Line 2: Line 2:
| number = ML16264A363
| number = ML16264A363
| issue date = 09/20/2016
| issue date = 09/20/2016
| title = 09/20/2016 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the Stpegs Emergency Plan Staff Augmentation Times
| title = Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times
| author name =  
| author name =  
| author affiliation = South Texas Association for Responsible Energy
| author affiliation = South Texas Association for Responsible Energy
Line 9: Line 9:
| docket = 05000489, 05000499
| docket = 05000489, 05000499
| license number = NPF-076, NPF-080
| license number = NPF-076, NPF-080
| contact person = Regner L M
| contact person = Regner L
| case reference number = CAC MF8280, CAC MF8281
| case reference number = CAC MF8280, CAC MF8281
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Pre-Application Public Meeting for Proposed License Amendment Request to Revise theSTPEGS Emergency Plan Staff Augmentation Times September 20, 2016 IntroductionsMike Murray
{{#Wiki_filter:Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016
-Regulatory Affairs ManagerJoe Enoch
 
-Supervisor, Emergency PlanningStephanie Rodgers
===Introductions===
-Staff, Emergency PlanningKathleen Van Daalen
* Mike Murray- Regulatory Affairs Manager
-Staff, Licensing 2
* Joe Enoch- Supervisor, Emergency Planning
Desired OutcomesCommunicate the content of the planned submittalProvide a common understanding of the planned submittal 3
* Stephanie Rodgers- Staff, Emergency Planning
4Proposed ChangesIncreases the STPEGS (STP) Emergency Plan staff augmentation times from 60 and 75 minutes to 90 minutes.-Increases the required augmentation time for Emergency Response Organization members to respond to their facility
* Kathleen Van Daalen- Staff, Licensing 2
-Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth
 
-Increases Emergency Response Facilities activation timesThe proposed changes considered the guidance of RIS 2016-10 Regulatory ComplianceApplicable Regulatory Documents10 CFR 50.47(b)(2)10 CFR 50.54(q)10 CFR 50.90 NUREG-0654 NUREG-0737RG 1.219RG 1.101RIS 2016-10Referenced in LAR SubmittalPlanning Standard (ERO)Prior Approval (Example 1.219)License Request (required)Guidance (Basis for Plan)STA (Engineering On
Desired Outcomes
-shift)Guidance for Changes (50.54q)Endorsement (NUREG-0654) Expectation (Staff)5 Comparison (RIS
* Communicate the content of the planned submittal
-STP LAR)RIS 2016-10Current License BasisFukushima (FLEX)NUREG-0654 Staffing
* Provide a common understanding of the planned submittal 3
-Major Functions
 
-Technology
Proposed Changes
-Table B-1, 60-90 MinuteOffsite Agency ImpactSTP Submittal 6May 20, 1993No credit takenStaffing > NUREG
* Increases the STPEGS (STP) Emergency Plan staff augmentation times from 60 and 75 minutes to 90 minutes.
-0654-Identified
  - Increases the required augmentation time for Emergency Response Organization members to respond to their facility
-Described
  - Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth
-DefinedState/County Concurrence Comparison (RIS
  - Increases Emergency Response Facilities activation times
-STP LAR)RIS 2016-10Major Functional TasksNotification and CommunicationEmergency DirectorOff-site Surveys / On
* The proposed changes considered the guidance of RIS 2016-10 4
-site (out
 
-of-plant) / In
Regulatory Compliance Applicable Regulatory   Referenced in LAR Documents              Submittal
-Plant SurveysChemistry/Radio
* 10 CFR 50.47(b)(2)
-chemistryTechnical SupportRepair and Corrective ActionsRadiation ProtectionDose AssessmentSTP Submittal 7Details2 Dedicated on
* Planning Standard (ERO)
-shift ( RO & NLO)2 Augmented at 90
* 10 CFR 50.54(q)
-minutesDescribes personnel and technologyOn-shift staffedSTA role and technologyIdentified Staffing > NUREG
* Prior Approval (Example 1.219)
-0654Staffing and technologyOn-shift staffed Site/Program EnhancementsTechnology
* 10 CFR 50.90
-Access/Dosimetry Controls
* License Request (required)
-Area Radiation Monitors
* NUREG-0654
-Dose Assessment
* Guidance (Basis for Plan)
-Plant Computer (System status trees)
* NUREG-0737
-Auto Notifications Systems
* STA (Engineering On-shift)
-Web EOCTraining-Licensed Operator Requalification and Simulator Modeling
* RG 1.219
-Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)Procedures
* Guidance for Changes (50.54q)
-Symptom Based
* RG 1.101
-Initiating Events (EALs NEI 99
* Endorsement (NUREG-0654)
-01 Rev. 6)Shift Complement 8
* RIS 2016-10
9Staffing ChangesIncreased in 1993 to staffing of 20Currently staffed at 25
* Expectation (Staff) 5
-Will remain staffed at 25Operations Staff2-SMs (ED qualified)2-SROs4-ROs4-NLOs1-STA Staffing ComparisonMajor Functional Area NUREG-0654NUREG-0654 On-shift/30/60 minutesCurrent STP StaffingOn-shift/60/75 minutesProposed STP StaffingOn-shift/90 minutesOperations *1. Shift Sup/Manager2. Shift Foreman/US3. RO4. Plant Operators5. STA6.Operations Discipline Lead1.1/0/02.1/0/03.2/0/04.2/0/05.1**/0/0   (not counted in On-shift Total) 6.None defined1.2/0/02.2/0/03.4/0/04.4/0/05.1**/0/0 (not counted in On-shift Total)6.0/0/1#1.2/02.2/03.4/04.4/05.1**/0 (not counted in On-shift Total)6.0/1#Emergency Direction and Control***
 
(STA, SS, or Facility Director)1**/0/0     (not counted in On-shift Total)2**/0/0 (not counted in On-shift Total)2**/0 (not counted in On-shift Total)Notification
Comparison (RIS-STP LAR)
/Communication1/1/22/0/22/210*     Unaffected Unit in operation maintain shift foreman, 1
RIS 2016-10                STP Submittal
-RO, 1-NLO**May be provided by shift personnel assigned other functions
* Current License Basis
***Assumed by EOF Director when all facilities are manned#     Filled by personnel with plant operations experience Major Functional Area NUREG-0654NUREG-0654 On-shift/30/60 minutesCurrent STP Staffing On-shift/60/75 minutesProposed STP Staffing On-shift/90 minutesRadiological AssessmentEmergency DirectorSenior HP Expertise Offsite/Onsite surveysChemistry/Radio
* May 20, 1993
-chem0/0/10/1/0 0/3/32/1/20/0/11/0/0 2/3/41/0/10/11/02**/7 1/1Engineering, Repair and Corrective Actions1. Technical Support STACore Electrical Mechanical2. Repair and Corr. ActionsRad Waste/
* Fukushima (FLEX)
MechanicalElectrical/I&CI&C1.1/0/0 0/1/0 0/0/1 0/0/12.1**/0/2 (not counted inOn-shift total)1**/1/1 (not counted in On-shift Total)0/1/01.1/0/0    0/1/0 0/0/1 0/0/12.2**/0/0(not counted in On-shift Total)         1**/0/11**and 1/0/11/0/01.1/0 0/1 0/1 0/12.2**/0 (not counted in On-shift Total)1**/11**and1/11/0Staffing Comparison (Continued) 11** May be provided by shift personnel assigned other functions Staffing Comparison (Continued)Major Functional Area NUREG-0654NUREG-0654 On-shift/30/60 minutesCurrent STP StaffingOn-shift/60/75 minutesProposed STP StaffingOn-shift/90 minutesProtective Actions (In Plant) Radiation Protection HP Technicians for:
* No credit taken
a.Access Control b.HP Coverage c.Personnel monitor d.Dosimetry 2**/2/2 (not counted in On-shift Total) 2**/4/0 (not counted in On-shift Total) 2**/4 (not counted in On-shift Total)FirefightingPer T/S / Local Support /
* NUREG-0654 Staffing
0Per T/S / Local Support / Local Support Per T/S / Local SupportRescue First Aid2**/ Local Support(not counted in On
* Staffing > NUREG-0654
-shift Total) 2**/ Local Support / Local Support2**/ Local SupportSecurity Site Access Control and Personnel AccountabilityPer Security PlanPer Security PlanPer Security PlanTotals10/11/15 = 3625/8/13 = 4625/21 = 4612** May be provided by shift personnel assigned other functions PrecedentPoint Beach Prairie IslandRAIs Reviewed13 Closing RemarksDesired OutcomeSubmittal DateSTP Point of Contact14}}
  - Major Functions           - Identified
  - Technology                 - Described
  - Table B-1, 60-90 Minute    - Defined
* Offsite Agency Impact
* State/County Concurrence 6
 
Comparison (RIS-STP LAR)
RIS 2016-10                        STP Submittal Major Functional Tasks                            Details
* Notification and Communication
* 2 Dedicated on-shift ( RO & NLO)
* Emergency Director
* 2 Augmented at 90-minutes
* Off-site Surveys / On-site (out-of-
* Describes personnel and plant) / In-Plant Surveys            technology
* Chemistry/Radio-chemistry
* On-shift staffed
* Technical Support
* STA role and technology
* Repair and Corrective Actions
* Identified Staffing > NUREG-0654
* Radiation Protection
* Staffing and technology
* Dose Assessment
* On-shift staffed 7
 
Site/Program Enhancements
* Technology
  - Access/Dosimetry Controls
  - Area Radiation Monitors
  - Dose Assessment
  - Plant Computer (System status trees)
  - Auto Notifications Systems
  - Web EOC
* Training
  - Licensed Operator Requalification and Simulator Modeling
  - Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)
* Procedures
  - Symptom Based
  - Initiating Events (EALs NEI 99-01 Rev. 6)
* Shift Complement 8
 
Staffing Changes
* Increased in 1993 to staffing of 20
* Currently staffed at 25
  - Will remain staffed at 25
* Operations Staff
* 2-SMs (ED qualified)
* 2-SROs
* 4-ROs
* 4-NLOs
* 1-STA 9
 
Staffing Comparison Major Functional Area               NUREG-0654                  Current STP Staffing Proposed STP Staffing NUREG-0654               On- shift/30/60 minutes On-shift/60/75 minutes                  On-shift/90 minutes Operations *
: 1. Shift Sup/Manager          1. 1/0/0                      1. 2/0/0                      1. 2/0
: 2. Shift Foreman/US          2. 1/0/0                      2. 2/0/0                      2. 2/0
: 3. RO                        3. 2/0/0                      3. 4/0/0                     3. 4/0
: 4. Plant Operators            4. 2/0/0                      4. 4/0/0                      4. 4/0
: 5. STA                        5. 1**/0/0   (not counted in 5. 1**/0/0 (not counted in    5. 1**/0 (not counted in On-shift Total)               On-shift Total)            On-shift Total)
: 6. Operations Discipline 6. None defined                      6. 0/0/1#                      6. 0/1#
Lead Emergency Direction and Control***                     1**/0/0 (not counted in           2**/0/0 (not counted in     2**/0 (not counted in (STA, SS, or Facility                          On-shift Total)               On-shift Total)            On-shift Total)
Director)
Notification/                     1/1/2                            2/0/2                        2/2 Communication
* Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO
  **   May be provided by shift personnel assigned other functions
  ***   Assumed by EOF Director when all facilities are manned
  #   Filled by personnel with plant operations experience                                                       10
 
Staffing Comparison (Continued)
Major Functional Area NUREG-0654                            NUREG-0654                     Current STP Staffing        Proposed STP Staffing On- shift/30/60 minutes              On-shift/60/75 minutes          On-shift/90 minutes Radiological Assessment Emergency Director                                0/0/1                            0/0/1                          0/1 Senior HP Expertise                              0/1/0                            1/0/0                         1/0 Offsite/Onsite surveys                            0/3/3                            2/3/4                        2**/7 Chemistry/Radio-chem                              2/1/2                            1/0/1                          1/1 Engineering, Repair and Corrective Actions
: 1. Technical Support                   1.                                    1.                           1.
STA                                                1/0/0                             1/0/0                        1/0 Core                                              0/1/0                              0/1/0                         0/1 Electrical                                        0/0/1                             0/0/1                         0/1 Mechanical                                        0/0/1                             0/0/1                        0/1
: 2. Repair and Corr. Actions
: 2.                                    2.                            2.
2**/0/0 (not counted in        2**/0 (not counted in Rad Waste/
1**/0/2 (not counted                       On-shift Total)              On-shift Total)
Mechanical                                              in On-shift total)           1**/0/1                      1**/1 Electrical/I&C                                  1**/1/1 (not counted              1**and 1/0/1                   1**and1/1 in On-shift Total)
I&C                                                                                    1/0/0                          1/0 0/1/0
** May be provided by shift personnel assigned other functions                                                                       11
 
Staffing Comparison (Continued)
Major Functional Area             NUREG-0654                Current STP Staffing Proposed STP Staffing NUREG-0654             On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Protective Actions (In Plant) Radiation                   2**/2/2 (not counted in     2**/4/0 (not counted in   2**/4 (not counted in Protection HP                              On-shift Total)            On-shift Total)         On-shift Total)
Technicians for:
: a. Access Control
: b. HP Coverage
: c. Personnel monitor
: d. Dosimetry Firefighting                  Per T/S / Local Support / Per T/S / Local Support Per T/S / Local Support 0                    / Local Support Rescue First Aid                2**/ Local Support            2**/ Local Support /    2**/ Local Support (not counted in On-shift Total)     Local Support Security Site Access             Per Security Plan            Per Security Plan      Per Security Plan Control and Personnel Accountability Totals                              10/11/15 = 36                  25/8/13 = 46            25/21 = 46
  ** May be provided by shift personnel assigned other functions                                       12
 
Precedent
* Point Beach
* Prairie Island
* RAIs Reviewed 13
 
Closing Remarks
* Desired Outcome
* Submittal Date
* STP Point of Contact 14}}

Latest revision as of 13:03, 4 December 2019

Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times
ML16264A363
Person / Time
Site: South Texas, Perkins  Duke Energy icon.png
Issue date: 09/20/2016
From:
South Texas Association for Responsible Energy
To:
Division of Operating Reactor Licensing
Regner L
References
CAC MF8280, CAC MF8281
Download: ML16264A363 (14)


Text

Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation Times September 20, 2016

Introductions

  • Mike Murray- Regulatory Affairs Manager
  • Joe Enoch- Supervisor, Emergency Planning
  • Stephanie Rodgers- Staff, Emergency Planning
  • Kathleen Van Daalen- Staff, Licensing 2

Desired Outcomes

  • Communicate the content of the planned submittal
  • Provide a common understanding of the planned submittal 3

Proposed Changes

- Increases the required augmentation time for Emergency Response Organization members to respond to their facility

- Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth

- Increases Emergency Response Facilities activation times

  • The proposed changes considered the guidance of RIS 2016-10 4

Regulatory Compliance Applicable Regulatory Referenced in LAR Documents Submittal

  • Planning Standard (ERO)
  • Prior Approval (Example 1.219)
  • License Request (required)
  • Guidance (Basis for Plan)
  • STA (Engineering On-shift)
  • Guidance for Changes (50.54q)
  • Expectation (Staff) 5

Comparison (RIS-STP LAR)

RIS 2016-10 STP Submittal

  • Current License Basis
  • May 20, 1993
  • No credit taken

- Major Functions - Identified

- Technology - Described

- Table B-1, 60-90 Minute - Defined

  • Offsite Agency Impact
  • State/County Concurrence 6

Comparison (RIS-STP LAR)

RIS 2016-10 STP Submittal Major Functional Tasks Details

  • Notification and Communication
  • 2 Dedicated on-shift ( RO & NLO)
  • Emergency Director
  • 2 Augmented at 90-minutes
  • Off-site Surveys / On-site (out-of-
  • Describes personnel and plant) / In-Plant Surveys technology
  • Chemistry/Radio-chemistry
  • On-shift staffed
  • Technical Support
  • STA role and technology
  • Repair and Corrective Actions
  • Radiation Protection
  • Staffing and technology
  • Dose Assessment
  • On-shift staffed 7

Site/Program Enhancements

  • Technology

- Access/Dosimetry Controls

- Area Radiation Monitors

- Dose Assessment

- Plant Computer (System status trees)

- Auto Notifications Systems

- Web EOC

  • Training

- Licensed Operator Requalification and Simulator Modeling

- Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)

  • Procedures

- Symptom Based

- Initiating Events (EALs NEI 99-01 Rev. 6)

  • Shift Complement 8

Staffing Changes

  • Increased in 1993 to staffing of 20
  • Currently staffed at 25

- Will remain staffed at 25

  • Operations Staff
  • 2-SMs (ED qualified)
  • 2-SROs
  • 4-ROs
  • 4-NLOs
  • 1-STA 9

Staffing Comparison Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Operations *

1. Shift Sup/Manager 1. 1/0/0 1. 2/0/0 1. 2/0
2. Shift Foreman/US 2. 1/0/0 2. 2/0/0 2. 2/0
3. RO 3. 2/0/0 3. 4/0/0 3. 4/0
4. Plant Operators 4. 2/0/0 4. 4/0/0 4. 4/0
5. STA 5. 1**/0/0 (not counted in 5. 1**/0/0 (not counted in 5. 1**/0 (not counted in On-shift Total) On-shift Total) On-shift Total)
6. Operations Discipline 6. None defined 6. 0/0/1# 6. 0/1#

Lead Emergency Direction and Control*** 1**/0/0 (not counted in 2**/0/0 (not counted in 2**/0 (not counted in (STA, SS, or Facility On-shift Total) On-shift Total) On-shift Total)

Director)

Notification/ 1/1/2 2/0/2 2/2 Communication

  • Unaffected Unit in operation maintain shift foreman, 1-RO, 1-NLO
    • May be provided by shift personnel assigned other functions
      • Assumed by EOF Director when all facilities are manned
  1. Filled by personnel with plant operations experience 10

Staffing Comparison (Continued)

Major Functional Area NUREG-0654 NUREG-0654 Current STP Staffing Proposed STP Staffing On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Radiological Assessment Emergency Director 0/0/1 0/0/1 0/1 Senior HP Expertise 0/1/0 1/0/0 1/0 Offsite/Onsite surveys 0/3/3 2/3/4 2**/7 Chemistry/Radio-chem 2/1/2 1/0/1 1/1 Engineering, Repair and Corrective Actions

1. Technical Support 1. 1. 1.

STA 1/0/0 1/0/0 1/0 Core 0/1/0 0/1/0 0/1 Electrical 0/0/1 0/0/1 0/1 Mechanical 0/0/1 0/0/1 0/1

2. Repair and Corr. Actions
2. 2. 2.

2**/0/0 (not counted in 2**/0 (not counted in Rad Waste/

1**/0/2 (not counted On-shift Total) On-shift Total)

Mechanical in On-shift total) 1**/0/1 1**/1 Electrical/I&C 1**/1/1 (not counted 1**and 1/0/1 1**and1/1 in On-shift Total)

I&C 1/0/0 1/0 0/1/0

    • May be provided by shift personnel assigned other functions 11

Staffing Comparison (Continued)

Major Functional Area NUREG-0654 Current STP Staffing Proposed STP Staffing NUREG-0654 On- shift/30/60 minutes On-shift/60/75 minutes On-shift/90 minutes Protective Actions (In Plant) Radiation 2**/2/2 (not counted in 2**/4/0 (not counted in 2**/4 (not counted in Protection HP On-shift Total) On-shift Total) On-shift Total)

Technicians for:

a. Access Control
b. HP Coverage
c. Personnel monitor
d. Dosimetry Firefighting Per T/S / Local Support / Per T/S / Local Support Per T/S / Local Support 0 / Local Support Rescue First Aid 2**/ Local Support 2**/ Local Support / 2**/ Local Support (not counted in On-shift Total) Local Support Security Site Access Per Security Plan Per Security Plan Per Security Plan Control and Personnel Accountability Totals 10/11/15 = 36 25/8/13 = 46 25/21 = 46
    • May be provided by shift personnel assigned other functions 12

Precedent

  • Point Beach
  • Prairie Island

Closing Remarks

  • Desired Outcome
  • Submittal Date
  • STP Point of Contact 14