EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment
ML20042E252
Person / Time
Site: Millstone, Oconee, Nine Mile Point, Palo Verde, Hope Creek, Sequoyah  Constellation icon.png
Issue date: 01/31/2020
From: Cinque M
Curtiss-Wright Flow Control Corp, Target Rock Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EN 54485, NID#20007 Rev. 1
Download: ML20042E252 (4)


Text

CURTISS-

  • wRIOHT At;tn:, _

_Doc:µ1)1,m C<>riJrol l>es~

u~s.,-.u~tear R*ui.,to,y Commiss_i~n --

\\/ilist;i.inSJton, o.c~ 20555-001 * * *' " _ _

1~

Subject; to qFR:PartZ1.Report_

ComDonent and Main Disc Lift_Misadiustment l

Uj!date -to_ Notification.of a Defeq

Dear-Sir,

orLMadam:*

Valve Group - Target Rock Industrial Division

_ 1_966E 8~h()ffowRoati E--Farmlngdale, NY 11735, USA*

T: +1.631.293.3800 IF: +1;631.293.4949 www.cw-iridustrial.cc:m1 NID#20007 Rev. 1 January~1. 2920 Modification of a Valve

.Bas.~ Qn ~dd.Wpria! T~rgeJ ~Qt% ~V!ew, ~is m)tffi~tiqn 1.~J~r ha$ ~~n upda~d t<> t~duce the

.nuro~er 9f affect~ Planf $ite L~tk>n$ and Valve MPdt:tl Numbers li~ed. in Attachment# 1 of 1fiis letter._ -All pfherJnformation rero_ajj,s.un~anged.

This letter provides nc,tification of-potential two defects iri -1" and' 2,; fail closed solenoid opera1ed valve. assemblies ~rid associated spare pans supplied by Target.Rock (TR):

(Q -Name a,nd address Qfthe individual or individuals infonri(ng the Commission.

Alex Dimeo

  • _

Oitectot of QtJijlijy As.sutance.

Miqhael Ciriqu~

Getier~I Manager Target Re>ck, )~u.slness Unit of Cu.rtiss..Wrigt,t Flow Cc,ntrolCorporation 1966E Broadh:oUow _Road East F~rmhigd~le, NY 11735 : -

(i1J tder,tifi~tion <Jl the: btJs.fc{X)mponent supplled for such, facility or such activity within the United

.Stat.,:s, whir;tJ may feil to comply, or co,,talns ~ pot(;)nt~i defect.

See Attachment (1) for i~entification of Bc:>nnet Assembly part numbers and Valve Model

Numbers, (iii) ldentific_ation of thefi.i'm supplyhig the basic ~ompcment, which/ails to comply or contains a.defe¢t.

Target Ro.ck, Business Unit of Curtiss-Wright Flow_ Control Corporation 1966E BroadhoUow Road East Farmln~daie, NY 11735

NIDtl 20007 Page3 (viij The corrective action which has been, is being, or will be taken; the name of the individual or

  • organization tf!sponsible for the.action; and the length of time that has been or wili be taken to complete the action.

Condition 1 {Modified Fixed Core):

The discrepant bonri.et assembiy/fixed core was documente.cl on a NCR (Non Conformance Report) and ~crapped; A new bonnet ~ssembly was issued to the valve kit. The valve assembly was reassembled, reteste.d and successfully p*assed all required produciion testing.

Condition 2 (Main.Disc Lift Misadjustment):

The initial valve assembly was readjusted in accordance with the applicable technical manual ahd soJenoid valve adjustment procedure: The valve assem,bly was re-tested. _per the applicable production test procedure and successful.ly passe.d.all required testing. Uppnfurther investigation of valves an additional 3 of 1 O. valve assemblies were verified to have rnisadjusted ma.in ciisc lift. The misadjl!sted valves were readjus,ed, tested and successful(

  • assed all reduction testing prior to shipment.

(viii) Any. advice related to the. defect or failure to comply about the facility, activity, or basic.

component that has b_een, is being, or-will be given to purchasers or licensees.

Condition 1 (Modified Fixed Core):

TR performs production testing on an valve assemblies prior to shipment. TR considers this testing ad~quate screening to identify this *condition at the factory. Satisfactory testing provides reasonable assurance the stated condition does not exist in shipped product.

However, TR recommends un-installed bonnet assemblie.s and complete valve assemblies be returned to* TR for re-inspection. This* condition potentially affects valve models and bonnet assemblies detailed in. Attachment 1 manufactured between 1/1/2018 and 10/31/2019.

Any installed valves containing these parts should be reviewed and evaluated for history of operational tesJing anomalies. Many of these installed valves are subject to regular plant testing, such as 1 OCF.R50 Appendix J. Satisfactory perforrnance in this testing will provide reasonable assurance of an acceptable valve condition.

Condition 2 (Main Disc*LiftMisadjustment):

l)llb#20007 Page4 All un-i_nstalledVa_lve Assemplies ~h*ould he! checkeci to determine if.a misc1gjustment.of the main disc lift exists. Althc:H..1tih the process to check for a rnisadjusted valve is not difficult, it requires partial w~lve qisas_senibly. Th_e ihstn.ictlons for pr9per adjustmen_f-are lqcaJed in \\he yalve specific rechriic::al Manual.

Any 1" Y~body soler,o_id y_alve a~se~t:,lies "thElt have be~n ipstijlled sh9µld b~ r~vi~wed an_c;t eyaJuated by,_eiaGlt.end user regarc;!ing the acceptability o:thc:iving a tower flow (Cv) ra.ting of 14 in tie.u oF15Jor the,sj:>ecific system ih which they are installed. Arwopportunity to disassernble the VEilye a~serribly for insp_e.qtion ancf r.eac;!j!Jstment ls repomme11deq. This_ concmio11 pptentiaUy aff~cts valve mode-ls-detailed ih Attachm.ent1 manufc1ctured between 7/1/2015 and 10/31 /2019.:

(1x) In tl1e <;a$e: of.an. ;t1arty slte:permif,Jhe cntiti¢_~ tq wh<>.tn,an ear,Y sfte. permH was tre1r1Sff#rrt1d.

Not appli9able,

~~qulc:1 you hc1v~ ;:my" qµestions reg~rding-this nic1tter,. plec1se conta~t Micha.el Cinque,* Generi:ll Manager at (a31) 29;3~3800 -

V~ry Trl:lly Yo_urs; -

7.YY/Q()

i.(:icZ--

Ger1era1 Mana,g_er Target Rock.-Bus1ness Unit ofCurtiss"WrightFloW Control Corpo*ration cc::

Jamia~ WhJte Alex. Dimeo

$tev~ Pauly Greg.Ryan Nick *:cam pane Iii WaiterQpak John DeBonis Attachment(s):

1". Attachmemt 1: List of Locations, Models, Bonnet Assemblies

Attachment #* 1 Plant Site Locations Arkansas Nuclear One.

Oconee Beaver:vanev

  • Palo Verde, Calvert Cliffs _

Seauovah Farley St. Lucie

_ Fitzpatrick South Texas Project *

'Hooe Cre~k Vocitle Nqte; Plants_ nqt subJect to NRC regulation will bf:l notlfi~d via separate correspondence Condition 1 (Modified Fixed Cote/:

Valve Model Numbers 76HH~oo1BB 030~004-1.

76HH~007BB 036-032-2 77LaO(l1 BB-1 04H~001a1 77DD-040BB 15L-011 790,018~2*

15L-012 79R~oo1 15L-015 79AB-004~2 15L-016 808-00189' 15L~028

82AG0001 ~1 BB

_ 15L-036 Bonnet -Assembly Part Numbers 202412::2 303123-2.

202412-4 303171-1 300571-1 3Cl31i'2-1 30061_9.-1

.303159-1

303045~1 303202-1 Condition 2 (Main Disc Lift Misadiustment):

.78E-007BB.

03Q-043,1 79R-001 100,032 79AB-001 10Q-051 i9AB-001BB 120-002 79UU-001BB 120-004 82AG~004

'12Q-007 SBPP-00688 12Q-021 932518-001 12Q-032 98F,001 12Q-038 15L-080 16E-001 -

303318-1 12Q-047 120-049 120~054 120-055*

12Q-058 120-060 15L-012s2 15L-014,1 15L~052si 152508-001 N1D#20CJD7 J>ag!! 5