Acceptance Review E-mail, License Amendment Request to Adopt TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process
ML13204A006
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/22/2013
From: Wang A
Plant Licensing Branch IV
To: Burmeister B, Clark J
Entergy Operations
Wang A
References
TAC MF2299
Download: ML13204A006 (1)


Text

1 Burkhardt, Janet From:

Wang, Alan Sent:

Monday, July 22, 2013 3:20 PM To:

BURMEISTER, BARRY M; Joseph Clark (JCLARK@entergy.com)

Cc:

Burkhardt, Janet

Subject:

Acceptance Review of River Bend Station License Amendment Request Regarding Technical Task Force (TSTF) -423 End States (TAC No. MF2299)

Barry and Joey, By letter dated June 13, 2013 (Agencywide Documents Access and Management System Accession No. ML13169A068) (RBG-47322), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The license amendment request (LAR) proposes to adopt TSTF-423, Revision 0, Technical Specifications End States. Specifically, the proposed amendment would modify Technical Specifications (TSs) to risk-informed requirements regarding selected Required Action end states. This TS improvement is part of the Consolidated Line Item Improvement Process (CLIIP) with some deviations noted.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Alan Wang Project Manager (River Bend Station)