Letter Sequence Request |
---|
|
|
MONTHYEARML12191A1222012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones Project stage: Request ML12201A2662012-07-18018 July 2012 Acceptance Review Email, License Amendment Request, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation Project stage: Acceptance Review ML12261A4722012-12-0505 December 2012 Issuance of Amendment No. 177, Revise Physical Protection License Condition Related to Milestone No. 6 of the Cyber Security Plan Implementation Project stage: Approval 2012-06-20
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23195A0222023-07-11011 July 2023 4-2022-012 Letter - OI Closure to Licensee IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report 2024-01-18
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-27027 February 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials2021-06-15015 June 2021 Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-0404 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-12-20020 December 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47918, Removal of the Table of Contents from the Technical Specifications2018-11-29029 November 2018 Removal of the Table of Contents from the Technical Specifications RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-18018 October 2018 Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 RBG-47883, Amendment 1 to License Renewal Application2018-08-0202 August 2018 Amendment 1 to License Renewal Application RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-24024 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-07-10010 July 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves2018-04-0202 April 2018 License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves RBG-47848, License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement2018-03-22022 March 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program - Supplement RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-02-28028 February 2018 Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) RBG-47830, License Renewal Application Update - Neutron Absorbing Material Monitoring Program2018-02-15015 February 2018 License Renewal Application Update - Neutron Absorbing Material Monitoring Program RBG-47823, Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling2018-01-29029 January 2018 Request for Review and Approval of Relocation of the Reactor Core Isolation Cooling (RCIC) Injection Point from the Reactor Vessel Head Spray Nozzle to the 'A' Feedwater Line Via the 'A' Residual Heat Removal (RHR) Shutdown Cooling ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments ML17153A2862017-05-31031 May 2017 River Bend Station, Unit 1, License Renewal Application RBG-47735, License Renewal Application - Appendices a Through D2017-05-31031 May 2017 License Renewal Application - Appendices a Through D ML17153A2852017-05-25025 May 2017 License Renewal Application RBG-47630, Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 12015-12-0303 December 2015 Resubmittal of License Amendment Request - Cyber Security Plan Implementation Schedule, River Bend Station - Unit 1 RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months2015-10-29029 October 2015 License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating2014-07-0909 July 2014 Application for Change to Technical Specification 3.8.1, AC Sources - Operating CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments RBG-47432, License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity2014-02-10010 February 2014 License Amendment Request 2013-18 Re Revision of Ultimate Heat Sink Design Capacity RBG-47382, Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-132013-07-29029 July 2013 Heavy Load Movement Over Fuel Assemblies, License Amendment Request 2013-13 RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs.2013-07-16016 July 2013 Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. RBG-47322, Submittal of Request for Amendment to the Technical Specifications2013-06-13013 June 2013 Submittal of Request for Amendment to the Technical Specifications CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments RBG-47332, Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria2013-02-0707 February 2013 Unit 1 - License Amendment Request 2013-01, Battery Surveillance Requirement Acceptance Criteria ML12191A1222012-06-20020 June 2012 License Amendment Request - Cyber Security Plan Implementation Schedule Milestones RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47072, License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies2010-09-0909 September 2010 License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities2010-07-22022 July 2010 License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML0934801612009-12-0909 December 2009 Submittal of License Amendment Request - Cyber Security Plan RBG-46932, License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles2009-08-10010 August 2009 License Amendment Request 2009-05 to Support Operation with 24-Month Fuel Cycles RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements2009-06-29029 June 2009 License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ML0902701982009-01-21021 January 2009 License Amendment Request 2009-01, Application for Technical Specifications (TS) Change to Adopt NRC Approved Generic Changes TSTF-163, TSTF-222, TSTF-230, and TSTF-306 to the Improved Technical Specifications RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request2008-12-0808 December 2008 License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request 2023-07-27
[Table view] |
Text
Entergy Operations, Inc.
River Bend Station
'Entergya 5485 U.S. Highway 61N St. Francisville, LA 70775 Tel 225-381-4374 Eric W. Olson Site Vice President 10CFR 2.390 Attachments Withheld RBG-47246 June 20, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request - Cyber Security Plan Implementation Schedule Milestones River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47
References:
- 1. NRC letter to River Bend Station, Issuance of Amendment Re: Approval of Cyber Security Plan, dated July 29, 2011, per RBC-50945
- 2. River Bend Station letter to NRC, Response to Additional Requests for Additional Information and Revision to the River Bend Station Cyber Security Plan, dated April 4, 2011, per RBG-47129
Dear Sir or Madam:
In Reference 1, the NRC issued License Amendment No. 171 to the Facility Operating License for River Bend Station (RBS) that approved the River Bend Station Cyber Security Plan and associated implementation milestone schedule. The Cyber Security Plan Implementation Schedule contained in Reference 2 was utilized as a portion of the basis for the NRC's safety evaluation report provided by Reference 1. River Bend is planning to implement the requirements of Implementation Schedule Milestone 6 in a slightly different manner than described in the approved Implementation Schedule. Although no change to the Implementation Schedule date is proposed, the change to the description of the milestone activity is conservatively considered to be a change to the Implementation Schedule, and in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90, Entergy is submitting this request for an amendment to the Facility Operating License for RBS. The River Bend Station Cyber Security Plan, Revision 0 was previously provided in Reference 2.
This letter contains security-related information - Attachments 1 (Swions 1, 2, and 3) and 4 are withheld from public disclosure per 10 CFR V390 '!ýo
RBG-47246 Page 2 of 3 This letter contains security-related information - Attachments I (Sections 1, 2, and 3) and 4 are withheld from public disclosure per 10 CFR 2.390 provides an evaluation of the proposed change. Attachment 2 contains a proposed marked-up operating license page for the Physical Protection license condition for RBS to reference the commitment change provided in this submittal. Attachment 3 contains the proposed revised operating license page. Attachment 4 contains a change to the scope of Implementation Milestone 6. RBS requests that Attachments 1 (Sections 1, 2, and 3) and 4 which contain security-related information (SRI) be withheld from public disclosure in accordance with 10 CFR 2.390.
The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. The bases for these determinations are included in .
River Bend requests this license amendment be effective as of its date of issuance.
Although this request is neither exigent nor emergency, your review and approval is requested prior to December 31, 2012.
The revised commitment contained in this submittal is summarized in Attachment 5. Should you have any questions concerning this letter, or require additional information, please contact Mr. Joseph Clark at 225-381-4177.
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 20, 2012.
Sincerely, EWO/JCR/JAC/wjf Attachments: 1. Analysis of Proposed Operating License Change (contains SRI)
- 2. Proposed RBS Operating License Changes (mark-up)
- 3. Revised RBS Operating License Page
- 4. Revised Cyber Security Plan Implementation Schedule (contains SRI)
- 5. List of Regulatory Commitments This letter contains security-related information - Attachments 1 (Sections 1, 2, and 3) and 4 are withheld from public disclosure per 10 CFR 2.390
RBG-47246 Page 3 of 3 This letter contains security-related information - Attachments 1 (Sections 1, 2, and 3) and 4 are withheld from public disclosure per 10 CFR 2.390 cc: U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
Arlington, TX 76011-4511 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Ms. Tracie Lowrey Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section JiYoung Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 Mr. Alan Wang, Project Manager U.S. Nuclear Regulatory Commission MS O-8B1 11555 Rockville Pike Rockville, MD 20852-2738 This letter contains security-related information - Attachments 1 (Sections 1, 2, and 3) and 4 are withheld from public disclosure per 10 CFR 2.390
This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390 Attachment 1 RBG-47246 Analysis of Proposed Operating License Change This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390 to RBG-47246 Page 2 of 5 This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria 10 CFR 73.54 requires licensees to maintain and implement a cyber security plan. River Bend Station Facility Operating License NPF-47 includes a Physical Protection license condition that requires Entergy Operations, Inc. (Entergy) to fully implement and maintain in effect all provisions of the Commission-approved cyber security plan, including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
4.2 Precedent Amendment No. 203 for the Callaway Plant (Reference 5) approved an implementation schedule using the Nuclear Energy Institute (NEI) template (Reference 3), with the exception of Milestone 6. The Callaway Plant deviated from the template for Milestone 6 to address only the NEI 08-09, Revision 6, Appendix D technical controls, excepting for the operational and management controls, on the basis that implementing the technical controls for the target set critical digital assets provides a high degree of protection against cyber related attacks that could lead to radiological sabotage.
The changes being proposed by Entergy in this amendment request are similar to those approved in the Callaway Plant Amendment No. 203.
This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390 to RBG-47246 Page 3 of 5 This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390 4.3 Significant Safety Hazards Consideration River Bend Station is requesting an amendment to the RBS Facility Operating License to revise the Physical Protection license condition as it relates to the cyber security plan. This change includes a proposed deviation to the scope of a Cyber Security Plan Implementation Schedule milestone and a proposed revision to the RBS Facility Operating License to include the proposed deviation. Specifically, River Bend proposes a change to the scope of Implementation Milestone 6 to apply to only technical cyber security controls.
River Bend has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to the Cyber Security Plan Implementation Schedule is administrative in nature. This change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents and has no impact on the probability or consequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change to the Cyber Security Plan Implementation Schedule is administrative in nature. This proposed change does not alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected. The proposed change does not require any plant modifications which affect the performance capability of the structures, systems, and components relied upon to mitigate the consequences of postulated accidents and does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390 to RBG-47246 Page 4 of 5 This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
Plant safety margins are established through limiting conditions for operation, limiting safety system settings, and safety limits specified in the technical specifications. The proposed change to the Cyber Security Plan Implementation Schedule is administrative in nature. Because there is no change to these established safety margins as result of this change, the proposed change does not involve a significant reduction in a margin of safety.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, River Bend concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusion In conclusion, based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
The proposed amendment provides a change to the Cyber Security Plan Implementation Schedule. The proposed amendment meets the eligibility criterion for a categorical exclusion set forth in 10 CFR 51.22(c)(1 2). Therefore, pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390 to RBG-47246 Page 5 of 5 This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390
6.0 REFERENCES
- 1. NRC letter to River Bend Station, Issuance of Amendment Re: Approval of Cyber Security Plan, dated July 29, 2011, per RBC-50945
- 2. River Bend Station letter to NRC, Response to Additional Requests for Additional Information and Revision to the River Bend Station Cyber Security Plan,dated April 4, 2011, per RBG-47129
- 3. Letter from Chris Earls (NEI) to Richard P. Correia (NRC), Template for the Cyber Security Plan Implementation Schedule, dated February 28, 2011 (ADAMS Accession No. ML110600211)
- 4. Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Template for the Cyber Security Plan Implementation Schedule, dated March 1, 2011 (ADAMS Accession No. ML110070348)
- 5. NRC letter from M. C. Thadani, USNRC, to A. C. Heflin, Union Electric Company, "Callaway Plant, Unit 1 - Issuance of Amendment Re: Approval of Cyber Security Plan (TAC NO. ME4536)," August 17, 2011 (ADAMS Accession No. ML112140087)
This attachment contains security-related information - Sections 1, 2, and 3 are withheld from public disclosure per 10 CFR 2.390
Attachment 2 RBG-47246 Proposed RBS Operating License Changes (mark-up)
D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan," submitted by letter dated May 16, 2006.
E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority .of 10 CER 50.90 an~d 10 CF is F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).
G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.
FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Attachments 1-5
- 2. Appendix A - Technical Specifications (NUREG-1 172)
- 3. Appendix B - Environmental Protection Plan
- 4. Appendix C - Antitrust Conditions Date of Issuance: November 20, 1985 Revised: December 16, 1993 Amendment No. 70 7-95 119 136 471
'Revised by let#er datod Qctobor 28, 2004 Rovicod by lett8r datod Novomber 19, 2001 Revicd by lottor dated
Attachment 3 RBG-47246 Revised RBS Operating License Page
D. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security, Safeguards Contingency and Training & Qualification Plan," submitted by letter dated May 16, 2006.
E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The licensee's CSP was approved by License Amendment No. 171 as supplemented by a change approved by License Amendment No.
F. Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(1 1) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).
G. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
H. This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.
FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Attachments 1-5
- 2. Appendix A - Technical Specifications (NUREG-1172)
- 3. Appendix B - Environmental Protection Plan
- 4. Appendix C - Antitrust Conditions Date of Issuance: November 20, 1985 Revised: December 16, 1993 Amendment No. 70 798 5 !1@ 135 171, Revised by loller datod_ October28 20 Rovised by loller dated Novomfbor 19, 2001 Revised by letrdattedd Januar' 21, 200
Attachment 5 RBG-47246 List of Regulatory Commitments to RBG-47246 Page 1 of 1 i.-
List of Regulatory Commitments The following table identifies those actions committed to by RBS in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED (Check One) COMPLETION COMMITMENT ONE- DATE TIME CONTINUING (If Required)
ACTION COMPLIANCE River Bend will implement milestones 1, X December 31, 2012 2, 3, 4, 5, and 7 described in Attachment 4 of letter dated April 4, 2011, and the revised Milestone 6 in Attachment 4 of this submittal.