 56319-001-00001 39228-001-00001 thru -00017, .39228-001-00158 thru 39228-001-00166, 39228-001-00170 thru 39228-001-00177 39407-001-00001 thru -00008, 39407-002-00001 thru-00005 38486-001-00001 and -00002, 38486-002-00001 31998Kl-Ol-0001 31391-001-00001 63245-001-00001 thru-00018 55133-001-00001  
& -00002 39602-001-00001 and -00002, 39602-002-00001 thru -00003 40033-001-00001and40033-001-00002, 40033-002-00001 thru -00003 33846-001-00001 thru -00009, 33846-001-00011 thru 33846-001-00015, 33846-002-00002  
& -00003 35941-001-00001 thru -00004 35891Kl-01-0001 thru -0005 36888-001-00001,  
-00003 thru -00005 36888K2-01-0001 39194-001"00001 thru -00006 40743-001-00001thru-00003,40743-002-00001 thru 33357-001-00001 thru -00003 38585-001-00001 thru -00004 40077-001-00001 33750-001-00001  
& -00002 Part 21 Report No: .P21-04302015, Rev. 2 Page4 of6 05/26/2016 08:52 P.006/007 South Texas Project 147962 37204-001-00001 thru-00006 South Texas Project 154172 51592-001-00001 thru -00004 South Texas Froject 171193 57894-001-00001 thru-00006 St Lucie Bechtel PO: 25486-974-38549-001-00002 thru-00005 FPA-EMR0-00001 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organl:u.tion respollllible for the action; and the length of time that has been or wUl be taken to complete the action. The relays that are currently in stock at NLI have been placed on hold until after the units have been detennined to be qualified for the specific application.
NLI has *completed the EMC qualification I testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable:
CE 10 l, CE102, RElOl, llEI02, RSIOI, RS103, CS101, CS114, CSllS and CS116. The results were satisfactory with exception of the following condition:
During Conducted I Susceptibility CS 114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the fettite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CSl 14. In addition to the EMC testing that was performed, the Verification and Validation I Dedication activities for the digital device was also completed, The results of the dedication activity are contained in NLI Verification and Validation/Dedication report VVR-700RTC-01, Rev. 1. The results of the V&V/dedication activity are satisfactory.
The firmware version verified is the only version that has been released since the change was implemented.
Part 21 Report No:
Rev. 2 Page 5 of6
* > 0512612016 08:52 P.0071007 (viii) Any advice related to the defect or failure to comply about the faeUlty, activity; or basic component that has beent is beingt or wiU be given to purchasers or licensees.
The functions of the relays supplied by NLI were tested for the foltowing critical characteristics:
The functions of the relays supplied by NLI were tested for the foltowing critical characteristics:
Pick-up at rated voltage Drop-out when the voltage is removed Pick"up at degraded voltage Over-Voltage operation Insulation resistance Off delay settings are ac:ljustable from 2-120 seconds Fick-up voltage Drop-out voltage Dimensions and Configuration The relays are dedicated for generic application usage in timing applications.
Pick-up at rated voltage Drop-out when the voltage is removed Pick"up at degraded voltage Over-Voltage operation Insulation resistance Off delay settings are ac:ljustable from 2-120 seconds Fick-up voltage Drop-out voltage Dimensions and Configuration The relays are dedicated for generic application usage in timing applications. The specific plant application(s) is unknown by NLI. The EMC qualification of the relay is dependent on the installed configuration and location in the plant. The plant should evaluate whether the installed relays are subjected to the specific EMIIRFI condition Conducted Susceptibility CS 114 between the :frequencies of 2.6 MHz to 20.3 MHz identified above.
The specific plant application(s) is unknown by NLI. The EMC qualification of the relay is dependent on the installed configuration and location in the plant. The plant should evaluate whether the installed relays are subjected to the specific EMIIRFI condition Conducted Susceptibility CS 114 between the :frequencies of 2.6 MHz to 20.3 MHz identified above. Please contact me with any questions or comments.
Please contact me with any questions or comments.
Sincerely, Quality Assurance Program Manager Part 21 Report No: P21-04302015, Rev. 2 Page 6 of6 0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 51030 Rep Org: AZZ/NLI NUCLEAR LOGISTICS, INC Supplier:
Sincerely, rt:!@~
ALLEN BRADLEY Notification Date I Time: 05/01/2015 13:32 (EDT) Event Date I Time: 04/30/2015 (CDT) Last Modification:
Quality Assurance Program Manager Part 21 Report No: P21-04302015, Rev. 2 Page 6 of6
04/08/2016 Region: 4 Docket#:
 
City: FORT WORTH Agreement State: Yes County: License #: State: TX NRC Notified by: TRACY BOLT Notifications:
0512612016                   U.S. Nuclear Regulatory Commission Operations Center Event Report                           Pagel Part 21 (PAR)                                                                                       Event#         51030 Rep Org: AZZ/NLI NUCLEAR LOGISTICS, INC                           Notification Date I Time: 05/01/2015 13:32         (EDT)
MEL GRAY HQ Ops Officer:
Supplier: ALLEN BRADLEY                                                  Event Date I Time: 04/30/2015               (CDT)
DANIEL MILLS FRANK EHRHARDT Emergency Class: NON EMERGENCY ROBERT ORLIKOWSKI 10 CFR Section:
Last Modification: 04/08/2016 Region: 4                                                     Docket#:
GEOFFREY MILLER 21.21(d)(3)(i)
City: FORT WORTH                                 Agreement State:             Yes County:                                                     License #:
DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTORS POTENTIALLY UNQUALIFIED COMPONENT IN CERTAIN ALLEN BRADLEY TIMING RELAYS The following is an excerpt from a document received from the licensee via email: "Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC "Pursuant to 10 CFR 21.21 ( d)(3)(ii},
State: TX NRC Notified by:   TRACY BOLT                             Notifications: MEL GRAY                               R1DO HQ Ops Officer:   DANIEL MILLS                                             FRANK EHRHARDT                       R2DO Emergency Class:       NON EMERGENCY                                           ROBERT ORLIKOWSKI                   R3DO 10 CFR Section:                                                             GEOFFREY MILLER                       R4DO 21.21(d)(3)(i)       DEFECTS AND NONCOMPLIANCE                               PART 21/50.55 REACTORS               EMAIL POTENTIALLY UNQUALIFIED COMPONENT IN CERTAIN ALLEN BRADLEY TIMING RELAYS The following is an excerpt from a document received from the licensee via email:
AZZ/N LI is providing written notification of the identification of a potential failure to comply. R1DO R2DO R3DO R4DO EMAIL "On the basis of our evaluation, it is determined that AZZ/NLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.  
"Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC "Pursuant to 10 CFR 21.21 (d)(3)(ii}, AZZ/N LI is providing written notification of the identification of a potential failure to comply.
"The specific part which fails to comply or contains a defect: "As of 2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device).
"On the basis of our evaluation, it is determined that AZZ/NLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley.
"The specific part which fails to comply or contains a defect:
There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.
"As of 2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration. Therefore, NLI qualification/dedication of the relays after 2009 have not included additional testing for the new CPLD component.
Therefore, NLI qualification/dedication of the relays after 2009 have not included additional testing for the new CPLD component.  
"The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.
"The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants. "Between 2009-2010 Allen Bradley made a design change without changing the part number of the commercial 0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are 'solid state', which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance of NEI 01-01." Potentially affected plants include Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project, and St. Lucie. ***UPDATE FROM TRACY BOLT TO JOHN SHOEMAKER AT 1744 EDT ON 4/8/16 * *
"Between 2009-2010 Allen Bradley made a design change without changing the part number of the commercial
* AZZ/NLI Nuclear Logistics provided additional information regarding Part 21 Report No: P21-04302015, Rev. 1. Notified R1DO (Rogge),
 
R2DO (Nease),
0512612016                     U.S. Nuclear Regulatory Commission Operations Center Event Report                         Page 2 relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are 'solid state', which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance of NEI 01-01."
R3DO(Skokowski),
Potentially affected plants include Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project, and St. Lucie.
R4DO (Kellar),
***UPDATE FROM TRACY BOLT TO JOHN SHOEMAKER AT 1744 EDT ON 4/8/16 * *
and PART 21/50.55 REACTORS via email. ***UPDATE FROM LES TAGGART TO BETHANY CECERE AT 0951 EDT ON 5/26/16 * *
* AZZ/NLI Nuclear Logistics provided additional information regarding Part 21 Report No: P21-04302015, Rev. 1.
* AZZ/NLI Nuclear Logistics provided Revision 2 to Part 21 Report No: P21-04302015 to correct the referenced EPRI TR-102323 Rev. 3 to Rev. 4 and change 'timing' contacts to 'instantaneous' contacts as shown below: "(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action. "The relays that are currently in stock at NLI have been. placed on hold until after the units have been determined to be qualified for the specific application.
Notified R1DO (Rogge), R2DO (Nease), R3DO(Skokowski), R4DO (Kellar), and PART 21/50.55 REACTORS via email.
NU has completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable:
  ***UPDATE FROM LES TAGGART TO BETHANY CECERE AT 0951 EDT ON 5/26/16 * *
CE101, CE102, RE101, RE102, RS101, RS103, CS101, CS114, CS115 and CS116. "The results were satisfactory with exception of the following condition:
* AZZ/NLI Nuclear Logistics provided Revision 2 to Part 21 Report No: P21-04302015 to correct the referenced EPRI TR-102323 Rev. 3 to Rev. 4 and change 'timing' contacts to 'instantaneous' contacts as shown below:
During Conducted Susceptibility CS114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the ferrite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CS114." Notified R1 DO (Lilliendahl),
  "(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
R2DO (Guthrie),
  "The relays that are currently in stock at NLI have been. placed on hold until after the units have been determined to be qualified for the specific application. NU has completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE101, CE102, RE101, RE102, RS101, RS103, CS101, CS114, CS115 and CS116.
R3DO(Kunowski),
  "The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the ferrite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CS114."
R4DO (Werner),
Notified R1 DO (Lilliendahl), R2DO (Guthrie), R3DO(Kunowski), R4DO (Werner), and PART 21/50.55 REACTORS via email.
and PART 21/50.55 REACTORS via email. ********************************************************************************************************************************
 
F* 0512612016 08:51 Date: May 26, 2016 To: FAX (301) 816 .. 5151 Docwnent Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 From: Les Taggart Quality Assurance Program Mgr. AZZINLI Nuclear Logistics 7410 Pebble Drive Fort Worth, Texas 76118 UPDATE -Report of potential lOCFR Part 21, Allen Bradley Timing Relay Model 700RTC Report No: P21-04_302015, Rev. 2 Previous NRC Event number 51030 Previous Accession No: ML15134A016 Total pages including this page: 1 NUCLEAR LOGISTICS INC:. P.0011007 NL IŽ www.au.com 741 o Pebble Drive
F*
0512612016 08:51                                                               P.0011007 NL I' Date: May 26, 2016 To:
FAX (301) 816.. 5151 Docwnent Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 From:
Les Taggart Quality Assurance Program Mgr.
AZZINLI Nuclear Logistics 7410 Pebble Drive Fort Worth, Texas 76118 UPDATE - Report of potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC Report No: P21-04_302015, Rev. 2 Previous NRC Event number 51030 Previous Accession No: ML15134A016 Total pages including this page: 1 NUCLEAR LOGISTICS INC:.                                                           www.au.com 741 o Pebble Drive
* Fort Worth, *Texas 761 *IS
* Fort Worth, *Texas 761 *IS
* 800.448.4124 Pho11e
* 800.448.4124 Pho11e
* s*17 .590.0494 Fox 05/26/2016 08:51 Date: May 25, 2016 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Part 21 Report No: P21-04302015, Rev. 2  
* s*17 .590.0494 Fox
 
05/26/2016     08:51                                                                                         P.002/007 N LI' Date: May 25, 2016 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Part 21 Report No: P21-04302015, Rev. 2


==Subject:==
==Subject:==
Update- Report ofpotential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC - NRC Event Number 51030, Accession Number MLl S134AO 16 Revision 2, corrections:
: 1. Page 5 (vii), znd paragraph: changed EPRI TR-102323 Rev. 3 to Rev. 4.
: 2. Page 5 (vii), 3rd paragraph: changed 'timing~ contacts to 'instantaneous' contacts.
Pursuant to 10CFR 21.21 (d) (3) (ii), AZZINLI is providing written notification of the identification of a potential failure to comply.
On the basis of our evaluation. it is determined that AZZINLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
The following information is required per 10CFR 21.21 (d) (4).
(i) Name and address of the individual or individuals informing the Commission.
Tracy Bolt, Director of Quality Assurance Nuclear Logistics, Inc 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility, activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
The specific part which fails to comply or contains a defect:
As of2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.
The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.
Page 1 of6 NUCLEAR LOGISTICS INC.                                                                                        www.e1:z;z:.co111 74'1 D Pebble Drive
* Fort Worth. Texas 76*11        a
* 800.448.4124 Phone
* 8"17 .590.0484 Fax


Update-Report ofpotential lOCFR Part 21, Allen Bradley Timing Relay Model 700RTC -NRC Event Number 51030, Accession Number MLl S 134AO 16 Revision 2, corrections:
05/26/2016   08:51                                                                                               P.003/007 (iii) Identification of the firm constructing or supplying the baste component which fails to comply or contains a defect.
: 1. Page 5 (vii), znd paragraph:
NLI procured the commercial grade relays, dedicated, qualified and supplied the subject relays as Safety Related.
changed EPRI TR-102323 Rev. 3 to Rev. 4. 2. Page 5 (vii), 3rd paragraph:
(iv) Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
changed contacts to 'instantaneous' contacts.
Between 2009-2010, Allen Bradley made a design change without changing the part number of the commercial relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are "solid state'\ which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance ofNEI 01-01. See Figures l and 2 below:
P.002/007 N LIŽ Pursuant to lOCFR 21.21 (d) (3) (ii), AZZINLI is providing written notification of the identification of a potential failure to comply. On the basis of our evaluation.
Figure 1- Original qualified design (prior to 2009).
it is determined that AZZINLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.
Relays supplied prior to 2009 are not affected by this issue.
The following information is required per lOCFR 21.21 (d) (4). (i) Name and address of the individual or individuals informing the Commission.
Part 21 Report No: P2lw04302015, Rev. 2 Page2 of6
Tracy Bolt, Director of Quality Assurance Nuclear Logistics, Inc 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility,
 
: activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect. The specific part which fails to comply or contains a defect: As of2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device).
05/26/2016 08:52                                                                                           P.004/007 Figure 2 - New design circuit board and CPLD that replaced the original component.
This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley.
(v) The date on which the information of such defect or failure to comply was obtained.
There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.
On April 27, 2015, enough information was gathered from the evaluations being perfonned to detennine the reportability of the failure to comply that is the root cause for the event.
The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants. Page 1 of6 NUCLEAR LOGISTICS INC. www.e1:z;z:.co111 74'1 D Pebble Drive
Part 21 Report No: P21-04302015, Rev. 2 Page 3 of6
* Fort Worth. Texas 76*11 a
 
* 800.448.4124 Phone
05/26/2016     08:52                                                             (FAX)                 P.005/007 (vi)   In th~ case of a basic component which contains a def~t or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be snpplled for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part.
* 8"17 .590.0484 Fax 05/26/2016 08:51 P.003/007 (iii) Identification of the firm constructing or supplying the baste component which fails to comply or contains a defect. NLI procured the commercial grade relays, dedicated, qualified and supplied the subject relays as Safety Related.  
Relays that have been procured and dedicated from 2009 to present are identified below.
(iv) Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply. Between 2009-2010, Allen Bradley made a design change without changing the part number of the commercial relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are "solid state'\ which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance ofNEI 01-01. See Figures l and 2 below:
Plant Name             Purchase order                             Serial Number Browns Ferrv           72923-1                 29760-001-00003 Ginna Station          6617899                  51475"001-00001 and -00002, 526S6Kl-Ol-0001 Grand Gulf              10304816                34182-001-00001 Grand Gulf              10400205                56319-001-00001 39228-001-00001 thru -00017, .39228-001-00158 thru Invensys              4540216542                39228-001-00166, 39228-001-00170 thru 39228-001-00177 39407-001-00001 thru -00008, 39407-002-00001 thru-KHNP                  Yl2-0292-010              00005 LunR1I1en              8749411E007CO            38486-001-00001 and -00002, 38486-002-00001 Millstone              45735761                  31998Kl-Ol-0001 Millstone              45735761                  31391-001-00001 Nine Mile Point        530734                  63245-001-00001 thru-00018 North Anna            70239037                  55133-001-00001 & -00002 39602-001-00001 and -00002, 39602-002-00001 thru -
* Figure 1-Original qualified design (prior to 2009). Relays supplied prior to 2009 are not affected by this issue. Part 21 Report No: P2lw04302015, Rev. 2 Page2 of6 05/26/2016 08:52 P.004/007 Figure 2 -New design circuit board and CPLD that replaced the original component.  
70239037                  00003 North Anna 40033-001-00001and40033-001-00002, 40033-002-00001 North Anna            70239037                  thru -00003 33846-001-00001 thru -00009, 33846-001-00011 thru OPPb Ft Calhoun        155213 33846-001-00015, 33846-002-00002 & -00003 QPPD Ft Calhoun        163495                  35941-001-00001 thru -00004 OPPD Ft Calhoun        164936                  35891Kl-01-0001 thru -0005 OPPD Ft Calhoun        164936                  36888-001-00001, -00003 thru -00005 OPPD Ft Calhoun        164936                  36888K2-01-0001 OPPD Ft Calhoun        177878                  39194-001"00001 thru -00006 OPPD Ft Calhoun                                  40743-001-00001thru-00003,40743-002-00001 182681 OPPD Ft Calhoun        187625                  51477~001-00001  thru ~00004 Perry Station          45354401                  33357-001-00001 thru -00003 River Bend Station      10349942                38585-001-00001 thru -00004 River Bend Station      10362573                40077-001-00001 River Bend Station      10378904                ~1627-001-00001 South Texas Project    134783                  33750-001-00001 & -00002 Part 21 Report No: .P21-04302015, Rev. 2 Page4 of6
(v) The date on which the information of such defect or failure to comply was obtained.
 
On April 27, 2015, enough information was gathered from the evaluations being perfonned to detennine the reportability of the failure to comply that is the root cause for the event. Part 21 Report No: P21-04302015, Rev. 2 Page 3 of6 05/26/2016 08:52 (FAX) P.005/007 (vi) In case of a basic component which contains a
05/26/2016   08:52                                                                                               P.006/007 South Texas Project     147962                     37204-001-00001 thru-00006 South Texas Project     154172                     51592-001-00001 thru -00004 South Texas Froject     171193                     57894-001-00001 thru-00006 Bechtel PO: 25486-974-St Lucie                                            38549-001-00002 thru-00005 FPA-EMR0-00001 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organl:u.tion respollllible for the action; and the length of time that has been or wUl be taken to complete the action.
or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be snpplled for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part. Relays that have been procured and dedicated from 2009 to present are identified below. Plant Name Purchase order Browns Ferrv 72923-1 Ginna Station 6617899 Grand Gulf 10304816 Grand Gulf 10400205 Invensys 4540216542 KHNP Yl2-0292-010 LunR1I1en 8749411E007CO Millstone 45735761 Millstone 45735761 Nine Mile Point 530734 North Anna 70239037 North Anna 70239037 North Anna 70239037 OPPb Ft Calhoun 155213 QPPD Ft Calhoun 163495 OPPD Ft Calhoun 164936 OPPD Ft Calhoun 164936 OPPD Ft Calhoun 164936 OPPD Ft Calhoun 177878 OPPD Ft Calhoun 182681 OPPD Ft Calhoun 187625 Perry Station 45354401 River Bend Station 10349942 River Bend Station 10362573 River Bend Station 10378904 South Texas Project 134783 Serial Number 29760-001-00003 51475"001-00001 and -00002, 526S6Kl-Ol-0001 34182-001-00001 56319-001-00001 39228-001-00001 thru -00017, .39228-001-00158 thru 39228-001-00166, 39228-001-00170 thru 39228-001-00177 39407-001-00001 thru -00008, 39407-002-00001 thru-00005 38486-001-00001 and -00002, 38486-002-00001 31998Kl-Ol-0001 31391-001-00001 63245-001-00001 thru-00018 55133-001-00001  
The relays that are currently in stock at NLI have been placed on hold until after the units have been detennined to be qualified for the specific application. NLI has *completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE 10 l, I
& -00002 39602-001-00001 and -00002, 39602-002-00001 thru -00003 40033-001-00001and40033-001-00002, 40033-002-00001 thru -00003 33846-001-00001 thru -00009, 33846-001-00011 thru 33846-001-00015, 33846-002-00002  
CE102, RElOl, llEI02, RSIOI, RS103, CS101, CS114, CSllS and CS116.
& -00003 35941-001-00001 thru -00004 35891Kl-01-0001 thru -0005 36888-001-00001,  
The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS 114 onto the power lines, with the timing circuit in operation, the instantaneous I
-00003 thru -00005 36888K2-01-0001 39194-001"00001 thru -00006 40743-001-00001thru-00003,40743-002-00001 thru 33357-001-00001 thru -00003 38585-001-00001 thru -00004 40077-001-00001 33750-001-00001  
contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the fettite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility   and   successfully passed the required test per CSl 14.
& -00002 Part 21 Report No: .P21-04302015, Rev. 2 Page4 of6 05/26/2016 08:52 P.006/007 South Texas Project 147962 37204-001-00001 thru-00006 South Texas Project 154172 51592-001-00001 thru -00004 South Texas Froject 171193 57894-001-00001 thru-00006 St Lucie Bechtel PO: 25486-974-38549-001-00002 thru-00005 FPA-EMR0-00001 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organl:u.tion respollllible for the action; and the length of time that has been or wUl be taken to complete the action. The relays that are currently in stock at NLI have been placed on hold until after the units have been detennined to be qualified for the specific application.
In addition to the EMC testing that was performed, the Verification and Validation I Dedication activities for the digital device was also completed, The results of the dedication activity are contained in NLI Verification and Validation/Dedication report VVR-700RTC-01, Rev. 1. The results of the V&V/dedication activity are satisfactory. The firmware version verified is the only version that has been released since the change was implemented.
NLI has *completed the EMC qualification I testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable:
Part 21 Report No:   P21-0430201S~      Rev. 2 Page 5 of6
CE 10 l, CE102, RElOl, llEI02, RSIOI, RS103, CS101, CS114, CSllS and CS116. The results were satisfactory with exception of the following condition:
 
During Conducted I Susceptibility CS 114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the fettite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CSl 14. In addition to the EMC testing that was performed, the Verification and Validation I Dedication activities for the digital device was also completed, The results of the dedication activity are contained in NLI Verification and Validation/Dedication report VVR-700RTC-01, Rev. 1. The results of the V&V/dedication activity are satisfactory.
0512612016   08:52                                                                                             P.0071007 (viii) Any advice related to the defect or failure to comply about the faeUlty, activity; or basic component that has beent is beingt or wiU be given to purchasers or licensees.
The firmware version verified is the only version that has been released since the change was implemented.
Part 21 Report No:
Rev. 2 Page 5 of6
* > 0512612016 08:52 P.0071007 (viii) Any advice related to the defect or failure to comply about the faeUlty, activity; or basic component that has beent is beingt or wiU be given to purchasers or licensees.
The functions of the relays supplied by NLI were tested for the foltowing critical characteristics:
The functions of the relays supplied by NLI were tested for the foltowing critical characteristics:
Pick-up at rated voltage Drop-out when the voltage is removed Pick"up at degraded voltage Over-Voltage operation Insulation resistance Off delay settings are ac:ljustable from 2-120 seconds Fick-up voltage Drop-out voltage Dimensions and Configuration The relays are dedicated for generic application usage in timing applications.
Pick-up at rated voltage Drop-out when the voltage is removed Pick"up at degraded voltage Over-Voltage operation Insulation resistance Off delay settings are ac:ljustable from 2-120 seconds Fick-up voltage Drop-out voltage Dimensions and Configuration The relays are dedicated for generic application usage in timing applications. The specific plant application(s) is unknown by NLI. The EMC qualification of the relay is dependent on the installed configuration and location in the plant. The plant should evaluate whether the installed relays are subjected to the specific EMIIRFI condition Conducted Susceptibility CS 114 between the :frequencies of 2.6 MHz to 20.3 MHz identified above.
The specific plant application(s) is unknown by NLI. The EMC qualification of the relay is dependent on the installed configuration and location in the plant. The plant should evaluate whether the installed relays are subjected to the specific EMIIRFI condition Conducted Susceptibility CS 114 between the :frequencies of 2.6 MHz to 20.3 MHz identified above. Please contact me with any questions or comments.
Please contact me with any questions or comments.
Sincerely, Quality Assurance Program Manager Part 21 Report No: P21-04302015, Rev. 2 Page 6 of6}}
Sincerely, rt:!@~
Quality Assurance Program Manager Part 21 Report No: P21-04302015, Rev. 2 Page 6 of6}}

Latest revision as of 01:56, 5 February 2020

Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC
ML16154A207
Person / Time
Site: Millstone, Browns Ferry, Nine Mile Point, Perry, Saint Lucie, North Anna, River Bend, Ginna, South Texas, Fort Calhoun  Constellation icon.png
Issue date: 05/26/2016
From: Bolt T
AZZ Nuclear Logistics
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16154A207 (9)


Text

0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 51030 Rep Org: AZZ/NLI NUCLEAR LOGISTICS, INC Notification Date I Time: 05/01/2015 13:32 (EDT)

Supplier: ALLEN BRADLEY Event Date I Time: 04/30/2015 (CDT)

Last Modification: 04/08/2016 Region: 4 Docket#:

City: FORT WORTH Agreement State: Yes County: License #:

State: TX NRC Notified by: TRACY BOLT Notifications: MEL GRAY R1DO HQ Ops Officer: DANIEL MILLS FRANK EHRHARDT R2DO Emergency Class: NON EMERGENCY ROBERT ORLIKOWSKI R3DO 10 CFR Section: GEOFFREY MILLER R4DO 21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTORS EMAIL POTENTIALLY UNQUALIFIED COMPONENT IN CERTAIN ALLEN BRADLEY TIMING RELAYS The following is an excerpt from a document received from the licensee via email:

"Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC "Pursuant to 10 CFR 21.21 (d)(3)(ii}, AZZ/N LI is providing written notification of the identification of a potential failure to comply.

"On the basis of our evaluation, it is determined that AZZ/NLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.

"The specific part which fails to comply or contains a defect:

"As of 2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration. Therefore, NLI qualification/dedication of the relays after 2009 have not included additional testing for the new CPLD component.

"The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.

"Between 2009-2010 Allen Bradley made a design change without changing the part number of the commercial

0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are 'solid state', which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance of NEI 01-01."

Potentially affected plants include Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project, and St. Lucie.

  • AZZ/NLI Nuclear Logistics provided additional information regarding Part 21 Report No: P21-04302015, Rev. 1.

Notified R1DO (Rogge), R2DO (Nease), R3DO(Skokowski), R4DO (Kellar), and PART 21/50.55 REACTORS via email.

  • AZZ/NLI Nuclear Logistics provided Revision 2 to Part 21 Report No: P21-04302015 to correct the referenced EPRI TR-102323 Rev. 3 to Rev. 4 and change 'timing' contacts to 'instantaneous' contacts as shown below:

"(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

"The relays that are currently in stock at NLI have been. placed on hold until after the units have been determined to be qualified for the specific application. NU has completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE101, CE102, RE101, RE102, RS101, RS103, CS101, CS114, CS115 and CS116.

"The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the ferrite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CS114."

Notified R1 DO (Lilliendahl), R2DO (Guthrie), R3DO(Kunowski), R4DO (Werner), and PART 21/50.55 REACTORS via email.

F*

0512612016 08:51 P.0011007 NL I' Date: May 26, 2016 To:

FAX (301) 816.. 5151 Docwnent Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 From:

Les Taggart Quality Assurance Program Mgr.

AZZINLI Nuclear Logistics 7410 Pebble Drive Fort Worth, Texas 76118 UPDATE - Report of potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC Report No: P21-04_302015, Rev. 2 Previous NRC Event number 51030 Previous Accession No: ML15134A016 Total pages including this page: 1 NUCLEAR LOGISTICS INC:. www.au.com 741 o Pebble Drive

  • Fort Worth, *Texas 761 *IS
  • 800.448.4124 Pho11e
  • s*17 .590.0494 Fox

05/26/2016 08:51 P.002/007 N LI' Date: May 25, 2016 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Part 21 Report No: P21-04302015, Rev. 2

Subject:

Update- Report ofpotential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC - NRC Event Number 51030, Accession Number MLl S134AO 16 Revision 2, corrections:

1. Page 5 (vii), znd paragraph: changed EPRI TR-102323 Rev. 3 to Rev. 4.
2. Page 5 (vii), 3rd paragraph: changed 'timing~ contacts to 'instantaneous' contacts.

Pursuant to 10CFR 21.21 (d) (3) (ii), AZZINLI is providing written notification of the identification of a potential failure to comply.

On the basis of our evaluation. it is determined that AZZINLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.

The following information is required per 10CFR 21.21 (d) (4).

(i) Name and address of the individual or individuals informing the Commission.

Tracy Bolt, Director of Quality Assurance Nuclear Logistics, Inc 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility, activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

The specific part which fails to comply or contains a defect:

As of2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.

The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.

Page 1 of6 NUCLEAR LOGISTICS INC. www.e1:z;z:.co111 74'1 D Pebble Drive

  • Fort Worth. Texas 76*11 a
  • 800.448.4124 Phone
  • 8"17 .590.0484 Fax

05/26/2016 08:51 P.003/007 (iii) Identification of the firm constructing or supplying the baste component which fails to comply or contains a defect.

NLI procured the commercial grade relays, dedicated, qualified and supplied the subject relays as Safety Related.

(iv) Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

Between 2009-2010, Allen Bradley made a design change without changing the part number of the commercial relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are "solid state'\ which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance ofNEI 01-01. See Figures l and 2 below:

Figure 1- Original qualified design (prior to 2009).

Relays supplied prior to 2009 are not affected by this issue.

Part 21 Report No: P2lw04302015, Rev. 2 Page2 of6

05/26/2016 08:52 P.004/007 Figure 2 - New design circuit board and CPLD that replaced the original component.

(v) The date on which the information of such defect or failure to comply was obtained.

On April 27, 2015, enough information was gathered from the evaluations being perfonned to detennine the reportability of the failure to comply that is the root cause for the event.

Part 21 Report No: P21-04302015, Rev. 2 Page 3 of6

05/26/2016 08:52 (FAX) P.005/007 (vi) In th~ case of a basic component which contains a def~t or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be snpplled for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part.

Relays that have been procured and dedicated from 2009 to present are identified below.

Plant Name Purchase order Serial Number Browns Ferrv 72923-1 29760-001-00003 Ginna Station 6617899 51475"001-00001 and -00002, 526S6Kl-Ol-0001 Grand Gulf 10304816 34182-001-00001 Grand Gulf 10400205 56319-001-00001 39228-001-00001 thru -00017, .39228-001-00158 thru Invensys 4540216542 39228-001-00166, 39228-001-00170 thru 39228-001-00177 39407-001-00001 thru -00008, 39407-002-00001 thru-KHNP Yl2-0292-010 00005 LunR1I1en 8749411E007CO 38486-001-00001 and -00002, 38486-002-00001 Millstone 45735761 31998Kl-Ol-0001 Millstone 45735761 31391-001-00001 Nine Mile Point 530734 63245-001-00001 thru-00018 North Anna 70239037 55133-001-00001 & -00002 39602-001-00001 and -00002, 39602-002-00001 thru -

70239037 00003 North Anna 40033-001-00001and40033-001-00002, 40033-002-00001 North Anna 70239037 thru -00003 33846-001-00001 thru -00009, 33846-001-00011 thru OPPb Ft Calhoun 155213 33846-001-00015, 33846-002-00002 & -00003 QPPD Ft Calhoun 163495 35941-001-00001 thru -00004 OPPD Ft Calhoun 164936 35891Kl-01-0001 thru -0005 OPPD Ft Calhoun 164936 36888-001-00001, -00003 thru -00005 OPPD Ft Calhoun 164936 36888K2-01-0001 OPPD Ft Calhoun 177878 39194-001"00001 thru -00006 OPPD Ft Calhoun 40743-001-00001thru-00003,40743-002-00001 182681 OPPD Ft Calhoun 187625 51477~001-00001 thru ~00004 Perry Station 45354401 33357-001-00001 thru -00003 River Bend Station 10349942 38585-001-00001 thru -00004 River Bend Station 10362573 40077-001-00001 River Bend Station 10378904 ~1627-001-00001 South Texas Project 134783 33750-001-00001 & -00002 Part 21 Report No: .P21-04302015, Rev. 2 Page4 of6

05/26/2016 08:52 P.006/007 South Texas Project 147962 37204-001-00001 thru-00006 South Texas Project 154172 51592-001-00001 thru -00004 South Texas Froject 171193 57894-001-00001 thru-00006 Bechtel PO: 25486-974-St Lucie 38549-001-00002 thru-00005 FPA-EMR0-00001 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organl:u.tion respollllible for the action; and the length of time that has been or wUl be taken to complete the action.

The relays that are currently in stock at NLI have been placed on hold until after the units have been detennined to be qualified for the specific application. NLI has *completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE 10 l, I

CE102, RElOl, llEI02, RSIOI, RS103, CS101, CS114, CSllS and CS116.

The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS 114 onto the power lines, with the timing circuit in operation, the instantaneous I

contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the fettite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CSl 14.

In addition to the EMC testing that was performed, the Verification and Validation I Dedication activities for the digital device was also completed, The results of the dedication activity are contained in NLI Verification and Validation/Dedication report VVR-700RTC-01, Rev. 1. The results of the V&V/dedication activity are satisfactory. The firmware version verified is the only version that has been released since the change was implemented.

Part 21 Report No: P21-0430201S~ Rev. 2 Page 5 of6

0512612016 08:52 P.0071007 (viii) Any advice related to the defect or failure to comply about the faeUlty, activity; or basic component that has beent is beingt or wiU be given to purchasers or licensees.

The functions of the relays supplied by NLI were tested for the foltowing critical characteristics:

Pick-up at rated voltage Drop-out when the voltage is removed Pick"up at degraded voltage Over-Voltage operation Insulation resistance Off delay settings are ac:ljustable from 2-120 seconds Fick-up voltage Drop-out voltage Dimensions and Configuration The relays are dedicated for generic application usage in timing applications. The specific plant application(s) is unknown by NLI. The EMC qualification of the relay is dependent on the installed configuration and location in the plant. The plant should evaluate whether the installed relays are subjected to the specific EMIIRFI condition Conducted Susceptibility CS 114 between the :frequencies of 2.6 MHz to 20.3 MHz identified above.

Please contact me with any questions or comments.

Sincerely, rt:!@~

Quality Assurance Program Manager Part 21 Report No: P21-04302015, Rev. 2 Page 6 of6

0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 51030 Rep Org: AZZ/NLI NUCLEAR LOGISTICS, INC Notification Date I Time: 05/01/2015 13:32 (EDT)

Supplier: ALLEN BRADLEY Event Date I Time: 04/30/2015 (CDT)

Last Modification: 04/08/2016 Region: 4 Docket#:

City: FORT WORTH Agreement State: Yes County: License #:

State: TX NRC Notified by: TRACY BOLT Notifications: MEL GRAY R1DO HQ Ops Officer: DANIEL MILLS FRANK EHRHARDT R2DO Emergency Class: NON EMERGENCY ROBERT ORLIKOWSKI R3DO 10 CFR Section: GEOFFREY MILLER R4DO 21.21(d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21/50.55 REACTORS EMAIL POTENTIALLY UNQUALIFIED COMPONENT IN CERTAIN ALLEN BRADLEY TIMING RELAYS The following is an excerpt from a document received from the licensee via email:

"Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC "Pursuant to 10 CFR 21.21 (d)(3)(ii}, AZZ/N LI is providing written notification of the identification of a potential failure to comply.

"On the basis of our evaluation, it is determined that AZZ/NLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.

"The specific part which fails to comply or contains a defect:

"As of 2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration. Therefore, NLI qualification/dedication of the relays after 2009 have not included additional testing for the new CPLD component.

"The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.

"Between 2009-2010 Allen Bradley made a design change without changing the part number of the commercial

0512612016 U.S. Nuclear Regulatory Commission Operations Center Event Report Page 2 relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are 'solid state', which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance of NEI 01-01."

Potentially affected plants include Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project, and St. Lucie.

  • AZZ/NLI Nuclear Logistics provided additional information regarding Part 21 Report No: P21-04302015, Rev. 1.

Notified R1DO (Rogge), R2DO (Nease), R3DO(Skokowski), R4DO (Kellar), and PART 21/50.55 REACTORS via email.

  • AZZ/NLI Nuclear Logistics provided Revision 2 to Part 21 Report No: P21-04302015 to correct the referenced EPRI TR-102323 Rev. 3 to Rev. 4 and change 'timing' contacts to 'instantaneous' contacts as shown below:

"(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

"The relays that are currently in stock at NLI have been. placed on hold until after the units have been determined to be qualified for the specific application. NU has completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE101, CE102, RE101, RE102, RS101, RS103, CS101, CS114, CS115 and CS116.

"The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS114 onto the power lines, with the timing circuit in operation, the instantaneous contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the ferrite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CS114."

Notified R1 DO (Lilliendahl), R2DO (Guthrie), R3DO(Kunowski), R4DO (Werner), and PART 21/50.55 REACTORS via email.

F*

0512612016 08:51 P.0011007 NL I' Date: May 26, 2016 To:

FAX (301) 816.. 5151 Docwnent Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 From:

Les Taggart Quality Assurance Program Mgr.

AZZINLI Nuclear Logistics 7410 Pebble Drive Fort Worth, Texas 76118 UPDATE - Report of potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC Report No: P21-04_302015, Rev. 2 Previous NRC Event number 51030 Previous Accession No: ML15134A016 Total pages including this page: 1 NUCLEAR LOGISTICS INC:. www.au.com 741 o Pebble Drive

  • Fort Worth, *Texas 761 *IS
  • 800.448.4124 Pho11e
  • s*17 .590.0494 Fox

05/26/2016 08:51 P.002/007 N LI' Date: May 25, 2016 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Part 21 Report No: P21-04302015, Rev. 2

Subject:

Update- Report ofpotential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC - NRC Event Number 51030, Accession Number MLl S134AO 16 Revision 2, corrections:

1. Page 5 (vii), znd paragraph: changed EPRI TR-102323 Rev. 3 to Rev. 4.
2. Page 5 (vii), 3rd paragraph: changed 'timing~ contacts to 'instantaneous' contacts.

Pursuant to 10CFR 21.21 (d) (3) (ii), AZZINLI is providing written notification of the identification of a potential failure to comply.

On the basis of our evaluation. it is determined that AZZINLI does not have sufficient information to determine if the subject condition would, or has, created a Substantial Safety Hazard or would have created a Technical Specification Safety Limit violation as it relates to the subject plant applications.

The following information is required per 10CFR 21.21 (d) (4).

(i) Name and address of the individual or individuals informing the Commission.

Tracy Bolt, Director of Quality Assurance Nuclear Logistics, Inc 7410 Pebble Drive Ft. Worth, TX 76118 (ii) Identification of the facility, activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.

The specific part which fails to comply or contains a defect:

As of2009-2010, Allen Bradley relays base model 700RTC, contain an unevaluated CPLD (Complex Programmable Logic Device). This was an unpublished design change that was implemented to replace an obsolete integrated circuit chip. The undocumented design change did not result in a part number change from Allen-Bradley. There was no change to the appearance of the relay that would identify any design changes were made to the relay configuration.

The timing relay model 700RTC has been dedicated/qualified for multiple applications for various plants.

Page 1 of6 NUCLEAR LOGISTICS INC. www.e1:z;z:.co111 74'1 D Pebble Drive

  • Fort Worth. Texas 76*11 a
  • 800.448.4124 Phone
  • 8"17 .590.0484 Fax

05/26/2016 08:51 P.003/007 (iii) Identification of the firm constructing or supplying the baste component which fails to comply or contains a defect.

NLI procured the commercial grade relays, dedicated, qualified and supplied the subject relays as Safety Related.

(iv) Nature of defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

Between 2009-2010, Allen Bradley made a design change without changing the part number of the commercial relay or providing any documented evidence of a design change. The manufacturer specification data sheets maintain the classification that the relays are "solid state'\ which would imply that there are no digital devices installed in the relay. However, after inspection of the internals of the timing relay (Figure 2), it has been identified that the unit does contain a CPLD which meets the definition of a digital device under the guidance ofNEI 01-01. See Figures l and 2 below:

Figure 1- Original qualified design (prior to 2009).

Relays supplied prior to 2009 are not affected by this issue.

Part 21 Report No: P2lw04302015, Rev. 2 Page2 of6

05/26/2016 08:52 P.004/007 Figure 2 - New design circuit board and CPLD that replaced the original component.

(v) The date on which the information of such defect or failure to comply was obtained.

On April 27, 2015, enough information was gathered from the evaluations being perfonned to detennine the reportability of the failure to comply that is the root cause for the event.

Part 21 Report No: P21-04302015, Rev. 2 Page 3 of6

05/26/2016 08:52 (FAX) P.005/007 (vi) In th~ case of a basic component which contains a def~t or fails to comply, the number and location of these components in use at, supplied for being supplied for, or may be snpplled for, manufactured or being manufactured for one or more facilities or activities subject to the regulations in this part.

Relays that have been procured and dedicated from 2009 to present are identified below.

Plant Name Purchase order Serial Number Browns Ferrv 72923-1 29760-001-00003 Ginna Station 6617899 51475"001-00001 and -00002, 526S6Kl-Ol-0001 Grand Gulf 10304816 34182-001-00001 Grand Gulf 10400205 56319-001-00001 39228-001-00001 thru -00017, .39228-001-00158 thru Invensys 4540216542 39228-001-00166, 39228-001-00170 thru 39228-001-00177 39407-001-00001 thru -00008, 39407-002-00001 thru-KHNP Yl2-0292-010 00005 LunR1I1en 8749411E007CO 38486-001-00001 and -00002, 38486-002-00001 Millstone 45735761 31998Kl-Ol-0001 Millstone 45735761 31391-001-00001 Nine Mile Point 530734 63245-001-00001 thru-00018 North Anna 70239037 55133-001-00001 & -00002 39602-001-00001 and -00002, 39602-002-00001 thru -

70239037 00003 North Anna 40033-001-00001and40033-001-00002, 40033-002-00001 North Anna 70239037 thru -00003 33846-001-00001 thru -00009, 33846-001-00011 thru OPPb Ft Calhoun 155213 33846-001-00015, 33846-002-00002 & -00003 QPPD Ft Calhoun 163495 35941-001-00001 thru -00004 OPPD Ft Calhoun 164936 35891Kl-01-0001 thru -0005 OPPD Ft Calhoun 164936 36888-001-00001, -00003 thru -00005 OPPD Ft Calhoun 164936 36888K2-01-0001 OPPD Ft Calhoun 177878 39194-001"00001 thru -00006 OPPD Ft Calhoun 40743-001-00001thru-00003,40743-002-00001 182681 OPPD Ft Calhoun 187625 51477~001-00001 thru ~00004 Perry Station 45354401 33357-001-00001 thru -00003 River Bend Station 10349942 38585-001-00001 thru -00004 River Bend Station 10362573 40077-001-00001 River Bend Station 10378904 ~1627-001-00001 South Texas Project 134783 33750-001-00001 & -00002 Part 21 Report No: .P21-04302015, Rev. 2 Page4 of6

05/26/2016 08:52 P.006/007 South Texas Project 147962 37204-001-00001 thru-00006 South Texas Project 154172 51592-001-00001 thru -00004 South Texas Froject 171193 57894-001-00001 thru-00006 Bechtel PO: 25486-974-St Lucie 38549-001-00002 thru-00005 FPA-EMR0-00001 (vii) The corrective action which has been, is being, or will be taken; the name of the individual or organl:u.tion respollllible for the action; and the length of time that has been or wUl be taken to complete the action.

The relays that are currently in stock at NLI have been placed on hold until after the units have been detennined to be qualified for the specific application. NLI has *completed the EMC qualification testing per the requirements of EPRI TR-102323 Rev. 4 for the following tests, as applicable: CE 10 l, I

CE102, RElOl, llEI02, RSIOI, RS103, CS101, CS114, CSllS and CS116.

The results were satisfactory with exception of the following condition: During Conducted Susceptibility CS 114 onto the power lines, with the timing circuit in operation, the instantaneous I

contacts exhibited chatter in the range of 2.6 MHz to 20.3 MHz. The unit requires a ferrite to be installed onto the input power lines of the relay with 3 turns through the fettite core. In this modified configuration, the relay was not susceptible to Conducted Susceptibility and successfully passed the required test per CSl 14.

In addition to the EMC testing that was performed, the Verification and Validation I Dedication activities for the digital device was also completed, The results of the dedication activity are contained in NLI Verification and Validation/Dedication report VVR-700RTC-01, Rev. 1. The results of the V&V/dedication activity are satisfactory. The firmware version verified is the only version that has been released since the change was implemented.

Part 21 Report No: P21-0430201S~ Rev. 2 Page 5 of6

0512612016 08:52 P.0071007 (viii) Any advice related to the defect or failure to comply about the faeUlty, activity; or basic component that has beent is beingt or wiU be given to purchasers or licensees.

The functions of the relays supplied by NLI were tested for the foltowing critical characteristics:

Pick-up at rated voltage Drop-out when the voltage is removed Pick"up at degraded voltage Over-Voltage operation Insulation resistance Off delay settings are ac:ljustable from 2-120 seconds Fick-up voltage Drop-out voltage Dimensions and Configuration The relays are dedicated for generic application usage in timing applications. The specific plant application(s) is unknown by NLI. The EMC qualification of the relay is dependent on the installed configuration and location in the plant. The plant should evaluate whether the installed relays are subjected to the specific EMIIRFI condition Conducted Susceptibility CS 114 between the :frequencies of 2.6 MHz to 20.3 MHz identified above.

Please contact me with any questions or comments.

Sincerely, rt:!@~

Quality Assurance Program Manager Part 21 Report No: P21-04302015, Rev. 2 Page 6 of6