ML090620067
Letter Sequence Acceptance Review | |
---|---|
TAC:ME0406, Control Room Habitability, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration, Control Rod SCRAM Time Testing, TSTF-1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling, Minimum Vs. Steady State Voltage and Frequency (Approved, Closed) | |
Initiation Administration Questions
| |
MONTHYEARML0900600462009-01-0606 January 2009
[Table View]E-Mail Acceptance Review for License Amendment Request Project stage: Acceptance Review ML0902701982009-01-21021 January 2009 License Amendment Request 2009-01, Application for Technical Specifications (TS) Change to Adopt NRC Approved Generic Changes TSTF-163, TSTF-222, TSTF-230, and TSTF-306 to the Improved Technical Specifications Project stage: Request RBG-46883, Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 3062009-01-23023 January 2009 Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 306 Project stage: Supplement ML0906200672009-03-0303 March 2009 Acceptance Review Project stage: Acceptance Review ML0908305222009-03-24024 March 2009 Acknowledgement of Change in Commitment Project stage: Other RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements Project stage: Supplement ML0920103702009-08-11011 August 2009 License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306 Project stage: Acceptance Review RBG-46943, Supplement to License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (Colr).2009-08-12012 August 2009 Supplement to License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (Colr). Project stage: Supplement ML0924301452009-09-29029 September 2009 Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method Project stage: Approval RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors Project stage: Request ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 Project stage: Other 2009-03-24 |
ML090620067 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 03/03/2009 |
From: | Lyon C Watts Bar Special Projects Branch |
To: | Lorfing D Entergy Operations |
Lyon CF, NRR/DORL, 415-2296 | |
References | |
TAC ME0406 | |
Download: ML090620067 (2) | |
Similar Documents at River Bend | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML20317A2922020-10-15015 October 2020
[Table view]Entergy Operations, Inc. (River Bend Station, Unit 1) - Acceptance Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML17187A0352017-08-0707 August 2017 Determination of Acceptability and Sufficiency for Docketing and Proposed Review Schedule Regarding the Application from Entergy Operations, Inc. for Renewal of the Operating License for River Bend Station, Unit 1 (CAC No. MF9747 and MF9778 ML14071A4542014-03-12012 March 2014 Acceptance Review Email, License Amendment Request to Revise Operating License Conditions Related to Cyber Security Plan Milestone 8 Full Implementation Date ML13274A0992013-10-0707 October 2013 Supplemental Information Needed for Acceptance of Licensing Action, Relief Request RBS-R&R-2013-001, Alternative to ASME Code Section III for Postweld Heat Treatment Exemption, Third 10-Year ISI Interval ML13268A4202013-09-25025 September 2013 Acceptance Review Email, License Amendment Request, Changes to Technical Requirements Manual and Updated Safety Analysis Report to Add Permanent Exception Allowing Heavy Load Movement Over Fuel Assemblies ML13211A3902013-07-30030 July 2013 Acceptance Review Email, License Amendment Request to Adopt Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML13204A0062013-07-22022 July 2013 Acceptance Review E-mail, License Amendment Request to Adopt TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML13197A2622013-07-16016 July 2013 Acceptance Review Email, License Amendment Request, Revise Technical Specification 2.1.1., Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML12311A1342012-11-0505 November 2012 Entergy Fleet and ISFSI-Acceptance Review Email, Direct License Transfer and Conforming Amendments for Arkansas Nuclear Units 1 & 2; Grand Gulf Unit 1, and Grand Gulf Early Site Permit; Indirect License Transfer for River Bend and Waterford ML12305A0492012-10-29029 October 2012 Acceptance Review Email, Request for Relief RBS-R&R-2011-001 from ASME Code Class 3 Table ND-4622.7(b)-1 Requirements for Post-Weld Heat Treatment Exemption of Valves, Third 10-Year Inservice Inspection Interval ML12299A4352012-10-25025 October 2012 E-mail - Acceptance Review, Request for Relief RBS-ISI-018 for Reactor Pressure Vessel Support Skirt, Second 10-Year Inservice Inspection Interval ML12271A2592012-09-27027 September 2012 Acceptance Review E-mail, Request for Exemption to 10 CFR Part 50, Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Related to the Definition of Pa ML12201A2662012-07-18018 July 2012 Acceptance Review Email, License Amendment Request, Revise Physical Protection License Condition Related to Cyber Security Plan Implementation ML1203202222012-02-0101 February 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification (TS) 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML1202502212012-01-25025 January 2012 Acceptance Review Email, License Amendment Request, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III Bus ML1131202922011-11-0808 November 2011 E-mail River Bend Station - Acceptance Review Email Following Supplement, License Amendment Request, Emergency Plan Change to Relocate Alternate Emergency Operations Facility from 23 to 28 Miles from the Technical Support Center ML1126303632011-09-20020 September 2011 Email, Acceptance Following Supplement - Request to Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints ML1117303552011-06-22022 June 2011 Acceptance Review Email, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-427, Revision 3, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML1113806002011-05-18018 May 2011 Acceptance Review Email, License Amendment Request, Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1013901052010-05-24024 May 2010 License Amendment Request for Approval of the Cyber Security Plan ML1006009362010-03-0101 March 2010 Acceptance Review E-mail, License Amendment Request LAR, Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML0935800722009-12-23023 December 2009 Acceptance Review Email Relief Request RBS-ISI-015, Request for Alternative to ASME Boiler and Pressure Vessel Code, Section XI, Sub Article IWB-2500 ML0935702002009-12-23023 December 2009 Acceptance Review Email, Relief Request RBS-ISI-014, Proposed Alternative to Examination Requirements for Reactor Pressure Vessel Weld. Inspections, for Third 10-Year Inservice Inspection Interval ML0926604942009-09-23023 September 2009 Acceptance Review Email, License Amendment Request, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals ML0920103642009-07-20020 July 2009 Acceptance Review Email, License Amendment Request, Revise Technical Specification 5.5.6, Inservice Testing Program. ML0917510622009-06-24024 June 2009 Acceptance Review Email, Relief Request Nos. RBS-ISI-007, -008, -009, -010,and -011, Volumetric and Visual Exams, for Second 10-year Inservice Inspection Interval ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) ML0906200672009-03-0303 March 2009 Acceptance Review ML0901300832009-01-13013 January 2009 E-mail Acceptance Review for License Amendment Request ML0820010842008-07-25025 July 2008 River Bend Station, and Waterford Steam Electric Station, Unit 3 - Acceptance Review, Relief Request No. CEP-ISI-011 for 10-Year Inservice Testing Interval (TAC MD8826, MD8827, MD8828, & MD8829) ML0822102662005-08-0808 August 2005 Acceptance Review Email, License Amendment Request, Application for Technical Specification Changes Dated 7/28/08, TSTF-475, Using the Consolidated Line Item Improvement Process (Cliip). (RBG-46690) 2020-10-15 Category:E-Mail MONTHYEARML24289A1442024-10-15015 October 2024
[Table view]NRR E-mail Capture - Acceptance Review - Entergy (Grand Gulf Nuclear Station and River Bend Station) - CNRO2024-00017 - Adopt TSTF-592 - CLIIP (L-2024-LLA-0133) ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML24031A2772023-11-27027 November 2023 (05000458/2024040) IP 95001 Regarding EA-23-071 Initial Request for Information ML24102A2442023-09-22022 September 2023 NRR E-mail Capture - Audit Question TSTF-505 and 50.69 ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23103A4662023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23103A4672023-04-0404 April 2023 NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23089A0702023-03-29029 March 2023 TSTF-505 Email Providing Reference for 0.3g HCLPF Value ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML21356A5882021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: River Bend Station 1 - IST Program Relief Request for PIV Testing Frequency ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21218A0412021-07-19019 July 2021 NRR E-mail Capture - River Bend Unit 1 - Acceptance of License Amendment Request to Add License Condition Concerning Receipt, Possession ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20337A1382020-11-23023 November 2020 Acceptance of License Amendment Request to Adopt GL 86-10 Standard License Condition for Fire Protection ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20317A2922020-10-15015 October 2020 Entergy Operations, Inc. (River Bend Station, Unit 1) - Acceptance Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A3542020-10-14014 October 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of TSTF-563 LAR, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20169A3782020-06-16016 June 2020 Email-20-0196-NRC Riv Response V. Dricks to Tom Gurdziel Inquiry: Extent of Condition Flex Equipment ML20169A6752020-05-20020 May 2020 Email-20-0196, Tom Gurdziel Inquiry to NRC Chairman Resource, Extent of Condition FLEX Equipment, 05/20/2020 ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) ML20086J6572020-03-26026 March 2020 NRR E-mail Capture - River Bend Station, Unit 1 -Acceptance Review of the LAR Associated with Extending the Implementation Date from 5/13/2020 to 9/30/2020 for Emergency Action Level Scheme ML20079D9302020-03-19019 March 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20057G1752020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems ML20057G1592020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML20038A2092020-02-0404 February 2020 05000458 Request for Information IR2020-001 Occupational Radiation Safety ML19352F5222019-12-17017 December 2019 NRR E-mail Capture - Acceptance Review Results for License Amend Request to Revise TS 3.3.5.2 to Adopt TSTF-425, Rev 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, for River Bend, ML19102A0722019-04-11011 April 2019 NRR E-mail Capture - River Bend Station, Unit 1 - Final Request for Additional Information Relief Request RBS-ISI-021 ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML19059A0292019-02-27027 February 2019 NRR E-mail Capture - Acceptance Review Results for License Amendment Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules, for Entergy Fleet ML19008A3592019-01-0808 January 2019 NRR E-mail Capture - Acceptance Review: RR Volumetric Exams (L-2018-LLR-0388) ML18365A1422018-12-28028 December 2018 NRR E-mail Capture - Acceptance Review Results - Removal of TS Table of Contents (L-2018-LLA-0489) 2024-05-16 |
Text
From: Fred Lyon Sent: Tuesday, March 03, 2009 8:31 AM To: LORFING, DAVID N Cc: 'BURMEISTER, BARRY M'; 'BRICE, WILLIAM B'; 'BYRD, RONALD W'
Subject:
Acceptance Review (TAC No. ME0406)
By letter dated January 21, as supplemented January 23, 2009, Entergy Operations, Inc.
(Entergy), submitted a license amendment request for River Bend Station, Unit 1. The proposed amendment adopts TSTFs 163, 222, 230, and 306, and makes minor administrative corrections.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Review (TAC No. ME0406)
Sent Date: 03/03/2009 8:28:43 AM Received Date: 03/03/2009 8:31:00 AM From: Fred Lyon Created By: Fred.Lyon@nrc.gov Recipients:
DLORFIN@entergy.com (LORFING, DAVID N)
Tracking Status: None BBURMEI@entergy.com ('BURMEISTER, BARRY M')
Tracking Status: None
WBRICE@entergy.com ('BRICE, WILLIAM B')
Tracking Status: None RBYRD@entergy.com ('BYRD, RONALD W')
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10638 03/03/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: