ML23103A467

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ML23103A467
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/04/2023
From: James Drake
NRC/NRR/DORL/LPL4
To: Bradley Jones
Entergy Nuclear Operations
References
L-2023-LLA-0038
Download: ML23103A467 (2)


Text

From: Jason Drake Sent: Tuesday, April 4, 2023 10:02 PM To: Jones, Brian A. (RBS); Crawford, Randy Cc: Jennifer Dixon-Herrity; Samson Lee

Subject:

River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors" (EPID: L-2023-LLA-0038)

Importance: High By letter dated February 27, 2023, Entergy Operations, Inc. (Entergy) sent a license amendment request (LAR) for River Bend Station (RBS) Unit 1, to adopt 10 CFR 50.69, "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors" (ADAMS Accession Number ML23058A217). The purpose of this email is to provide the results of the NRC staffs acceptance review of the submittal. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of this request in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 1,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> to complete. The NRC staff expects to complete this review on or before April 1, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me.

Jason Drake Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8378

Hearing Identifier: NRR_DRMA Email Number: 2036 Mail Envelope Properties (MN2PR09MB58036337B35A489934DDB815FB909)

Subject:

River Bend Station, Unit 1 - Acceptance Review for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (EPID L-2023-LLA-0038)

Sent Date: 4/4/2023 10:01:55 PM Received Date: 4/4/2023 10:01:00 PM From: Jason Drake Created By: Jason.Drake@nrc.gov Recipients:

"Jennifer Dixon-Herrity" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Samson Lee" <Samson.Lee@nrc.gov>

Tracking Status: None "Jones, Brian A. (RBS)" <bjone10@entergy.com>

Tracking Status: None "Crawford, Randy" <RCRAWFO@entergy.com>

Tracking Status: None Post Office: MN2PR09MB5803.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2325 4/4/2023 10:01:00 PM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: