ML12201A266: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML12201A266 | | number = ML12201A266 | ||
| issue date = 07/18/2012 | | issue date = 07/18/2012 | ||
| title = | | title = Acceptance Review Email, License Amendment Request, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation | ||
| author name = Wang A | | author name = Wang A | ||
| author affiliation = NRC/NRR/DORL/LPLIV | | author affiliation = NRC/NRR/DORL/LPLIV | ||
| addressee name = Burmeister B | | addressee name = Burmeister B, Clark J | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000458 | | docket = 05000458 | ||
| license number = NPF-047 | | license number = NPF-047 | ||
| contact person = Wang A | | contact person = Wang A | ||
| case reference number = TAC ME8942 | | case reference number = TAC ME8942 | ||
| document type = Acceptance Review Letter, E-Mail | | document type = Acceptance Review Letter, E-Mail | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:From:Wang, | {{#Wiki_filter:From: Wang, Alan To: BURMEISTER, BARRY M; Joseph Clark (JCLARK@entergy.com) | ||
Cc: FOUNTAIN, WILLIAM J; Burkhardt, Janet; Chen, Qiao-Lynn | |||
By letter dated June 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12178A078), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The license amendment request (LAR) proposes to implement the requirements of Implementation Schedule Milestone 6 in License Amendment No. 171 in a slightly different manner than described in the approved Implementation Schedule. Entergy | ==Subject:== | ||
Acceptance Review of River Bend Station License Amendment Request Regarding Cyber Security Plan Implementation (TAC No. ME8942) | |||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical | Date: Wednesday, July 18, 2012 4:28:52 PM Barry and Joey, By letter dated June 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12178A078), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The license amendment request (LAR) proposes to implement the requirements of Implementation Schedule Milestone 6 in License Amendment No. 171 in a slightly different manner than described in the approved Implementation Schedule. Entergy stated that although no change to the Implementation Schedule date is proposed, the change to the description of the milestone activity is conservatively considered to be a change to the Implementation Schedule Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | ||
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The | The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | ||
If you have any questions, please contact me at (301) 415-1445. | |||
Alan Wang Project Manager (River Bend Station) | |||
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 | |||
Fax: (301) 415-1222}} | |||
}} |
Latest revision as of 00:45, 12 November 2019
ML12201A266 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 07/18/2012 |
From: | Wang A Plant Licensing Branch IV |
To: | Burmeister B, Clark J Entergy Operations |
Wang A | |
References | |
TAC ME8942 | |
Download: ML12201A266 (2) | |
Text
From: Wang, Alan To: BURMEISTER, BARRY M; Joseph Clark (JCLARK@entergy.com)
Cc: FOUNTAIN, WILLIAM J; Burkhardt, Janet; Chen, Qiao-Lynn
Subject:
Acceptance Review of River Bend Station License Amendment Request Regarding Cyber Security Plan Implementation (TAC No. ME8942)
Date: Wednesday, July 18, 2012 4:28:52 PM Barry and Joey, By letter dated June 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12178A078), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The license amendment request (LAR) proposes to implement the requirements of Implementation Schedule Milestone 6 in License Amendment No. 171 in a slightly different manner than described in the approved Implementation Schedule. Entergy stated that although no change to the Implementation Schedule date is proposed, the change to the description of the milestone activity is conservatively considered to be a change to the Implementation Schedule Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (River Bend Station)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445
Fax: (301) 415-1222