 Issue dateTitleTopic
ML23348A39414 December 2023Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve
ML23335A0721 December 2023Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump
ML23320A25416 November 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
ML23282A0026 October 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
ML23279A0615 October 2023Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)Commercial Grade Dedication
ML23254A0246 September 2023Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)
ML23241A00225 August 2023Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils
RBG-48245, Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay24 August 2023Part 21 Notification of a Failure to Comply Identified During Preinstallation Testing on a Motor Driven Relay
ML23221A3703 August 2023Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0
ML23207A07614 July 2023EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06
ML23192A06230 June 2023Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0
ML23187A47230 June 202356603-EN 56603 - Engine Systems, Inc., Report No. 10CFR21-0136, Rev. 0 Re Voltage Regulator Chassis
ML23100A10710 April 2023Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker
ML23066A2217 March 2023Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose
ML23038A0196 February 2023Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays
ML22341A03230 November 202210 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
ML22208A00417 June 2022Nutherm International, Inc., USNRC 10CFR Part 21 Notification Reference: Arnold Magnetics Power Supply Part Number PBM-24-106
ML22153A0797 April 202210CFR Part 21 Notification for Curtiss-Wright Supplied RCS-Dresser Actuator P/N: SURE-24-10-4
ML22019A17628 December 2021Lake Engineering Company - Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No . 18CLVS431
ML21306A18028 October 2021United Controls International - Part 21 Notification for York Pin: TCM-1 a Temperature Control Modules
ML21294A0294 October 2021Flowserve Part 21 Notification for Limitorque Supplied DC Motor
ML21271A23423 September 2021EN 55282 (Updated) - Framatome Part 21 Reportable Defect - Vacuum BreakersOvertravel
ML21260A0079 September 2021Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay
ML21225A0814 August 2021Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293
ML21181A22029 June 2021Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
ML21168A21717 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsFuel cladding
M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors17 June 2021GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 ReactorsFuel cladding
ML21126A17229 April 2021Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
ML20366A0487 December 202010CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1Safe Shutdown
ML21014A2347 December 2020Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293
ML20366A04718 November 2020Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293
ML20304A16114 October 2020Lake Engineering Co., Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 Final Report Per 10 CFR Part 21
M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients24 June 2020GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss CoefficientsFuel cladding
ML20176A43224 June 2020GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss CoefficientsFuel cladding
ML20136A25521 April 202010 CFR Part 21 Report Notification for Curtiss Wright Scientech Certain RTL500 and RTL851 Modules
ML20108F53020 March 202010CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720
ML20097B69120 March 2020Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852
ML20049A07511 February 2020C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries
ML20042E25231 January 2020EN 54485 Target Rock Redacted Update to Part 21 Report on Defect of Modification of Valve Component and Main Disc Lift Misadjustment
ML20029D16121 January 202010 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment
ML19347A42610 December 2019General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C)Post Accident Monitoring
ML19317D09325 October 2019Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing
ML19253A05329 August 2019Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19199A0345 July 2019Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518
ML19120A10617 April 2019Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19121A15515 April 2019Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid
ML19080A0598 March 2019Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors
ML19072A0636 March 201910 CFR Part 21 Report Notification of a Defect with Target Rock Modulating Valve Positioner; Model 810000-X
ML19071A1121 March 2019Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21