MONTHYEARML13018A1002009-01-20020 January 2009 Drift Study for ABB Model ITE-27H Undervoltage Relays Project stage: Other ML13018A1072009-01-20020 January 2009 Drift Study for General Electric Model NGV13B Undervoltage Relays Project stage: Other ML13018A1032009-01-26026 January 2009 Drift Study for ABB ITE-62 Timers Project stage: Other ML13018A1102009-02-11011 February 2009 Drift Study for Agastat ETR Series Time Delay Relays Project stage: Other RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating Project stage: Request RBG-47193, License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes2011-12-0808 December 2011 License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes Project stage: Request ML12261A4912012-01-31031 January 2012 Licensee Calculations Related to License Amendment Request to Revise TS 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions Project stage: Request ML1203202222012-02-0101 February 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification (TS) 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions Project stage: Acceptance Review ML1207204092012-03-12012 March 2012 Email, Request for Additional Information, Amendment Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 / Revise Allowable Values for Certain Functions Project stage: RAI ML1207603762012-03-16016 March 2012 Email, Request for Additional Information, Round 2, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions Project stage: RAI ML12125A3062012-05-0202 May 2012 Response to Request for Additional Information on License Amendment Request 2011-05 Project stage: Response to RAI ML12220A5462012-08-0707 August 2012 Request for Additional Information E-mail, Round 3, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions Project stage: RAI RBG-47279, Response to Request for Additional Information on License Amendment Request 2011-052012-09-0505 September 2012 Response to Request for Additional Information on License Amendment Request 2011-05 Project stage: Response to RAI RBG-47281, Notification of Spent Fuel Cask Use2012-09-0505 September 2012 Notification of Spent Fuel Cask Use Project stage: Request ML12291A7632012-10-16016 October 2012 Email, License Amendment Request for Degraded Voltage Surveillance Frequency Extension; Revised Calculations and White Paper Which Discusses Methodology Used for Revision Project stage: Request ML13023A1092012-10-16016 October 2012 Dv/Lop Calculations (ME7767) Project stage: Other ML13022A2202012-11-0707 November 2012 Email Agastat ETR Relay Catalog Project stage: Request ML13022A1952012-11-0707 November 2012 ABB Model 27H Under-Voltage Relays in Calc G13.18.6.2-ENS*006 Project stage: Request ML13022A1922012-11-0707 November 2012 Email ABB Model 27H Under-Voltage Relays in Calc G13.18.6.2-ENS*006 Project stage: Request ML13022A1382012-11-0707 November 2012 Email ABB 62K Manual for 62-2 Relay in Uncertainty Calculation G13.18.6.2-ENS*006 (TAC No. ME7767 Project stage: Other ML13022A2242012-11-0707 November 2012 Agastat ETR Relay Information Project stage: Request ML12341A0032012-12-0505 December 2012 Email, Request for Additional Information, Round 3, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions Project stage: RAI RBG-47321, Response to Request for Additional Information on License Amendment Request 2011-052013-01-0909 January 2013 Response to Request for Additional Information on License Amendment Request 2011-05 Project stage: Response to RAI ML13018A0842013-01-17017 January 2013 Email from Licensee Drift Study Calculations Project stage: Other RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 Project stage: Supplement ML13060A2102013-03-29029 March 2013 Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain Functions Project stage: Approval 2012-02-01
[Table View] |
Text
From:
Wang, Alan Sent:
Wednesday, February 01, 2012 11:09 AM To:
'BURMEISTER, BARRY M'; 'Joseph Clark (JCLARK@entergy.com)'
Cc:
Lent, Susan; Burkhardt, Janet; WILLIAMSON, DANNY H
Subject:
Acceptance Review of River Bend Station License Amendment Request Regarding Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes (TAC No. ME7767)
Barry and Joey, By letter dated December 8, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11349A246), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The proposed license amendment request (LAR) will: (1) extend the frequency of Surveillance Requirement (SR) 3.3.8.1.3 (calibration of loss of power instrumentation) from 18 to 24 months, and, (2) revise certain Allowable Values in TS 3.3.8.1, "Loss of Power Instrumentation."
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1445.
Alan Wang Project Manager (River Bend Station)