ML12342A257: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 15: Line 15:
| page count = 90
| page count = 90
}}
}}
=Text=
{{#Wiki_filter:C-I APPENDIX C LICENSING BASIS EVALUATIONS
==SUMMARY==
WCAP-17678-NP                                    November 2012 Revision 0
C-2 Item  Item Tag/ID    Component
  #  or Room No. Description                  Issue Description              Status                  Resolution I  EGLT0002    CCW SURGE TK B  SWT observed scaffolding in zone of influence      Y    Licensing Basis Evaluation:
of level transmitter with no bracing or wall            SWT received WCNOC Scaffolding anchorage at top bay (3 bays total). Members            Evaluation (Scaffold Request # 12-SO 189, appear suitable to withstand moment so as to            Work Order # 11-345393 (Reference 24))
preclude collapse, but verification is required        that validates scaffold installation in from scaffolding documentation on site.                accordance with procedure. SWT concludes from engineering judgment that scaffolding is acceptable given member capacity in bending and light loading due to single bay at the top. No adverse seismic concern.
2  EKJ03B      INTERCOOLER    SWT could not verify 1-1/4" anchor bolts in        Y    Licensing Basis Evaluation:
HEAT EXCHANGER  field. Verify from CLB documentation.                  AB-83 bolts verified as 1-1/4" per C-1 C51 11 (Reference 25).
3  FKJ02C      KKJO1B AIR      SWT could not verify 3/4" double-nutted            Y    Licensing Basis Evaluation:
INTAKE FILTER  anchor bolts in field. Verify from CLB                  AB-69 anchor bolt verified as 3/4" and documentation.                                          double nutted per C-0033 (Reference 26).
4  GNPT0934    CONTAINMENT    Anchorage documentation brought in field was      Y    Licensing Basis Evaluation:
ATMOSPHERE      not sufficient to verify anchorage. Verify              SWT received M-771-00048-W04 whether as-installed configuration which was            (Reference 27), which calls out 4 no. 3/8" as-built in field consisting of 4 no. 3/8" bolts        bolts for mounting. Anchorage configuration meets CLB anchorage configuration                      is verified.
documentation.
5  KKJO1B      STANDBY DIESEL  SWT observed an anchor bolt with 10"              Y    Licensing Basis Evaluation: Operability (GENERATOR)    projection whereas 8" required per CLB                  Evaluation KJ-12-015 (Reference 28) via CR documentation. Verification was required to            #57391 determined that the as-installed determine whether condition was previously              condition is not in violation of the seismic analyzed or condition is acceptable as-                licensing basis given that all bolts undergo installed.                                              zero net uplift under all design load combinations. CR #57391 is tracking this observation.
6  NE002      STANDBY #2      Component is on the common skid with              Y    Licensing Basis Evaluation:
KKJO1B (rule of the box) and therefore has the          See resolution for KKJO1B above.
same anchorage concerns. (see Issue                    CR #57391 is tracking this observation.
Description for KKJO    lB.)
WCAP-17678-NP                                                                                                                November 2012 Revision 0
C-3 Item    Item Tag/ID    Component
  #    or Room No.      Description                Issue Description                Status                    Resolution 7    NF039B      CONT SHED/SEQ    Adjacent cabinets are flush. Concern regarding    Y    Licensing Basis Evaluation:
CH 4 LOGIC      potential sensitive equipment changing state            SWT review of WCNOC Calculation due to chatter. Check that cabinets are                XX-FH-009-002 (Reference 23) confirms attached.                                              that cabinet NF039B and adjacent cabinets NF039A and NF039C have been analyzed for proximity concerns with adjacent cabinets and are therefore acceptable.
8    NG004C      480 VAC          Observed 1-7/8" clearance from back of MCC        Y    Licensing Basis Evaluation:
(drip shield) to concrete wall. There is concern        Using a conservative lower bound frequency that the MCC could close the gap in SSE event          estimate of 5 Hz, a modal shape factor (SF) and cause equipment to malfunction,                    of 1.6 for cantilever action, and taking the Verification needed to ensure gap is sufficient        peak spectral acceleration of approx. Ig at given MCC flexibility (gap oriented in weak            the 2047.5 ft elevation for 3% damping direction) and high elevation of the Aux                (conservative), the upper-bound Building (2047.5').                                    displacement is 6.3 in (= 1.6*386.4 in/s 2
* lg
                                                                                              / (2*pi*5 Hz) 2). Therefore, a 1-7/8" gap is acceptable. This conclusion is based on the use of the component displacement equation described on pg 5-1 and obtained from Reference 22.
9    RP08 IA/B    SUBCOOLING      SWT noted same top support bolting                Y    Licensing Basis Evaluation:
MONITORING      modification as for SB041. Verify whether              Condition is analyzed per WCNOC CABINET          modification documents the qualification                Calculation XX-FH-009-002 (Reference 23).
reconciliation of individual equipment.                No adverse seismic concern.
10  SA036E      ESFAS CH4 LOGIC  Adjacent cabinets are 1/16" apart. Check that      Y    Licensing Basis Evaluation:
CABINET          cabinets are bolted together so as to preclude          SWT review of WCNOC Calculation chatter.                                                XX-FH-009-002 (Reference 23) confirms that cabinet SA036E has been analyzed for proximity concerns with adjacent cabinets and is therefore acceptable.
11  SB032C      W SS PROT SYS    SWT noted a modification to add top support        Y    Licensing Basis Evaluation:
OUT 1 TRN        to fasten SBD32D to SBD33A. Verify whether              Condition is analyzed per WCNOC modification documents the qualification                Calculation XX-FH-009-002 (Reference 23).
reconciliation of individual equipment.                No adverse seismic concern.
WCAP- 17678-NP                                                                                                                November 2012 Revision 0
C-4 Item  Item Tag/ID    Component
    #  or Room No. Description                  Issue Description              Status                  Resolution 12  SB032D      W SS PROT SYS  SWT noted a modification to add top support        Y    Licensing Basis Evaluation:
OUT 2 TRN      to fasten SBD32D to SBD33A. Verify whether              Condition is analyzed per WCNOC modification documents the qualification                Calculation XX-FH-009-002 (Reference 23).
reconciliation of individual equipment.                No adverse seismic concern.
13  SB041      W PROCESS      1.) SWT noted cable tray with 1/4" vertical        Y    Licensing Basis Evaluation:
ANALOG          clearance to top of cabinet support                    1.) Inspection of vertical response spectra at PROTECTION SET  modification. Concern is that differential              this level confirms that 1/4" is more than CAB-04          movement between the floors can cause                  adequate separation for vertically rigid equipment to spatially interact and cause              components. No adverse seismic concern.
change of state in SB041. Both pieces can be            2.) Condition is analyzed per WCNOC Calc taken as rigid in the vertical direction. Verify        XX-FH-009-002 (Reference 23). No adverse from In-Structure Response Spectra whether              seismic concern.
clearance is acceptable.
2.) Cabinets RPO18, SB041, and SB042 are bolted at their tops. This appears to be a modification not included in original equipment qualifications. Verify whether modification documents the qualification reconciliation of individual equipment.
14  SB079      RPV LEVEL INSTR Anchorage documentation brought in field did      Y    Licensing Basis Evaluation:
SYS PROC PROT  not reflect as-installed configuration. Verify          Detail 5 on WCNOC Dwg C-0008 SYS            whether as-installed configuration which was            (Reference 29) indicates an acceptable as-built in field meets CLB anchorage                  anchorage weld pattern of 3/16" fillet welds, configuration documentation.                            2" long at 8" o.c. The as-installed configuration recorded in the field meets this requirement; therefore, there is no adverse seismic condition.
15  SE054B      W NUC INSTM NIS 1.) Anchorage documentation brought in field      Y    1.) Licensing Basis Evaluation: As-installed 2              did not reflect as-installed configuration.            configuration could be verified per NCR Verify whether as-installed configuration              ISN21407EW against Dwg C-0008 (Ref.
which was as-built in field meets CLB                  22). 2.) Licensing Basis Evaluation:
anchorage configuration documentation.                  Condition is analyzed per WCNOC Calc 2.) Top of panel is bolted to adjacent panel            XX-FH-009-002 (Reference 23). No adverse SD055A. Verify whether bolting modification            seismic concern.
reconciled individual equipment qualification.
WCAP- 17678-NP                                                                                                              November 2012 Revision 0
C-5 Item  Item Tag/ID    Component
  #  or Room No. Description                Issue Description                Status                  Resolution 16  SGK04B      CONTROL ROOM    Cannot visually identify 2 interior anchor bolts  Y    Licensing Basis Evaluation: Follow-up A/C UNITS      on N side of AHU. Bolts may be covered in              walkdown performed by WCNOC revealed concrete. Action required to verify whether the        the interior anchor bolts installed in bolts are present.                                      accordance with configuration documentation. Photographs (located in SWC) were reviewed by the SWT and confirmed to be acceptable. No issue.
17  SGK05B      CLASS IE ELEC  SWT noted tubing/piping support mounted off        Y    Licensing Basis Evaluation:
EQUIP A/C/ UNIT of AHU that does not appear to be included in          SWT inspected WCNOC DCP #09879 original equipment qualification (possibly.from        (Reference 30), which states that the later modification). Verify whether                    connecting equipment between the more modification is documented and AHU                      recently installed condenser and the AHU equipment qualification reconciliation was              does not invalidate the individual equipment addressed.                                              seismic qualifications and that the qualification of the AHU remains valid.
Therefore, no adverse seismic concern.
18  TEGOIB      CCW SURGE      SWT observed scaffolding in zone of influence      Y    Licensing Basis Evaluation:
TANK B          of the tank soft targets (site glass) with no          SWT received WCNOC Scaffolding bracing or wall anchorage at top bay (3 bays            Evaluation (Scaffold Request # 12-S0189, total). Members appear suitable to withstand            Work Order # 11-345393 (Reference 24))
moment so as to preclude collapse, but                  that validates scaffold installation in verification is required from scaffolding              accordance with procedure. SWT concludes documentation on site. Also, scaffolding is            from engineering judgment that scaffolding braced to tank legs. While the tank legs and            is acceptable given negligible additional anchorage appear adequate to withstand                  loading due to SSE on rugged tank legs.
relatively light added scaffold lateral load, verification is required to confirm equipment qualification for tank was reconciled.
19  XNG02      CLASS IE LOAD  SWT observed bolting from XNG02 to                Y    Licensing Basis Evaluation:
CENTER          adjacent and flush cabinet NG002. While it              The SWT concluded that the presence of TRANSFORMER    was confirmed that adequate bolting was                bolting is not required to preclude seismic provided to preclude chatter, one bolt hole was        chatter; therefore no adverse seismic noted to be empty without a bolt. Verify                condition.
whether bolt is required from configuration documentation.
WCAP-17678-NP                                                                                                                November 2012 Revision 0
C-6 Item  Item Tag/ID      Component
    #  or Room No.      Description                Issue Description                Status                  Resolution 20  DGB Rm      Area Walk-By      1.) SWT noted fire piping is flexibly supported  Y    Licensing Basis Evaluation:
5201                        (rod-hung) with Victaulic couplings. Verify              1.) Per WCNOC Specification M-650 whether 2:1 adequacy from qualification                (Reference 31), fire piping in diesel documents. 2.) Noted lighting supported by its          generator building is designed for Seismic own conduit spanning horizontally. Concern is          Category 2:1 qualifications; therefore no that flexibly support light could overstress            adverse seismic condition.
conduit and fall. Verify whether lighting              2.) Re-inspection of photos shows conduit is support is adequate.                                    galvanized rigid conduit, which has significant bending capacity to resist vertical loading of light. No adverse seismic concern.
21  AUX Rm      Area Walk-By    SWT observed scaffolding in zone of influence      Y    Licensing Basis Evaluation:
1502                        of safety-related equipment with no bracing Or          SWT received WCNOC Scaffolding wall anchorage at top bay (3 bays total).              Evaluation (Scaffold Request # 12-SO 189, Members appear suitable to withstand                    Work Order # 11-345393 (Reference 24))
movement so as to preclude collapse, but                that validates scaffold installation in verification is required from scaffolding              accordance with procedure. No adverse documentation on site.                                  seismic concern.
22  CTRL Rm    Area Walk-By    Observed portable table approx. 3/4" from          N    Licensing Basis Evaluation:
3601                        control panel. Table could rock and impact the          No qualification document was identified to panel. Shift manager indicated that                    justify presence of table in proximity to Engineering qualified the table for SSE. Verify        safety-related control panel equipment.
whether the table has seismic calculation              CR #57419 was issued by WCNOC to justifying placement where it was located or            determine if the table has been seismically remove to a safe location,                              evaluated for this location as well as documenting removal of table to a safe location.
23  CTRL Rm    Area Walk-By    General note for equipment w/ modified top        Y    Licensing Basis Evaluation:
3605                        fasteners added to rigidly connect tops of              Bolted connections of cabinets in the control cabinets. Verify whether modifications                  room area is analyzed per WCNOC reconciled individual equipment qualifications.        Calculation XX-FH-009-002 (Reference 23).
No adverse seismic concern.
WCAP- 17678-NP                                                                                                                November 2012 Revision 0
C-7 Item    Item Tag/ID          Component
    #    or Room No.          Description                        Issue Description                Status                  Resolution 24    AUX Rm          Area Walk-By          Observed vertical HSS cable tray supports            Y    Licensing Basis Evaluation:
1409                                    welded to the floor and connected to the ceiling          HSS section verified to only react lateral above. Connection at ceiling appears to be a.            load at its top connection per Detail 3 on C-jacket connection that only transfers lateral              1408 (Reference 32). Therefore, there is no load. If the ceiling connection transfers vertical        adverse seismic condition.
load, there is a concern the support's connections will fail in an SSE event due to differential floor displacement. Verification is required to determine whether either the ceiling connection transfers vertical load or if the support and its connections are designed for the vertical load transfer due to SSE.
KEY:
Y    - The Seismic Licensing Basis is satisfied and no adverse seismic condition exists.
N    - As a result of the walkdown inspection, a corrective action was required.
WCAP-1 7678-NP                                                                                                                            November 2012 Revision 0
D-I APPENDIX D PEER REVIEW CHECKLISTS WCAP-17678-NP                        November 2012 Revision 0
D-2 Sheet 1 of 5 WCNOC Unit I                            Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.
: 1. Were the five safety functions adequately represented in the SWEL 1 selection?                    YN NEI Requirementmet.
112 Items representing the five safety functions were selected to SWEL 1.
61 Reactivity Control, 63 Pressure Control, 72 Inventory Control, 90 DHR/UHS, 58 Containment Function Remarks:
SWEL Peer Review was held on September 7, 2012 with the following personnel in attendance: WEC SWEL Developers (Dave Bersi Mike Cymbor. Derek Seaman), Peer Review Team (Gary Douglas, Todd Bacon).
WEC (Dave Bersi, Mike Cymbor, Derek Seaman) performed initialscreening; WCNOC Operations(John Weber) provided verification of safety function selections and WCNOC Operations (Eric Carlson) participatedin SWEL selections; WCNOC Engineering (Rick Foust,Bob Kopecky, Tim Solberg) provided technical input to screening and selection of equipment.
The methodology and the development of the SWEL List selections for WCNOC were performed in accordance with Section 3 of the Seismic Walkdown Guidance (EPRI TR-1025286, dated June 2012).
The startingpoint for the development of the SWKIEL was the Individual Plants Examination of External Events (IPEEE)Report, Table 3.6, which listed safe shutdown equipment from each redundant train of the systems supporting the 5 safety functions.
The IPEEE SSEL, 568 items, provideda complete list of all active and passive components associatedwith operationof requiredsupport and frontline systems.
The IPEEE SSEL equipment list was increasedby adding SC-1 items from the Internal Events ProbabilityRisk Assessment (IE-PRA) databaseand comparison with sister plant Callaway that were not alreadyidentified in the IPEEE.
Based on review of "WCNOC Selection of SSCs 9-05-12.xIs" Noted 13 of 739 records that 'screen in' (column R) with no SC-I basis Noted 27 records that support a safety function, but do not screen in to base list Screen outs had been determined after populatinginformation that followed the screening criteriaand needed to be removed. SC-I basis information was inadvertently unpopulatedfor some items.
These items were correctedby the SWEL developers.
WCNOC Unit I Peer Review ChecklisL. for SWEL-20120620                                                    9/7/2012 WCAP-17678-NP                                                                                            November 2012 Revision 0
D-3 Sheet 2 of 5 WCNOC Unit I                            Peer Review Checklist for SWEL
: 2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
: a. Various types of systems?                                                                YZ NEI Requirement met.
38 of 41 base list systems were representedin the SWEL list.
Remarks:
It was recommended that a note be added to explain why components from the GD, GF, and KC systems were not selected.
A note was added to Sort I that states "The GD and GF systems were not selected due to accessibilityissues. This is acceptablesince the GD system consists primarilyof equipment type "other"Which is Well represented. Similarly system GF consists of equipment type "Air Handlers"which is also already well represented.
The KC system was not representedsince it contained only a single valve and containment isolationvalves are already well represented."
: b. Major new and replacement equipment?                                                      YN N-Requirement met.
52 modified items identified; 16'were representedin SWEL 1.
Remarks:
Indicate the sourceand results for the modifications review.
Provide explanation of the results of review of "recentupgradesand changes" Note 4 was expanded to say "A review of Major New or Replacement equipment was conducted by reviewing the Wolf Creek corrective actions relatedto seismic equipment as well reviewing a databaseof any major capitalprojects since 1998. Since these databasesmay not necessarily contain new or emergent conditions site Operationswas also question to ensure recently modified and upgraded(< I yr) equipment was reviewed."
: c. Various types of equipment?                                                              YZ NE Requirement met.
19 of the 22 equipment types were representedin S WEL 1.
3 equipment types not represented were not safety-related items.
Remarks:
Three EPRI equipment types were not represented: Chillers, Air Compressors,and Motor-GeneratorSets. Provide a reason for inability to select these types.
Sort 3 added a note stating "Discussionwith Operationsrevealed that Wolf Creek does not have any SC-I Chillers, Air Compressors or Motor Generators."
WCNOC Unit 1 Peer Review Checklist for SWEL-20120620                                                9/7/2012 WCAP-1 7678-NP                                                                                  November 2012 Revision 0
D-4 Sheet 3 of 5 WCNOC Unit I                            Peer Review Checklist for SWEL
: d. Various environments?                                                                YE NM Requirement met.
The range of room environments and inside/outsidelocations was representedin SWEL 1.
Remarks:
The Wolf Creek Environmental Classificationsare based on room temperature and humidity presentedin USAR Table 3.11(B)-1.
: e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program?      Y[D NE-]
Requirement met.
3 of 8 IPEEE findings are represented on SWEL 1.
Remarks:
Battery ChargerNNOI I was not selected to S VVEL I because of inaccessibility.
This item is cited in an IPEEE Finding: A transformer on an inverter was not bolted to the frame on one side (WR 2857-94).
Recommend providing additionaldetailjustifying selection of other battery chargers over NNOI 1.
A comment was added stating "NN01I1 was not selected due to it not being scheduled to be worked on in the nearfuture and due to safety considerationsan availablebattery chargerwas selected instead"
: f. Were risk insights considered in the development of SVEL 1?                          Y[    NEI Requirement met.
Risk insightsfrom the Internal Events models were consideredin the SWEL selections and are clearly indicatedon the spreadsheet.The Risk Achievement Worth (RA W) derivedfrom the WCNOC internal events PRA model were compiled for the Base List 1 items to determine potentially risk-significantSSCs (RAW> 2).
The maximum risk between internalevents and the seismic RAW values was used in the SWEL selection process. The Base List 1 items were sortedin the SWEL spreadsheetin the orderof descending maximum RAW values (Worksheet "Sort 5). 27 of the 67 risk significant SSCs from Base List 1 were selected for SWEL 1.
WCNOC Unit I Peer Review Checklist for SWEL-20120620                                            9/7/2012 WCAP-17678-NP                                                                                November 2012 Revision 0
D-5 Sheet 4 of 5 WCNOC Unit I                            Peer Review Checklist for SWEL
: 3. For SWEL 2:
: a. Were spent fuel pool related items considered, and if applicable included in            YE NEI SWEL 2?
Requirement met.
Spent Fuel Pool equipment that passed screen 2 and are part of Train B were selected (since Wolf Creek Train A will be unavailable during the scheduled seismic walkdown).
This resulted in 5 items added to the S WEL.
Remarks:
The starting list of SFP SC-I equipment was based on the DBM descriptions,piping and instrumentationdrawings (P&IDs), and isometrics.
An analysis of the SFPfor Rapid Drain-Down considerationswas performed. Pool connections to the spent fuel pool, fuel transfer canal, and wet cask pit were verified by a review of the spent fuel pool P&lDs, piping isometrics, civil and structural drawings, and FSAR sections 9.1.2 and 9.1.3. The fuel pool cooling P&ID shows several connections to the pool with anti-siphoningholes present per notes. The currentdesign drawings (includingpiping isometrics) were reviewed and support the assertions in the FSAR concerning pool drain-downprotection.
No Rapid Drain-Downitems were identified for input to S WEL 2.
: b. Was an appropriate justification documented for spent fuel pool related items not        YO NEI included in SWEL 2?
Requirement met.
The Spent Fuel Pool equipment selected is part of Train B (since Wolf Creek Train A will be unavailableduring the scheduled seismic walkdown).
Action taken to meet requirement:
Indicate the source and results for the modifications review.
Need explanationof the results of review of "recentupgrades and changes" Note 5 revised to state 'Spent Fuel Pool equipment that passed screen 2 and arepart of Train B were selected (since Wolf Creek Train A will be unavailableduring the scheduled seismic walkdown). Note that operations did not note any major modification or changes to the spent fuel pool SC-I items. "
WCNOC Unit I Peer Review Checklist for SWEL-201 20620                                              9/7/2012 WCAP-17678-NP                                                                                    November 2012 Revision 0
D-6 Sheet 5 of 5 WCNOC Unit I                          Peer Review Checklist for SWEL 4, Provide any other comments related to the peer review of the SWELs.
SWEL PeerReview was held on September 7, 2012.
Sampling considerationsfor system variety, equipment type variety, environment variety, new or replacement items, and IPEEE enhancements were reviewed and verified to be adequatelyrepresentedin the SWEL.
S. Have all peer review comments been adequately addressed in the final SWEL?                    Y''  NO Peer Reviewer # 1: Gary L. Douglas                          .                  Date: 9/7/12 Peer Reviewer #2: Todd Bacon                                                  Date: 9/7/12 WCNOC UnijI Peer Review~ Chiecklist 1orSWIiL.-20120620                                              9/7/2U12 November 2012 WCAP-17678-NP                                                                                              Revision 0
E-1 APPENDIX E BASE LIST 1 WCAP-17678-NP            November 2012 Revision 0
E-2 Wolf Creek Base List I Base List I                                                            Screen No. I                    Screen No. 3 Item      Walkdown                                                (SC - I Licensing Screen No. 2  (Safety Function Number      Equipment              Description        Building(2)      Basis?)      (Screens In?)    Support('&deg;)
I    ABHV0005    MAIN STM LOOP 2 TO TDAFW PUMP      AUX              Yes            Yes            DHR 2      ABHV0006    MAIN STM LOOP 3 AFWP TURBINE ISO    AUX              Yes            Yes            DHR 3      ABHVOOI    LOOP-4 MAIN STEAM ISOLATION VALVE  AUX              Yes            Yes          PC DHR 4      ABHV0014    LOOP-I MAIN STEAM ISOLATION VALVE  AUX              Yes            Yes          PC DHR 5      ABHVOO17    LOOP-2 MAIN STEAM ISOLATION VALVE  AUX              Yes            Yes          PC DHR 6      ABHV0020    LOOP-3 MAIN STEAM ISOLATION VALVE  AUX              Yes            Yes          PC DHR 7      ABPTOOO1    STM GEN A STEAMLINE PRESSURE        AUX              Yes            Yes          PC DHR 8      ABPT0002    STM GEN B STEAMLINE PRESSURE        AUX              Yes            Yes          PC DHR 9      ABPT0003    STM GEN C STEAMLINE PRESSURE        AUX              Yes            Yes          PC DHR 10    ABPT0004    STM GEN D STEAMLINE PRESSURE        AUX              Yes            Yes          PC DHR 11    ABPT0514    STEAM GEN A PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 12    ABPT0515    STEAM GEN A PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 13    ABPT0516    STEAM GEN A PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 14    ABPT0524    STEAM GEN B PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 15    ABPT0525    STEAM GEN B PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 16    ABPT0526    STEAM GEN B PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 17    ABPT0534    STEAM GEN C PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 18    ABPT0535    STEAM GEN C PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 19    ABPT0536    STEAM GEN C PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC 20    ABPT0544    STEAM GEN D PRESSURE TRANSMITTER    AUX              Yes            Yes          RC PC WCAP- 17678-NP                                                                                            November 2012 Revision 0
E-3 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. I                    Screen No. 3 Item      Walkdown                                                  (SC - I Licensing Screen No. 2  (Safety Function Number    Equipment              Description            Building(2 )      Basis?)      (Screens In?)    Support())
21    ABPT0545  STEAM GEN D PRESSURE TRANSMITTER      AUX              Yes            Yes          RC PC 22    ABPT0546  STEAM GEN D PRESSURE TRANSMITTER      AUX              Yes            Yes          RC PC 23    ABPV0001  SG A ATMOSPHERIC RELIEF VLV          AUX              Yes            Yes          PC DHR 24    ABPV0002  SG B ATMOSPHERIC RELIEF VLV          AUX              Yes            Yes          PC DHR 25    ABPV0003  SG C ATMOSPHERIC RELIEF VLV          AUX              Yes            Yes          PC DHR 26    ABPV0004  SG D ATMOSPHERIC RELIEF VLV          AUX              Yes            Yes          PC DHR 27    AEFV0039  EBB30A FEEDWATER ISOLATION VALVE      AUX              Yes            Yes          PC DHR 28    AEFV0040  EBB30B FEEDWATER ISOLATION VALVE      AUX              Yes            Yes          PC DHR 29    AEFV0041  EBB30C FEEDWATER ISOLATION VALVE      AUX              Yes            Yes          PC DHR 30    AEFV0042  EBBO0D FEEDWATER ISOLATION VALVE      AUX              Yes            Yes          PC DHR 31    AELT0501  STM GEN A WIDE RANGE                  RB              Yes            Yes          PC DHR 32    AELT0502  STM GEN B WIDE RANGE                  RB              Yes            Yes          PC DHR 33    AELT0503  STM GEN C WIDE RANGE                  RB              Yes            Yes          PC DHR 34    AELT0504  SG D WIDE RANGE (SG LVL L/4 CH TEST    RB              Yes            Yes          PC DHR CARD) 35    AELT0517  STM GEN LEVEL A NARROW RANGE            RB              Yes            Yes          PC DHR 36    AELT0518  STM GEN LEVEL A NARROW RANGE            RB              Yes            Yes          PC DHR 37    AELT0519  STM GEN LEVEL A NARROW RANGE            RB              Yes            Yes          PC DHR 38    AELT0527  STM GEN B LEVEL                        RB              Yes            Yes          PC DHR 39    AELT0528  STM GEN B NARROW RNG LEVEL              RB              Yes            Yes          PC DHR WCAP-17678-NP                                                                                                November 2012 Revision 0
E-4 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                  (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support(')
40      AELT0529  STM GEN LEVEL B NARROW RANGE            RB            Yes              Yes          PC DHR 41      AELT0537  STM GEN LEVEL C NARROW RANGE            RB            Yes              Yes          PC DHR 42      AELT0538  STM GEN LEVEL C NARROW RANGE            RB            Yes              Yes          PC DHR 43      AELT0539  STM GEN LEVEL C NARROW RANGE            RB            Yes              Yes          PC DHR 44      AELT0547  STM GEN LEVEL D NARROW RANGE            RB            Yes            Yes          PC DHR 45      AELT0548  STM GEN D NARROW RNG LEVEL              RB            Yes              Yes          PC DHR 46      AELT0549  STM GEN LEVEL D NARROW RANGE            RB            Yes            Yes          PC DHR 47      AELT0551  STM GEN A LEVEL                        RB            Yes              Yes          PC DHR 48      AELT0552  STM GEN B LEVEL                        RB            Yes              Yes          PC DHR 49      AELT0553  STM GEN C LEVEL                        RB            Yes              Yes          PC DHR 50      AELT0554  STM GEN D LEVEL                        RB            Yes              Yes          PC DHR 51    -ALFTOOOI  AFW TO SG D FLOW TRANSMITTER          AUX            Yes              Yes          PC DHR 52      ALFT0002  AFW TO SG D FLOW TRANSMITTER          AUX            Yes              Yes          PC DHR 53      ALFT0003  AFW TO SG D FLOW TRANSMITTER          AUX              Yes            Yes          PC DHR 54      ALFT0004  AFW TO SG D FLOW TRANSMITTER          AUX            Yes              Yes          PC DHR 55      ALFT0007  AUX FDW FLO TO SG A                  AUX              Yes            Yes          PC DHR 56      ALFT0009  AUX FDW FLO TO SG B                  AUX              Yes            Yes          PC DHR 57      ALFTOO1 1  AUX FDW FLO TO SGC                    AUX              Yes            Yes          PC DHR 58      ALHV0005  MTR DRIV AFWP DISCH HDR TO SG D ISO  AUX              Yes            Yes          PC DHR VLV WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-5 Wolf Creek Base List 1 (cont.)
Base List I                                                                Screen No. I                  Screen No. 3 Item      Walkdown                                                  (SC - I Licensing  Screen No. 2 (Safety Function Number      Equipment              Description            Building(2)      Basis?)      (Screens In?)    Support(")
59    ALHV0006    TURB DRIVEN AFWP DISCH HDR TO SG D    AUX              Yes            Yes          PC DHR ISO 60    ALHV0007    MTR DRIV AFWP DISCH HDR TO SG A ISO  AUX              Yes            Yes          PC DHR VLV 61    ALHV0008    TURB DRIVEN AFWP DISCH HDR TO SG A    AUX              Yes            Yes          PC DHR ISO 62    ALHV0009    MTR DRIV AFWP DISCH HDR TO SG B ISO  AUX              Yes            Yes          PC DHR VLV 63    ALHVOO1O    TURB DRIVEN AFWP DISCH HDR TO SG B    AUX              Yes            Yes          PC DHR ISO 64    ALHVOO1 1  MTR DRIV AFWP DISCH HDR TO SG G ISO  AUX              Yes            Yes          PC DHR VLV 65    ALHV0012    TURB DRIVEN AFWP DISCH HDR TO SG C    AUX              Yes            Yes          PC DHR ISO 66    ALHV0030    ESW TO MDAFW PUMP B 6" BTFL VLV      AUX              Yes            Yes          PC DHR W/LIMITQ 67    ALHV0031    ESW TO MDAFW PUMP A 6" BTFL VLV      AUX              Yes            Yes          PC DHR W/LIMITQ 68    ALHV0032    ESW SUPPLY TO PAL02 8" BTFL VLV      AUX              Yes            Yes          PC DHR W/LIMITQ 69    ALHV0033    ESW TO TDAFW PUMP 8" BTFL VALVE      AUX              Yes            Yes          PC DHR W/LIMITQ 70    ALHV0034    COND STOR TK TO MD AUX FW PUMP B 8"  AUX              Yes            Yes          PC DHR GATE VALVE WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-6 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                  (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment                Description          Building( 2)      Basis?)      (Screens In?)    Support(])
71    ALHV0035  CONDENSATE STOR TO AUX FW PUMP A      AUX              Yes            Yes          PC DHR 8" GATE VALVE 72      ALHV0036  CONDENSATE STOR TO TD AUX FW PUMP    AUX              Yes            Yes          PC DHR 10" GATE VALVE 73      ALPT0025  AFP SUCTION PRESSURE TRANSMITTER      AUX              Yes            Yes          PC DHR (2) 74      ALPT0026  AFP SUCTION PRESSURE TRANSMITTER      AUX              Yes            Yes          PC DHR (4) 75      ALPT0037  ESFAS AFW LOW SUCTION PRESS          AUX              Yes            Yes          PC DHR TRANSMITTER 76      ALPT0038  ESFAS AFW LOW SUCTION PRESS          AUX              Yes            Yes          PC DHR TRANSMITTER 77      ALPT0039  ESFAS AFW LOW SUCTION PRESS          AUX              Yes            Yes          PC DHR TRANSMITTER 78      BB004A    W THERMOCOUPLE REF-JCT I              RB              Yes            Yes            DHR 79      BB004B    W THERMOCOUPLE JUNCTION BOX-JCT 2      RB              Yes            Yes            DHR 80      BB007      DC CONTACT CABINET                    AUX              Yes            Yes          PC DHR 81    BB008      DC CONTACT CABINET                    AUX              Yes            Yes          PC DHR 82    BBHV8000A  PZR POWER RELIEF PCV-455A INLET ISO    RB              Yes            Yes          PC DHR 83    BBHV8000B  PZR POWER RELIEF PCV-456A INLET ISO    RB              Yes            Yes          PC DHR 84    BBLIS 1311 RV SUBCOOLING MONITOR TRN A          AUX              Yes            Yes            RC 85    BBLIS1312  RV SUBCOOLING MONITOR TRN A          AUX              Yes            Yes            RC 86    BBLIS1321  RV SUBCOOLING MONITOR TRN B          AUX              Yes            Yes            RC WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-7 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                  (SC - I Licensing Screen No. 2  (Safety Function Number      Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support(")
87      BBLIS1322  RV SUBCOOLING MONITOR TRN B          AUX              Yes            Yes            RC 88      BBLT0459  PRESS LEVEL (NARROW RANGE)              RB            Yes            Yes            IC 89      BBLT0460  PRESS LEVEL (NARROW RANGE)              RB            Yes            Yes            IC 90      BBLT0461  PRESS LEVEL (NARROW RANGE)              RB            Yes            Yes            IC 91      BBLT0462  PRESS LEVEL (WIDE RANGE)                RB            Yes            Yes            IC 92      BBPCV0455A PZR POWER OPERATED RELIEF VALVE        RB            Yes            Yes          PC DHR 93      BBPCV0456A PZR POWER OPERATED RELIEF VALVE        RB            Yes            Yes          PC DHR 94      BBPT0403  RCS WIDE RANGE PR XMTR                AUX              Yes            Yes            PC 95      BBPT0405  RCS WR PRESSURE TRANSMITTER          AUX              Yes            Yes            PC 96      BBPT0455  PRESSURIZER PRESSURE                    RB            Yes            Yes            PC 97      BBPT0456  PRESSURIZER PRESSURE                    RB            Yes            Yes            PC 98      BBPT0457  PRESSURIZER PRESSURE                    RB            Yes            Yes            PC 99      BBPT0458  PRESSURIZER PRESSURE                    RB            Yes            Yes            PC 100    BBPV8702A  RCS HOT LEG 1 TO RHR PUMP A SUCTION    RB            Yes            Yes            DHR 101    BBPV8702B  RCS HOT LEG 4 TO RHR PUMP B SUCTION    RB            Yes            Yes            DHR 102    BBTE0413A  REC COOLANT LP 1 HOT LEG                RB            Yes            Yes            DHR 103    BBTE0413B  REC COOLANT LP 1 COLD LEG              RB            Yes            Yes            DHR 104    BBTE0423A  REC COOLANT LP 2 HOT LEG                RB            Yes            Yes            DHR 105    BBTE0423B  REC COOLANT LP 2 COLD LEG              RB            Yes            Yes            DHR 106    BBTE0433A  REC COOLANT LP 3 HOT LEG                RB            Yes            Yes            DHR WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-8 Wolf Creek Base List 1 (cont.)
Base List I                                                          Screen No. 1                    Screen No. 3 Item      Walkdown                                              (SC - I Licensing Screen No. 2  (Safety Function Number    Equipment                Description        Building2      Basis?)      (Screens In?)    Support(')
107    BBTE0433B  REC COOLANT LP 3 COLD LEG            RB            Yes            Yes            DHR 108    BBTE0443A  REC COOLANT LP 4 HOT LEG            RB            Yes            Yes            DHR 109    BBTE0443B  REC COOLANT LP 4 COLD LEG            RB            Yes            Yes            DHR 110    BGFCV0 121  CENTRIFUGAL CHG PMP FLOW CONTROL    AUX            Yes            Yes          RC PC IC 111    BGFT215A    TOTAL SEAL INJECTION FLOW          AUX            Yes            Yes              IC TRANSMITTER (4) 112    BGFT215B    TOTAL SEAL INJECTION FLOW          AUX            Yes            Yes              IC TRANSMITTER (2) 113    BGHV8100    SEAL WATER RETURN CONTAINMENT ISO  AUX            Yes            Yes              IC VLV 114    BGHV8105    CHARGING PUMPS TO REGEN HX/CTMT    AUX            Yes            Yes          PC IC CF ISO 115    BGHV8106    CHARGING PUMPS TO REGENERATIVE HX  AUX            Yes            Yes            PC IC ISO 116    BGHV8 110  CHARGING PUMPS MINIMUM FLOW VLV    AUX            Yes            Yes            RC IC 117    BGHV81 11  CHARGING PUMPS MINIMUM FLOW VLV    AUX            Yes            Yes            RC IC 118    BGHV8112    SEAL WATER RETURN CTMT ISO VLV      RB            Yes            Yes            IC CF 119    BGHV8152    LETDOWN SYSTEM CONTAINMENT ISO      AUX            Yes            Yes            IC CF VLV 120    BGHV8160    LETDOWN SYSTEM CONTAINMENT ISO      RB            Yes            Yes            IC CF VLV 121    BGLCV0I 12B VCT LOW LEVEL ISO GATE VALVE ON    AUX            Yes            Yes            RC IC BG020HCB-4 WCAP-17678-NP                                                                                            November 2012 Revision 0
E-9 Wolf Creek Base List 1 (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                  (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment                Description          Building(2)      Basis?)      (Screens In?)    Support(")
122    BGLCVOI 12C VCT LOW LEVEL ISO GATE VALVE ON      AUX              Yes            Yes            RC IC BG020HCB-4 123    BLHV8047    REACTOR M/U WATER CONTAINMENT ISO    AUX              Yes            Yes            IC CF 124    BMHV000I    SG A BLOWDOWN AFAS ISO              AUX              Yes            Yes          PC IC CF 125    BMHV0002    SG B BLOWDOWN AFAS ISO              AUX              Yes            Yes          PC IC CF 126    BMHV0003    SG C BLOWDOWN AFAS ISO              AUX              Yes            Yes          PC IC CF 127    BMHV0004    SG D BLOWDOWN AFAS ISO              AUX              Yes            Yes          PC IC CF 128    BNHV0003    RWST SUPPLY TO CTMT SPRAY PUMP B    AUX              Yes            Yes            CF 129    BNHV0004    RWST SUPPLY TO CTMT SPRAY PUMP A    AUX              Yes            Yes            CF 130    BNHV8806A  RWST TO SAFETY INJ PUMP SUCTION      AUX              Yes            Yes          IC DHR 131    BNHV8806B  RWST TO SAFETY INJ PUMP SUCTION      AUX              Yes            Yes          IC DHR 132    BNHV8812A  RWST TO RHR PUMP A SUCTION          AUX              Yes            Yes          IC DHR 133    BNHV8812B  RWST TO RHR PUMP B SUCTION          AUX              Yes            Yes          IC DHR 134    BNHV8813    SAFETY INJECTION TO RWST ISOLATION  AUX              Yes            Yes          IC DHR VLV 135    BNLCVO0 12D CHARGING PUMPS SUCTION FROM RWST    AUX              Yes            Yes            RC IC 136    BNLCVOl 12E CHARGING PUMPS SUCTION FROM RWST    AUX              Yes            Yes            RC IC 137    BNLT0930    RWST LEVEL TRANSMITTER (1)            YRD            Yes            Yes        RC IC DHR 138    BNLT0931    RWST LEVEL TRANSMITTER (2)          YRD              Yes            Yes        RC IC DHR 139    BNLT0932    RWST LEVEL TRANSMITTER (3)            YRD            Yes            Yes        RC IC DHR 140    BNLT0933    RWST LEVEL TRANSMITTER (4)            YRD            Yes            Yes        RC IC DHR WCAP-17678-NP                                                                                              November 2012 Revision 0
E-10 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. I                    Screen No. 3 Item      Walkdown                                              (SC - I Licensing Screen No. 2  (Safety Function Number      Equipment              Description        Building 2(      Basis?)      (Screens In?)    Support(")
141    BNVOOI 1    RWST OUTLET ISO VALVE              AUX              Yes            Yes        RC IC DHR 142    CGDO1A      ESW PUMP HOUSE SUPPLY FAN          ESW              Yes            Yes        RC PC IC DHR 143    CGDO1B      ESW PUMP HOUSE SUPPLY FAN          ESW              Yes            Yes        RC PC IC DHR 144    CGMO1A      DIESEL GENERATOR BLDG SUPPLY FAN  DGB              Yes            Yes        RC PC IC DHR 145    CGMO1B      DIESEL GENERATOR BLDG SUPPLY FAN  DGB              Yes            Yes        RC PC IC DHR 146    EBGO1      LETDOWN HEAT EXCHANGER            AUX              Yes            Yes            DHR 147    EBG02      EXCESS LETDOWN HEAT EXCHANGER        R              Yes            Yes            DHR 148    EBG03      SEAL WATER HEAT EXCHANGER          AUX              Yes            Yes            PC IC 149    EEGO1A      COMPONENT COOL WATER HEAT          AUX              Yes            Yes        RC PC IC DHR EXCHANGER 150    EEGO1B      COMPONENT COOL WATER HEAT          AUX              Yes            Yes        RC PC IC DHR EXCHANGER 151    EEJOIA      RESIDUAL HEAT REMOVAL HEAT        AUX              Yes            Yes            DHR EXCHANGER 152    EEJO1B      RESIDUAL HEAT REMOVAL HEAT        AUX              Yes            Yes            DHR EXCHANGER 153    EFI55      ESW CONTROL PANEL                  ESW              Yes            Yes      RC PC IC DHR CF 154    EF 156      ESW CONTROL PANEL                  ESW              Yes            Yes      RC PC IC DHR CF 155    EFFE0053    ESW A FLO TO POWER BLOCK            CB              Yes            Yes      RC PC IC DHR CF 156    EFFE0054    ESW B FLO TO POWER BLOCK            CB              Yes            Yes      RC PC IC DHR CF 157    EFFT053    ESW PUMP A DISCHARGE FLOW        CB/CC            Yes            Yes      RC PC IC DHR CF TRANSMITTER WCAP- 17678-NP                                                                                            November 2012 Revision 0
E-11 Wolf Creek Base List I (cont.)
Base List 1                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing  Screen No. 2  (Safety Function Number    Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support"')
158    EFFT054    ESW PUMP B DISCHARGE FLOW          CB/CC            Yes            Yes      RC PC IC DHR CF TRANSMITTER 159    EFHV0023  ESW A/SERVICE WATER CROSS CONNECT  CB/CC            Yes            Yes      RC PC IC DHR CF VALVE 160    EFHV0024  ESW B/SERVICE WATER CROSS CONNECT  CB/CC            Yes            Yes      RC PC IC DHR CF VALVE 161    EFHV0025  ESW A/SERVICE WATER CROSS CONNECT  CB/CC            Yes            Yes      RC PC IC DHR CF VALVE 162    EFHV0026  ESW B/SERVICE WATER CROSS CONNECT  CB/CC            Yes            Yes      RC PC IC DHR CF VALVE 163    EFHV0031  ESW A TO CTMT AIR COOLERS BUTT VLV  AUX              Yes            Yes      RC PC IC DHR CF 164    EFHV0032  ESW B TO CTMT AIR COOLERS            AUX              Yes            Yes      RC PC IC DHR CF BUTTERFLY VALVE 165    EFHV0033  ESW A TO CTMT AIR COOLERS              RB            Yes            Yes      RC PC IC DHR CF BUTTERFLY VLV 166    EFHV0034  ESW B T CTMT AIR COOLERS BUTTERFLY    RB            Yes            Yes      RC PC IC DHR CF VLV 167    EFHV0037  ESW A TO UNTIMATE HEAT SINK        CB/CC            Yes            Yes      RC PC IC DHR CF THROTTLED 168    EFHV0038  ESW B TO ULTIMATE HEAT SINK        CB/CC            Yes            Yes      RC PC IC DHR CF 169    EFHV0039  ESW TRAIN A TO SW CROSS CONNECT    CB/CC            Yes            Yes      RC PC IC DHR CF VALVE 170    EFHV0040  ESW TRAIN B TO SW CROSS CONNECT    CB/CC            Yes            Yes      RC PC IC DHR CF VALVE November 2012 WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-12 Wolf Creek Base List 1 (cont.)
Base List I                                                          Screen No. 1                    Screen No. 3 Item      Walkdown                                              (SC - 1 Licensing  Screen No. 2  (Safety Function Number    Equipment              Description        Building2(      Basis?)      (Screens In?)    Support(")
171    EFHV0041  ESW TRAIN A TO SW CROSS CONNECT                    Yes            Yes      RC PC IC DHR CF VALVE 172    EFHV0042  ESW TRAIN B TO SW CROSS CONNECT                    Yes            Yes      RC PC IC DHR CF VALVE 173    EFHV0043  ESW TRAIN A TO AIR COMPRESSOR ISO  AUX            Yes            Yes      RC PC IC DHR CF VALVE 174    EFHV0044  ESW TRAIN B TO AIR COMPRESSOR ISO  AUX            Yes            Yes      RC PC IC DHR CF VALVE 175    EFHV0045  ESW A FROM CTMT AIR COOLERS          RB            Yes            Yes      RC PC IC DHR CF BUTTERFLY VLV 176    EFHV0046  ESW B FROM CTMT AIR COOLERS          RB            Yes            Yes      RC PC IC DHR CF BUTTERFLY VLV 177    EFHV0047  ESW A FROM CTMT AIR COOLERS BYP    AUX            Yes            Yes      RC PC IC DHR CF BUTTERFLY VALVE 178    EFHV0048  ESW A FROM CTMT AIR CLRS BYP        AUX            Yes            Yes      RCPC IC DHR CF BUTTERFLY VALVE 179    EFHV0049  ESW A FROM CTMT AIR CLRS BUTT VLV  AUX            Yes            Yes      RC PC IC DHR CF 180    EFHV0050  ESW B FROM CTMT AIR COOLERS        AUX            Yes            Yes      RC PC IC DHR CF BUTTERFLY VALVE 181    EFHV0051  ESW A TO CCW HX A                  AUX            Yes            Yes      RC PC IC DHR CF 182    EFHV0052  ESW B TO CCW HX B                  AUX            Yes            Yes      RC PC IC DHR CF 183    EFHV0059  ESW TRAIN A FROM CCW HX ISO VALVE  AUX            Yes            Yes      RC PC IC DHR CF 184    EFHV0060  ESW TRAIN B FROM CCW HX ISO VALVE  AUX            Yes            Yes      RC PC IC DHR CF 185    EFHV0091  ESW SCREEN A SPRAY VALVE            ESW            Yes            Yes      RC PC IC DHR CF WCAP- 17678-NP                                                                                          November 2012 Revision 0
E-13 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing  Screen No. 2  (Safety Function Number    Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support"1*)
186    EFHV0092  ESW SCREEN B SPRAY VALVE            ESW              Yes            Yes      RC PC IC DHR CF 187    EFHV0097  ESW PUMP A DISCHARGE RECIRC VALVE    ESW              Yes            Yes      RC PC IC DHR CF 188    EFHV0098  ESW PUMP B DISCHARGE AIR RELEASE    ESW              Yes            Yes      RC PC IC DHR CF VALVE 189    EFPDT0019  ESW 2A SELF-CLN STR DIFF PRES      YARD              Yes            Yes      RC PC IC DHR CF 190    EFPDT0020  ESW 2B SELF-CLN STR DIFF PRES      YARD              Yes-            Yes      RC-PC-IC-DHR CF 191    EFPDT0043  ESW TO AIR COMPRESSOR ISO            AUX              Yes            Yes      RC PC IC DHR CF 192    EFPDT0044  ESW TO AIR COMPRESSOR ISO            AUX              Yes            Yes      RC PC IC DHR CF 193    EFPDVO019  ESW SELF-CLEANING STRAINER A TRASH  ESW              Yes            Yes      RC PC IC DHR CF VLV 194    EFPDVO020  ESW SELF-CLEANING STRAINER B TRASH  ESW              Yes            Yes      RC PC IC DHR CF VLV 195    EFPTOOOI  ESW PUMP DISCHARGE                  ESW              Yes            Yes      RC PC IC DHR CF 196    EFPT0002  ESW PUMP DISCHARGE                  ESW              Yes            Yes      RC PC IC DHR CF 197    EFTE0061  ESW A TEMP TO POWER BLOCK          CB/CC            Yes            Yes      RC PC IC DHR CF 198    EFTE0062  ESW B TEMPT TO POWER BLOCK          CB/CC            Yes            Yes      RC PC IC DHR CF 199    EGFT0062  RCP OUT FLOW                        AUX              Yes            Yes              IC 200    EGFT128    CCW HX OUTLET TO RCP BYPASS          AUX              Yes            Yes            DHR 201    EGFT129    CCW HX OUTLET TO RCP BYPASS          AUX              Yes            Yes            DHR 202    EGHV00I I  ESW TO CCW TRAIN A PMP SUCT ISO      AUX              Yes            Yes            DHR 203    EGHV0012  ESW MAKE-UP TO CCW SYS NG04CJF1      AUX              Yes            Yes            DHR WCAP-17678-NP                                                                                              November 2012 Revision 0
E-14 Wolf Creek Base List I (cont.)
Base List 1                                                          Screen No. I                    Screen No. 3 Item      Walkdown                                              (SC - 1 Licensing Screen No. 2  (Safety Function Number    Equipment              Description      Building(2)      Basis?)      (Screens In?)    Support(")
204    EGHV0013  ESW TO CCW TRAIN A PMP SUCT ISO  AUX              Yes            Yes            DHR 205    EGHV0014  ESW MAKE-UP TO CCW SYS NG04CJF2  AUX              Yes            Yes            DHR 206    EGHV0015  CCW TRAIN A RETURN ISO VALVE      AUX              Yes            Yes            DHR 207    EGHV0016  CCW TRAIN B RETURN ISO VALVE      AUX              Yes            Yes            DHR 208    EGHV0053  CCW TRAIN A SUPPLY ISO VALVE      AUX              Yes            Yes            DHR 209    EGHV0054  CCW TRAIN B SUPPLY ISO VALVE      AUX              Yes            Yes            DHR 210    EGHV0058  CCW TO RCS ISO                    AUX              Yes            Yes            DHR 211    EGHV0059  CCW RETURN FROM RCS ISO          AUX              Yes            Yes            DHR 212    EGHV0060  CCW RETURN FOR RCS ISO              RB            Yes            Yes            DHR 213    EGHV0061  CCW RETURN FROM RCS ISO          AUX              Yes            Yes            DHR 214    EGHV0062  CCW RETURN FROM RCS ISO            RB            Yes            Yes            DHR 215    EGHV0069A  CCW SUPLY TO RADWST BLDG ISO      AUX              Yes            Yes            DHR BTTFLY VLV 216    EGHV0069B  RADWST BLDG CCW RETN HDR ISO      AUX              Yes            Yes            DHR BTTFLY VLV 217    EGHV0070A  CCW SUPLY TO RADWST BLDG ISO      AUX              Yes            Yes            DHR BTTFLY VLV 218    EGHV0070B  RADWST BLDG CCW RETN HDR ISO      AUX              Yes            Yes            DHR BTTFLY VLV 219    EGHV0071  CCW TO RCS ISO                    AUX              Yes            Yes            DHR 220    EGHV0101  CCW TO RHR HX A ISO              AUX              Yes            Yes            DHR 221    EGHVO 102  CCW TO RHR HX B ISO              AUX              Yes            Yes            DHR WCAP-17678-NP                                                                                          November 2012 Revision 0
E-15 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                  (SC - 1 Licensing  Screen No. 2 (Safety Function Number    Equipment              Description          Building 2 )      Basis?)      (Screens In?)    Support('")
222    EGLT0001  CCW SURGE TK A                        AUX              Yes            Yes            DHR 223    EGLT0002  CCW SURGE TK B                        AUX              Yes            Yes            DHR 224    EGPT0077  CCW PMPS A&C DISCH PRESS              AUX              Yes            Yes            DHR 225    EGPT0078  CCW PMPS B&D DISCH PRESS              AUX              Yes            Yes            DHR 226    EGTE0031  CCW HX A OUTLET TEMP                  AUX              Yes            Yes          RC DHR 227    EGTE0032  CCW HX B OUTLET TEMP                  AUX              Yes            Yes          RC DHR 228    EGTV0029  CCW HX A TEMP CV WAFER BTFFLY VLV    AUX              Yes            Yes          RC DHR 229    EGTV0030  CCW HX B TEMP CV WAFER BTTFLY VLV    AUX              Yes            Yes          RC DHR 230    EHBO1      REACTOR COOLANT DRAIN TANK HX          RB              Yes            Yes              IC 231    EJFCV0610  RIHR PUMP A MINIFLOW VALVE            AUX              Yes            Yes            DHR 232    EJFCV0611  RHR PUMP B MINIFLOW VALVE            AUX              Yes            Yes            DHR 233    EJFCV0618  RHR HX A BYPASS                      AUX              Yes            Yes            DHR 234    EJFCV0619  RHR HX B BYPASS                      AUX              Yes            Yes            DHR 235    EJFIS0610  RHR PMP IA MINIFLOW CONTROL          AUX              Yes            Yes            DHR DISCHARGE 236    EJFIS0611  RHR PMP PEJOIB MINIFLOW CONTROL      AUX              Yes            Yes            DHR DISCHARGE 237    EJHCV0606  RHR HX A OUTLET ISO                  AUX              Yes            Yes            DHR 238    EJHCV0607  RHR HX B OUTLET ISO                  AUX              Yes            Yes            DHR 239    EJHV8701A  RCS HOT LEG I TO RHR PUMP A SUCTION    RB              Yes            Yes            DHR 240    EJHV8701B  RCS HOT LEG 4 TO RHR PUMP B SUCTION    RB              Yes            Yes            DHR WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-16 Wolf Creek Base List I (cont.)
Base List 1                                                                Screen No. 1                    Screen No. 3 Item      Walkdown                                                    (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment                Description          Building(2)      Basis?)      (Screens In?)    Support(")
241    EJHV8716A  RHR A TO SIS HOT LEG RECIRC LOOPS 2    AUX              Yes            Yes            DHR
                        & 3 ISO 242    EJHV8716B  RHR B TO SIS HOT LEG RECIRC LOOPS 2    AUX              Yes            Yes            DHR
                        & 3 ISO 243    EJHV8804A  RHR A TO CVCS CCP ISO                  AUX              Yes            Yes            DHR 244    EJHV8804B  RHR SUPPLY TO SI PUMP B ISO VALVE      AUX              Yes            Yes            DHR 245    EJHV8809A  RHR TO ACCUM INJ LOOPS 1 & 2 ISO VLV  AUX              Yes            Yes            DHR 246    EJHV8809B  RHR TO ACCUM INJ LOOPS 3 & 4 ISO VLV  AUX              Yes            Yes            DHR 247    EJHV8811 A  CTMT RECIRC SUMP TO RHR PUMP A        AUX              Yes            Yes            DHR SUCTION 248    EJHV88 11 B CTMT RECIRC SUMP TO RHR PUMP B        AUX              Yes            Yes            DHR SUCTION 249    EJHV8840    RHR/SI HOT LEG RECIRC ISO VALVE        AUX              Yes            Yes            DHR 250    EJLE0008A  CTMT RECIRC SUMP LEVEL                  RB              Yes            Yes            DHR 251    EJLE0008B  CTMT RECIRC SUMP LEVEL                  RB              Yes            Yes            DHR 252    EJLE007A    CTMT SUMP A LEVEL                      RB              Yes            Yes            DHR 253    EJLE007B    CTMT SUMP B LEVEL                      RB              Yes            Yes            DHR 254    EJLIT007    CTMT Sump B Level                    CB/CC            Yes            Yes            DHR 255    EJLIT008    CTMT SUMP A LEVEL INDICATING          CB/CC            Yes            Yes            DHR TRANSMITTER 256    EKJ03A      INTERCOOLER HEAT EXCHANGER            DGB              Yes            Yes      RC PC IC DHR CF 257    EKJ03B      INTERCOOLER HEAT EXCHANGER            DGB              Yes            Yes      RC PC IC DHR CF WCAP-17678-NP                                                                                                  November 2012 Revision 0
E-17 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - I Licensing Screen No. 2  (Safety Function Number      Equipment                Description        Building 2)      Basis?)      (Screens In?)    Support(")
258    EKJ04A      LUBE OIL COOLER                      DGB              Yes            Yes      RC PC IC DHR CF 259    EKJ04B      LUBE OIL COOLER                      DGB              Yes            Yes      RC PC IC DHR CF 260    EKJ06A      DIESEL JACKET WATER HEAT            DGB              Yes            Yes      RC PC IC DHR CF EXCHANGER 261    EKJ06B      DIESEL JACKET WATER HEAT            DGB              Yes            Yes      RC PC IC DHR CF EXCHANGER 262    EMFS0917C  CNTFGL CHG PMPS TO BRN INJ TK        AUX              Yes            Yes        RC IC DHR 263    EMFS0917D  CNTFGL CHG PMPS TO BRN INJ TK        AUX              Yes            Yes        RC IC DHR 264    EMFT0917A  CCP A TO BIT FLOW TRANSMITTER        AUX              Yes            Yes          RC IC DHR 265    EMFT0917B  CCP B TO BIT FLOW TRANSMITTER        AUX              Yes            Yes          RC IC DHR 266    EMHV8801A  BIT OUTLET ISO                      AUX              Yes            Yes        RC IC DHR CF 267    EMHV8801 B  BIT OUTLET ISO                      AUX              Yes            Yes        RC IC DHR CF 268    EMHV8802A  SI PUMP A DISCH HOT LEG ISO VLV      AUX              Yes            Yes        RC IC DHR CF 269    EMHV8802B  SI PUMP B DIS HOT LEG ISO VLV        AUX              Yes            Yes        RC IC DHR CF 270    EMHV8803A  CHARGING PUMP DISCH HDR TO BIT ISO  AUX              Yes            Yes          RC IC DHR 271    EMHV8803B  CHARGING PUMP DISCH HDR TO BIT ISO  AUX              Yes            Yes          RC IC DHR 272    EMHV8807A  RHR HX A/CVCS TO SI PUMP A          AUX              Yes            Yes          RC IC DHR DOWNSTREAM ISO 273    EMHV8807B  RHR HX A/CVCS TO SI PUMP A          AUX              Yes            Yes          RC IC DHR DOWNSTREAM ISO 274    EMHV8814A  SI PUMP A RETURN TO RWST ISO VLV    AUX              Yes            Yes          RC IC DHR 275    EMHV8814B  SI PUMP B RETURN TO RWST ISO VALVE  AUX              Yes            Yes          RC IC DHR WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-18 Wolf Creek Base List I (cont.)
Base List I                                                                Screen No. 1                  Screen No. 3 Item      Walkdown                                                  (SC - I Licensing  Screen No. 2 (Safety Function Number      Equipment              Description            Building 2)      Basis?)      (Screens In?)    Support&deg;o) 276    EMHV882IA  SI PUMP A DISCHARGE ACCUM INJ ISO      AUX              Yes            Yes        RC IC DHR VALVE 277    EMHV8821B  SI PUMP B DISCHARGE ACCUM INJ ISO      AUX              Yes            Yes        RC IC DHR VALVE 278    EMHV8824    SAFETY INJ PUMP B TEST LINE ISO VLV    RB              Yes            Yes        IC DHR CF 279    EMHV8835    SAFETY INJ COLD LEG ISO VALVE          AUX              Yes            Yes        IC DHR CF 280    EMHV8923A  SAFETY INJECTION PUMP A SUCT ISO      AUX              Yes            Yes          IC DHR VALVE 281    EMHV8923B  SAFETY INJECTION PUMP B SUCT ISO VLV  AUX              Yes            Yes          IC DHR 282    EMHV8924    RHR HX A/CVCS TO SI PUMP A UPSTREAM    AUX              Yes            Yes          IC DHR ISO 283    ENHVOOOI    CTMT RECIRC SUMP TO CTMT SPRAY        AUX              Yes            Yes              CF PUMP A ISO 284    ENHV0006    CTMT SPRAY TRAIN A DISCH ISO VLV      AUX              Yes            Yes              CF 285    ENHV0007    CTMT RECIRC SUMP TO CTMT SPRAY        AUX              Yes            Yes              CF PUMP B ISO 286    ENHV0012    CTMT SPRAY TRAIN B DISCH ISO VLV      AUX              Yes            Yes              CF 287    ENHV0015    SPRAY ADDITIVE TANK OUTLET TO CTMT    AUX              Yes            Yes              CF SPRAY A ISO 288    ENHV0016    SPRAY ADDITIVE TANK OUTLET TO CTMT    AUX              Yes            Yes              CF SPRAY B ISO 289    EPHV8808A  ACCUMULATOR TANK A OUTLET ISO          RB              Yes            Yes            DHR VALVE WCAP-17678-NP                                                                                                November 2012 Revision 0
E-19 Wolf Creek Base List I (cont.)
Base List 1                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support(')
290    EPHV8808B  ACCUMULATOR TANK B OUTLET ISO          RB            Yes            Yes        *, DHR VALVE 291    EPHV8808C  ACCUMULATOR TANK C OUTLET ISO          RB            Yes            Yes            DHR VALVE 292    EPHV8808D  ACCUMULATOR TANK D OUTLET ISO          RB            Yes            Yes            DHR VALVE 293    FC0219    LOCAL CONTROL PANEL FOR TD AFW      AUX              Yes            Yes          PC DHR PUMP 294    FCFV0313  TDAFP GOVERNOR VALVE                AUX              Yes            Yes          PC DHR 295    FCHV0312  AUX FW PUMP TURBINE MECH            AUX              Yes            Yes          PC DHR TRIP/THROT VLV 296    FEFO0A    ESW TRAVELING WATER SCREENS          ESW            Yes            Yes      RC PC IC DHR CF 297    FEFOIB    ESW TRAVELING WATER SCREENS          ESW            Yes            Yes      RC PC IC DHR CF 298    FEF02A    ESW SELF-CLEANING STRAINER (MTR      ESW            Yes            Yes      RC PC IC DHR CF OP.-IN MOV PROG.)
299    FEF02B    ESW SELF-CLEAN STRAIN. (MTR OP.-IN    ESW            Yes            Yes      RC PC IC DHR CF MOV PROG.)
300    FEF03A    ESW PRELUBE STORAGE TANK FILTER    YARD              Yes            Yes      RC PC IC DHR CF 301    FEF03B    ESW PRELUBE STORAGE TANK FILTER    YARD              Yes            Yes      RC PC IC DHR CF 302    FKJ02A    KKJ01A AIR INTAKE FILTER              DGB            Yes            Yes      RC PC IC DHR CF 303    FKJ02B    KKJO1A AIR INTAKE FILTER              DGB            Yes            Yes      RC PC IC DHR CF 304    FKJ02C    KKJO1B AIR INTAKE FILTER              DGB            Yes            Yes      RC PC IC DHR CF 305    FKJ02D    KKJO1B AIR INTAKE FILTER              DGB            Yes            Yes      RC PC IC DHR CF WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-20 Wolf Creek Base List I (cont.)
Base List 1                                                              Screen No. I                    Screen No. 3 Item      Walkdown                                                  (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description          Building( 2)      Basis?)      (Screens In?)    Support(')
306    GDDOOO1    ESW PUMP RM SUP FAN IA INLET          ESW              Yes            Yes      RC PC IC DHR CF TORNADO DAMPER 307    GDD0003    ESW PUMP RM A EXHAUST SPRING          ESW              Yes            Yes      RC PC IC DHR CF LOADED TORNADO DAMPER 308    GDD0008    ESW PUMP RM SUP FAN lB INLET          ESW              Yes            Yes      RC PC IC DHR CF TORNADO DAMPER 309    GDD0010    ESW PUMP RM B EXHAUST SPRING          ESW              Yes            Yes      RC PC IC DHR CF LOADED TORNADO DAMPER 310    GDTEOOO1  ESW PMP RM TEMP IA DM                ESW              Yes            Yes      RC PC IC DHR CF 311    GDTE0011  ESW PMP RM SUP FAN 1B DMPR            ESW              Yes            Yes      RC PC IC DHR CF 312    GDTSLOOO1  ESW PMP RM FAN CGDO1A TEMP SWITCH      CB              Yes            Yes      RC PC IC DHR CF LOW 313    GDTZOOO1A  ACTUATOR FOR O.A. DAMPER GDD0002      ESW              Yes            Yes          IC DHR 314    GDTZOOO1B  ESW ACTUATOR FOR RETURN AIR          ESW              Yes            Yes          IC DHR DAMPER GDD0004 315    GDTZOOO1C  ACTUATOR FOR EXHAUST DAMPER          ESW              Yes            Yes          IC DHR GDDOO 12 316    GDTZ001 1A ACT. FOR ESW PMP RM SUP FAN OA DMPR  ESW              Yes            Yes          IC DHR GDD0009 317    GDTZ0011B  ACTUATOR FOR ESW PUMP RM SUPPLY      ESW              Yes            Yes          IC DHR FAN RETURN DAMPER 318    GDTZOOIIC  ACT. FOR ESW PMP RM SP FAN EXH DMPR  ESW              Yes            Yes          IC DHR GDD0013 WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-21 Wolf Creek Base List 1 (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing  Screen No. 2  (Safety Function Number      Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support(l) 319    GKHZOO 19D  CTRL RM A/C UNIT 4A OUT ACTUATOR                      Yes            Yes      RC PC IC DHR CF (GKD0285) 320    GKHZ0030D  CTRL RM FLTR FAN 4B DISCH ACTUATOR    CB              Yes            Yes      RC PC IC DHR CF (D0318) 321    GKHZ029A    CONT ROOM A/C UNIT A RETURN          AUX              Yes            Yes      RC PC IC DHR CF DAMPER 322    GKHZ029B    CONT ROOM A/C UNIT A DISCHARGE      AUX            Yes              Yes      RC PC IC DHR CF DAMPER 323    GKHZ040A    CONT ROOM A/C UNIT B RETURN          AUX            Yes              Yes      RC PC IC DHR CF DAMPER 324    GKHZ040B    CONT ROOM A/C UNIT A DISCHARGE      AUX            Yes              Yes      RC PC IC DHR CF DAMPER 325    GKV0765    SGK04A WATER REGULATING VALVE        CB              Yes            Yes      RC PC IC DHR CF 326    GKV0766    SGK04B WATER REGULATING VALVE        CB              Yes            Yes      RC PC IC DHR CF 327    GKV0767    SGK05A WATER REGULATING VALVE        CB              Yes            Yes      RC PC IC DHR CF 328    GKV0768    SGK05B WATER REGULATING VALVE        CB              Yes            Yes      RC PC IC DHR CF 329    GMHZ0009    DSL GEN RM EXH DMPR A, GMD0005      DGB              Yes            Yes      RC PC IC DHR CF 330    GMHZ0019    DSL GEN RM EXH DMPR B, GMDOO1O      DGB              Yes            Yes      RC PC IC DHR CF 331    GMTEOOOI    DIESEL GEN VENT SUPPLY FAN IA        DGB              Yes            Yes      RC PC IC DHR CF 332    GMTE001 I  DIESEL GEN VENT SUPPLY FAN IB        DGB              Yes            Yes      RC PC IC DHR CF 333    GMTZOOO1A  ACT FOR DG VENT SUPPLY FAN DAMPER    DGB              Yes            Yes      RC PC IC DHR CF GMD0002 WCAP-1 7678-NP                                                                                              November 2012 Revision 0
E-22 Wolf Creek Base List 1 (cont.)
Base List 1                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - I Licensing  Screen No. 2  (Safety Function Number    Equipment              Description          Building(2)      Basis?)      (Screens In?)    Supporte")
334    GMTZOOO1B  ACT FOR DG VENT SUPPLY FAN DAMPER  DGB              Yes            Yes      RC PC IC DHR CF GMD0007 335    GMTZOOI I A ACT FOR DG VENT SUPPLY FAN DAMPER  DGB              Yes            Yes      RC PC IC DHR CF GMD0002 336    GMTZOO I IB ACT FOR DG VENT SUPPLY FAN DAMPER  DGB              Yes            Yes      RC PC IC DHR CF GMD0007 337    GNPT0934    CONTAINMENT ATMOSPHERE              RB              Yes            Yes              CF 338    GNPT0935    CONTAINMENT ATMOSPHERE              RB              Yes            Yes              CF 339    GNPT0936    CONTAINMENT ATMOSPHERE              RB              Yes            Yes              CF 340    GNPT0937    CONTAINMENT ATMOSPHERE              AUX              Yes            Yes              CF 341    GNPT0938    CONTAINMENT ATMOSPHERE              RB              Yes            Yes              CF 342    GNPT0939    CONTAINMENT ATMOSPHERE              RB              Yes            Yes              CF 343    GNTE060    CTMT COOLER A INLET TEMP ELEMENT    RB              Yes            Yes              CF 344    GNTE061    CTMT COOLER D INLET TEMP ELEMENT    RB              Yes            Yes              CF 345    GNTE062    CTMT COOLER C INLET TEMP ELEMENT    RB              Yes            Yes              CF 346    GNTE063    CTMT COOLER B INLET TEMP ELEMENT    RB              Yes            Yes              CF 347    GNVOOO I    CTMT COOLER A ESW OUTLET FLOW        RB              Yes            Yes              CF CONTROL VLV 348    GNVO002    CTMT COOLER B ESW OUTLET FLOW        RB              Yes            Yes              CF CONTROL VLV 349    GNVO003    CTMT COOLER C ESW OUTLET FLOW        RB              Yes            Yes              CF CONTROL VLV WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-23 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing Screen No. 2  (Safety Function Number    Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support")
350    GNVO004    CTMT COOLER D ESW OUTLET FLOW        RB              Yes            Yes            CF CONTROL VLV 351    GNVO039    CTMT COOLER A ESW SUPPLY ISOLATION    RB              Yes            Yes            CF 352    GNVO040    CTMT COOLER B ESW SUPPLY ISOLATION    RB              Yes            Yes            CF 353    GNVO041    CTMT COOLER C ESW SUPPLY ISOLATION    RB              Yes            Yes            CF 354  - GNVO042    CTMT COOLER D ESW SUPPLY ISOLATION    RB    -        Yes            Yes            CF 355    GSHV0020  H2 PURGE INNER CTMT ISO BTTFLY VLV    RB              Yes            Yes            CF 356    GSHV0021  H2 PURGE OUTER CTMT ISO BUTT VLV    AUX              Yes            Yes            CF 357    GSHV0031  CTMT ATMOS MON (RE-32) SUPPLY        RB              Yes            Yes            CF INSIDE CTMT ISO 358    GSHV0032  CTMT ATMOSPHERE MONITOR SUPPLY      AUX              Yes            Yes            CF OUTER ISO 359    GSHV0033  CTMT ATMOS MON (RE-32) SUPPLY        AUX              Yes            Yes            CF OUTSIDE CTMT ISO 360    GSHV0034  CTMT ATMOS MONITOR (RE-32) RET        RB              Yes            Yes            CF INSIDE CTMT ISO 361    GSHV0036  CTMT ATM MONIT (RE-31) SUPPLY        RB              Yes            Yes            CF OUTSIDE CTMT ISO 362    GSHV0037  CTMT ATMOSPHERE MONITOR SUPPLY      AUX              Yes            Yes            CF INSIDE ISO 363    GSHV0038  CTMT ATM MON (RE-31) RET-CTMT        AUX              Yes            Yes            CF OUTSIDE ISO 364    GSHV0039  CTMT ATMOS MONITOR (RE-31) RETURN    RB              Yes            Yes            CF TO CTMT INSIDE ISO November 2012 WCAP-17678-NP WCAP-17678-NP                                                                                              November 2012 Revision 0
E-24 Wolf Creek Base List I (cont.)
Base List I                                                              Screen No. 1                    Screen No. 3 Item      Walkdown                                                  (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description          Building(2)      Basis?)      (Screens In?)    Support~')
365    GTHZ0004  CTMT MINI PURGE AIR SUPLY O/SIDE      AUX              Yes            Yes            CF CTMT ISO BTTFLY VLV 366    GTHZ0005  CTMT MINI PURGE AIR SUPPLY I/S CTMT    RB              Yes            Yes            CF ISO BTTFLY VLV 367    GTHZ0006  CTMT MINI PURGE AIR SUPLY O/SIDE      AUX              Yes            Yes            CF CTMT ISO BTTFLY VLV 368    GTHZ0007  CTMT SD PURGE SUPPLY INSIDE CTMT      RB              Yes            Yes            CF ISO BTTFLY VLV 369    GTHZ0008  CTMT SD PURGE EXCH INSIDE CTMT ISO    RB              Yes            Yes            CF BTTFLY VLV 370    GTHZ0009  CTMT MINI PURGE EXH OUTSIDE CTMT      AUX              Yes            Yes            CF ISO 371    GTHZOO1 1  CTMT MINI PURGE EXH INSIDE CTMT ISO    RB              Yes            Yes            CF BTTFLY VLV 372    GTHZ0012  CTMT MINI PURGE EXH OUTSIDE CTMT      AUX              Yes            Yes            CF ISO BTTFLY VLV 373    GTRE031    CTMT ATMOSHERE RADIATION MONITOR      AUX              Yes            Yes            CF 374    GTRE032    CTMT ATMOSHERE RADIATION MONITOR      AUX              Yes            Yes            CF 375    GTRT031    CTMT ATMOSHERE RADIATION MONITOR      AUX              Yes            Yes            CF (2) 376    GTRT032    CTMT ATMOSHERE RADIATION MONITOR      AUX              Yes            Yes            CF 377    HBHV7176  RCDT PUMPS DISCH HDR INSIDE CTMT      RB              Yes            Yes            CF ISO WCAP-1 7678-NP                                                                                              November 2012 Revision 0
E-25 Wolf Creek Base List I (cont.)
Base List 1                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                              (SC - 1 Licensing  Screen No. 2  (Safety Function Number      Equipment              Description        Building(2)      Basis?)      (Screens In?)    Support(')
378    JELT0001    EMER FUEL OIL DAY TK A LEV        DGB              Yes            Yes      RC PC IC DHR CF 379    JELT0021    EMER FUEL OIL DAY TK B LEV        DGB              Yes            Yes      RC PC IC DHR CF 380    JELT0032    EMER FUEL OIL TK B LEV            DGB              Yes            Yes      RC PC IC DHR CF 381    JELT012    TJE02A LEVEL TRANSMITTER          DGB              Yes            Yes      RC PC IC DHR CF 382    JELT032    TJE02B LEVEL TRANSMITTER          DGB              Yes            Yes      RC PC IC DHR CF 383    KAPCV0101  TKA03 OUTLET PRESSURE CONTROL      AUX              Yes            Yes            DHR VALVE 384    KAPCV0102  TKA04 OUTLET PRESSURE CONTROL      AUX              Yes            Yes            DHR VALVE 385    KAPCVO 103  TKA05 OUTLET PRESSURE CONTROL      AUX              Yes            Yes            DHR VALVE 386    KAPCV0200  TKA02 OUTLET PRESSURE CONTROL      AUX              Yes            Yes            DHR VALVE 387    KCHV0253    FIRE PROT SYS HDR OUTER CTMT ISO                    Yes            Yes              CF 388    KJO121      GAUGE PANEL                        DGB              Yes            Yes      RC PC IC DHR CF 389    KJ0122      GAUGE PANEL                        DGB              Yes            Yes      RC PC IC DHR CF 390    KKJO1A      STANDBY DIESEL (GENERATOR)        DGB              Yes            Yes      RC PC IC DHR CF 391    KKJO1B      STANDBY DIESEL (GENERATOR)        DGB              Yes            Yes      RC PC IC DHR CF 392    LFFV0095    CTMT NOR SUMPS TO FLOOR DRN TK      RB            Yes            Yes              CF INSIDE CTMT ISO 393    LFFV0096    CTMT NOR SUMPS TO FLR DRN TK      AUX              Yes            Yes              CF OUTSIDE CTMT ISO WCAP- 17678-NP                                                                                            November 2012 Revision 0
E-26 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. 1                    Screen No. 3 Item    Walkdown                                                (SC - I Licensing Screen No. 2  (Safety Function Number    Equipment                Description        Building(2)      Basis?)      (Screens In?)    Support(")
394    NBOO1      4.16 KV BUS                          CB            Yes            Yes      RC PC IC DHR CF 395    NB100110  CTRL BLDG LC NG03                    CB            Yes            Yes      RC PC IC DHR CF
    .396    NBOO112    FDRXFMRXNB0I                          CB            Yes            Yes      RC PC IC DHR CF 397    NBOO113    CTRL BLDG LC NGO1                    CB            Yes            Yes      RC PC IC DHR CF 398    NB002      4.16 KV BUS #2                        CB            Yes            Yes      RC PC IC DHR CF 399    NB00209    FDR XFMR XNB02                        CB            Yes            Yes      RC PC IC DHR CF 400    NB00210    CTRL BLDG LC NG04                    CB            Yes            Yes      RC PC IC DHR CF 401    NB00211    EMG D/G SUPPLY FDR BRKR              CB            Yes            Yes      RC PC IC DHR CF 402    NB00213    CTRL BLDG LC NG02 SWGR BRKR          CB            Yes            Yes      RC PC IC DHR CF 403    NB00215    ESW PUMP DPEFO1B SWGR BRKR            CB            Yes            Yes      RC PC IC DHR CF 404    NEOO1      STANDBY #1                          DGB              Yes            Yes      RC PC IC DHR CF 405    NE002      STANDBY #2                          DGB              Yes            Yes      RC PC IC DHR CF 406    NE003      DG 'A' NEUTRAL GROUNDING RESISTOR  DGB              Yes            Yes      RC PC IC DHR CF 407    NE004      DG 'B' NEUTRAL GROUNDING RESISTOR  DGB              Yes            Yes      RC PC IC DHR CF 408    NE106      CONT STBY GEN (NE02) RELAY          DGB              Yes            Yes      RC PC IC DHR CF 409    NE107      CONT STBY GEN (NEO1) RELAY          DGB              Yes            Yes      RC PC IC DHR CF 410    NF039A    CONT SHED/SEQ CH I LOGIC              CB            Yes            Yes      RC PC IC DHR CF 411    NF039B    CONT SHED/SEQ CH 4 LOGIC              CB            Yes            Yes      RC PC IC DHR CF 412    NF039C    CONTROL PANEL SHED/SEQ CH 1 & 4    CB/CC            Yes            Yes      RC PC IC DHR CF TERM WCAP-17678-NP                                                                                              November 2012 Revision 0
E-27 Wolf Creek Base List I (cont.)
Base List I                                                      Screen No. 1                    Screen No. 3 Item      Walkdown                                          (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description    Building(2)      Basis?)      (Screens In?)    Support(')
413    NG001      480 VAC                      CB/CC            Yes            Yes      RC PC IC DHR CF 414    NG00101    NG0I FDR BRKR                    CB            Yes            Yes      RC PC IC DHR CF 415    NG00106    NGO1A FDR BRKR                  CB            Yes            Yes      RC PC IC DHR CF 416    NG001A    480 VAC                      CB/CC            Yes            Yes      RC PC IC DHR CF 417    NGOO1B    480 VAC MOTOR CONTROL CENTER  AUX              Yes            Yes      RC PC IC DHR CF 418    NGOO1T    480 VAC MOTOR CONTROL CENTER  AUX              Yes            Yes      RC PC IC DHR CF 419    NG002      480 VAC                      CB/CC            Yes            Yes      RC PC IC DHR CF 420    NG00201    MAIN BREAKER                    CB            Yes            Yes      RC PC IC DHR CF 421    NG00206    NG02A FDR BRKR                  CB            Yes            Yes      RC PC IC DHR CF 422    NG002A    480 VAC                      CB/CC            Yes            Yes      RC PC IC DHR CF 423    NG002B    480 VAC MOTOR CONTROL CENTER  AUX              Yes            Yes      RC PC IC DHR CF 424    NG002T    480 VAC MOTOR CONTROL CENTER  AUX              Yes            Yes      RC PC IC DHR CF 425    NG003      480 VAC                      CB/CC            Yes            Yes      RC PC IC DHR CF 426    NG00301    NG03 FDR BRKR                    CB            Yes            Yes      RC PC IC DHR CF 427    NG003C    480 VAC                        AUX              Yes            Yes      RC PC IC DHR CF 428    NG003D    480 VAC                        DGB            Yes            Yes      RC PC IC DHR CF 429    NG003T    480 VAC MOTOR CONTROL CENTER  AUX              Yes            Yes      RC PC IC DHR CF 430    NG004      480 VAC                      CB/CC            Yes            Yes      RC PC IC DHR CF 431    NG00401    NG04 FDR BRKR                    CB            Yes            Yes      RC PC IC DHR CF 432    NG004C    480 VAC                        AUX              Yes            Yes      RC PC IC DHR CF WCAP- 17678-NP                                                                                        November 2012 Revision 0
E-28 Wolf Creek Base List 1 (cont.)
Base List I                                                        Screen No. 1                    Screen No. 3 Item      Walkdown                                            (SC - 1 Licensing Screen No. 2  (Safety Function Number    Equipment                Description  Building(2 )      Basis?)      (Screens In?)    Support(")
433    NG004D    480 VAC                        DGB              Yes            Yes      RC PC IC DHR CF 434    NG004T    480 VAC MOTOR CONTROL CENTER    AUX              Yes            Yes      RC PC IC DHR CF 435    NG005E    480 VAC                        ESW              Yes            Yes      RC PC IC DHR CF 436    NG006E    480 VAC                        ESW              Yes            Yes      RC PC IC DHR CF 437    NK001      125 VDC BUS SWITCHBOARD        CB/CC              Yes            Yes      RC PC IC DHR CF 438    NK002      125 VDC BUS SWITCHBOARD        CB/CC              Yes            Yes      RC PC IC DHR CF 439    NK003      125 VDC BUS SWITCHBOARD        CB/CC              Yes            Yes      RC PC IC DHR CF 440    NK004      125 VDC BUS SWITCHBOARD        CB/CC              Yes            Yes      RC PC IC DHR CF 441    NKO1 1    125-VDC NO. 1 60-CELL BATTERY  CB/CC              Yes            Yes      RC PC IC DHR CF 442    NK012      125-VDC NO.2 60-CELL BATTERY  CB/CC              Yes            Yes      RC PC IC DHR CF 443    NK013      125-VDC NO.3 60-CELL BATTERY  CB/CC              Yes            Yes      RC PC IC DHR CF 444    NK014      125-VDC NO.4 60-CELL BATTERY  CB/CC              Yes            Yes      RC PC IC DHR CF 445    NK021      125 VDC NO I                  CB/CC              Yes            Yes      RC PC IC DHR CF 446    NK022      125 VDC NO 2                  CB/CC              Yes            Yes      RC PC IC DHR CF 447    NK023      125 VDC NO 3                  CB/CC              Yes            Yes      RC PC IC DHR CF 448    NK024      125 VDC NO 4                  CB/CC              Yes            Yes      RC PC IC DHR CF 449    NK041      DIST 125 VDC                  CB/CC              Yes            Yes      RC PC IC DHR CF 450    NK042      DIST 125 VDC                  CB/CC              Yes            Yes      RC PC IC DHR CF 451    NK043      DIST 125 VDC                  CB/CC              Yes            Yes      RC PC IC DHR CF 452    NK044      DIST 125 VDC                  CB/CC              Yes            Yes      RC PC IC DHR CF WCAP- 17678-NP                                                                                          November 2012 Revision 0
E-29 Wolf Creek Base List I (cont.)
Base List I                                                          Screen No. 1                    Screen No. 3 Item      Walkdown                                            (SC - 1 Licensing  Screen No. 2  (Safety Function Number      Equipment                Description    Building(2)      Basis?)      (Screens In?)    Support('))
453    NK051      DIST 125 VDC                    CB/CC            Yes              Yes      RC PC IC DHR CF 454    NK054      DIST 125 VDC                    CB/CC            Yes              Yes      RC PC IC DHR CF 455    NN001      DIST 120 VAC INSTR              CB/CC            Yes            Yes      RC PC IC DHR CF 456    NNO02      DIST 120 VAC INSTR              CB/CC            Yes              Yes      RC PC IC DHR CF 457    NN003      DIST 120 VAC INSTR              CB/CC            Yes              Yes      RC PC IC DHR CF 458    NN004      DIST 120 VAC INSTR              CB/CC            Yes              Yes      RC PC IC DHR CF 459    NNO11      7.5 KVA                        CB/CC            Yes            Yes      RC PC IC DHR CF 460    NNO12      7.5 KVA                        CB/CC            Yes            Yes      RC PC IC DHR CF 461    NNO13      7.5 KVA                        CB/CC            Yes            Yes      RC PC IC DHR CF 462    NNO14      7.5 KVA                        CB/CC            Yes            Yes      RC PC IC DHR CF 463    PALO0A      AUX FEEDWATER PUMP              AUX              Yes            Yes          PC DHR 464    PALOIB      AUX FEEDWATER PUMP              AUX              Yes            Yes          PC DHR 465    PAL02      AFW PUMP--TURBINE DRIVEN        AUX              Yes            Yes          PC DHR 466    PBG02A      BORIC ACID TRANSFER PUMP MOTOR  AUX              Yes            Yes              RC 467    PBG02B      BORIC ACID TRANSFER PUMP MOTOR  AUX              Yes            Yes              RC 468    PBG03A      CENT. CHARGING PUMP A            AUX              Yes            Yes            RC IC AUXILIARYLUBE OIL PUMP 469    PBG03B      CENT. CHARGING PUMP B            AUX              Yes            Yes            RC IC AUXILIARYLUBE OIL PUMP 470    PBG04      NORMAL CHARGING PUMP            AUX              Yes            Yes            RC IC 471    PBG05A      CENTRIFUGAL CHARGING PUMP        AUX              Yes            Yes        RC PC IC DHR WCAP- 17678-NP                                                                                          November 2012 Revision 0
E-30 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - I Licensing  Screen No. 2  (Safety Function Number      Equipment                  Description    Buildingt2 )      Basis?)      (Screens In?)    Support(")
472    PBG05B      CENTRIFUGAL CHARGING PUMP          AUX              Yes            Yes        RC PC IC DHR 473    PEFOIA      ESSENTIAL SERV. WATER PUMP        ESW              Yes            Yes      RC PC IC DHR CF 474    PEFOIB      ESSENTIAL SERV. WATER PUMP        ESW              Yes            Yes      RC PC IC DHR CF 475    PEGO0A      COMPONENT COOL. WATER PUMP        AUX              Yes            Yes      RC PC IC DHR CF 476    PEGOIB      COMPONENT COOL. WATER PUMP        AUX              Yes            Yes      RC PC IC DHR CF 477    PEGOIC      COMPONENT COOL. WATER PUMP        AUX              Yes            Yes      RC PC IC DHR CF 478    PEGO0D      COMPONENT COOL. WATER PUMP        AUX              Yes            Yes      RC PC IC DHR CF 479    PEJO1A      RESIDUAL HEAT REMOVAL PUMP        AUX              Yes            Yes          IC DHR 480    PEJOIB      RESIDUAL HEAT REMOVAL PUMP        AUX              Yes            Yes          IC DHR 481    PEMOIA      SAFETY INJ. PUMP                  AUX              Yes            Yes          IC DHR 482    PEMOIB      SAFETY INJ. PUMP                  AUX              Yes            Yes          IC DHR 483    PENO0A      Containment Spray Pump A          AUX              Yes            Yes              CF 484    PENO1B      Containment Spray Pump B          AUX              Yes            Yes              CF 485    PJEO1A      EMERGENCY FUEL OIL TRANSFER PUMP  YRD              Yes            Yes      RC PC IC DHR CF 486    PJEO1B      EMERGENCY FUEL OIL TRANSFER PUMP  YRD              Yes            Yes      RC PC IC DHR CF 487    PKJ03A      AUXILIARY LUBE-OIL (KEEP-WARM)      DG              Yes            Yes      RC PC IC DHR CF PUMP FOR KKJO1A 488    PKJ03B      AUXILIARY LUBE-OIL (KEEP-WARM)      DG              Yes            Yes      RC PC IC DHR CF PUMP FOR KKJOIB 489    RLOO        REACTOR COOLANT AND SUPT SYS        CB              Yes            Yes      RC PC IC DHR CF CONSOLE WCAP-17678-NP                                                                                              November 2012 Revision 0
E-31 Wolf Creek Base List I (cont.)
Base List I                                                        Screen No. I                    Screen No. 3 Item      Walkdown                                            (SC - 1 Licensing Screen No. 2  (Safety Function Number    Equipment              Description    Building(2)      Basis?)      (Screens In?)    Support~'()
490    RL002      REACTOR COOLANT AND SUPT SYS    CB              Yes            Yes        RC PC IC DHR CONSOLE 491    RL003      REACTOR OPERATOR'S CONSOLE      CB              Yes            Yes          RC DHR 492    RL004      REACTOR OPERATOR'S CONSOLE      CB              Yes            Yes          RC DHR 493    RL005      TURBOGENERATOR AND FW CONSOLE    CB              Yes            Yes          PC DHR 494 . RL006      TURBOGENERATOR AND FW CONSOLE  -CB -            Yes            Yes        RC PC DHR 495    RL013      SITE-RELATED SECTION MCB        CB              Yes            Yes      RC PC IC DHR CF 496    RL014      SITE-RELATED SECTION MCB        CB              Yes            Yes      RC PC IC DHR CF 497    RL015      STATION ELECTRICAL DIST MCB      CB              Yes            Yes      RC PC IC DHR CF 498    RL016      STATION ELECTRICAL DIST MCB      CB              Yes            Yes      RC PC IC DHR CF 499    RL017      ESF MCB                          CB              Yes            Yes      RC PC IC DHR CF 500    RL018      ESF MCB                          CB              Yes            Yes      RC PC IC DHR CF 501    RL019      ESF MCB                          CB              Yes            Yes      RC PC IC DHR CF 502    RL020      ESF MCB                          CB              Yes            Yes      RC PC IC DHR CF 503    RL021      REACTOR AUXILIARIES PANEL        CB              Yes            Yes      RC PC IC DHR CF 504    RL022      REACTOR AUXILIARIES PANEL        CB              Yes            Yes      RC PC IC DHR CF 505    RP040      PROCESS CONTROL GROUP 3          CB              Yes            Yes        RC PC IC DHR 506    RP043      PROCESS CONTROL GROUP 1          CB              Yes            Yes        RC PC IC DHR 507    RP044      PROCESS CONTROL GROUP 4          CB              Yes            Yes        RC PC IC DHR 508    RP047      PROCESS CONTROL GROUP 2          CB              Yes            Yes        RC PC IC DHR WCAP-17678-NP                                                                                          November 2012 Revision 0
E-32 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. I                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description        Building(2)      Basis?)      (Screens In?)    Support"'*)
509    RP068      MISC BOP PANEL                        CB            Yes            Yes        RC PC IC DHR 510    RP080      RPV LEVEL INSTR SYS PROC PROT SYS    CB            Yes            Yes              IC 511    RP08 I A/B SUBCOOLING MONITORING CABINET        CB            Yes            Yes            DHR 512    RP118A    AUX SHUTDOWN PANEL                  AUX            Yes              Yes      RC PC IC DHR CF 513    RPI18B    AUX SHUTDOWN PANEL                  AUX            Yes              Yes      RC PC IC DHR CF 514    RP290      DC DISTRIBUTION                    AUX              Yes            Yes      RC PC IC DHR CF 515    SA036A    ESFAS CHI TERM                    CB/CC            Yes            Yes      RC PC IC DHR CF 516    SA036B    ESFAS CH4 TERM                    CB/CC            Yes            Yes      RC PC IC DHR CF 517    SA036C    ESFAS CH2 LOGIC/TERM CABINET      CB/CC            Yes            Yes      RC PC IC DHR CF 518    SA036D    ESFAS CHI LOGIC CABINET            CB/CC            Yes            Yes      RC PC IC DHR CF 519    SA036E    ESFAS CH4 LOGIC CABINET            CB/CC            Yes            Yes      RC PC IC DHR CF 520    SA075A    CONT MN STM & FW ISO ACT          CB/CC            Yes            Yes            DHR 521    SA075B    CONT MN STM & FW ISO ACT          CB/CC            Yes            Yes            DHR 522    SB029A    W SS PROT SYS INPUT TRN            CB/CC            Yes            Yes      RC PC IC DHR CF 523    SB029B    W SS PROT SYS LOGIC TRN            CB/CC            Yes            Yes      RC PC IC DHR CF 524    SB029C    WSS PROT SYS OUT I TRN            CB/CC            Yes              Yes      RC PC IC DHR CF 525    SB029D    W SS PROT SYS OUT 2 TRN            CB/CC            Yes            Yes      RC PC IC DHR CF 526    SB032A    W SS PROT SYS INPUT TRN            CB/CC            Yes            Yes      RC PC IC DHR CF 527    SB032B    W SS PROT SYS LOGIC TRN            CB/CC            Yes            Yes      RC PC IC DHR CF 528    SB032C    W SS PROT SYS OUT 1 TRN            CB/CC            Yes            Yes      RC PC IC DHR CF WCAP-17678-NP                                                                                              November 2012 Revision 0
E-33 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description        Building(2)      Basis?)      (Screens In?)    Support(")
529    SB032D    W SS PROT SYS OUT 2 TRN            CB/CC            Yes            Yes      RC PC IC DHR CF 530    SB037      W PROCESS ANALOG PROTECTION SET    CB/CC            Yes            Yes      RC PC IC DHR CF CAB-03 531    SB038      W PROCESS ANALOG PROTECTION SET    CB/CC            Yes            Yes      RC PC IC DHR CF CAB-01 532    SB041      W PROCESS ANALOG PROTECTION SET    CB/CC            Yes            Yes      RC PC IC DHR CF CAB-04 533    SB042      W PROCESS ANALOG PROTECTION SET    CB/CC            Yes            Yes      RC PC IC DHR CF CAB-02 534    SB046      CONTROL BOARD DEMULTIPLEXER          CB              Yes            Yes      RC PC IC DHR CF 535    SB078      RPV LEVEL INSTR SYS PROC PROT SYS    CB            Yes            Yes              IC 536    SB079      RPV LEVEL INSTR SYS PROC PROT SYS    CB            Yes            Yes              IC 537    SBI02A    W CABINET FOR REACTOR TRIP SWG      AUX              Yes            Yes              RC TRAIN-A 538    SBI02B    W CABINET FOR REACTOR TRIP SWG      AUX              Yes            Yes              RC TRAIN-B 539    SB148A    WEST. PROCESS PROTECTION          CB/CC            Yes            Yes              RC 540    SB148B    WEST. PROCESS PROTECTION          CB/CC            Yes            Yes              RC 541    SE031      SOURCE RANGE CHANNEL 1 PREAMP      AUX              Yes            Yes              RC 542    SE032      SOURCE RANGE CHANNEL 2 PREAMP      AUX              Yes            Yes              RC 543    SE054A    W NUC INSTM NIS I                  CB/CC            Yes            Yes              RC 544    SE054B    W NUC INSTM NIS 2                  CB/CC            Yes            Yes              RC WCAP- 17678-NP                                                                                            November 2012 Revision 0
E-34 Wolf Creek Base List I (cont.)
Base List I                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                              (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment                Description        Building(2)      Basis?)      (Screens In?)    Support(")
545    SE054C    W NUC INSTM NIS 3                  CB/CC            Yes              Yes              RC 546    SE054D    W NUC INSTM NIS 4                  CB/CC            Yes              Yes              RC 547    SENE031    SOURCE RANGE NUCLEAR INSTRUMENT      RB            Yes              Yes              RC 548    SENE032    SOURCE RANGE NUCLEAR INSTRUMENT      RB            Yes              Yes              RC 549    SENE035    INTERMEDIATE RANGE NUCLEAR          RB            Yes              Yes              RC INSTRUMENT 550    SENE036    INTERMEDIATE RANGE NUCLEAR          RB            Yes              Yes              RC INSTRUMENT 551    SENE060    EXCORE NEUTRON DETECTOR              RB            Yes              Yes              RC 552    SENE061    EXCORE NEUTRON DETECTOR              RB            Yes              Yes              RC 553    SENY060A  EXCORE NEUTRON DETECTOR AMPLIFIER  AUX            Yes              Yes              RC 554    SENY060B  PROCESSOR                          AUX            Yes              Yes              RC 555    SENY061A  EXCORE NEUTRON DETECTOR AMPLIFIER  AUX            Yes              Yes              RC 556    SENY061B  PROCESSOR                          AUX            Yes              Yes              RC 557    SGF02A    AUX FW PUMP ROOMCOOLER              AUX            Yes              Yes          PC DHR 558    SGF02B    AUX FW PUMP ROOMCOOLER              AUX            Yes              Yes          PC DHR 559    SGK04A    CONTROL ROOM A/C UNITS              AUX            Yes              Yes      RC PC IC DHR CF 560    SGK04B    CONTROL ROOM A/C UNITS              AUX            Yes              Yes      RC PC IC DHR CF 561    SGK05A    CLASS IE ELEC. EQUIP. A/C UNIT    CB/CC            Yes            Yes      RC PC IC DHR CF 562    SGK05B    CLASS IE ELEC. EQUIP. A/C UNIT    CB/CC            Yes            Yes      RC PC IC DHR CF 563    SGL09A    SAFETY INJECTION PUMP ROOM COOLER  AUX            Yes              Yes          IC DHR WCAP- 17678-NP                                                                                            November 2012 Revision 0
E-35 Wolf Creek Base List I (cont.)
Base List 1                                                        Screen No. 1                    Screen No. 3 Item        Walkdown                                          (SC - I Licensing Screen No. 2  (Safety Function Number        Equipment              Description  Building(2)      Basis?)      (Screens In?)    Support(")
564        SGL09B    ROOM COOLER FOR PEMO 1B      AUX              Yes            Yes          RC IC DHR 565        SGL1OA    RHR PUMP ROOM COOLER          AUX              Yes            Yes          IC DHR 566        SGL1OB    RHR PUMP ROOM COOLER          AUX              Yes            Yes          IC DHR 567        SGL11A    CCW PUMP A ROOM COOLER        AUX              Yes            Yes      RC PC IC DHR CF 568        SGLI lB    CCW PUMP B ROOM COOLER        AUX              Yes            Yes      RC PC IC DHR CF 569        SGL12A    ROOM COOLER FOR PBG05A        AUX              Yes            Yes            RC IC 570        SGL12B    ROOM COOLER FOR PBG05B        AUX              Yes            Yes            RC IC 571        SGL13A    CTMT SPRAY PUMP ROOM COOLER  AUX              Yes            Yes              CF 572        SGL13B    CTMT SPRAY PUMP ROOM COOLER  AUX              Yes            Yes              CF 573        SGL15A    PENETRATION ROOMCOOLER        AUX              Yes            Yes              CF 574        SGL15B    PENETRATION ROOM COOLER      AUX              Yes            Yes              CF 575        SGNO1A    CONTAINMENT COOLER              RB            Yes            Yes              CF 576        SGNO1B    CONTAINMENT COOLER              RB            Yes            Yes              CF 577        SGNO1C    CONTAINMENT COOLER              RB            Yes            Yes              CF 578        SGNO1D    CONTAINMENT COOLER              RB            Yes            Yes              CF 579        SKJ02A    D/G A EXHAUST SILENCER        DGB              Yes            Yes      RC PC IC DHR CF 580        SKJ02B    D/G B EXHAUST SILENCER        DGB              Yes            Yes      RC PC IC DHR CF 581        TALOlA    TURBINE DRIVEN AUXILIARY      AUX              Yes            Yes          PC DHR FEEDWATER STANDY TANK (CONDENSATE)
November 2012 WCAP-    17678-NP WCAP- I17678-NP                                                                                        November 2012 Revision 0
E-36 Wolf Creek Base List I (cont.)
Base List 1                                                            Screen No. 1                    Screen No. 3 Item      Walkdown                                                (SC - 1 Licensing Screen No. 2  (Safety Function Number      Equipment              Description        Building(2)      Basis?)      (Screens In?)    Support(')
582    TALOIB      TURBINE DRIVEN AUXILIARY            AUX              Yes            Yes          PC DHR FEEDWATER STANDY TANK (CONDENSATE) 583    TALOIC      TURBINE DRIVEN AUXILIARY            AUX              Yes            Yes          PC DHR FEEDWATER STANDY TANK (CONDENSATE) 584    TEFO0A      ESW PUMP PRELUBESTORAGE TANK      YARD              Yes            Yes          IC DHR 585    TEFOIB      ESW PUMP PRELUBESTORAGE TANK      YARD              Yes            Yes          IC DHR 586    TEGOIA      CCW SURGE TANK A                    AUX              Yes            Yes      RC PC IC DHR CF 587    TEGO1B      CCW SURGE TANK B                    AUX              Yes            Yes      RC PC IC DHR CF 588    TEMO0      BORON INJECTION TANK                AUX              Yes            Yes              IC 589    TJEO1A      EMERGENCY FUEL OIL TANK            YRD              Yes            Yes      RC PC IC DHR CF 590    TJEO1B      EMERGENCY FUEL OIL TANK            YRD              Yes            Yes      RC PC IC DHR CF 591    TJE02A      EMERGENCY FUEL OIL DAY TANK        DGB              Yes            Yes      RC PC IC DHR CF 592    TJE02B      EMERGENCY FUEL OIL DAY TANK        DGB              Yes            Yes      RC PC IC DHR CF 593    TKA02      AFW CTRL/MAIN STEAM ARV ACCUM      AUX              Yes            Yes          PC DHR 594    TKA03      AFW CTRL/MAIN STEAM ARV ACCUM      AUX              Yes            Yes          PC DHR 595    TKA04      AFW CTRL/MAIN STEAM ARV ACCUM      AUX              Yes            Yes          PC DHR 596    TKA05      AFW CTRL/MAIN STEAM ARV ACCUM      AUX              Yes            Yes          PC DHR 597    TKJO1A      D/G A JACKET WATER EXPANSION TANK  DGB              Yes            Yes      RC PC IC DHR CF 598    TKJO1B      D/G B JACKET WATER EXPANSION TANK  DGB              Yes            Yes      RC PC IC DHR CF 599    TKJ02A      START AIR TANK D/G                  DGB              Yes            Yes      RC PC IC DHR CF 600    TKJ02B      START AIR TANK D/G                  DGB              Yes            Yes      RC PC IC DHR CF WCAP- 17678-NP                                                                                              November 2012 Revision 0
E-37 Wolf Creek Base List I (cont.)
Base List I                                                                                              Screen No. I                            Screen No. 3 Item        Walkdown                                                                                (SC - 1 Licensing  Screen No. 2        (Safety Function Number        Equipment                          Description                          Building(2)          Basis?)        (Screens In?)          Support"l))
601      TKJ02C            START AIR TANK D/G                                        DGB                Yes              Yes          RC PC IC DHR CF 602      TKJ02D            START AIR TANK D/G                                        DGB                Yes              Yes          RC PC IC DHR CF 603      TKJ04A            D/G A AUX LUBE OIL TANK                                    DGB                Yes              Yes          RC PC IC DHR CF 604      TKJ04B            D/G B AUX LUBE OIL TANK                                    DGB                Yes              Yes          RC PC IC DHR CF 605      XNGO1            CLASS 1E LOAD CENTER TRANSFORMER                          CB/CC                Yes              Yes          RC PC IC DHR CF 606      XNG02            CLASS I E LOAD CENTER TRANSFORMER                        CB/CC                Yes              Yes          RC PC IC DHR CF 607      XNG03            CLASS I E LOAD CENTER TRANSFORMER                        CB/CC                Yes              Yes          RC PC IC DHR CF 608      XNG04            CLASS IE LOAD CENTER TRANSFORMER                          CB/CC                Yes              Yes          RC PC IC DHR CF 609      XNG05            FEED MCC NG05E                                            ESW                Yes              Yes                IC DHR 610      XNG06            FEEDS MCC NG06E                                            ESW                Yes              Yes                IC DHR 611      XPN07A            120 V INSTRUMENT AC TRANSFORMER                          CB/CC                Yes              Yes              RC IC DHR 612      XPN07B            120 V INSTRUMENT AC TRANSFORMER                          CB/CC                Yes              Yes              RC IC DHR 613      XPN07C            120 V INSTRUMENT AC TRANSFORMER                          CB/CC                Yes              Yes              RC IC DHR 614      XPN08A            120 V INSTRUMENT AC TRANSFORMER                          CB/CC                Yes              Yes                IC DHR 615      XPN08B            120 V INSTRUMENT AC TRANSFORMER                          CB/CC                Yes              Yes                IC DHR 616      XPN08C            120 V INSTRUMENT AC TRANSFORMER                          CB/CC                Yes              Yes                IC DHR Notes:
I RC= Reactivity Control, PC= Reactor Coolant Pressure Control, IC = Reactor Coolant Inventory Control, DHR = Decay Heat Removal (including Ultimate Heat Sink),
and CF = Containment Function 2 AUX= Auxiliary Building, CB= Control Building, CC=Communication Corridor, DGB= Diesel Generator Building, ESW= Essential Service Water Building, RB=
Reactor Building, YARD= Yard WCAP- 17678-NP                                                                                                                                      November 2012 Revision 0
F-1 APPENDIX F SWEL 1 WCAP-17678-NP            November 2012 Revision 0
F-2 SWEL 1 Screen #4 Sample Considerations Screen #1              Screen #3 SWEL                                          (SC - I  Screen #2      (Safety                              Major new or                      IPEEE      Walkdown Item    Walkdown                            Licensing  (Screens    Function  Equipment        System      replacement      Environment  vulnerability Deferred to Number  Equipment      Description Building  Basis?)    In?)      Support)        Class        Type      equipment?        (Temp, 'F) enhancement?    Outage?
I  ABHV0014    LOOP-I MAIN      AUX        Yes      Yes        PC DHR      POV (7)        AB              X              hot/dry STEAM ISOLATION VALVE 2  ABPT0002    STM GEN B        AUX        Yes      Yes        PC DHR  Inst. Racks (18)    AB                            mild/dry STEAMLINE PRESSURE 3  ABPV0002    SG B ATMOSPHERIC  AUX        Yes      Yes        PC DHR      POV (7)        AB                            hot/dry RELIEF VLV 4  AEFV0039    EBBOIA            AUX        Yes      Yes        PC DHR      POV (7)          AE            X              hot/dry FEEDWATER
                  . ISOLATION VALVE                              I.                            .
5  AELT0502    STM GEN B WIDE    RB        Yes      Yes        PC DHR  Inst. Racks (18)    AE                          hot/humid                    Yes RANGE 6  AELT0519    STM GEN LEVEL A    RB        Yes      Yes        PC DHR  Inst. Racks (18)    AE                          hot/humid                  Yes NARROW RANGE 7  ALHV0030    ESW TO MDAFW      AUX        Yes      Yes        PC DHR    VALVE (8)          AL PUMP B 6" BTFL VLV W/LIMITQ 8  BBLIS1321  RV SUBCOOLING    AUX        Yes      Yes          RC    Inst. Racks (18)    BB                            mild/dry MONITOR TRN B 9  BBPT0456    PRESSURIZER        RB        Yes      Yes            PC  Inst. Racks (18)    BB                                                        Yes PRESSURE 10  BGFCV0121  CENTRIFUGAL CHG  AUX        Yes      Yes      RC PC IC      POV (7)          BG                            hot/dry PMP FLOW CONTROL II  BGHV8105    CHARGING PUMPS    AUX        Yes      Yes        PC IC CF    MOV (8)          BG                            mild/dry TO REGEN HX/CTMT ISO 12  BGHV8152    LETDOWN SYSTEM    AUX        Yes      Yes          IC CF      POV (7)          BG                            mild/dry CONTAINMENT ISO VLV 13  BLHV8047    REACTOR M/U      AUX        Yes        Yes        IC CF      POV (7)          BL                            mild/dry WATER CONTAINMENT ISO WCAP- 17678-NP                                                                                                                                      November 2012 Revision 0
F-3 SWEL I (cont.)
Screen #4 Sample Considerations Screen #1          Screen #3 SWEL                                          (SC - I  Screen #2  (Safety                              Major new or                      IPEEE      Walkdown Item    Walkdown                            Licensing  (Screens Function    Equipment      System      replacement      Environment  vulnerability Deferred to Number    Equipment      Description  Building  Basis?)    In?)  Support)        Class      Type      equipment?        (Temp, OF) enhancement?    Outage?
14 BMHV0002    SG B BLOWDOWN      AUX        Yes      Yes    PC IC CF      POV (7)      BM                              hot/dry AFAS ISO I5 BNHV0003    RWST SUPPLY TO    AUX        Yes      Yes      CF        MOV (8)      BN                              hot/dry CTMT SPRAY PUMP B
16 BNLT0931    RWST LEVEL        YRD        Yes      Yes      RC IC  Inst. Racks (18)  BN                          hot/humid TRANSMITTER (2)                                  DHR 17 BNV00I I    RWST OUTLET ISO    AUX        Yes      Yes      RC IC          (8)        BN VALVE                                            DHR 18 CGMOIB      DIESEL GENERATOR  DGB        Yes      Yes    RC PC IC      Fans (9)    GM                            hot/humid BLDG SUPPLY FAN                                  DHR 19 EEG0IB      COMPONENT COOL    AUX        Yes      Yes    RC PC IC        Heat        EG                            mild/dry WATER HEAT                                      DHR    Exchangers (21)
EXCHANGER 20  EF156        ESW CONTROL        ESW        Yes      Yes    RC PC IC  Control Panel    EF                            hot/dry PANEL                                          DHRCF          (20) 21  EFHV0024    ESW B/SERVICE    CB/CC      Yes      Yes    RC PC IC      MOV (8)        EF            X              mild/dry WATER CROSS                                    DHR CF CONNECT VALVE 22  EFHV0040    ESW TRAIN B TO SW CB/CC      Yes      Yes    RC PC IC      MOV (8)        EF            X              mild/dry CROSS CONNECT                                  DHR CF VALVE 23  EFHV0052    ESW B TO CCW HX B  AUX        Yes      Yes    RC PC IC      MOV (8)        EF DHRCF 24  EFHV0098    ESW PUMP B        ESW        Yes      Yes    RC PC IC    MOV (8)        EF                          hot/humid DISCHARGE AIR                                  DHR CF RELEASE VALVE 25  EFTE0062    ESW B TEMPT TO    CB/CC      Yes      Yes    RC PC IC  Temp. Sensor      EF                            mild/dry POWER BLOCK                                    DHRCF          (19) 26  EGHV0016    CCW TRAIN B        AUX        Yes      Yes      DHR        MOV (8)        EG              X            mild/dry RETURN ISO VALVE 27  EGHVO102    CCW TO RHR HX B    AUX        Yes      Yes      DHR        MOV (8)        EG                            mild/dry ISO 28  EGLT0002    CCW SURGE TK B    AUX        Yes      Yes      DHR    Inst. Racks (18)  EG                            mild/dry WCAP-17678-NP                                                                                                                                      November 2012 Revision 0
F-4 SWEL 1 (cont.)
Screen #4 Sample Considerations Screen #1          Screen #3 SWEL                                          (SC - I  Screen #2  (Safety                            Major new or                        IPEEE      Walkdown Item    Walkdown                            Licensing  (Screens Function    Equipment      System      replacement      Environment    vulnerability Deferred to Number    Equipment      Description  Building  Basis?)    In?)  Support)        Class      Type      equipment?        (Temp, *F)  enhancement?    Outage?
29  EGTE0032    CCW HX B OUTLET    AUX        Yes      Yes    RC DHR    Temp. Sensor      EG                            mild/dry TEMP                                                          (19) 30  EGTV0030    CCW HX B TEMP CV  AUX        Yes      Yes    RC DHR        POV (7)        EG                            mild/dry WAFER BTTFLY VLV 31  EJFCV0611    RHRPUMP1B          AUX        Yes      Yes      DHR        MOv (8)        EJ                            hot/dry MINIFLOW VALVE 32  EJFIS0611    RHR PMP PEJ0IB    AUX        Yes      Yes      DHR    Inst. Racks (18)  EJ                            mild/dry MINIFLOW CONTROL DISCHARGE 33  EJHV8809B    RHR TO ACCUM INJ  AUX        Yes      Yes      DHR        MOV (8)        EJ                            mild/dry LOOPS 3 & 4 ISO VLV 34  EKJ03B      INTERCOOLER        OGB        Yes      Yes    RC PC IC        Heat        KJ            X            hot/humid HEATEXCHANGER                                  DHRCF    Exchangers (21) 35  EKJ04B      LUBE OIL COOLER    DGB        Yes      Yes    RC PC IC        Heat        KJ            X            hot/humid DHR CF  Exchangers (2 1) 36  EKJ06B      DIESEL JACKET      DGB        Yes      Yes    RC PC IC        Heat        KJ            X            hot/humid WATER HEAT                                      DHR CF  Exchangers (2 )
EXCHANGER 37  EMFT0917B    CCP B TO BIT FLOW  AUX        Yes      Yes      RC IC  Inst. Racks (18)  EM                        mild/chemical TRANSMITTER                                      DHR 38  EMHV8814B    SI PUMP B RETURN  AUX        Yes      Yes      RCIC        MOV (8)        EM                            hot/dry TO RWST ISO                                      DHR VALVE 39  EMHV8923B    SAFETY INJECTION  AUX        Yes      Yes    IC DHR      MOV (8)        EM                            hot/dry PUMP B SUCT ISO VLV 40  EPHV8808B    ACCUMULATOR        RB        Yes      Yes      DHR        MOV (8)        EP                          hot/humid                      Yes TANK B OUTLET ISO VALVE 41  FC0219      LOCAL CONTROL      AUX        Yes      Yes    PC DHR    Control Panel    FC              X              hot/dry PANEL FOR TD AFW                                              (20)
PUMP WCAP- 17678-NP                                                                                                                                      November 2012 Revision 0
F-5 SWEL I (cont.)
Screen #4 Sample Considerations Screen #1          Screen #3 SWEL                                            (SC - I  Screen #2  (Safety                              Major new or                      IPEEE      Walkdown Item    Walkdown                              Licensing  (Screens Function    Equipment      System      replacement      Environment  vulnerability Deferred to Number  Equipment      Description    Building  Basis?)    In?)  Support)        Class      Type      equipment?        (Temp, IF) enhancement?    Outage?
42  FCHV0312    AUX FW PUMP          AUX        Yes      Yes    PC DHR        MOV (8)        FC                            hot/dry TURBINE MECH TRIP/THROT VLV 43  FEF02B      ESW SELF-CLEAN      ESW        Yes      Yes    RC PC IC      Other (0)      EF            X              hot/dry STRAIN. (MTR OP.-IN                              DHR CF MOV PROG.)
44  FKJ02C      KKJOI B AIR INTAKE  DGB        Yes      Yes    RC PC IC      Other (0)      KJ                          hot/humid FILTER                                          DHR CF 45  GKV0766    SGK04B WATER          CB        Yes      Yes    RC PC IC      MOV (8)      GK                            mild/dry REGULATING                                      DHR CF VALVE 46  GKV0768    SGK05B WATER          CB        Yes      Yes    RC PC IC    MOV (8)        GK                            cool/dry                  Yes REGULATING                                      DHR CF VALVE 47  GMHZ0019    DSL GEN RM EXH      DGB        Yes      Yes    RC PC IC    Other (0)      GM                            hot/humid DMPR B, GMDOO10                                  DHR CF 48  GMTE001 I  DIESEL GEN VENT      DGB        Yes      Yes    RC PC IC  Temp. Sensor    GM                            hot/humid SUPPLY FAN IB                                    DHR CF          (19) 49  GMTZO0I I B ACT FOR DG VENT      DGB        Yes      Yes    RC PC IC    Other (0)      GM                            hot/humid SUPPLY FAN                                      DHR CF DAMPER GMD0007 50  GNPT0934    CONTAINMENT          RB        Yes      Yes      CF    Inst. Racks (18)  GN                            mild/dry                  Yes ATMOSPHERE 51  GNVO002    CTMT COOLER B        RB        Yes      Yes      CF        POV (7)      GN              X            hot/humid                  Yes ESW OUTLET FLOW CONTROL VLV 52  GSHV0021    H2 PURGE OUTER      AUX        Yes      Yes      CF        MOV (8)        GS                            mild/dry CTMT ISO BUTT VLV 53  GTRE031    CTMT ATMOSHERE      AUX        Yes      Yes      CF    Inst. Racks (18)  GT                            mild/dry RADIATION MONITOR 54  HBHV7176    RCDT PUMPS DISCH      RB        Yes      Yes      CF        POV (7)        HB                                                      Yes HDR INSIDE CTMT ISO 55  JELT0021    EMER FUEL OIL        DGB        Yes      Yes    RC PC IC  Inst. Racks (18)  JE                          hot/humid DAY TK B LEV                                    DHR CF WCAP-17678-NP                                                                                                                                      November 2012 Revision 0
F-6 SWEL I (cont.)
Screen #1          Screen #3                        Screen #4 Sample Considerations SWEL                                            (SC - I  Screen #2  (Safety                              Major new or                      IPEEE      Walkdown Item    Walkdown                            Licensing  (Screens Function    Equipment      System      replacement      Environment  vulnerability Deferred to Number    Equipment      Description Building  Basis?)    In?)  Support)        Class      Type      equipment?        (Temp, 'F) enhancement?    Outage?
56  KAPCV0I03    TKA05 OUTLET      AUX        Yes      Yes      DHR        POV (7)        KA                            mild/dry PRESSURE CONTROL VALVE 57  KJ0122      GAUGE PANEL        DGB        Yes      Yes    RC PC IC  Control Panel    KJ                          hot/humid DHR CF        (20) 58  KKJ,01B      STANDBY DIESEL    DGB        Yes      Yes    RC PC IC  Eng. Gen. (17)    KJ                          hot/humid (GENERATOR)                                    DHR CF 59  LFFV0096    CTMT NOR SUMPS    AUX        Yes      Yes      CF        POV (7)        LF                            mild/dry TO FLR DRN TK OUTSIDE CTMT ISO 60  NB002        4.16 KV BUS #        CB      Yes      Yes    RC PC IC    Med. Volt      NB                            cool/dry                  Yes DHR CF      Swgr. (3) 61  NB00213      CTRL BLDG LC NG02    CB      Yes      Yes    RC PC IC    Med. Volt      NB                                                      Yes SWGR BRKR                                      DHR CF      Swgr. (3) 62  NE002        STANDBY #2        DGB        Yes      Yes    RC PC IC  Eng. Gen. (17)    NE                          hot/humid DHR CF 63  NF039B      CONT SHED/SEQ CH    CB      Yes      Yes    RC PC IC  Control Panel    NF                            cool/dry 4 LOGIC                                        DHR CF        (20) 64  NG002        480 VAC          CB/CC      Yes      Yes    RC PC IC  Low Volt Swgr. NG                            cool/dry      X          Yes DHR CF          (2) 65  NG00201      MAIN BREAKER        CB      Yes      Yes    RC PC IC  Low Volt Swgr. NG                            cool/dry                  Yes DHR CF          (2) 66  NG00206      NG02A FDR BRKR      CB      Yes      Yes    RC PC IC  Low Volt Swgr. NG                            cool/dry                  Yes DHR CF          (2) 67  NG002B      480 VAC MOTOR      AUX        Yes      Yes    RC PC IC    MCC (I)        NG                            mild/dry                  Yes CONTROL CENTER                                  DHR CF 68  NG004C      480 VAC            AUX        Yes      Yes    RC PC IC    MCC (1)        NG                            mild/dry                  Yes DHR CF 69  NG006E      480 VAC            ESW      Yes      Yes    RC PC IC    MCC (1)        NG                            hot/dry                  Yes DHR CF 70  NK004        125 VDC BUS      CB/CC      Yes      Yes    RC PC IC  Dist. Panel (14)  NK                            cool/dry                  Yes SWITCHBOARD                                    DHR CF 71  NK012        125-VDC NO.2 60-  CB/CC      Yes      Yes    RC PC IC    Battery Rack    NK                            cool/dry CELL BATTERY                                    DHR CF        (15)
WCAP- 17678-NP                                                                                                                                    November 2012 Revision 0
F-7 SWEL 1 (cont.)
Screen #1          Screen #3                      Screen #4 Sample Considerations SWEL                                            (SC - I  Screen #2  (Safety                            Major new or                    IPEEE        Walkdown Item  Walkdown                              Licensing (Screens  Function  Equipment      System    replacement      Environment  vulnerability Deferred to 0
Number  Equipment      Description - Building  Basis?)    In?)  Support)      Class        Type      equipment?        (Temp, F)  enhancement?    Outage?
72  NK014      125-VDC NO.4 60-    CB/CC      Yes      Yes    RC PC IC  Battery Rack    NK                            cool/dry CELL BATTERY                                      DHR CF        (15) 73  NK024      125 VDC NO 4        CB/CC      Yes      Yes    RC PC IC  Battery Chg      NK                            cool/dry                  Yes DHRCF          (16) 74  NK044      DIST 125 VDC        CB/CC      Yes      Yes    RC PC IC  Dist. Panel (14)  NK                            cool/dry                  Yes DHR CF 75  NK054      D1ST 125 VDC        CB/CC      Yes      Yes    RC PC IC  Dist. Panel (14)  NK                            cool/dry                  Yes DHR CF 76  NN014      7.5 KVA            CB/CC      Yes      Yes    RC PC IC  Battery Chg      NN                            cool/dry                  Yes DHRCF          (16) 77  PALO lB    AUX FEEDWATER        AUX        Yes      Yes    PC DHR    Horz. Pumps      AL                            hot/dry PUMP                                                              (5) 78  PAL02      AFW PUMP--          AUX        Yes      Yes    PC DHR    Horz. Pumps      AL                            hot/dry TURBINE DRIVEN                                                    (5) 79  PBG02B      BORIC ACID          AUX        Yes      Yes        RC    Horz. Pumps      BG            X            hot/dry TRANSFER PUMP                                                    (5)
MOTOR 80  PBG04      NORMAL              AUX        Yes      Yes      RC IC    Horz. Pumps      BG                            hot/dry CHARGING PUMP                                                    (5) 81  PBG05B      CENTRIFUGAL          AUX        Yes      Yes    RC PC IC  Horz.*Pumps      BG                            hot/dry CHARGING PUMP                                      DHR          (5) 82  PEGOIB      COMPONENT COOL.      AUX        Yes      Yes    RC PC IC  Horz. Pumps      EG                          mild/dry WATER PUMP                                        DHR CF          (5) 83  PEJO0B      RESIDUAL HEAT        AUX        Yes      Yes    IC DHR  Vert. Pump (6)    EJ            X            hot/dry REMOVAL PUMP 84  PENOIB      Containment Spray    AUX        Yes      Yes        CF    Vert. Pump (6)    EN                          hot/dry Pump B 85  PKJ03B      AUXILIARY LUBE-      DG        Yes      Yes    RC PC IC  Horz. Pumps      KJ            X            hot/humid OIL (KEEP-WARM)                                  DHR CF          (5)
PUMP FOR KKJOIB 86  RL017      ESF MCB              CB        Yes      Yes    RC PC IC  Control Panel    RL                          cool/dry DHR CF        (20) 87  RL020      ESF MCB              CB        Yes      Yes    RC PC IC  Control Panel    RL                          cool/dry DHRCF          (20)
WCAP-17678-NP                                                                                                                                      November 2012 Revision 0
F-8 SWEL 1 (cont.)
Screen #1          Screen #3                    Screen #4 Sample Considerations SWEL                                            (SC - I Screen #2  (Safety                          Major new or                    IPEEE      Walkdown Item    Walkdown                            Licensing  (Screens  Function  Equipment    System      replacement      Environment  vulnerability Deferred to 0
Number    Equipment      Description  Building  Basis?)    In?)    Support)    Class      Type      equipment?        (Temp, F)  enhancement?    Outage?
88  RL021        REACTOR            CB        Yes      Yes    RC PC IC  Control Panel  RL                          cool/dry AUXILIARIES PANEL                              DHR CF      (20) 89  RPOSIA/B    SUBCOOLING          CB        Yes      Yes        DHR  Control Panel  RP                          cool/dry MONITORING                                                  (20)
CABINET 90  RP290        DC DISTRIBUTION    AUX        Yes      Yes    RC PC IC  Control Panel  RP                          mild/dry DHR CF      (20) 91  SA036E      ESFAS CH4 LOGIC  CB/CC        Yes      Yes    RC PC IC  Control Panel  SA                          cool/dry CABINET                                        DHRCF        (20) 92  SBO32C      W SS PROT SYS OUT CB/CC        Yes      Yes    RC PC IC  Control Panel  SB                          cool/dry I TRN                                          DHRCF        (20) 93  SB032D      W SS PROT SYS OUT CB/CC        Yes      Yes    RC PC IC  Control Panel  SB                            cool/dry 2 TRN                                          DHRCF        (20) 94  SB041        W PROCESS        CB/CC        Yes      Yes    RC PC IC  Control Panel  SB                            cool/dry ANALOG                                          DHR CF      (20)
PROTECTION SET CAB-04 95  SB079        RPV LEVEL INSTR    CD        Yes      Yes        IC  Control Panel  SB                            cool/dry SYS PROC PROT SYS                                            (20) 96  SE032        SOURCE RANGE      AUX        Yes      Yes        RC    Control Panel  SE                          mild/dry                    Yes CHANNEL 2 PREAMP                                            (20) 97  SE054B      W NUC INSTM NIS 2 CB/CC        Yes      Yes        RC  Control Panel  SE                            cool/dry                  Yes (20) 98  SENY061A    EXCORE NEUTRON    AUX        Yes      Yes        RC  Control Panel  SE                            mild/dry                  Yes DETECTOR                                                    (20)
AMPLIFIER 99  SGK04B      CONTROL ROOM      AUX        Yes      Yes    RC PC IC  AHU (10)      GK            X              mild/dry        X A/C UNITS                                      DHR CF 100 SGK05B      CLASS IE ELEC. CB/CC        Yes      Yes    RC PC IC  AHU (10)      GK            X              cool/dry        X          Yes EQUIP. A/C UNIT                                DHR CF 101  SGL09B      ROOM COOLER FOR    AUX        Yes      Yes      RC IC    AHU (10)      GL                            hot/dry PEMOIB                                            DHR 102  SGLlOB      RHR PUMP ROOM      AUX        Yes      Yes      IC DHR  AHU (10)      GL                            hot/dry COOLER WCAP- 17678-NP                                                                                                                                November 2012 Revision 0
F-9 SWEL I (cont.)
Screen #4 Sample Considerations Screen #1            Screen #3 SWEL                                                    (SC - I    Screen #2  (Safety                          Major new or                    IPEEE      Walkdown Item    Walkdown                                      Licensing  (Screens  Function    Equipment    System    replacement    Environment  vulnerability Deferred to 0
Number    Equipment            Description    Building  Basis?)      In?)  Support)      Class      Type      equipment?        (Temp, F) enhancement?    Outage?
103  SGL15B          PENETRATION            AUX        Ycs        Yes        CF      AHU (10)      GL                          mild/dry ROOM COOLER 104  TEGOIB          CCW SURGE TANK B      AUX        Yes        Yes    RC PC IC    Tank(21)      EG                          mild/dry DHR CF 105  TJE02B          EMERGENCY FUEL        DGI3        Yes        Yes    RC PC IC    Tank (21)      JE                        hot/humid OIL DAY TANK                                          DHR CF 106  TKA04            AFW CTRL/MAIN          AUX        Yes        Yes    PC DHR      Tank (21)      KA                          mild/dry STEAM ARV ACCUM 107  TKJOIB          D/G B JACKET          DGB        Yes        Yes    RC PC IC    Tank (21)      KJ                        hot/humid WATER EXPANSION                                        DHR CF TANK 108  TKJ02C          START AIR TANK        DGB        Yes        Yes    RC PC IC    Tank (21)      KJ                        hot/humid D/G                                                    DHR CF 109  TKJ04B          D/G B AUX LUBE        DGB        Yes        Yes    RC PC IC    Tank (21)      KJ                        hot/humid OIL TANK                                              DHR CF 110  XNG02            CLASS I E LOAD        CB/CC        Yes        Yes    RC PC IC  Transformer (4)  NG                          cool/dry                  Yes CENTER                                                DHR CF TRANSFORMER 1H1  XNG06            FEEDS MCC NG06E        ESW        Yes        Yes    IC DHR  Transformer (4)  NG                            hot/dry                  Yes 112  XPN08B            120 V INSTRUMENT    CB/CC        Yes        Yes    IC DHR  Transformer (4)  PN                          cool/dry AC TRANSFORMER Note:
The Walkdown Deferred to Outage column was populated at the time of the SWEL development site visit on August 27-28, 2012, and was later modified depending on component accessibility during the at-power walkdowns in September, 2012.
WCAP-17678-NP                                                                                                                                              November 2012 Revision 0
G-1 APPENDIX G WOLF CREEK COMPOSITE SWEL TRANSMITTAL WCAP-17678-NP                                      November 2012 Revision 0
G-2 O        Westinghouse Seismic Walkdown Equipment List, Revision 0 In Response to NTTF Recommendation 2.3:
Seismic Wolf Creek Generating Station DAVID BERSIE.
Equipment Selection Personny1 Lead                                  date DEREK SEAMAN                                &#xfd;        '&#xfd;                            .
Equipment Selection Personihel                                      date ERIC CARLSON                              (      c'        7 9/612012 Station Operations                                                  date Wolf Creek Seismic Walkdown Equipment List September 7, 2012              Page 1 WCAP-17678-NP                                                                              November 2012 Revision 0
G-3 Seismic Walkdown Equipment List, Rev. 0                        Attachment to LTR-RAM-1l-12-083 NT'TF Recommendation 2.3: Seismic Walkdown                        Wolf Creek Generating Station Seismic Walkdown Equipment List (SWEL)
A listing of structures, systems, and components (SSCs) that will be viewed during the walkdown, the Seismic Walkdown Equipment List (SWEL), has been prepared in advance of the walkdown effort.
The selection of SSCs process described in EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012 {Reference 1}, was utilized to develop the SWEL for Wolf Creek.
The SWEL is comprised of two groups of items:
                *. SWEL 1 (Attachment 1) is a sample of items to safely shut down the reactor and maintain containment integrity.
                *. SWEL 2 (Attachment 2) is a list of spent fuel pool related items. Note that no rapid drain down items have been identified for Wolf Creek Generating Station, however, it is recommended that an area walk-by of the spent fuel building instrument air be conducted to ensure gate seal integrity.
Wolf Creek Operations and Engineering Staff Members participated in the selection of SSCs compiling the SWEL and provided direct input to the Equipment Selection Personnel during the SWEL development process. This input included:
                " Confirmation of the equipment information retrieved from the Wolf Creek Seismic Category I documentation.
* Discussions with the Equipment Selection Personnel to identify upgrades, modifications, and replacements of equipment which might be pertinent to the selection of the SWEL.
                " Input into the selection of the SWEL using operational experience relevant to equipment classifications, safety function support, and environmental considerations.
                " Approval of the components selected for the SWEL.
The process detailed in Reference 1 for the Selection of SSCs to produce the SWEL was discussed with the Wolf Creek Operations and Engineering Staff Members during the site visit August 2 7 th through 28 nd, 2012. The details describing the process for Selection of SSCs to produce the SWEL will be provided in the "Selection of SSCs" section of the Submittal Report.
Wolf Creek Seismic Walkdown Equipment List    September 7, 2012                          Page 2 WCAP- 17678-NP                                                                                          November 2012 Revision 0
G4 Seismic Walkdown Equipment List, Rev. 0                      Attachment to LTR-RAM-II-12-083 NTTF Recommendation 2.3: Seismic Walkdown                      Wolf Creek Generating Station References
: 1) EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012.
Attachments
: 1) Seismic Walkdown Equipment List 1
: 2) Seismic Walkdown Equipment List 2 Wolf Creek Seismic Walkdown Equipment List September 7, 2012                          Page 3 WCAP-17678-NP                                                                                        November 2012 Revision 0
G-5 SeismiC Walkdown Equipenent List, Rev. 0                                                                                                                                        Attachment to LTR-RAM-I-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                      Attachment 1 - SWEL I                                                                  Wolf Creek Generating Station Screen  Screen  Screen                              #4 Sample Considerations Screen______Walkdown SWEL      Walkdown                                                              2                                        Major new                                Deferred Item    Equipment                  Description          Building  (SC- 1  (Screens  (Safety  Equipment      System        or        Environment    IPEEE                        Comments Number                                                              Ucensing  In?)  Function      Class      Type    replacement    (remp,&deg;F)  vulnerability Ot Basis?)          support)                          equipment?                enhancement?
I    ABHVOO14    LOOP-1 MAINSTEAMISOLATIONVALVE        AUX      Yes      Yes    PC DHR      POV (7)      AB            x          hot/dry 2    ABPTO002    STM GEN BSTEAMUNE PRESSURE<TIME        AUX      Yes      Yes    PCODHR    InstURacks      AB                      mild/dry CRITICAL  ACTIONEQUIPMENT>                                                    (28}
3    ASPVO02    SGBATMOSPHERIC REUEFVLV                AUX      Yes      Yes    PC OHR      POV (7)      AB                        hot/dry 4    AEFVOO39    EBROLAFEEDWATER        ISOLATIONVALVE  AUX        Yes      Yes    PCDHR      POV (7)      AE            a          hot/dry Inst Racks S    AELTOS02    STM GEN BWIDE RANGE                    RB        Yes      Yes    PCOHR                    AE                      hot/humid                    Yes Inst Racks S    AELT0519    STMGEN LEVELA NARROW RANGE              RB        Yes      Yes    PCDHR                    AE                      hot/humid                    Yes (18)
ESW TO MOAFW PUMP B56STEL VLV 7    ALHV0030      WTUMIJQ                              AUX        Yes      Yes    PCOHR      VALVE  (8)    AL Ins. Racks 8    B.1S1321    RVSUBCODOUNG      MONITORTRN B        AUX        Yes      Yes      RC                      SB                      mild/dry Inst. Racks 9    BOPT0456    PRESSURIZER    PRESSURE                RB        Yes      Yes      PC          (18)        SB                                                  Yes CENTRIFUGAL    CHG PMP FLOW CONTROL 10    BGFCV012L  <CAT2 AOV PROGRAM VALVE><TIME          AUX        Yes      Yes    RCPCIC      POV (7)      BG                        hot/dry CRITICAL  ACTIONEQUIPMENT>
11CHARGING                      PUMPSTOREGENHX/CTMT      AUX        Yes      Yes    PCICCF    MOV(8)        BG                      mild/dry ISO LETDOWN SYSTEM CONTAINMENT ISO 12    BGHV8152                                          AUX        Yes      Yes    ICCF      POV (7)      BG                      mild/dry VLV REACTOR MAI WATER CONTAINMENT 13    BMHVSO47                                          AUX        Yes      Yes    ICCF      POV (7)      8L                      mild/dry ISO Wolf Creek Seismic Walkdown Equipment Ust      September7, 2012                                                                                                                                            Page 4 WCAP-17678-NP                                                                                                                                                                                November 2012 Revision 0
G-6 Seismic Walkdown Equipment List, Rev. 0                                                                                                                                          Attachment to LTR-RAM-1I.12-083 NTrFRecommendation 2.3: Seismic Walkdowm                                                      Attachment I -SWEL I                                                                  Wolf Creek Generating Station Sceree    c        Screen                      Screen R4 Sample Considerations Screen                                                                                Walkdown SWEL                                                                #1                  63                                                                        Wldw Waldown                                                      1                  32                            Major new                                Deferred Item      WakonDsrpinBidn Equipment                                                S          2      (safety escpion                            -1  (Screens              Equipment    System        or      Environment                                    Cmet Comments Number                                                            Licensing  In?)    Function Support)      Ca Clss    Typ      replacement    (Temp, "F)  e vulnerability hne    et      to uae Basis?)
BSequipment?                enhancement?
14    BMHVO002    SG B BLOWDOWN AFAS ISO                AUX    Yes      Yes      PC IC CF    POV (7)      BM                      hot/dry 15    BNHVOOO3    RWST SUPPLY TO CTMT SPRAY PUMP B      AUX    Yes      Yes        CF        MOV (B)      BN                      hot/dry RC IC    Inst. Racks 16    BNLTO931    RWST LEVEL TRANSMITTER (2)            YRD    Yes      Yes                                BN                    hot/humid DHR          (18)
RC IC 17    RNVOO11    RWST OUTLET ISO VALVE                  AUX    Yes      Yes        DHR            (8)      BN RC PC IC 18    CGMOB      DIESELGENERATOR BLDG SUPPLY FAN        DGB    Yes      Yes                  Fans (9)    GM                    hot/humid DHR Heat COMPONENTCOOL WATER HEAT                                        RC PC IC 19    EEG01B      EXCHANGER                              AUX    Yes      Yes        DHR      Exchangers    EG                      mild/dry (21)
RC PC IC      Control 20    EF156      ESW CONTROL PANEL                      ESW    Yes      Yes      DHR CF      Panel (20)    EF                      hot/dry 21    EFHVO0G24  ESW B/SERVICE WATER CROSS CONNECT VLECR/CC                                      Yes      YesMO(8 RC PC IC                    EFml/y VALVE                                                            DHRCF            V ESW TRAIN B TO SW CROSS CONNECT                                PC PC IC 22    EFHV0040                                          CB/CC    Yes      Yes                  MOV (8)      EF          X        mild/dry VALVE                                                            DHR CF RCPCIC 23    EFHVOO52    ESW B TO CCW HX B                      AUX    Yes      Yes        RCI DHR  CF    MOV MOg)  (8)    EF E
ESW PUMP B DISCHARGE AIR RELEASE                                RC PC IC 24    EFHVD098                                          ESW    Yes      Yes                  MOV (8)      EF                    hot/humid VALVE                                                            DHRCF RC PC IC      Temp.
25    EFTE0062    ESW B TEMPT TO POWER BLOCK            CB/CC    Yes      Yes                                EF                    mild/dry DHR CF    Sensor (19) 26    EGHVOO16    CCW TRAIN B RETURN ISO VALVE          AUX    Yes      Yes        DHR        MOV (8)      EG            X        mild/dry Wolf Creek Seismic Walkdown Equipment List    September 7, 2012                                                                                                                                            Page 5 WCAP- 17678-NP                                                                                                                                                                                  November 2012 Revision 0
G-7 Seismic Walkdown Equipment List,Rev. 0                                                                                                                                                Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                      Attachment 1 - SWEL 1                                                                      Wolf Creek Generating Station Screen            Screen                        Screen #4 Sample Considerations SWLScreen                                                                                                                                        Walkdown Walkdown                                                            #2        #3                              Major new                                  Deferred Item      Equipment                  Description          Building  (SC- 1  (Screens  (Safety    Equipment System            or      Environment                      toEComments NumberEquipment                                  ~~~Licensing In?)
Function Class setSsm Type or replacement Evon (Temp, *F) nt  ulraity vulnerability    t o
Basis?)          Support)                            equipment?                  enhancement?    Outage?
27    EGHV0102    CCW TO RHRHX BISO                    AUX        Yes    Yes      DHR        MOV(8)        EG                    mild/dry Inst. Racks 28    EGLTO002    CCW SURGE TKB                        AUX        Yes    Yes      DHR                      EG                    mild/dry (18)
Temp.
29    EGTEO032    CCW HXB OUTLETTEMP                    AUX        Yes    Yes    RCDHR                      EG                    mild/dry Sensor (19) 30    EGTVO030    CCW HXR TEMP CV WAFER BTTFLY    VLV  AUX        Yes    Yes    RCDHR        POV(7)        EG                    mild/dry 31    EJFCV0611  RHRPUMP B MINIFLOW VALVE              AUX        Yes    Yes      DHR        MOV)8)        El                      hot/dry RHRPMP PEJO1B MINIFLOW CONTROL Inst. Racks 32    EJFIS0611  DISCHARGE    <TIME CRITICAL ACTION    AUX        Yes    Yes      DHR                      EJ                    mild/dry EQUIPMENT>                                                                      (18) 33    EJHV8809B  RHRTO ACCUM INJ LOOPS3&4 ISOVLV      AUX        Yes    Yes      DHR        MOV (8)        El                    mild/dry RC PC IC        Heat 34    EKJ03B      INTERCOOLER    HEATEXCHANGER          DGB        Yes    Yes                Exchangers      KJ          X        hot/humid DHRCF      E (21) ro Heat RCPC IC 35    EKJO4B      LUBEOILCOOLER                        DGB        Yes    Yes    DHRCF Exchangers Ecagr KJ          X        hot/humid o/ui (21)
Heat IC RCPC 36    EK06B        DIESELJACKETWATER HEATEXCHANGER DGB            Yes    Yes                Exchangers        KJ          X        hotthumid DHR CF    Ecagr                                    o/ui 121)
RC IC    Inst. Racks 37    EMFTO917B  CCP BTO BIT FLOWTRANSMITTER          AUX        Yes    Yes                                EM                  mild/chemical DHR          (18)
BC IC 38    EMHV8814B  SI PUMP B RETURNTO RWST ISOVALVE      AUX        Yes    Yes                  MOV(g)        EM                      hot/dry DHR 39    EMHV8923B  SAFETYINJECTIONPUMP B SUCTISO VLV    AUX        Yes    Yes      ICDHR      MOV (8)        EM                      hot/dry Wolf Creek Seismic Walkdown Equipment List    September7, 2012                                                                                                                                                  Page 6 WCAP- 17678-NP                                                                                                                                                                                      November 2012 Revision 0
G-8 Seismic Walkdown Equipment List,Rev. 0                                                                                                                                              Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                        Attachment 1 - SWEL1                                                                    Wolf Creek Generating Station Screen                Screen                  Screen #4 Sample Considerations Screen                                                                              Walkdown SWEL                                                                  l~l                  l#3 Walkdown                                                      1      12                                      Major new                                Deferred Item    Equipment                Description          Building  (SC -1  (Screens    (Safety  Equipment  System        or      Environment    lEEE rComments Number                                                              Licensing          ln?(
Suppry)
Function      Class    Type    replacement    (Temp, &deg;F)  nacmnt vulnerability    uae ta Basis?)            Support)                        equipment?                enhancement?
ACCUMULATOR TANK B OUTLET ISO 40    EPHV8808B  VALVE <TIME CRITICALACTION              RB      Yes      Yes        DHR      MOV (8)    EP                    hot/humid                      Yes EQUIPMENT>
LOCALCO NTROL PANEL FDORTDAFW                                                  Control 41    FC0219                                            AUX      Yes      Yes      PC DHR                  PC          X          hot/dry PUMP                                                                          Panel (20)
AUX PW PUMPTURBINE MECH 42    FCHV0312    TRFPUTR      VLV T                        AUX        Yes      Yes      PC DHR      MOV (8)    FC                      hot/dry                            High attention level item TRIP/THROT  VLV 43    PEP02B      ESW SELF-CLEANSTRAIN. (MTR OP.-IN                Yes      Yes      BC PC IC R
MOV PROG.)                                                          DHR CF BC PC IC 44    FKJ02C      KKJOSBAIR INTAKE FILTER                DGB      Yes      Yes                Other (5)    KJ                  hot/humid DHR CP BC PC IC 45    GKV0766      SGK04B WATER REGULATING VALVE          CB        Yes      Yes                  MOV (8)    GK                      mild/dry DHRCF BC PC IC 46    GKV0768      SGK05BWATER REGULATING VALVE          CB        Yes      Yes                  MOV (8)    GK                      coo/dry                      Yes DHRCF BC PC IC 47    GMHZO019    DSLGEN RM EXH DMPR B, GMDO010          DGB      Yes      Yes                  Other(0)    GM                    hot/humid DHRCF BC PC IC    Temp.
48    GMTEO011    DIESELGEN VENT SUPPLY FAN 1B          DGB      Yes      Yes                              GM                    hot/humid DHRCF    Sensor (19) 49    GMTZD001B    ACT FOR DG VENT SUPPLY FAN DAMPER      DGB      Yes      Yes      RC PC IC  Ohr()        G                      o/ui GMDO007                                                            DHRCF Inst. Racks SD    GNPT0934    CONTAINMENT ATMOSPHERE                  RB      Yes      Yes        CF                  GN                      mild/dry                    Yes (18)
CTMT CODLER B tOW3OUTLET FLOW 51    GNVO002                                              RB      Yes      Yes          CF      POV (7)    GN          X        hot/humid                      Yes CONTROL VLV 52    GSHV0021    H2 PURGE OUTER CTMT ISO BUTT VLV      AUX        Yes      Yes        CF      MOV (8)    GS                      mild/dry Wolf Creek Seismic Walkdown Equipment List  September 7, 2012                                                                                                                                                  Page 7 WCAP- 17678-NP                                                                                                                                                                                      November 2012 Revision 0
G-9 Seismic Walkdown Equipment List, Rev. 0                                                                                                                                        Attachment to LTR-RAM-II-12-083 NT-F Recommendation 2.3: Seismic Walkdown                                                    Attachment 1 - SWEL1                                                                  Wolf Creek Generating Station Screen            Screen                      Screen 84 Sample Considerations Screen      43Walkdown SWEL                SE                                              #11                83 Walkdown                                                            P2                                        Major new                                Deferred Item    Equipment                Description            Building [SC - 1 (Screens  (Safety    Equipment    System        or      Environment                    to NubeULcensing                                                      Functionvunrblt Iasing in?)                    Class    Type    replacement    (Temp, F)    vulnerability Basis?          Support)                            equipment?                enhancement?  Outage?
53    GTRE031      CTMT ATMOSHERE RADIATION              AUX    Yes      Yes        CFGT      Inst. Racks                          mild/dry MONITOR                                                                        (18)
RCDT PUMPS DISCH HDR INSIDE CTMT 54    HBHV7176      ISO                                    RB    Yes      Yes        CF          POV (7)    HB                                                Yes 55    JELTOO21      EMER FUELOILDAYTTK B LEVuTIME        DoG    Yes      Yes    RC PC IC      Inst. Racks  JE                    hot/humid CRITICAL ACTION EQUIPMENT>                                      DHRCE            (18)
TKAOS OUTLET PRESSURE CONTROL 56    KAPCVO013    VALVE                                  AUX    Yes      Yes      DHR          POV (7)    KA                    mild/dry RC PC IC        Control 57    KJO122      GAUGE PANEL                            DGB    Yes      Yes                                KJ                  hot/humid DHRCF        Panel (20)
RC PC IC      Eng. Gen.
58    KKIJO1B      STANDBY DIESEL (GENERATOR)            DGB    Yes      Yes                                KJ                  hot/humid DNRCF            (17)
CTMT NOR SUMPS TO FLR DRN TK 59    LFFVO096                                            AUX    Yes      Yes        CF          POV (7)    LF                    mild/dry OUTSIDE CTMT ISO 60    NBO02        4.16 KV BUS #2 <TIME CRITICALACTION    CR    Yes      Yes    RC PC IC      Med. Volt    NB                    cool/dry                    Yes EQUIPMENT>                                                    DHR CF        Swgr. (3)
RC PC IC      Med. Volt 61    NB00213      CTRL BLDG LC NG02 SWGR BRKR            CB    Yes      Yes                                NB                                                Yes DHR CF        Swgr. (3)
RC PC IC      Eng. Gen.
62    NEO02        STANDBY #f2                            DGB    Yes      Yes                              NE                    hot/humid DHR CF            (17)
RC PCIC        Control 63    NFO39B      CONT SHED/SEQ CH 4 LOGIC                CB    Yes      Yes                                NF                    cool/dry DHRCF        Panel (20)
RC PCIC        Low Volt 64    NGO02        480 VAC                              CB/CC    Yes      Yes                              NG                    cool/dry          X        Yes DHRCF        Swgr. (2)
RC PC IC        Low Volt 65    NG00201      MAIN BREAKER                          CB      Yes    Yes                                NG                    cool/dry                    Yes DHRCF        Swgr. (2)
Wolf Creek Seismic Walkdown Equipment List    September 7, 2012                                                                                                                                          Page8 WCAP-17678-NP                                                                                                                                                                                November 2012 Revision 0
G- 10 Seismic Walkdown Equipment Ust, Rev. 0                                                                                                                                    Attachment to LTR-RAM-ll-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                Attachment I - SWEL 1                                                                Wolf Creek Generating Station Scrcree    r      Screen                      Screen 44 Sample Considerations SWI                                            1    Screen      13Walkdown Item      Walkdown                                                  1    #2                                        Major new                    IPEEE    Deferred          Comments Equipment                                                    (Screens  (Sty        Equipment    System        or      Environment                    to NumerLicensing                                Basis?)  In?)  Functionvunrbit Fuppon          Class    Type    replacement  (Temp, 'F)  vulnerability Support)                          equipment?                enhancement?  Outage?
66    NG00206      NG02A FDR BRKR <TIME CRITICAL        CE  Yes      Yes    RC PC IC      Low Volt    NG                    cobol/dry                  Yes ACTION EQUIPMENT>                                          DHRCF        Swgr. (2)
RC PC IC 67      NG002B      480 VAC MOTOR CONTROL CENTER          AUX  Yes      Yes    DHRCF          MCC (1)
MCS        NG Oml/r                mild/dry                    Yes RC PC IC 68      NGO04C      480 VAC                              AUX  Yes      Yes    R              MCC (1)    NG                    mild/dry                    Yes DHRCF RC PC IC 69      NGOO6E      480 VAC                              ESW  Yes      Yes                    MCC  (1)    NG                    hot/dry                    Yes DHRCF          MC()        Nho/r SC PC IC    Dist. Panel 70      NKO04        125 VDC BUS SWITCHBOARD            CB/CC  Yes      Yes    DHRCF          (14)      NK                    cool/dry                    Yes RC PC IC        Buttery 71      NK012        125-VDC NO.2 60-CELL BATTERY        CB/CC  Yes      Yes                                NK                    cool/dry OHRCF        Rack (15)
RC PC IC        Battery 72      NK014        125-VDC NO.4 60-CELL BATTERY        CB/CC  Yes      Yes                                NK                    cool/dry DHRCF        Rack (15)
RC PC IC    Buttery Chg 73      NK024        125 VDC NO 4                        CB/CC  Yes      Yes                                NK                    cool/dry                    Yes DHRCF          (16)
SC PC IC      Dist. Panel 74      NK044        DIST 125 VDC                        CB/CC  Yes    Yes                                NK                    cool/dry                    Yes DHRCF          (14)
RC PC IC    Dist; Panel 75      NK054        DIST 125 VDC                        CB/CC  Yes    Yes                                NK                    cool/dry                    Yes DHRCF          (14)
RC PCIC      Battery Chg 76      NNO14        7.5 KVA                            CB/CC  Yes    Yes                                NN                    cool/dry                    Yes DHRCF          (16)
Horz.
77      PALOIB      AUX FEEDWATER PUMP                  AUX    Yes    Yes    PC DHR                    AL                    hot/dry Pumps (5)
Horz.
78      PAL02        AFW PUMP-TURBINE DRIVEN              AUX    Yes    Yes    PC DHR                    AL                    hot/dry Pumps (5)
Wolf Creek Seismic Walkdown Equipment Ust    September 7, 2012                                                                                                                                      Page 9 WCAP- 17678-NP                                                                                                                                                                            November 2012 Revision 0
G-11 Seismic Walkdown Equipment List,Rev. 0                                                                                                                                        Attachment to LTR-RAM-lI-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                    Attachment 1 - SWEL 1                                                                Wolf Creek Generating Station Screen              Screen                    Screen #4 Sample Considerations SWEL                                                                        Screen                                                                              Walkdown Rit                R3 Walkdown                                                            #2                                      Major new                                Deferred Item      Equipment                Description          Building (SC - 1  (Screens  (Safety  Equipment    System        or      Environment                      to            Comments Number                                                              acensing  In?)  Function      Class      Type    replacement    (Temp,  'F)  vulnerability Outage?
Basis?            Support)                          equipment?                enhancement?
Honz.
79    PBG02B      BORIC ACID TRANSFER PUMP MOTOR        AUX    Yes        Yes        RC                    BG          X          hot/dry Pumps (5)
Ho11.
80    PBG04      NORMAL CHARGING PUMP                  AUX    Yes        Yes      RC IC                  BG                      hot/dry Pumps (5)
RC PC IC      Horz.
81    PBG05B      CENTRIFUGAL CHARGING PUMP            AUX    Yes        Yes                              BG                      hot/dry DHR    Pumps (5)
RC PC IC      Hor.
82    PEGO1B      COMPONENT COOL. WATER PUMP            AUX    Yes        Yes                              EG                    mild/dry DHR CF    Pumps (5)
Vert. Pump 83    PEJO1B      RESIDUAL HEAT REMOVAL PUMP            AUX    Yes        Yes    IC DHR                  EJ          u          hot/dry (6)
Vert. Pump 84    PENO1B      Containment Spray Pump B              AUX    Yes        Yes        CF                    EN                      hot/dry (B) 85    PKJO3B      AUXILIARY LUBE-OIL (KEEP-WARM)        DO    Yes        Yes    RC PC IC      Horz.      It]                  hot/humid PUMP FOR KKJO1B                                                  DHRCF    Pumps (5)
RC PC IC    Control 86    RL017      ESF MCB                                CB    Yes        Yes                              RL                    cool/dry DHRCF    Panel (20)
BC PC IC    Control 87    RL020      ESF MCB                                CB    Yes        Yes                              RL                    cool/dry DHRCF    Panel (20)
BC PC IC    Control 88    RL021      REACTOR AUXILIARIES PANEL              CB    Yes        Yes                              RL                    cool/dry DHR CF    Panel (20)
Control 89    RPO81A/B    SUBCOOLING MONITORING CABINET          CB    Yes        Yes      DHR                    RP                    cool/dry Panel (20)
BC PC IC    Control 90    RP290        DC DISTRIBUTION                      AUX    Yes        Yes                              RP                    mild/dry DHRCF    Panel (20)
RC PC IC    Control 91    SA036E      ESFASCH4 LOGIC CABINET              CB/CC    Yes        Yes                              SA                    cool/dry DHRCF    Panel (20)
Wolf Creek Seismic Walkdown Equipment List  September 7, 2012                                                                                                                                          Page 10 WCAP- 17678-NP                                                                                                                                                                              November 2012 Revision 0
G-12 Seismic Walkdown Equipment Ust, Rev. 0                                                                                                                                          Attachment to LTR-RAM-I1-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                      Attachment I - SWEL 1                                                              Wolf Creek Generating Station Scrcree    r    Screen                    Screen #4 Sample Considerations SEN1                                                        Screen    #3Walkdown e      Walkdown                                                                #2                                    Major new                                Deferred Nmer      Equipment                Description              Building  (  -            (Safet    Equipment    System        or      Environment                                  Coment Number                                                                Licensing  In?) Function      Class      Type    replacement    (Temp, 'F)  vulnerability    ta Basis?)        Support)                        equipment?                enhancement?  Outage?
RC PC IC    Control 92    SB032C      W SS PROT SYSOUT 1 TRN                  CB/CC      Yes      Yes  RS                                              cool/dry DHRCF      Panel (20)
RC PC IC    Control 93    SB032D      W SS PROT SYSOUT 2 TRN                  CB/CC      Yes      Yes                            SB                    cool/dry DHRCF      Panel (20) 94    SB041    ~  WB4CB/CC PROCESS ANALOGPROTECTION      SET                Yes      Yes  RCPC IC      Control      SB                    cool/dry CAB-04                                                            DHRCF      Panel (20)
Control 95    SB079        RPVLEVELINSTRSYSPROCPROTSYS              CB        Yes      Yes    IC                    SB                    cool/dry Panel (20)
Control 96      5E032      SOURCE RANGECCHANNEL      2 PREAMP        AUX      Yes      Yes    RC                    SE                    mild/dry                    Yes Panel (20)
Control 97    SE0S4B      W NUC INSTM NIS2                        CB/CC      Yes      Yes    RC                    SE                    cool/dry                    Yes Panel (20)
Control 98    SENYO61A    EXCORENEUTRON DETECTOR        AMPLIFIER  AUX      Yes      Yes    RC                    SE                    mild/dry                    Yes Panel (20)
RC PC IC 99    SGKO4B      CONTROL ROOM A/C UNITS                    AUX      Yes      Yes              AHU(10)      GK          X        mild/dry        X DHRCF RC PC IC 100    SGKO5B      CLASSIE ELEC.EQUIP. A/C UNIT            CB/CC      Yes      Yes              AHU(10)      GK          X        cool/dry        X          Yes DHRCF 101    SGLO98      ROOM COOLERFOR PEMO1B                    AUX      Yes    Yes              AHU(10)      GL                      hot/dry OHR 102    SGLOB        RHRPUMP ROOM COOLER                      AUX      Yes      Yes  ICDHR      AHU(10)      GIL                    hot/dry 103    SGL158      PENETRATION  ROOM COOLER                  AUX      Yes      Yes    CF      AHU(10)      GL                    mild/dry RC PC IC 104    TEGOIB      CCW SURGE TANKB                          AUX      Yes    Yes              Tank (21)    EG                    mid/dry DHRCF Wolf Creek Seismic Walkdown Equipment List  September 7, 2012                                                                                                                                          Page 11 WCAP- I 7678-NP                                                                                                                                                                                November 2012 Revision 0
G- 13 Seismic Walkdown Equipment Ust, Rev. 0                                                                                                                                                          Attachment to LTR-RAM-lI-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                                Attachment I - SWEL 1                                                                      Wolf Creek Generating Station Screen    Screen    Screen                      Screen #4 Sample Considerations                Walkdown SWEL      Walkdown                                                                    #2        H3                              Major new                                  Deferred Item      Equipment                      Description          Building  (SC - 1  (Screens    (Safety    Equipment    System        or        Environment      IPEEE          toComments Number                                                                    Licensing    In?)    Function      Class      Type    replacement    (Temp,  *F)  vulnerability    to Basis?)            Support)                          equipment?                  enhancement?    Outage?
RC PC IC 105    TJE02B          EMERGENCY FUEL OIL DAY TANK              DGB      Yes      Yes                  Tk DHR CF    rn      2) )o  J                      o/ui u 106    TKA04            AFW CTRL/MAIN STEAM ARV ACCUM            AUX      Yes      Yes      PC DHR      Tank (21)      KA                      mild/dry RC PC IC 107    TKJO1B          D/G BJACKET WATER EXPANSION TANK        DGB      Yes      Yes                  Tank (21)                            hot/humid DHR CF    T RC PC IC 108      TKJ02C          START AIR TANK D/G                      DGB      Yes      Yes                  Tank (21)                            hot/humid DHR CF RCPCIC 109      TKJO4B          D/G B AUX LU BE OIL TANK                DGB      Yes      Yes  'HRDHR CFCF    Tank (21)
Tn    2)      K                      hot/humid o/ui RC PC IC  Transformer 110      XNG02          CLASS 1E LOAD CENTER TRANSFORMER        CB/CC      Yes      Yes                                NG                      cool/dry                    Yes DHRCF          (4)
Transformer 111      XNGO6            FEEDS MCC NG06E                        ESW      Yes      Yes      IC DHR                    NG                      hot/dry                    Yes (4)
Transformer 112      XPNO8B          120 V INSTRUMENT AC TRANSFORMER        CB/CC      Yes      Yes      IC DHR                    PN                      cool/dry (4)
          - React Resctsly Cotnol (RRC)
Rector Coasnt Pressur Conrct (RCPC)
Rector Cotaant tenet0wyCteaol (RCIC)
PecayNeatRemova I(DHR)
Castalseet Funaoto (CF)
Wolf Creet Seismic Walkdown Equipment Ust          September 7, 2012                                                                                                                                                    Page 12 WCAP- 17678-NP                                                                                                                                                                                                November 2012 Revision 0
G- 14 Seismic Walkdown Equipment List,Rev. 0                                                                                                        Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown                                                Attachment 2 -SWEL 2                                      Wolf Creek generating Station SWEL                                                                                                Screen #1                Associated Item    Walkdown                        DsrpinBuilding            Equipment  System                (Seismic  Screen #2    with Rapid Comment Number    Equipment                                                    Class    Type                Licensing (Screens In?) Draindown?
Basis?)
Heat 1    EEC001B    FUELPOOLCOOUNG HEATEXCHANGER                                EC        FR          Yes        Yes            No EIchangers 2    SGG04B      SFP PUMP ROOM COOLERB                            AHU        GG        GG          Yes        Yes            No 3    PECOIB      FUELPOOLCOOLING PUMP                            PUMP        EC        FB          Yes        Yes            No 4    ECHV012    FUELPOOL HEATEXCHANGER    SHELLSIDEOUTLETISO    MOV        EC        FB          Yes        Yes            No FUELPOOL COOLING PUMP DISCHARGE    FLOW 5    ECFTO018 TRANSMITTER                                      Inst. Racks  EC        FB          Yes        Yes            No Wolf Creek Seismic Walkdown Equipment List September 7, 2012                                                                                                            Page 13 WCAP- 17678-NP                                                                                                                                              November 2012 Revision 0
H-1 APPENDIX H QUALIFICATIONS WCAP-17678-NP                November 2012 Revision 0
H-2 Seismic Walkdown and SWEL Development Resumes David A. Bersi, P.E.
Thirty-seven years experience in Mechanical and Project Engineering design, analysis, construction support, and operating plant support in the Nuclear Power Generation and Petrochemical industries.
Education University of Arkansas, BS Mechanical Engineering, 1975 Registered Professional Engineer, Texas #48444 Westinghouse PM-2 Project Management Qualification Professional Experience Westinghouse (May 2006 - Present)
As Project Manager and Principal Engineer, participated inCPNPP support activities for Safety Injection System Check Valve Replacement, support of Plant and Systems Engineering for various Corrective Action Program issues, Outage Support, Condition Report Resolution, and Engineering Improvement Initiatives. Functioned as Acting Manager of the Dallas Core Design and Safety Analysis Group for 5 months. Supported an Equipment Reliability Kaizen, and led a Materials Management Program Self Assessment. Supported System reviews at Fort Calhoun Station and TVA Watts Bar plants. Provided Engineering support for Passive Containment Cooling System Storage Tank design and analysis and Modular Isometric reviews.
As Project Manager and Deputy Project Manager for the Waterford 3 Replacement Steam Generator Project, held responsible for overall project management, execution and customer satisfaction for the design, manufacture, shipment, and installation support activities relating to Waterford 3 Replacement Steam Generators by providing the schedule integration and task coordination to manage the project, the day to day project direction, the cost and schedule baseline control management, and the interface with the customer, fabricator, and installer, as well as internal organizations.
As Principal Project Engineer for CPNPP Replacement Steam Generator, Replacement Reactor Vessel Closure Head, and Head Assembly Upgrade Package Project, acted as the Project Engineer and Component Lead Engineer for the design and fabrication of the indicated components.
WCAP-17678-NP                                                                                November 2012 Revision 0
H-3 David A. Bersi, P.E.
Page 2 Professional Experience (cont.)
TXU Electric (Sept 1987- May 2006)
As Consulting Project Engineer for CPNPP Replacement Steam Generator, Replacement Reactor Vessel Closure Head, and Head Assembly Upgrade Package Project, acted as the Project Engineer and Component Lead Engineer for the design and fabrication of the indicated components.
Acting Testing Group Supervisor for 5 months supporting testing activities for the refueling outage.
As System Engineer, performed duties for Reactor Coolant, Residual Heat Removal, Safety Injection, Liquid, Gaseous, and Solid Waste Processing, Steam Generator Blowdown, Boron Recycle, Station Service Water, Component Cooling Water, Chemical Feed, and Primary Plant Ventilation for Safeguards Building, Auxiliary Building, Primary Plant, and Fuel Building Ventilation Systems. Also, back-up System Engineer Auxiliary Feedwater, Post Accident Sampling, and Secondary Sampling.
Responsible for preparation of material and teaching of assigned Systems for the Plant Certification Class. 10CFR50.59 Evaluator Qualified and Subject Matter Expert, and CPSES Mechanical Equipment List Subject Matter Expert. Member ofEmergency Response Organization. Westinghouse Owner's Group System Engineering Representative. System Engineering ALARA committee representative. System Engineering representative to Reactor Coolant Pump and Motor Management Team. Site Safety Steering Committee representative.
Engineering duties during construction completion, initial start up, and operation phases at CPNPP.
Activities included system and modification reviews, testing reviews, licensing and FSAR reviews, calculation reviews, and procurement documentation reviews.
OTHER (May 1975 - Sept 1987)
Various Project Mechanical Engineering assignments in the Nuclear and Petrochemical Industries.
WCAP-17678-NP                                                                                November 2012 Revision 0
H-4 Timothy S. Nealon Education 2010 - 2012      University at Buffalo, Buffalo, New York Master of Science, Civil Engineering (MSc) 2006- 2010        University at Buffalo, Buffalo, New York Bachelor of Science, Civil and Environmental Engineering (BSCE)
Professional Capabilities Structural analysis and design of steel, concrete, and masonry structures using IBC and UBC Dynamic analysis of structures for seismic, vibration, blast, fluid, and wind loads Competed the NTTF Recommendation 2.3 Plant Seismic Walkdown training course Finite element modeling and analysis including use of ABAQUS, and SAP2000 Professional History 2012 - Present        Stevenson and Associates, Goodyear,Arizona Engineer Project Experience Summary Seismic FragilityProjects Mr. Nealon has performed seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments. Mr. Nealon has executed the seismic analyses of concrete foundations, masonry walls, large storage tanks, piping, and electrical and mechanical equipment anchorages. In addition, Mr. Nealon has performed seismic walkdowns of tank and their associated leakpath piping to assess loss of inventory in the event of beyond design basis seismic events. He has assessed piping systems for excessive stresses due to differential support movement and performed subsequent analyses using manual and finite element methods.
WCAP-1 7678-NP                                                                              November 2012 Revision 0
2',~
1.~
I t                  :4-
                    '2                                    - ~. .
                                                                        .1 __          Ft~
  -a z                                                                                        A 4<..
      *S . / i Certificate of Completion Tim Nealon Successfulhlj Completed Training on Near Term Task Force Recommendation 2.3 - Plant Seismic Walkdowns Date:  06/26/12 Bruce M. Lor- Instructor NTTF 2.3 Seismic Walkdown Course z0
(~
1' C
C
H-6 Derek J. Seaman Education WP Carey School of Business at Arizona State University, Tempe, Arizona - May 2011 Master of Business Administration, Finance Emphasis Oregon State University, Corvallis,Oregon - December 2005 Bachelor of Science, Nuclear Engineering Professional Experience Senior Engineer, Westinghouse Electric Company, June 2009 - Present Major Responsibilities
* Manage final-stage engineering projects as part of multi-million dollar nuclear fuel campaigns.
Includes attending senior management meetings and coordinating efforts of an 8 engineer team.
* Quantify equipment risk by performing plant walkdowns and developing risk assessments.
* Rotate through various plant outage positions to learn multiple aspects of refueling outages and work with systems hands on.
0      Conduct reload engineering analyses to ensure safe implementation of core designs.
0      Perform apparent cause analyses to correct plant issues and prevent recurrence.
Accomplishments 0      Authored, reviewed and mentored all aspects of the nuclear fuel reload process.
0      Successfully project managed multiple fuel reload campaigns with fuel valued over $100 million.
0      Modeled multiple reloads analyses in SIMULATE under customer's quality program.
0      Analyzed fuel CRUD load to support lowering plant operating pressure which helped result in saving an unnecessary plant shutdown.
* Performed and implemented multiple corrective actions to correct quality and non conforming errors.
WCAP-17678-NP                                                                                November 2012 Revision 0
H-7 Derek J. Seaman Page 2 Professional Experience (cont.)
Engineer, Westinghouse Electric Company, February2006 - June 2009 Major Responsibilities
* Evaluate power increase proposals from a safety analysis perspective to enable power utilities to generate additional revenue.
* Create monthly budgets and acquire necessary funding from management to resolve quality related rework within the engineering organization as part of customer focus.
* Analyze system and human performance failures as an apparent cause investigator and provided innovative plans to prevent reoccurrence.
Accomplishments
* Designed and implemented a quality assurance metrics system decreasing quality related costs saving nearly $ 1OOK in first year group implementation and improving customer relations.
* Managed group's quality assurance and implemented corrective actions to reduce quality related errors by nearly 8% in the first year.
Professional and Community Relations Team Captain, American Cancer Society Climb to Conquer Cancer - 2008-Present Planned and organized 9 climbs raising over $40,000 to fight cancer.
0      Worked with company executives to improve company visibility in the community.
Volunteer, Phoenix Baptist Hospital -2007-2008 Policy Chairman, North American Young Generation in Nuclear (New England Chapter) - 2006-2007 WCAP-17678-NP                                                                            November 2012 Revision 0
H-8 Timothy W. Solberg Education 2010 - 2011      Stanford University, Stanford, California Master of Science, Structural Engineering (MS) 2005- 2009      Rice University, Houston, Texas Bachelor of Science, Civil and Environmental Engineering (BSCE)
Professional Capabilities Earthquake hazard and risk analysis Seismic design of structural systems Structural design and analysis of steel and concrete structures Dynamic analysis of structures Completed EPRI Fundamentals of Equipment Seismic Qualification Training Competed NTTF Recommendation 2.3 Plant Seismic Walkdown Training Professional History 2012 - Present        Wolf Creek Nuclear OperatingCorporation,Burlington,Kansas Design Engineer 2011  - 2012          Risk Management Solutions, Inc., Hoboken, New Jersey Risk Analyst Experience Summary Wolf Creek Nuclear OperatingCorporation Mr. Solberg has participated in various civil, structural, and seismic engineering tasks while at Wolf Creek. He has developed experience in civil/structural design and supports in addition to seismic analyses and evaluations of plant systems and components.
Risk Management Solutions, Inc.
Mr. Solberg worked with a risk assessment company to accurately predict building and casualty losses that would arise from natural and man-made catastrophes. He worked on using theory from the hazards of earthquakes, hurricanes, and other extreme events to quantify the potential vulnerability and damage to structures and their inhabitants, and interpreting these results to clients.
WCAP-1 7678-NP                                                                                November 2012 Revision 0
ELETRC PWE Certificateof Completion Tim Solberg Training on Near Term Task Force Recommendation 2.3
      - Plant Seismic Walkdowns July 11, 2012 Date                    Robert K. Kassawara EPRI Manager, Cz                                Structural Reliability & Integrity CD
H-10 Hunter A. Young, P.E.
Education 2008 - 2009      Massachusetts Institute of Technology, Cambridge,Massachusetts Master of Engineering, Structural Engineering (MEng) 2002 - 2006      University of Notre Dame, Notre Dame, IN Bachelor of Science, Civil and Environmental Engineering (BSCE)
Registration and Affiliations Registered Professional Engineer, California, No. C79404 Member of ASCE, ASME Professional Capabilities Structural analysis and design of steel, concrete, and masonry structures using IBC and UBC Dynamic analysis of structures for seismic, vibration, blast, fluid, and wind loads Competed SQUG training course for walkdown and fragility analysis of nuclear facilities and their components Finite element modeling and analysis including use ofANSYS, SOLVIA, GTStrudl, and SAP2000 Vehicle barrier design for the protection of plant facilities and personnel Project management including planning, scheduling, and preparing technical reports Risk and hazard analysis Construction support and inspection Professional History 2009 - Present        Stevenson andAssociates, Woburn, Massachusetts Senior Engineer 2007- 2008          Hensel Phelps Construction Company, Washington, D.C.
Field Engineer WCAP-17678-NP                                                                            November 2012 Revision 0
H-11 Hunter A. Young, P.E.
Page 2 Project Experience Summary Seismic FragilityProjects Mr. Young has managed and led seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments. On these projects, he has walked down both Safety Related and non-Safety Related structures, systems, and components in all areas of the power block. Mr. Young has executed the seismic analyses of braced steel frames, concrete foundations, masonry walls, large storage tanks, and electrical and mechanical equipment anchorages. In addition, Mr. Young has performed the walkdown and analysis of tank structures and their associated leakpath piping to assess loss of inventory in the event of beyond design basis seismic events. He has assessed piping systems for excessive stresses due to differential support movement and performed subsequent nonlinear analyses using manual and finite element methods.
Miscellaneous NuclearProjects Mr. Young has conducted seismic analysis of Safety Related structures with soil structure interaction using both response spectrum and nonlinear time history methodologies. He has analyzed and designed stilling wells for hydrodynamic loads in cask loading pit. He has evaluated penetration/cut reinforcement for cask loading pit concrete walls and assessed the modification of steel support frames for spent fuel cask. Mr. Young has performed structural evaluation of the rigging operation for the replacement of the main generating startup transformer. Additionally, he has developed risk analyses using contingency matrices for transformer replacement and rigging operations.
Security/Blast Loading Projects Mr. Young has performed blast analyses of existing structures for minimum safe standoff distances and subsequently designed passive vehicle barrier systems. He has conducted preliminary wind and seismic loading analysis for the conceptual design of a new security facility. Mr. Young has designed structural supports for equipment vulnerable to shock loading. He has designed foundations for new security structures.
WCAP-17678-NP                                                                                November 2012 Revision 0
CD CD CD 0j
H-13 Peer Review Team Rksum s Todd A Bacon Education 1976 - 1980    University of Illinois - Urbana-Champaign Bachelor of Science - Civil Engineering Registration/Certification Professional Engineer: California License No. C-0336104 (Civil), Georgia License. No. 015562, Ohio License No. E-57497 Professional History 2012 - Present        Stevenson & Associates, Charlotte, North Carolina, Senior Consultant and General Manager, Charlotte, NC Office 1980-2012              AREVA Inc., Charlotte, NC, Engineering Manager Professional Experience Mr. Bacon has thirty years of experience in the design and modification of mechanical and structural systems. His responsibilities as an Engineering Manager have included work from the conceptual design through to the installation support phases of projects. Mr. Bacon has served as Project Engineer and Project Manager for numerous work scope efforts, including coordination of personnel in multiple locations. The efforts have also included significant client and/or regulatory interface, as required. These activities have also included responsibility for budgets, schedules and the technical accuracy of work performed. In addition, he has extensive experience in proposal and report development, as well as personnel training activities.
Mr. Bacon's work has involved extensive use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, including various piping system related committees. These have included the design group for the HDPE buried pipe group of Section III, and the Flaw Analysis group of Section XI.
Other Code experience includes the American Institute of Steel Construction (AISC), American Concrete Institute (ACI), and ASME (ANSI) B3 1.1 and B331.3 codes. He serves on the AREVA College of Experts in the areas of structural and dynamic analysis and is also fluent in using numerous piping and finite element computer programs, as well as in typical frame analysis programs.
WCAP-17678-NP                                                                                  November 2012 Revision 0
H-14 Todd A Bacon Page 2 Professional Experience (cont.)
EngineeringManager,Civil and Layout Department ARE VA NP Inc.
Mr. Bacon served as an Engineering Manager in the Civil and Layout Department in Charlotte, North Carolina. In this role he was responsible for the efforts involving work on the 3D model for an AREVA US EPR plant being designed for the Calvert Cliffs site in Maryland. His areas of responsibility also included the balance of plant piping system design efforts for the plant. In this role, he was involved with interfaces with numerous groups utilizing the 3D model information, as well as consortium partner Bechtel Power, and AREVA offices throughout the US and Europe who served as subcontractors for various portions of the overall project scope of work. This included coordinating the efforts of approximately fifty individuals for these efforts involving technical resolution of issues, manpower planning, personnel issues, and development of the group.
In addition to the managerial responsibilities, he was a member of the AREVA College of Experts in the area of mechanics and fluid mechanics. This group was comprised of approximately one percent of the company worldwide which served as the technical leaders for the company, shfaring best practices and knowledge throughout the global organization.
In addition to the New Plants activities in the US, Mr. Bacon supported efforts involving current activities for the International Thermonuclear Experimental Reactor (ITER) effort in which AREVA had the responsibility for the Cooling System involving the piping system evaluations and development of Technical Guides and impact to the building resulting from the piping system.
He previously served as an Engineering Manager in the Structural and Engineering Mechanics Group, working on projects involving operating plants. As a Project Engineer and Manager, he helds responsibility for leading project teams in technical areas, as well as in budget and schedule item tracking functions.
Examples of typical projects include the following:
Mixed Oxide (MOX) Fuel FabricationFacility,Savannah River Site - Conducted third party review of overall project identifying ways to achieve efficiencies and improve production rates for the building design and construction effort. This resulted in numerous recommendations for the site to improve production in the areas of scheduling, group interfacing (engineering disciplines, construction, etc.),
procedural development as well as improvements through procedural revisions. This also included performing as the lead engineer on projects for the facility involving development of procedures for field routing of small bore piping systems, as well as conduit runs.
WCAP-1 7678-NP                                                                                  November 2012 Revision 0
H-15 Todd A Bacon Page 3 Professional Experience (cont.)
ECCS DebrisBlockage Issue, Tokyo Electric Power Company (TEPCO) - Established contact and led proposal efforts to obtain contracts for ECCS suction strainer replacements for first plant performing this scope in Japan. Subsequently won contracts for two additional TEPCO units as well, resulting in $ 8M in revenue for AREVA. This work involved extensive interface and oversight of the strainer hardware vendor during the design, fabrication an!d construction phases of the projects.
ASME BPVC Work, Various Facilities- Served in positions of increasing responsibility performing and reviewing ASME Boiler and Pressure Vessel Code work in the Structural and Engineering Mechanics Group. Work included Class 1 analyses of flued heads, mechanical equipment evaluations and numerous piping system analyses.
ECCS Debris Blockage Issue, involving numerous US B WR clients - Served in various roles including Project Engineer, Project Manager, and Technical Consultant. Had a significant amount of involvement with this issue including involvement with the BWR Owner's Group for this issue spanning numerous years.
GL 96-06 Operabilityand Design Basis Resolution, Oconee Nuclear Station, Duke Power - Served as the Project Engineer for the Operability Evaluation for the Oconee Nuclear Station in an effort to show all three units operable under the additional loadings resulting from the USNRC Generic Letter. This assessment included evaluation of the LPSW system, including piping, supports, equipment nozzles, as well as structural platforms and associated components. In addition, operability guidelines were developed for Oconee during this effort.
Reactor Cavity DrainLine Modifications, PalisadesNuclear Power Plant, Consumers Power - Project Manager for the Reactor Cavity Drain Line modifications and letdown piping support modifications at the Palisades Plant. Work scopes included both engineering functions and the generation of modification package paperwork.
NRC Bulletin 79-14 Large-BorePipingProject Evaluation,D. C. Cook Nuclear Power Plant, Indiana/MichiganPower - Work included serving as Project Engineer to evaluate the adequacy of D.C.
Cook's NRC Bulletin 79-14 Large-Bore Piping Project. The work scope involved supervising a project team performing piping and piping support evaluations. Conclusions drawn from this study have enabled the client to realize significant cost savings during recent maintenance outages through discrepancy trending and margin assessment studies.
ReactorPressure Vessel Bottom Head DrainLine Unplugging Project,Dresden Nuclear Generating Station Units 2 & 3, Commonwealth Edison. Included serving as Project Engineer responsible for unplugging reactor pressure vessel bottom head drain lines for Dresden Units 2 and 3. This project was successfully completed within schedule and budget constraints, and also was part of the Unit 2 critical path outage work.
WCAP-17678-NP                                                                                  November 2012 Revision 0
H-16 Todd A Bacon Page 4 Professional Experience (cont.)
HPCI System SpargerModification, Quad Cities Nuclear GeneratingStation, CornEd- Served as the Structural and Engineering Mechanics Project Engineer and Manager for Quad Cities Unit 1 and 2 high pressure coolant injection (HPCI) system modification, which resulted in the addition of a sparger assembly inside the torus. The project also included the addition of platforms to provide accessibility for personnel performing maintenance activities at both units.
Hardened Wetwell Vent Project Third PartyReviews, Dresden and Quad Cities Nuclear Generating Stations, CornEd- Led the third party reviews of the hardened wetwell vent projects for the Dresden and Quad Cities stations. These projects involved the evaluation of existing, as well as new, piping and auxiliary steel. Design codes used for the mechanical work included ASME Section III, Subsections NC, ND, NE and NF, as well as AISC and Uniform Building Code (UBC) standards for the structural evaluations.
StructuralProjects, Various Facilities- Past projects have included extensive structural experience, such as the Hope Creek Nuclear Generating Station's drywell inner water seal plate analysis, and also Mark I piping and pipe support evaluations. Previous work also included extensive experience working on various mechanical and structural design projects.
Licensing and Special Projects,Comanche Peak Steam Electric Station, TU Electric - Involved in licensing and special studies projects for the Comanche Peak Station.
SSFI Audit Responses, CoinEd - Participated in responding to concerns raised during safety system functional inspection (SSFI) audits.
Project Summary Reports and OperabilityGuidelines, CoinEdand AEPSC - Wrote numerous project summary reports and operability guidelines for Commonwealth Edison (ComEd) and American Electric Power Company (AEPC).
Piping,Piping Support andHVAC Modifications, Various Facilities- Served as Project Engineer for piping, piping support and HVAC modification work for various nuclear plants, including Dresden Units 2 and 3, Quad Cities Units 1 and 2, D. C. Cook Units 1 and 2, and Duane Arnold. Project Engineer responsibilities included coordinating schedule and budget issues, as well as addressing technical questions as they arose.
Control Rod Drive Frame Analysis, Browns FerryNuclear PowerPlant, Tennessee Valley Authority (TVA) - Involved in the analysis of the control rod drive frames for the Browns Ferry Plant.
WCAP-17678-NP                                                                                November 2012 Revision 0
H-17 Gary L. Douglas Principal Engineer, Risk Applications & Methods Westinghouse Nuclear Services Division Education B.S. Oceanography                U.S. Naval Academy Nuclear Power Program              United States Navy M.Eng. Materials Science          Cornell University Summary Mr. Douglas is a Principal Engineer in the Risk Applications and Methods Group of the Systems & Risk Applications Engineering Department of Westinghouse's Nuclear Services Division. He has 14 years of experience with PWR design, including qualifications in the Navy Nuclear Power Program. He has safety analysis experience in the Nuclear Power and Aerospace Industries. He worked as an engineer for 9 years at South Texas Project Electric Generating Station, with emphasis on root cause analysis, reliability engineering, systems engineering and PRA applications analysis. He worked as an engineer for 10 years at Hamilton Sundstrand, with emphasis on root cause analysis, FMEA, and safety hazards analysis ofjet engine controls and space & submarine life support systems.
Specifically, Mr. Douglas's prior engineering experience as an engineer in the Navy Nuclear Power Program and at South Texas Project Electric Generating Station has afforded him plant-wide hands-on experience with all safety and non-safety related equipment comprising military and commercial nuclear steam supply systems.
Mr. Douglas is presently involved in PSA applications activities for several plant sites, with emphasis on External Events and Internal Flooding PRA Modeling. He recently completed a site visit to Fort Calhoun Station for the purpose of performing verification walkdowns of systems supporting the station's PRA model.
Some of the recognitions Mr. Douglas has achieved over his career include the following: Distinguished Midshipman Award, 1983; Advanced Root Cause Analysis Certified, 1996; INPO Recognition as South Texas Project Plant Doctor, 1997; AS9 100 Certified Quality Engineer, 2005; NASA Environmental Controls & Life Support Systems Award, 2011 (for contributions to the Oxygen Generation System aboard the International Space Station).
November 2012 WCAP-1 7678-NP WCAP-17678-NP                                                                                November 2012 Revision 0}}

Latest revision as of 18:05, 11 November 2019

WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix C, Licensing Basis Evaluations Summary, Page C-1 Through End
ML12342A257
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/30/2012
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
References
ET 12-0032 WCAP-17678-NP, Rev 0
Download: ML12342A257 (90)


Text

C-I APPENDIX C LICENSING BASIS EVALUATIONS

SUMMARY

WCAP-17678-NP November 2012 Revision 0

C-2 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution I EGLT0002 CCW SURGE TK B SWT observed scaffolding in zone of influence Y Licensing Basis Evaluation:

of level transmitter with no bracing or wall SWT received WCNOC Scaffolding anchorage at top bay (3 bays total). Members Evaluation (Scaffold Request # 12-SO 189, appear suitable to withstand moment so as to Work Order # 11-345393 (Reference 24))

preclude collapse, but verification is required that validates scaffold installation in from scaffolding documentation on site. accordance with procedure. SWT concludes from engineering judgment that scaffolding is acceptable given member capacity in bending and light loading due to single bay at the top. No adverse seismic concern.

2 EKJ03B INTERCOOLER SWT could not verify 1-1/4" anchor bolts in Y Licensing Basis Evaluation:

HEAT EXCHANGER field. Verify from CLB documentation. AB-83 bolts verified as 1-1/4" per C-1 C51 11 (Reference 25).

3 FKJ02C KKJO1B AIR SWT could not verify 3/4" double-nutted Y Licensing Basis Evaluation:

INTAKE FILTER anchor bolts in field. Verify from CLB AB-69 anchor bolt verified as 3/4" and documentation. double nutted per C-0033 (Reference 26).

4 GNPT0934 CONTAINMENT Anchorage documentation brought in field was Y Licensing Basis Evaluation:

ATMOSPHERE not sufficient to verify anchorage. Verify SWT received M-771-00048-W04 whether as-installed configuration which was (Reference 27), which calls out 4 no. 3/8" as-built in field consisting of 4 no. 3/8" bolts bolts for mounting. Anchorage configuration meets CLB anchorage configuration is verified.

documentation.

5 KKJO1B STANDBY DIESEL SWT observed an anchor bolt with 10" Y Licensing Basis Evaluation: Operability (GENERATOR) projection whereas 8" required per CLB Evaluation KJ-12-015 (Reference 28) via CR documentation. Verification was required to #57391 determined that the as-installed determine whether condition was previously condition is not in violation of the seismic analyzed or condition is acceptable as- licensing basis given that all bolts undergo installed. zero net uplift under all design load combinations. CR #57391 is tracking this observation.

6 NE002 STANDBY #2 Component is on the common skid with Y Licensing Basis Evaluation:

KKJO1B (rule of the box) and therefore has the See resolution for KKJO1B above.

same anchorage concerns. (see Issue CR #57391 is tracking this observation.

Description for KKJO lB.)

WCAP-17678-NP November 2012 Revision 0

C-3 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 7 NF039B CONT SHED/SEQ Adjacent cabinets are flush. Concern regarding Y Licensing Basis Evaluation:

CH 4 LOGIC potential sensitive equipment changing state SWT review of WCNOC Calculation due to chatter. Check that cabinets are XX-FH-009-002 (Reference 23) confirms attached. that cabinet NF039B and adjacent cabinets NF039A and NF039C have been analyzed for proximity concerns with adjacent cabinets and are therefore acceptable.

8 NG004C 480 VAC Observed 1-7/8" clearance from back of MCC Y Licensing Basis Evaluation:

(drip shield) to concrete wall. There is concern Using a conservative lower bound frequency that the MCC could close the gap in SSE event estimate of 5 Hz, a modal shape factor (SF) and cause equipment to malfunction, of 1.6 for cantilever action, and taking the Verification needed to ensure gap is sufficient peak spectral acceleration of approx. Ig at given MCC flexibility (gap oriented in weak the 2047.5 ft elevation for 3% damping direction) and high elevation of the Aux (conservative), the upper-bound Building (2047.5'). displacement is 6.3 in (= 1.6*386.4 in/s 2

  • lg

/ (2*pi*5 Hz) 2). Therefore, a 1-7/8" gap is acceptable. This conclusion is based on the use of the component displacement equation described on pg 5-1 and obtained from Reference 22.

9 RP08 IA/B SUBCOOLING SWT noted same top support bolting Y Licensing Basis Evaluation:

MONITORING modification as for SB041. Verify whether Condition is analyzed per WCNOC CABINET modification documents the qualification Calculation XX-FH-009-002 (Reference 23).

reconciliation of individual equipment. No adverse seismic concern.

10 SA036E ESFAS CH4 LOGIC Adjacent cabinets are 1/16" apart. Check that Y Licensing Basis Evaluation:

CABINET cabinets are bolted together so as to preclude SWT review of WCNOC Calculation chatter. XX-FH-009-002 (Reference 23) confirms that cabinet SA036E has been analyzed for proximity concerns with adjacent cabinets and is therefore acceptable.

11 SB032C W SS PROT SYS SWT noted a modification to add top support Y Licensing Basis Evaluation:

OUT 1 TRN to fasten SBD32D to SBD33A. Verify whether Condition is analyzed per WCNOC modification documents the qualification Calculation XX-FH-009-002 (Reference 23).

reconciliation of individual equipment. No adverse seismic concern.

WCAP- 17678-NP November 2012 Revision 0

C-4 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 12 SB032D W SS PROT SYS SWT noted a modification to add top support Y Licensing Basis Evaluation:

OUT 2 TRN to fasten SBD32D to SBD33A. Verify whether Condition is analyzed per WCNOC modification documents the qualification Calculation XX-FH-009-002 (Reference 23).

reconciliation of individual equipment. No adverse seismic concern.

13 SB041 W PROCESS 1.) SWT noted cable tray with 1/4" vertical Y Licensing Basis Evaluation:

ANALOG clearance to top of cabinet support 1.) Inspection of vertical response spectra at PROTECTION SET modification. Concern is that differential this level confirms that 1/4" is more than CAB-04 movement between the floors can cause adequate separation for vertically rigid equipment to spatially interact and cause components. No adverse seismic concern.

change of state in SB041. Both pieces can be 2.) Condition is analyzed per WCNOC Calc taken as rigid in the vertical direction. Verify XX-FH-009-002 (Reference 23). No adverse from In-Structure Response Spectra whether seismic concern.

clearance is acceptable.

2.) Cabinets RPO18, SB041, and SB042 are bolted at their tops. This appears to be a modification not included in original equipment qualifications. Verify whether modification documents the qualification reconciliation of individual equipment.

14 SB079 RPV LEVEL INSTR Anchorage documentation brought in field did Y Licensing Basis Evaluation:

SYS PROC PROT not reflect as-installed configuration. Verify Detail 5 on WCNOC Dwg C-0008 SYS whether as-installed configuration which was (Reference 29) indicates an acceptable as-built in field meets CLB anchorage anchorage weld pattern of 3/16" fillet welds, configuration documentation. 2" long at 8" o.c. The as-installed configuration recorded in the field meets this requirement; therefore, there is no adverse seismic condition.

15 SE054B W NUC INSTM NIS 1.) Anchorage documentation brought in field Y 1.) Licensing Basis Evaluation: As-installed 2 did not reflect as-installed configuration. configuration could be verified per NCR Verify whether as-installed configuration ISN21407EW against Dwg C-0008 (Ref.

which was as-built in field meets CLB 22). 2.) Licensing Basis Evaluation:

anchorage configuration documentation. Condition is analyzed per WCNOC Calc 2.) Top of panel is bolted to adjacent panel XX-FH-009-002 (Reference 23). No adverse SD055A. Verify whether bolting modification seismic concern.

reconciled individual equipment qualification.

WCAP- 17678-NP November 2012 Revision 0

C-5 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 16 SGK04B CONTROL ROOM Cannot visually identify 2 interior anchor bolts Y Licensing Basis Evaluation: Follow-up A/C UNITS on N side of AHU. Bolts may be covered in walkdown performed by WCNOC revealed concrete. Action required to verify whether the the interior anchor bolts installed in bolts are present. accordance with configuration documentation. Photographs (located in SWC) were reviewed by the SWT and confirmed to be acceptable. No issue.

17 SGK05B CLASS IE ELEC SWT noted tubing/piping support mounted off Y Licensing Basis Evaluation:

EQUIP A/C/ UNIT of AHU that does not appear to be included in SWT inspected WCNOC DCP #09879 original equipment qualification (possibly.from (Reference 30), which states that the later modification). Verify whether connecting equipment between the more modification is documented and AHU recently installed condenser and the AHU equipment qualification reconciliation was does not invalidate the individual equipment addressed. seismic qualifications and that the qualification of the AHU remains valid.

Therefore, no adverse seismic concern.

18 TEGOIB CCW SURGE SWT observed scaffolding in zone of influence Y Licensing Basis Evaluation:

TANK B of the tank soft targets (site glass) with no SWT received WCNOC Scaffolding bracing or wall anchorage at top bay (3 bays Evaluation (Scaffold Request # 12-S0189, total). Members appear suitable to withstand Work Order # 11-345393 (Reference 24))

moment so as to preclude collapse, but that validates scaffold installation in verification is required from scaffolding accordance with procedure. SWT concludes documentation on site. Also, scaffolding is from engineering judgment that scaffolding braced to tank legs. While the tank legs and is acceptable given negligible additional anchorage appear adequate to withstand loading due to SSE on rugged tank legs.

relatively light added scaffold lateral load, verification is required to confirm equipment qualification for tank was reconciled.

19 XNG02 CLASS IE LOAD SWT observed bolting from XNG02 to Y Licensing Basis Evaluation:

CENTER adjacent and flush cabinet NG002. While it The SWT concluded that the presence of TRANSFORMER was confirmed that adequate bolting was bolting is not required to preclude seismic provided to preclude chatter, one bolt hole was chatter; therefore no adverse seismic noted to be empty without a bolt. Verify condition.

whether bolt is required from configuration documentation.

WCAP-17678-NP November 2012 Revision 0

C-6 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 20 DGB Rm Area Walk-By 1.) SWT noted fire piping is flexibly supported Y Licensing Basis Evaluation:

5201 (rod-hung) with Victaulic couplings. Verify 1.) Per WCNOC Specification M-650 whether 2:1 adequacy from qualification (Reference 31), fire piping in diesel documents. 2.) Noted lighting supported by its generator building is designed for Seismic own conduit spanning horizontally. Concern is Category 2:1 qualifications; therefore no that flexibly support light could overstress adverse seismic condition.

conduit and fall. Verify whether lighting 2.) Re-inspection of photos shows conduit is support is adequate. galvanized rigid conduit, which has significant bending capacity to resist vertical loading of light. No adverse seismic concern.

21 AUX Rm Area Walk-By SWT observed scaffolding in zone of influence Y Licensing Basis Evaluation:

1502 of safety-related equipment with no bracing Or SWT received WCNOC Scaffolding wall anchorage at top bay (3 bays total). Evaluation (Scaffold Request # 12-SO 189, Members appear suitable to withstand Work Order # 11-345393 (Reference 24))

movement so as to preclude collapse, but that validates scaffold installation in verification is required from scaffolding accordance with procedure. No adverse documentation on site. seismic concern.

22 CTRL Rm Area Walk-By Observed portable table approx. 3/4" from N Licensing Basis Evaluation:

3601 control panel. Table could rock and impact the No qualification document was identified to panel. Shift manager indicated that justify presence of table in proximity to Engineering qualified the table for SSE. Verify safety-related control panel equipment.

whether the table has seismic calculation CR #57419 was issued by WCNOC to justifying placement where it was located or determine if the table has been seismically remove to a safe location, evaluated for this location as well as documenting removal of table to a safe location.

23 CTRL Rm Area Walk-By General note for equipment w/ modified top Y Licensing Basis Evaluation:

3605 fasteners added to rigidly connect tops of Bolted connections of cabinets in the control cabinets. Verify whether modifications room area is analyzed per WCNOC reconciled individual equipment qualifications. Calculation XX-FH-009-002 (Reference 23).

No adverse seismic concern.

WCAP- 17678-NP November 2012 Revision 0

C-7 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 24 AUX Rm Area Walk-By Observed vertical HSS cable tray supports Y Licensing Basis Evaluation:

1409 welded to the floor and connected to the ceiling HSS section verified to only react lateral above. Connection at ceiling appears to be a. load at its top connection per Detail 3 on C-jacket connection that only transfers lateral 1408 (Reference 32). Therefore, there is no load. If the ceiling connection transfers vertical adverse seismic condition.

load, there is a concern the support's connections will fail in an SSE event due to differential floor displacement. Verification is required to determine whether either the ceiling connection transfers vertical load or if the support and its connections are designed for the vertical load transfer due to SSE.

KEY:

Y - The Seismic Licensing Basis is satisfied and no adverse seismic condition exists.

N - As a result of the walkdown inspection, a corrective action was required.

WCAP-1 7678-NP November 2012 Revision 0

D-I APPENDIX D PEER REVIEW CHECKLISTS WCAP-17678-NP November 2012 Revision 0

D-2 Sheet 1 of 5 WCNOC Unit I Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Were the five safety functions adequately represented in the SWEL 1 selection? YN NEI Requirementmet.

112 Items representing the five safety functions were selected to SWEL 1.

61 Reactivity Control, 63 Pressure Control, 72 Inventory Control, 90 DHR/UHS, 58 Containment Function Remarks:

SWEL Peer Review was held on September 7, 2012 with the following personnel in attendance: WEC SWEL Developers (Dave Bersi Mike Cymbor. Derek Seaman), Peer Review Team (Gary Douglas, Todd Bacon).

WEC (Dave Bersi, Mike Cymbor, Derek Seaman) performed initialscreening; WCNOC Operations(John Weber) provided verification of safety function selections and WCNOC Operations (Eric Carlson) participatedin SWEL selections; WCNOC Engineering (Rick Foust,Bob Kopecky, Tim Solberg) provided technical input to screening and selection of equipment.

The methodology and the development of the SWEL List selections for WCNOC were performed in accordance with Section 3 of the Seismic Walkdown Guidance (EPRI TR-1025286, dated June 2012).

The startingpoint for the development of the SWKIEL was the Individual Plants Examination of External Events (IPEEE)Report, Table 3.6, which listed safe shutdown equipment from each redundant train of the systems supporting the 5 safety functions.

The IPEEE SSEL, 568 items, provideda complete list of all active and passive components associatedwith operationof requiredsupport and frontline systems.

The IPEEE SSEL equipment list was increasedby adding SC-1 items from the Internal Events ProbabilityRisk Assessment (IE-PRA) databaseand comparison with sister plant Callaway that were not alreadyidentified in the IPEEE.

Based on review of "WCNOC Selection of SSCs 9-05-12.xIs" Noted 13 of 739 records that 'screen in' (column R) with no SC-I basis Noted 27 records that support a safety function, but do not screen in to base list Screen outs had been determined after populatinginformation that followed the screening criteriaand needed to be removed. SC-I basis information was inadvertently unpopulatedfor some items.

These items were correctedby the SWEL developers.

WCNOC Unit I Peer Review ChecklisL. for SWEL-20120620 9/7/2012 WCAP-17678-NP November 2012 Revision 0

D-3 Sheet 2 of 5 WCNOC Unit I Peer Review Checklist for SWEL

2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
a. Various types of systems? YZ NEI Requirement met.

38 of 41 base list systems were representedin the SWEL list.

Remarks:

It was recommended that a note be added to explain why components from the GD, GF, and KC systems were not selected.

A note was added to Sort I that states "The GD and GF systems were not selected due to accessibilityissues. This is acceptablesince the GD system consists primarilyof equipment type "other"Which is Well represented. Similarly system GF consists of equipment type "Air Handlers"which is also already well represented.

The KC system was not representedsince it contained only a single valve and containment isolationvalves are already well represented."

b. Major new and replacement equipment? YN N-Requirement met.

52 modified items identified; 16'were representedin SWEL 1.

Remarks:

Indicate the sourceand results for the modifications review.

Provide explanation of the results of review of "recentupgradesand changes" Note 4 was expanded to say "A review of Major New or Replacement equipment was conducted by reviewing the Wolf Creek corrective actions relatedto seismic equipment as well reviewing a databaseof any major capitalprojects since 1998. Since these databasesmay not necessarily contain new or emergent conditions site Operationswas also question to ensure recently modified and upgraded(< I yr) equipment was reviewed."

c. Various types of equipment? YZ NE Requirement met.

19 of the 22 equipment types were representedin S WEL 1.

3 equipment types not represented were not safety-related items.

Remarks:

Three EPRI equipment types were not represented: Chillers, Air Compressors,and Motor-GeneratorSets. Provide a reason for inability to select these types.

Sort 3 added a note stating "Discussionwith Operationsrevealed that Wolf Creek does not have any SC-I Chillers, Air Compressors or Motor Generators."

WCNOC Unit 1 Peer Review Checklist for SWEL-20120620 9/7/2012 WCAP-1 7678-NP November 2012 Revision 0

D-4 Sheet 3 of 5 WCNOC Unit I Peer Review Checklist for SWEL

d. Various environments? YE NM Requirement met.

The range of room environments and inside/outsidelocations was representedin SWEL 1.

Remarks:

The Wolf Creek Environmental Classificationsare based on room temperature and humidity presentedin USAR Table 3.11(B)-1.

e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? Y[D NE-]

Requirement met.

3 of 8 IPEEE findings are represented on SWEL 1.

Remarks:

Battery ChargerNNOI I was not selected to S VVEL I because of inaccessibility.

This item is cited in an IPEEE Finding: A transformer on an inverter was not bolted to the frame on one side (WR 2857-94).

Recommend providing additionaldetailjustifying selection of other battery chargers over NNOI 1.

A comment was added stating "NN01I1 was not selected due to it not being scheduled to be worked on in the nearfuture and due to safety considerationsan availablebattery chargerwas selected instead"

f. Were risk insights considered in the development of SVEL 1? Y[ NEI Requirement met.

Risk insightsfrom the Internal Events models were consideredin the SWEL selections and are clearly indicatedon the spreadsheet.The Risk Achievement Worth (RA W) derivedfrom the WCNOC internal events PRA model were compiled for the Base List 1 items to determine potentially risk-significantSSCs (RAW> 2).

The maximum risk between internalevents and the seismic RAW values was used in the SWEL selection process. The Base List 1 items were sortedin the SWEL spreadsheetin the orderof descending maximum RAW values (Worksheet "Sort 5). 27 of the 67 risk significant SSCs from Base List 1 were selected for SWEL 1.

WCNOC Unit I Peer Review Checklist for SWEL-20120620 9/7/2012 WCAP-17678-NP November 2012 Revision 0

D-5 Sheet 4 of 5 WCNOC Unit I Peer Review Checklist for SWEL

3. For SWEL 2:
a. Were spent fuel pool related items considered, and if applicable included in YE NEI SWEL 2?

Requirement met.

Spent Fuel Pool equipment that passed screen 2 and are part of Train B were selected (since Wolf Creek Train A will be unavailable during the scheduled seismic walkdown).

This resulted in 5 items added to the S WEL.

Remarks:

The starting list of SFP SC-I equipment was based on the DBM descriptions,piping and instrumentationdrawings (P&IDs), and isometrics.

An analysis of the SFPfor Rapid Drain-Down considerationswas performed. Pool connections to the spent fuel pool, fuel transfer canal, and wet cask pit were verified by a review of the spent fuel pool P&lDs, piping isometrics, civil and structural drawings, and FSAR sections 9.1.2 and 9.1.3. The fuel pool cooling P&ID shows several connections to the pool with anti-siphoningholes present per notes. The currentdesign drawings (includingpiping isometrics) were reviewed and support the assertions in the FSAR concerning pool drain-downprotection.

No Rapid Drain-Downitems were identified for input to S WEL 2.

b. Was an appropriate justification documented for spent fuel pool related items not YO NEI included in SWEL 2?

Requirement met.

The Spent Fuel Pool equipment selected is part of Train B (since Wolf Creek Train A will be unavailableduring the scheduled seismic walkdown).

Action taken to meet requirement:

Indicate the source and results for the modifications review.

Need explanationof the results of review of "recentupgrades and changes" Note 5 revised to state 'Spent Fuel Pool equipment that passed screen 2 and arepart of Train B were selected (since Wolf Creek Train A will be unavailableduring the scheduled seismic walkdown). Note that operations did not note any major modification or changes to the spent fuel pool SC-I items. "

WCNOC Unit I Peer Review Checklist for SWEL-201 20620 9/7/2012 WCAP-17678-NP November 2012 Revision 0

D-6 Sheet 5 of 5 WCNOC Unit I Peer Review Checklist for SWEL 4, Provide any other comments related to the peer review of the SWELs.

SWEL PeerReview was held on September 7, 2012.

Sampling considerationsfor system variety, equipment type variety, environment variety, new or replacement items, and IPEEE enhancements were reviewed and verified to be adequatelyrepresentedin the SWEL.

S. Have all peer review comments been adequately addressed in the final SWEL? Y NO Peer Reviewer # 1: Gary L. Douglas . Date: 9/7/12 Peer Reviewer #2: Todd Bacon Date: 9/7/12 WCNOC UnijI Peer Review~ Chiecklist 1orSWIiL.-20120620 9/7/2U12 November 2012 WCAP-17678-NP Revision 0

E-1 APPENDIX E BASE LIST 1 WCAP-17678-NP November 2012 Revision 0

E-2 Wolf Creek Base List I Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support('°)

I ABHV0005 MAIN STM LOOP 2 TO TDAFW PUMP AUX Yes Yes DHR 2 ABHV0006 MAIN STM LOOP 3 AFWP TURBINE ISO AUX Yes Yes DHR 3 ABHVOOI LOOP-4 MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 4 ABHV0014 LOOP-I MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 5 ABHVOO17 LOOP-2 MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 6 ABHV0020 LOOP-3 MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 7 ABPTOOO1 STM GEN A STEAMLINE PRESSURE AUX Yes Yes PC DHR 8 ABPT0002 STM GEN B STEAMLINE PRESSURE AUX Yes Yes PC DHR 9 ABPT0003 STM GEN C STEAMLINE PRESSURE AUX Yes Yes PC DHR 10 ABPT0004 STM GEN D STEAMLINE PRESSURE AUX Yes Yes PC DHR 11 ABPT0514 STEAM GEN A PRESSURE TRANSMITTER AUX Yes Yes RC PC 12 ABPT0515 STEAM GEN A PRESSURE TRANSMITTER AUX Yes Yes RC PC 13 ABPT0516 STEAM GEN A PRESSURE TRANSMITTER AUX Yes Yes RC PC 14 ABPT0524 STEAM GEN B PRESSURE TRANSMITTER AUX Yes Yes RC PC 15 ABPT0525 STEAM GEN B PRESSURE TRANSMITTER AUX Yes Yes RC PC 16 ABPT0526 STEAM GEN B PRESSURE TRANSMITTER AUX Yes Yes RC PC 17 ABPT0534 STEAM GEN C PRESSURE TRANSMITTER AUX Yes Yes RC PC 18 ABPT0535 STEAM GEN C PRESSURE TRANSMITTER AUX Yes Yes RC PC 19 ABPT0536 STEAM GEN C PRESSURE TRANSMITTER AUX Yes Yes RC PC 20 ABPT0544 STEAM GEN D PRESSURE TRANSMITTER AUX Yes Yes RC PC WCAP- 17678-NP November 2012 Revision 0

E-3 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2 ) Basis?) (Screens In?) Support())

21 ABPT0545 STEAM GEN D PRESSURE TRANSMITTER AUX Yes Yes RC PC 22 ABPT0546 STEAM GEN D PRESSURE TRANSMITTER AUX Yes Yes RC PC 23 ABPV0001 SG A ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 24 ABPV0002 SG B ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 25 ABPV0003 SG C ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 26 ABPV0004 SG D ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 27 AEFV0039 EBB30A FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 28 AEFV0040 EBB30B FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 29 AEFV0041 EBB30C FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 30 AEFV0042 EBBO0D FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 31 AELT0501 STM GEN A WIDE RANGE RB Yes Yes PC DHR 32 AELT0502 STM GEN B WIDE RANGE RB Yes Yes PC DHR 33 AELT0503 STM GEN C WIDE RANGE RB Yes Yes PC DHR 34 AELT0504 SG D WIDE RANGE (SG LVL L/4 CH TEST RB Yes Yes PC DHR CARD) 35 AELT0517 STM GEN LEVEL A NARROW RANGE RB Yes Yes PC DHR 36 AELT0518 STM GEN LEVEL A NARROW RANGE RB Yes Yes PC DHR 37 AELT0519 STM GEN LEVEL A NARROW RANGE RB Yes Yes PC DHR 38 AELT0527 STM GEN B LEVEL RB Yes Yes PC DHR 39 AELT0528 STM GEN B NARROW RNG LEVEL RB Yes Yes PC DHR WCAP-17678-NP November 2012 Revision 0

E-4 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

40 AELT0529 STM GEN LEVEL B NARROW RANGE RB Yes Yes PC DHR 41 AELT0537 STM GEN LEVEL C NARROW RANGE RB Yes Yes PC DHR 42 AELT0538 STM GEN LEVEL C NARROW RANGE RB Yes Yes PC DHR 43 AELT0539 STM GEN LEVEL C NARROW RANGE RB Yes Yes PC DHR 44 AELT0547 STM GEN LEVEL D NARROW RANGE RB Yes Yes PC DHR 45 AELT0548 STM GEN D NARROW RNG LEVEL RB Yes Yes PC DHR 46 AELT0549 STM GEN LEVEL D NARROW RANGE RB Yes Yes PC DHR 47 AELT0551 STM GEN A LEVEL RB Yes Yes PC DHR 48 AELT0552 STM GEN B LEVEL RB Yes Yes PC DHR 49 AELT0553 STM GEN C LEVEL RB Yes Yes PC DHR 50 AELT0554 STM GEN D LEVEL RB Yes Yes PC DHR 51 -ALFTOOOI AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 52 ALFT0002 AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 53 ALFT0003 AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 54 ALFT0004 AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 55 ALFT0007 AUX FDW FLO TO SG A AUX Yes Yes PC DHR 56 ALFT0009 AUX FDW FLO TO SG B AUX Yes Yes PC DHR 57 ALFTOO1 1 AUX FDW FLO TO SGC AUX Yes Yes PC DHR 58 ALHV0005 MTR DRIV AFWP DISCH HDR TO SG D ISO AUX Yes Yes PC DHR VLV WCAP- 17678-NP November 2012 Revision 0

E-5 Wolf Creek Base List 1 (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

59 ALHV0006 TURB DRIVEN AFWP DISCH HDR TO SG D AUX Yes Yes PC DHR ISO 60 ALHV0007 MTR DRIV AFWP DISCH HDR TO SG A ISO AUX Yes Yes PC DHR VLV 61 ALHV0008 TURB DRIVEN AFWP DISCH HDR TO SG A AUX Yes Yes PC DHR ISO 62 ALHV0009 MTR DRIV AFWP DISCH HDR TO SG B ISO AUX Yes Yes PC DHR VLV 63 ALHVOO1O TURB DRIVEN AFWP DISCH HDR TO SG B AUX Yes Yes PC DHR ISO 64 ALHVOO1 1 MTR DRIV AFWP DISCH HDR TO SG G ISO AUX Yes Yes PC DHR VLV 65 ALHV0012 TURB DRIVEN AFWP DISCH HDR TO SG C AUX Yes Yes PC DHR ISO 66 ALHV0030 ESW TO MDAFW PUMP B 6" BTFL VLV AUX Yes Yes PC DHR W/LIMITQ 67 ALHV0031 ESW TO MDAFW PUMP A 6" BTFL VLV AUX Yes Yes PC DHR W/LIMITQ 68 ALHV0032 ESW SUPPLY TO PAL02 8" BTFL VLV AUX Yes Yes PC DHR W/LIMITQ 69 ALHV0033 ESW TO TDAFW PUMP 8" BTFL VALVE AUX Yes Yes PC DHR W/LIMITQ 70 ALHV0034 COND STOR TK TO MD AUX FW PUMP B 8" AUX Yes Yes PC DHR GATE VALVE WCAP- 17678-NP November 2012 Revision 0

E-6 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building( 2) Basis?) (Screens In?) Support(])

71 ALHV0035 CONDENSATE STOR TO AUX FW PUMP A AUX Yes Yes PC DHR 8" GATE VALVE 72 ALHV0036 CONDENSATE STOR TO TD AUX FW PUMP AUX Yes Yes PC DHR 10" GATE VALVE 73 ALPT0025 AFP SUCTION PRESSURE TRANSMITTER AUX Yes Yes PC DHR (2) 74 ALPT0026 AFP SUCTION PRESSURE TRANSMITTER AUX Yes Yes PC DHR (4) 75 ALPT0037 ESFAS AFW LOW SUCTION PRESS AUX Yes Yes PC DHR TRANSMITTER 76 ALPT0038 ESFAS AFW LOW SUCTION PRESS AUX Yes Yes PC DHR TRANSMITTER 77 ALPT0039 ESFAS AFW LOW SUCTION PRESS AUX Yes Yes PC DHR TRANSMITTER 78 BB004A W THERMOCOUPLE REF-JCT I RB Yes Yes DHR 79 BB004B W THERMOCOUPLE JUNCTION BOX-JCT 2 RB Yes Yes DHR 80 BB007 DC CONTACT CABINET AUX Yes Yes PC DHR 81 BB008 DC CONTACT CABINET AUX Yes Yes PC DHR 82 BBHV8000A PZR POWER RELIEF PCV-455A INLET ISO RB Yes Yes PC DHR 83 BBHV8000B PZR POWER RELIEF PCV-456A INLET ISO RB Yes Yes PC DHR 84 BBLIS 1311 RV SUBCOOLING MONITOR TRN A AUX Yes Yes RC 85 BBLIS1312 RV SUBCOOLING MONITOR TRN A AUX Yes Yes RC 86 BBLIS1321 RV SUBCOOLING MONITOR TRN B AUX Yes Yes RC WCAP- 17678-NP November 2012 Revision 0

E-7 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

87 BBLIS1322 RV SUBCOOLING MONITOR TRN B AUX Yes Yes RC 88 BBLT0459 PRESS LEVEL (NARROW RANGE) RB Yes Yes IC 89 BBLT0460 PRESS LEVEL (NARROW RANGE) RB Yes Yes IC 90 BBLT0461 PRESS LEVEL (NARROW RANGE) RB Yes Yes IC 91 BBLT0462 PRESS LEVEL (WIDE RANGE) RB Yes Yes IC 92 BBPCV0455A PZR POWER OPERATED RELIEF VALVE RB Yes Yes PC DHR 93 BBPCV0456A PZR POWER OPERATED RELIEF VALVE RB Yes Yes PC DHR 94 BBPT0403 RCS WIDE RANGE PR XMTR AUX Yes Yes PC 95 BBPT0405 RCS WR PRESSURE TRANSMITTER AUX Yes Yes PC 96 BBPT0455 PRESSURIZER PRESSURE RB Yes Yes PC 97 BBPT0456 PRESSURIZER PRESSURE RB Yes Yes PC 98 BBPT0457 PRESSURIZER PRESSURE RB Yes Yes PC 99 BBPT0458 PRESSURIZER PRESSURE RB Yes Yes PC 100 BBPV8702A RCS HOT LEG 1 TO RHR PUMP A SUCTION RB Yes Yes DHR 101 BBPV8702B RCS HOT LEG 4 TO RHR PUMP B SUCTION RB Yes Yes DHR 102 BBTE0413A REC COOLANT LP 1 HOT LEG RB Yes Yes DHR 103 BBTE0413B REC COOLANT LP 1 COLD LEG RB Yes Yes DHR 104 BBTE0423A REC COOLANT LP 2 HOT LEG RB Yes Yes DHR 105 BBTE0423B REC COOLANT LP 2 COLD LEG RB Yes Yes DHR 106 BBTE0433A REC COOLANT LP 3 HOT LEG RB Yes Yes DHR WCAP- 17678-NP November 2012 Revision 0

E-8 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building2 Basis?) (Screens In?) Support(')

107 BBTE0433B REC COOLANT LP 3 COLD LEG RB Yes Yes DHR 108 BBTE0443A REC COOLANT LP 4 HOT LEG RB Yes Yes DHR 109 BBTE0443B REC COOLANT LP 4 COLD LEG RB Yes Yes DHR 110 BGFCV0 121 CENTRIFUGAL CHG PMP FLOW CONTROL AUX Yes Yes RC PC IC 111 BGFT215A TOTAL SEAL INJECTION FLOW AUX Yes Yes IC TRANSMITTER (4) 112 BGFT215B TOTAL SEAL INJECTION FLOW AUX Yes Yes IC TRANSMITTER (2) 113 BGHV8100 SEAL WATER RETURN CONTAINMENT ISO AUX Yes Yes IC VLV 114 BGHV8105 CHARGING PUMPS TO REGEN HX/CTMT AUX Yes Yes PC IC CF ISO 115 BGHV8106 CHARGING PUMPS TO REGENERATIVE HX AUX Yes Yes PC IC ISO 116 BGHV8 110 CHARGING PUMPS MINIMUM FLOW VLV AUX Yes Yes RC IC 117 BGHV81 11 CHARGING PUMPS MINIMUM FLOW VLV AUX Yes Yes RC IC 118 BGHV8112 SEAL WATER RETURN CTMT ISO VLV RB Yes Yes IC CF 119 BGHV8152 LETDOWN SYSTEM CONTAINMENT ISO AUX Yes Yes IC CF VLV 120 BGHV8160 LETDOWN SYSTEM CONTAINMENT ISO RB Yes Yes IC CF VLV 121 BGLCV0I 12B VCT LOW LEVEL ISO GATE VALVE ON AUX Yes Yes RC IC BG020HCB-4 WCAP-17678-NP November 2012 Revision 0

E-9 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

122 BGLCVOI 12C VCT LOW LEVEL ISO GATE VALVE ON AUX Yes Yes RC IC BG020HCB-4 123 BLHV8047 REACTOR M/U WATER CONTAINMENT ISO AUX Yes Yes IC CF 124 BMHV000I SG A BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 125 BMHV0002 SG B BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 126 BMHV0003 SG C BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 127 BMHV0004 SG D BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 128 BNHV0003 RWST SUPPLY TO CTMT SPRAY PUMP B AUX Yes Yes CF 129 BNHV0004 RWST SUPPLY TO CTMT SPRAY PUMP A AUX Yes Yes CF 130 BNHV8806A RWST TO SAFETY INJ PUMP SUCTION AUX Yes Yes IC DHR 131 BNHV8806B RWST TO SAFETY INJ PUMP SUCTION AUX Yes Yes IC DHR 132 BNHV8812A RWST TO RHR PUMP A SUCTION AUX Yes Yes IC DHR 133 BNHV8812B RWST TO RHR PUMP B SUCTION AUX Yes Yes IC DHR 134 BNHV8813 SAFETY INJECTION TO RWST ISOLATION AUX Yes Yes IC DHR VLV 135 BNLCVO0 12D CHARGING PUMPS SUCTION FROM RWST AUX Yes Yes RC IC 136 BNLCVOl 12E CHARGING PUMPS SUCTION FROM RWST AUX Yes Yes RC IC 137 BNLT0930 RWST LEVEL TRANSMITTER (1) YRD Yes Yes RC IC DHR 138 BNLT0931 RWST LEVEL TRANSMITTER (2) YRD Yes Yes RC IC DHR 139 BNLT0932 RWST LEVEL TRANSMITTER (3) YRD Yes Yes RC IC DHR 140 BNLT0933 RWST LEVEL TRANSMITTER (4) YRD Yes Yes RC IC DHR WCAP-17678-NP November 2012 Revision 0

E-10 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2( Basis?) (Screens In?) Support(")

141 BNVOOI 1 RWST OUTLET ISO VALVE AUX Yes Yes RC IC DHR 142 CGDO1A ESW PUMP HOUSE SUPPLY FAN ESW Yes Yes RC PC IC DHR 143 CGDO1B ESW PUMP HOUSE SUPPLY FAN ESW Yes Yes RC PC IC DHR 144 CGMO1A DIESEL GENERATOR BLDG SUPPLY FAN DGB Yes Yes RC PC IC DHR 145 CGMO1B DIESEL GENERATOR BLDG SUPPLY FAN DGB Yes Yes RC PC IC DHR 146 EBGO1 LETDOWN HEAT EXCHANGER AUX Yes Yes DHR 147 EBG02 EXCESS LETDOWN HEAT EXCHANGER R Yes Yes DHR 148 EBG03 SEAL WATER HEAT EXCHANGER AUX Yes Yes PC IC 149 EEGO1A COMPONENT COOL WATER HEAT AUX Yes Yes RC PC IC DHR EXCHANGER 150 EEGO1B COMPONENT COOL WATER HEAT AUX Yes Yes RC PC IC DHR EXCHANGER 151 EEJOIA RESIDUAL HEAT REMOVAL HEAT AUX Yes Yes DHR EXCHANGER 152 EEJO1B RESIDUAL HEAT REMOVAL HEAT AUX Yes Yes DHR EXCHANGER 153 EFI55 ESW CONTROL PANEL ESW Yes Yes RC PC IC DHR CF 154 EF 156 ESW CONTROL PANEL ESW Yes Yes RC PC IC DHR CF 155 EFFE0053 ESW A FLO TO POWER BLOCK CB Yes Yes RC PC IC DHR CF 156 EFFE0054 ESW B FLO TO POWER BLOCK CB Yes Yes RC PC IC DHR CF 157 EFFT053 ESW PUMP A DISCHARGE FLOW CB/CC Yes Yes RC PC IC DHR CF TRANSMITTER WCAP- 17678-NP November 2012 Revision 0

E-11 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"')

158 EFFT054 ESW PUMP B DISCHARGE FLOW CB/CC Yes Yes RC PC IC DHR CF TRANSMITTER 159 EFHV0023 ESW A/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 160 EFHV0024 ESW B/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 161 EFHV0025 ESW A/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 162 EFHV0026 ESW B/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 163 EFHV0031 ESW A TO CTMT AIR COOLERS BUTT VLV AUX Yes Yes RC PC IC DHR CF 164 EFHV0032 ESW B TO CTMT AIR COOLERS AUX Yes Yes RC PC IC DHR CF BUTTERFLY VALVE 165 EFHV0033 ESW A TO CTMT AIR COOLERS RB Yes Yes RC PC IC DHR CF BUTTERFLY VLV 166 EFHV0034 ESW B T CTMT AIR COOLERS BUTTERFLY RB Yes Yes RC PC IC DHR CF VLV 167 EFHV0037 ESW A TO UNTIMATE HEAT SINK CB/CC Yes Yes RC PC IC DHR CF THROTTLED 168 EFHV0038 ESW B TO ULTIMATE HEAT SINK CB/CC Yes Yes RC PC IC DHR CF 169 EFHV0039 ESW TRAIN A TO SW CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 170 EFHV0040 ESW TRAIN B TO SW CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE November 2012 WCAP- 17678-NP November 2012 Revision 0

E-12 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building2( Basis?) (Screens In?) Support(")

171 EFHV0041 ESW TRAIN A TO SW CROSS CONNECT Yes Yes RC PC IC DHR CF VALVE 172 EFHV0042 ESW TRAIN B TO SW CROSS CONNECT Yes Yes RC PC IC DHR CF VALVE 173 EFHV0043 ESW TRAIN A TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF VALVE 174 EFHV0044 ESW TRAIN B TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF VALVE 175 EFHV0045 ESW A FROM CTMT AIR COOLERS RB Yes Yes RC PC IC DHR CF BUTTERFLY VLV 176 EFHV0046 ESW B FROM CTMT AIR COOLERS RB Yes Yes RC PC IC DHR CF BUTTERFLY VLV 177 EFHV0047 ESW A FROM CTMT AIR COOLERS BYP AUX Yes Yes RC PC IC DHR CF BUTTERFLY VALVE 178 EFHV0048 ESW A FROM CTMT AIR CLRS BYP AUX Yes Yes RCPC IC DHR CF BUTTERFLY VALVE 179 EFHV0049 ESW A FROM CTMT AIR CLRS BUTT VLV AUX Yes Yes RC PC IC DHR CF 180 EFHV0050 ESW B FROM CTMT AIR COOLERS AUX Yes Yes RC PC IC DHR CF BUTTERFLY VALVE 181 EFHV0051 ESW A TO CCW HX A AUX Yes Yes RC PC IC DHR CF 182 EFHV0052 ESW B TO CCW HX B AUX Yes Yes RC PC IC DHR CF 183 EFHV0059 ESW TRAIN A FROM CCW HX ISO VALVE AUX Yes Yes RC PC IC DHR CF 184 EFHV0060 ESW TRAIN B FROM CCW HX ISO VALVE AUX Yes Yes RC PC IC DHR CF 185 EFHV0091 ESW SCREEN A SPRAY VALVE ESW Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-13 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"1*)

186 EFHV0092 ESW SCREEN B SPRAY VALVE ESW Yes Yes RC PC IC DHR CF 187 EFHV0097 ESW PUMP A DISCHARGE RECIRC VALVE ESW Yes Yes RC PC IC DHR CF 188 EFHV0098 ESW PUMP B DISCHARGE AIR RELEASE ESW Yes Yes RC PC IC DHR CF VALVE 189 EFPDT0019 ESW 2A SELF-CLN STR DIFF PRES YARD Yes Yes RC PC IC DHR CF 190 EFPDT0020 ESW 2B SELF-CLN STR DIFF PRES YARD Yes- Yes RC-PC-IC-DHR CF 191 EFPDT0043 ESW TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF 192 EFPDT0044 ESW TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF 193 EFPDVO019 ESW SELF-CLEANING STRAINER A TRASH ESW Yes Yes RC PC IC DHR CF VLV 194 EFPDVO020 ESW SELF-CLEANING STRAINER B TRASH ESW Yes Yes RC PC IC DHR CF VLV 195 EFPTOOOI ESW PUMP DISCHARGE ESW Yes Yes RC PC IC DHR CF 196 EFPT0002 ESW PUMP DISCHARGE ESW Yes Yes RC PC IC DHR CF 197 EFTE0061 ESW A TEMP TO POWER BLOCK CB/CC Yes Yes RC PC IC DHR CF 198 EFTE0062 ESW B TEMPT TO POWER BLOCK CB/CC Yes Yes RC PC IC DHR CF 199 EGFT0062 RCP OUT FLOW AUX Yes Yes IC 200 EGFT128 CCW HX OUTLET TO RCP BYPASS AUX Yes Yes DHR 201 EGFT129 CCW HX OUTLET TO RCP BYPASS AUX Yes Yes DHR 202 EGHV00I I ESW TO CCW TRAIN A PMP SUCT ISO AUX Yes Yes DHR 203 EGHV0012 ESW MAKE-UP TO CCW SYS NG04CJF1 AUX Yes Yes DHR WCAP-17678-NP November 2012 Revision 0

E-14 Wolf Creek Base List I (cont.)

Base List 1 Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

204 EGHV0013 ESW TO CCW TRAIN A PMP SUCT ISO AUX Yes Yes DHR 205 EGHV0014 ESW MAKE-UP TO CCW SYS NG04CJF2 AUX Yes Yes DHR 206 EGHV0015 CCW TRAIN A RETURN ISO VALVE AUX Yes Yes DHR 207 EGHV0016 CCW TRAIN B RETURN ISO VALVE AUX Yes Yes DHR 208 EGHV0053 CCW TRAIN A SUPPLY ISO VALVE AUX Yes Yes DHR 209 EGHV0054 CCW TRAIN B SUPPLY ISO VALVE AUX Yes Yes DHR 210 EGHV0058 CCW TO RCS ISO AUX Yes Yes DHR 211 EGHV0059 CCW RETURN FROM RCS ISO AUX Yes Yes DHR 212 EGHV0060 CCW RETURN FOR RCS ISO RB Yes Yes DHR 213 EGHV0061 CCW RETURN FROM RCS ISO AUX Yes Yes DHR 214 EGHV0062 CCW RETURN FROM RCS ISO RB Yes Yes DHR 215 EGHV0069A CCW SUPLY TO RADWST BLDG ISO AUX Yes Yes DHR BTTFLY VLV 216 EGHV0069B RADWST BLDG CCW RETN HDR ISO AUX Yes Yes DHR BTTFLY VLV 217 EGHV0070A CCW SUPLY TO RADWST BLDG ISO AUX Yes Yes DHR BTTFLY VLV 218 EGHV0070B RADWST BLDG CCW RETN HDR ISO AUX Yes Yes DHR BTTFLY VLV 219 EGHV0071 CCW TO RCS ISO AUX Yes Yes DHR 220 EGHV0101 CCW TO RHR HX A ISO AUX Yes Yes DHR 221 EGHVO 102 CCW TO RHR HX B ISO AUX Yes Yes DHR WCAP-17678-NP November 2012 Revision 0

E-15 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2 ) Basis?) (Screens In?) Support('")

222 EGLT0001 CCW SURGE TK A AUX Yes Yes DHR 223 EGLT0002 CCW SURGE TK B AUX Yes Yes DHR 224 EGPT0077 CCW PMPS A&C DISCH PRESS AUX Yes Yes DHR 225 EGPT0078 CCW PMPS B&D DISCH PRESS AUX Yes Yes DHR 226 EGTE0031 CCW HX A OUTLET TEMP AUX Yes Yes RC DHR 227 EGTE0032 CCW HX B OUTLET TEMP AUX Yes Yes RC DHR 228 EGTV0029 CCW HX A TEMP CV WAFER BTFFLY VLV AUX Yes Yes RC DHR 229 EGTV0030 CCW HX B TEMP CV WAFER BTTFLY VLV AUX Yes Yes RC DHR 230 EHBO1 REACTOR COOLANT DRAIN TANK HX RB Yes Yes IC 231 EJFCV0610 RIHR PUMP A MINIFLOW VALVE AUX Yes Yes DHR 232 EJFCV0611 RHR PUMP B MINIFLOW VALVE AUX Yes Yes DHR 233 EJFCV0618 RHR HX A BYPASS AUX Yes Yes DHR 234 EJFCV0619 RHR HX B BYPASS AUX Yes Yes DHR 235 EJFIS0610 RHR PMP IA MINIFLOW CONTROL AUX Yes Yes DHR DISCHARGE 236 EJFIS0611 RHR PMP PEJOIB MINIFLOW CONTROL AUX Yes Yes DHR DISCHARGE 237 EJHCV0606 RHR HX A OUTLET ISO AUX Yes Yes DHR 238 EJHCV0607 RHR HX B OUTLET ISO AUX Yes Yes DHR 239 EJHV8701A RCS HOT LEG I TO RHR PUMP A SUCTION RB Yes Yes DHR 240 EJHV8701B RCS HOT LEG 4 TO RHR PUMP B SUCTION RB Yes Yes DHR WCAP- 17678-NP November 2012 Revision 0

E-16 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

241 EJHV8716A RHR A TO SIS HOT LEG RECIRC LOOPS 2 AUX Yes Yes DHR

& 3 ISO 242 EJHV8716B RHR B TO SIS HOT LEG RECIRC LOOPS 2 AUX Yes Yes DHR

& 3 ISO 243 EJHV8804A RHR A TO CVCS CCP ISO AUX Yes Yes DHR 244 EJHV8804B RHR SUPPLY TO SI PUMP B ISO VALVE AUX Yes Yes DHR 245 EJHV8809A RHR TO ACCUM INJ LOOPS 1 & 2 ISO VLV AUX Yes Yes DHR 246 EJHV8809B RHR TO ACCUM INJ LOOPS 3 & 4 ISO VLV AUX Yes Yes DHR 247 EJHV8811 A CTMT RECIRC SUMP TO RHR PUMP A AUX Yes Yes DHR SUCTION 248 EJHV88 11 B CTMT RECIRC SUMP TO RHR PUMP B AUX Yes Yes DHR SUCTION 249 EJHV8840 RHR/SI HOT LEG RECIRC ISO VALVE AUX Yes Yes DHR 250 EJLE0008A CTMT RECIRC SUMP LEVEL RB Yes Yes DHR 251 EJLE0008B CTMT RECIRC SUMP LEVEL RB Yes Yes DHR 252 EJLE007A CTMT SUMP A LEVEL RB Yes Yes DHR 253 EJLE007B CTMT SUMP B LEVEL RB Yes Yes DHR 254 EJLIT007 CTMT Sump B Level CB/CC Yes Yes DHR 255 EJLIT008 CTMT SUMP A LEVEL INDICATING CB/CC Yes Yes DHR TRANSMITTER 256 EKJ03A INTERCOOLER HEAT EXCHANGER DGB Yes Yes RC PC IC DHR CF 257 EKJ03B INTERCOOLER HEAT EXCHANGER DGB Yes Yes RC PC IC DHR CF WCAP-17678-NP November 2012 Revision 0

E-17 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2) Basis?) (Screens In?) Support(")

258 EKJ04A LUBE OIL COOLER DGB Yes Yes RC PC IC DHR CF 259 EKJ04B LUBE OIL COOLER DGB Yes Yes RC PC IC DHR CF 260 EKJ06A DIESEL JACKET WATER HEAT DGB Yes Yes RC PC IC DHR CF EXCHANGER 261 EKJ06B DIESEL JACKET WATER HEAT DGB Yes Yes RC PC IC DHR CF EXCHANGER 262 EMFS0917C CNTFGL CHG PMPS TO BRN INJ TK AUX Yes Yes RC IC DHR 263 EMFS0917D CNTFGL CHG PMPS TO BRN INJ TK AUX Yes Yes RC IC DHR 264 EMFT0917A CCP A TO BIT FLOW TRANSMITTER AUX Yes Yes RC IC DHR 265 EMFT0917B CCP B TO BIT FLOW TRANSMITTER AUX Yes Yes RC IC DHR 266 EMHV8801A BIT OUTLET ISO AUX Yes Yes RC IC DHR CF 267 EMHV8801 B BIT OUTLET ISO AUX Yes Yes RC IC DHR CF 268 EMHV8802A SI PUMP A DISCH HOT LEG ISO VLV AUX Yes Yes RC IC DHR CF 269 EMHV8802B SI PUMP B DIS HOT LEG ISO VLV AUX Yes Yes RC IC DHR CF 270 EMHV8803A CHARGING PUMP DISCH HDR TO BIT ISO AUX Yes Yes RC IC DHR 271 EMHV8803B CHARGING PUMP DISCH HDR TO BIT ISO AUX Yes Yes RC IC DHR 272 EMHV8807A RHR HX A/CVCS TO SI PUMP A AUX Yes Yes RC IC DHR DOWNSTREAM ISO 273 EMHV8807B RHR HX A/CVCS TO SI PUMP A AUX Yes Yes RC IC DHR DOWNSTREAM ISO 274 EMHV8814A SI PUMP A RETURN TO RWST ISO VLV AUX Yes Yes RC IC DHR 275 EMHV8814B SI PUMP B RETURN TO RWST ISO VALVE AUX Yes Yes RC IC DHR WCAP- 17678-NP November 2012 Revision 0

E-18 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2) Basis?) (Screens In?) Support°o) 276 EMHV882IA SI PUMP A DISCHARGE ACCUM INJ ISO AUX Yes Yes RC IC DHR VALVE 277 EMHV8821B SI PUMP B DISCHARGE ACCUM INJ ISO AUX Yes Yes RC IC DHR VALVE 278 EMHV8824 SAFETY INJ PUMP B TEST LINE ISO VLV RB Yes Yes IC DHR CF 279 EMHV8835 SAFETY INJ COLD LEG ISO VALVE AUX Yes Yes IC DHR CF 280 EMHV8923A SAFETY INJECTION PUMP A SUCT ISO AUX Yes Yes IC DHR VALVE 281 EMHV8923B SAFETY INJECTION PUMP B SUCT ISO VLV AUX Yes Yes IC DHR 282 EMHV8924 RHR HX A/CVCS TO SI PUMP A UPSTREAM AUX Yes Yes IC DHR ISO 283 ENHVOOOI CTMT RECIRC SUMP TO CTMT SPRAY AUX Yes Yes CF PUMP A ISO 284 ENHV0006 CTMT SPRAY TRAIN A DISCH ISO VLV AUX Yes Yes CF 285 ENHV0007 CTMT RECIRC SUMP TO CTMT SPRAY AUX Yes Yes CF PUMP B ISO 286 ENHV0012 CTMT SPRAY TRAIN B DISCH ISO VLV AUX Yes Yes CF 287 ENHV0015 SPRAY ADDITIVE TANK OUTLET TO CTMT AUX Yes Yes CF SPRAY A ISO 288 ENHV0016 SPRAY ADDITIVE TANK OUTLET TO CTMT AUX Yes Yes CF SPRAY B ISO 289 EPHV8808A ACCUMULATOR TANK A OUTLET ISO RB Yes Yes DHR VALVE WCAP-17678-NP November 2012 Revision 0

E-19 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

290 EPHV8808B ACCUMULATOR TANK B OUTLET ISO RB Yes Yes *, DHR VALVE 291 EPHV8808C ACCUMULATOR TANK C OUTLET ISO RB Yes Yes DHR VALVE 292 EPHV8808D ACCUMULATOR TANK D OUTLET ISO RB Yes Yes DHR VALVE 293 FC0219 LOCAL CONTROL PANEL FOR TD AFW AUX Yes Yes PC DHR PUMP 294 FCFV0313 TDAFP GOVERNOR VALVE AUX Yes Yes PC DHR 295 FCHV0312 AUX FW PUMP TURBINE MECH AUX Yes Yes PC DHR TRIP/THROT VLV 296 FEFO0A ESW TRAVELING WATER SCREENS ESW Yes Yes RC PC IC DHR CF 297 FEFOIB ESW TRAVELING WATER SCREENS ESW Yes Yes RC PC IC DHR CF 298 FEF02A ESW SELF-CLEANING STRAINER (MTR ESW Yes Yes RC PC IC DHR CF OP.-IN MOV PROG.)

299 FEF02B ESW SELF-CLEAN STRAIN. (MTR OP.-IN ESW Yes Yes RC PC IC DHR CF MOV PROG.)

300 FEF03A ESW PRELUBE STORAGE TANK FILTER YARD Yes Yes RC PC IC DHR CF 301 FEF03B ESW PRELUBE STORAGE TANK FILTER YARD Yes Yes RC PC IC DHR CF 302 FKJ02A KKJ01A AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF 303 FKJ02B KKJO1A AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF 304 FKJ02C KKJO1B AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF 305 FKJ02D KKJO1B AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-20 Wolf Creek Base List I (cont.)

Base List 1 Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building( 2) Basis?) (Screens In?) Support(')

306 GDDOOO1 ESW PUMP RM SUP FAN IA INLET ESW Yes Yes RC PC IC DHR CF TORNADO DAMPER 307 GDD0003 ESW PUMP RM A EXHAUST SPRING ESW Yes Yes RC PC IC DHR CF LOADED TORNADO DAMPER 308 GDD0008 ESW PUMP RM SUP FAN lB INLET ESW Yes Yes RC PC IC DHR CF TORNADO DAMPER 309 GDD0010 ESW PUMP RM B EXHAUST SPRING ESW Yes Yes RC PC IC DHR CF LOADED TORNADO DAMPER 310 GDTEOOO1 ESW PMP RM TEMP IA DM ESW Yes Yes RC PC IC DHR CF 311 GDTE0011 ESW PMP RM SUP FAN 1B DMPR ESW Yes Yes RC PC IC DHR CF 312 GDTSLOOO1 ESW PMP RM FAN CGDO1A TEMP SWITCH CB Yes Yes RC PC IC DHR CF LOW 313 GDTZOOO1A ACTUATOR FOR O.A. DAMPER GDD0002 ESW Yes Yes IC DHR 314 GDTZOOO1B ESW ACTUATOR FOR RETURN AIR ESW Yes Yes IC DHR DAMPER GDD0004 315 GDTZOOO1C ACTUATOR FOR EXHAUST DAMPER ESW Yes Yes IC DHR GDDOO 12 316 GDTZ001 1A ACT. FOR ESW PMP RM SUP FAN OA DMPR ESW Yes Yes IC DHR GDD0009 317 GDTZ0011B ACTUATOR FOR ESW PUMP RM SUPPLY ESW Yes Yes IC DHR FAN RETURN DAMPER 318 GDTZOOIIC ACT. FOR ESW PMP RM SP FAN EXH DMPR ESW Yes Yes IC DHR GDD0013 WCAP- 17678-NP November 2012 Revision 0

E-21 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(l) 319 GKHZOO 19D CTRL RM A/C UNIT 4A OUT ACTUATOR Yes Yes RC PC IC DHR CF (GKD0285) 320 GKHZ0030D CTRL RM FLTR FAN 4B DISCH ACTUATOR CB Yes Yes RC PC IC DHR CF (D0318) 321 GKHZ029A CONT ROOM A/C UNIT A RETURN AUX Yes Yes RC PC IC DHR CF DAMPER 322 GKHZ029B CONT ROOM A/C UNIT A DISCHARGE AUX Yes Yes RC PC IC DHR CF DAMPER 323 GKHZ040A CONT ROOM A/C UNIT B RETURN AUX Yes Yes RC PC IC DHR CF DAMPER 324 GKHZ040B CONT ROOM A/C UNIT A DISCHARGE AUX Yes Yes RC PC IC DHR CF DAMPER 325 GKV0765 SGK04A WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 326 GKV0766 SGK04B WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 327 GKV0767 SGK05A WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 328 GKV0768 SGK05B WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 329 GMHZ0009 DSL GEN RM EXH DMPR A, GMD0005 DGB Yes Yes RC PC IC DHR CF 330 GMHZ0019 DSL GEN RM EXH DMPR B, GMDOO1O DGB Yes Yes RC PC IC DHR CF 331 GMTEOOOI DIESEL GEN VENT SUPPLY FAN IA DGB Yes Yes RC PC IC DHR CF 332 GMTE001 I DIESEL GEN VENT SUPPLY FAN IB DGB Yes Yes RC PC IC DHR CF 333 GMTZOOO1A ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0002 WCAP-1 7678-NP November 2012 Revision 0

E-22 Wolf Creek Base List 1 (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Supporte")

334 GMTZOOO1B ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0007 335 GMTZOOI I A ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0002 336 GMTZOO I IB ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0007 337 GNPT0934 CONTAINMENT ATMOSPHERE RB Yes Yes CF 338 GNPT0935 CONTAINMENT ATMOSPHERE RB Yes Yes CF 339 GNPT0936 CONTAINMENT ATMOSPHERE RB Yes Yes CF 340 GNPT0937 CONTAINMENT ATMOSPHERE AUX Yes Yes CF 341 GNPT0938 CONTAINMENT ATMOSPHERE RB Yes Yes CF 342 GNPT0939 CONTAINMENT ATMOSPHERE RB Yes Yes CF 343 GNTE060 CTMT COOLER A INLET TEMP ELEMENT RB Yes Yes CF 344 GNTE061 CTMT COOLER D INLET TEMP ELEMENT RB Yes Yes CF 345 GNTE062 CTMT COOLER C INLET TEMP ELEMENT RB Yes Yes CF 346 GNTE063 CTMT COOLER B INLET TEMP ELEMENT RB Yes Yes CF 347 GNVOOO I CTMT COOLER A ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV 348 GNVO002 CTMT COOLER B ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV 349 GNVO003 CTMT COOLER C ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV WCAP- 17678-NP November 2012 Revision 0

E-23 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support")

350 GNVO004 CTMT COOLER D ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV 351 GNVO039 CTMT COOLER A ESW SUPPLY ISOLATION RB Yes Yes CF 352 GNVO040 CTMT COOLER B ESW SUPPLY ISOLATION RB Yes Yes CF 353 GNVO041 CTMT COOLER C ESW SUPPLY ISOLATION RB Yes Yes CF 354 - GNVO042 CTMT COOLER D ESW SUPPLY ISOLATION RB - Yes Yes CF 355 GSHV0020 H2 PURGE INNER CTMT ISO BTTFLY VLV RB Yes Yes CF 356 GSHV0021 H2 PURGE OUTER CTMT ISO BUTT VLV AUX Yes Yes CF 357 GSHV0031 CTMT ATMOS MON (RE-32) SUPPLY RB Yes Yes CF INSIDE CTMT ISO 358 GSHV0032 CTMT ATMOSPHERE MONITOR SUPPLY AUX Yes Yes CF OUTER ISO 359 GSHV0033 CTMT ATMOS MON (RE-32) SUPPLY AUX Yes Yes CF OUTSIDE CTMT ISO 360 GSHV0034 CTMT ATMOS MONITOR (RE-32) RET RB Yes Yes CF INSIDE CTMT ISO 361 GSHV0036 CTMT ATM MONIT (RE-31) SUPPLY RB Yes Yes CF OUTSIDE CTMT ISO 362 GSHV0037 CTMT ATMOSPHERE MONITOR SUPPLY AUX Yes Yes CF INSIDE ISO 363 GSHV0038 CTMT ATM MON (RE-31) RET-CTMT AUX Yes Yes CF OUTSIDE ISO 364 GSHV0039 CTMT ATMOS MONITOR (RE-31) RETURN RB Yes Yes CF TO CTMT INSIDE ISO November 2012 WCAP-17678-NP WCAP-17678-NP November 2012 Revision 0

E-24 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support~')

365 GTHZ0004 CTMT MINI PURGE AIR SUPLY O/SIDE AUX Yes Yes CF CTMT ISO BTTFLY VLV 366 GTHZ0005 CTMT MINI PURGE AIR SUPPLY I/S CTMT RB Yes Yes CF ISO BTTFLY VLV 367 GTHZ0006 CTMT MINI PURGE AIR SUPLY O/SIDE AUX Yes Yes CF CTMT ISO BTTFLY VLV 368 GTHZ0007 CTMT SD PURGE SUPPLY INSIDE CTMT RB Yes Yes CF ISO BTTFLY VLV 369 GTHZ0008 CTMT SD PURGE EXCH INSIDE CTMT ISO RB Yes Yes CF BTTFLY VLV 370 GTHZ0009 CTMT MINI PURGE EXH OUTSIDE CTMT AUX Yes Yes CF ISO 371 GTHZOO1 1 CTMT MINI PURGE EXH INSIDE CTMT ISO RB Yes Yes CF BTTFLY VLV 372 GTHZ0012 CTMT MINI PURGE EXH OUTSIDE CTMT AUX Yes Yes CF ISO BTTFLY VLV 373 GTRE031 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF 374 GTRE032 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF 375 GTRT031 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF (2) 376 GTRT032 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF 377 HBHV7176 RCDT PUMPS DISCH HDR INSIDE CTMT RB Yes Yes CF ISO WCAP-1 7678-NP November 2012 Revision 0

E-25 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

378 JELT0001 EMER FUEL OIL DAY TK A LEV DGB Yes Yes RC PC IC DHR CF 379 JELT0021 EMER FUEL OIL DAY TK B LEV DGB Yes Yes RC PC IC DHR CF 380 JELT0032 EMER FUEL OIL TK B LEV DGB Yes Yes RC PC IC DHR CF 381 JELT012 TJE02A LEVEL TRANSMITTER DGB Yes Yes RC PC IC DHR CF 382 JELT032 TJE02B LEVEL TRANSMITTER DGB Yes Yes RC PC IC DHR CF 383 KAPCV0101 TKA03 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 384 KAPCV0102 TKA04 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 385 KAPCVO 103 TKA05 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 386 KAPCV0200 TKA02 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 387 KCHV0253 FIRE PROT SYS HDR OUTER CTMT ISO Yes Yes CF 388 KJO121 GAUGE PANEL DGB Yes Yes RC PC IC DHR CF 389 KJ0122 GAUGE PANEL DGB Yes Yes RC PC IC DHR CF 390 KKJO1A STANDBY DIESEL (GENERATOR) DGB Yes Yes RC PC IC DHR CF 391 KKJO1B STANDBY DIESEL (GENERATOR) DGB Yes Yes RC PC IC DHR CF 392 LFFV0095 CTMT NOR SUMPS TO FLOOR DRN TK RB Yes Yes CF INSIDE CTMT ISO 393 LFFV0096 CTMT NOR SUMPS TO FLR DRN TK AUX Yes Yes CF OUTSIDE CTMT ISO WCAP- 17678-NP November 2012 Revision 0

E-26 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

394 NBOO1 4.16 KV BUS CB Yes Yes RC PC IC DHR CF 395 NB100110 CTRL BLDG LC NG03 CB Yes Yes RC PC IC DHR CF

.396 NBOO112 FDRXFMRXNB0I CB Yes Yes RC PC IC DHR CF 397 NBOO113 CTRL BLDG LC NGO1 CB Yes Yes RC PC IC DHR CF 398 NB002 4.16 KV BUS #2 CB Yes Yes RC PC IC DHR CF 399 NB00209 FDR XFMR XNB02 CB Yes Yes RC PC IC DHR CF 400 NB00210 CTRL BLDG LC NG04 CB Yes Yes RC PC IC DHR CF 401 NB00211 EMG D/G SUPPLY FDR BRKR CB Yes Yes RC PC IC DHR CF 402 NB00213 CTRL BLDG LC NG02 SWGR BRKR CB Yes Yes RC PC IC DHR CF 403 NB00215 ESW PUMP DPEFO1B SWGR BRKR CB Yes Yes RC PC IC DHR CF 404 NEOO1 STANDBY #1 DGB Yes Yes RC PC IC DHR CF 405 NE002 STANDBY #2 DGB Yes Yes RC PC IC DHR CF 406 NE003 DG 'A' NEUTRAL GROUNDING RESISTOR DGB Yes Yes RC PC IC DHR CF 407 NE004 DG 'B' NEUTRAL GROUNDING RESISTOR DGB Yes Yes RC PC IC DHR CF 408 NE106 CONT STBY GEN (NE02) RELAY DGB Yes Yes RC PC IC DHR CF 409 NE107 CONT STBY GEN (NEO1) RELAY DGB Yes Yes RC PC IC DHR CF 410 NF039A CONT SHED/SEQ CH I LOGIC CB Yes Yes RC PC IC DHR CF 411 NF039B CONT SHED/SEQ CH 4 LOGIC CB Yes Yes RC PC IC DHR CF 412 NF039C CONTROL PANEL SHED/SEQ CH 1 & 4 CB/CC Yes Yes RC PC IC DHR CF TERM WCAP-17678-NP November 2012 Revision 0

E-27 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

413 NG001 480 VAC CB/CC Yes Yes RC PC IC DHR CF 414 NG00101 NG0I FDR BRKR CB Yes Yes RC PC IC DHR CF 415 NG00106 NGO1A FDR BRKR CB Yes Yes RC PC IC DHR CF 416 NG001A 480 VAC CB/CC Yes Yes RC PC IC DHR CF 417 NGOO1B 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 418 NGOO1T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 419 NG002 480 VAC CB/CC Yes Yes RC PC IC DHR CF 420 NG00201 MAIN BREAKER CB Yes Yes RC PC IC DHR CF 421 NG00206 NG02A FDR BRKR CB Yes Yes RC PC IC DHR CF 422 NG002A 480 VAC CB/CC Yes Yes RC PC IC DHR CF 423 NG002B 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 424 NG002T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 425 NG003 480 VAC CB/CC Yes Yes RC PC IC DHR CF 426 NG00301 NG03 FDR BRKR CB Yes Yes RC PC IC DHR CF 427 NG003C 480 VAC AUX Yes Yes RC PC IC DHR CF 428 NG003D 480 VAC DGB Yes Yes RC PC IC DHR CF 429 NG003T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 430 NG004 480 VAC CB/CC Yes Yes RC PC IC DHR CF 431 NG00401 NG04 FDR BRKR CB Yes Yes RC PC IC DHR CF 432 NG004C 480 VAC AUX Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-28 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2 ) Basis?) (Screens In?) Support(")

433 NG004D 480 VAC DGB Yes Yes RC PC IC DHR CF 434 NG004T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 435 NG005E 480 VAC ESW Yes Yes RC PC IC DHR CF 436 NG006E 480 VAC ESW Yes Yes RC PC IC DHR CF 437 NK001 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 438 NK002 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 439 NK003 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 440 NK004 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 441 NKO1 1 125-VDC NO. 1 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 442 NK012 125-VDC NO.2 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 443 NK013 125-VDC NO.3 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 444 NK014 125-VDC NO.4 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 445 NK021 125 VDC NO I CB/CC Yes Yes RC PC IC DHR CF 446 NK022 125 VDC NO 2 CB/CC Yes Yes RC PC IC DHR CF 447 NK023 125 VDC NO 3 CB/CC Yes Yes RC PC IC DHR CF 448 NK024 125 VDC NO 4 CB/CC Yes Yes RC PC IC DHR CF 449 NK041 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 450 NK042 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 451 NK043 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 452 NK044 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-29 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support('))

453 NK051 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 454 NK054 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 455 NN001 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 456 NNO02 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 457 NN003 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 458 NN004 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 459 NNO11 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 460 NNO12 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 461 NNO13 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 462 NNO14 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 463 PALO0A AUX FEEDWATER PUMP AUX Yes Yes PC DHR 464 PALOIB AUX FEEDWATER PUMP AUX Yes Yes PC DHR 465 PAL02 AFW PUMP--TURBINE DRIVEN AUX Yes Yes PC DHR 466 PBG02A BORIC ACID TRANSFER PUMP MOTOR AUX Yes Yes RC 467 PBG02B BORIC ACID TRANSFER PUMP MOTOR AUX Yes Yes RC 468 PBG03A CENT. CHARGING PUMP A AUX Yes Yes RC IC AUXILIARYLUBE OIL PUMP 469 PBG03B CENT. CHARGING PUMP B AUX Yes Yes RC IC AUXILIARYLUBE OIL PUMP 470 PBG04 NORMAL CHARGING PUMP AUX Yes Yes RC IC 471 PBG05A CENTRIFUGAL CHARGING PUMP AUX Yes Yes RC PC IC DHR WCAP- 17678-NP November 2012 Revision 0

E-30 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Buildingt2 ) Basis?) (Screens In?) Support(")

472 PBG05B CENTRIFUGAL CHARGING PUMP AUX Yes Yes RC PC IC DHR 473 PEFOIA ESSENTIAL SERV. WATER PUMP ESW Yes Yes RC PC IC DHR CF 474 PEFOIB ESSENTIAL SERV. WATER PUMP ESW Yes Yes RC PC IC DHR CF 475 PEGO0A COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 476 PEGOIB COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 477 PEGOIC COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 478 PEGO0D COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 479 PEJO1A RESIDUAL HEAT REMOVAL PUMP AUX Yes Yes IC DHR 480 PEJOIB RESIDUAL HEAT REMOVAL PUMP AUX Yes Yes IC DHR 481 PEMOIA SAFETY INJ. PUMP AUX Yes Yes IC DHR 482 PEMOIB SAFETY INJ. PUMP AUX Yes Yes IC DHR 483 PENO0A Containment Spray Pump A AUX Yes Yes CF 484 PENO1B Containment Spray Pump B AUX Yes Yes CF 485 PJEO1A EMERGENCY FUEL OIL TRANSFER PUMP YRD Yes Yes RC PC IC DHR CF 486 PJEO1B EMERGENCY FUEL OIL TRANSFER PUMP YRD Yes Yes RC PC IC DHR CF 487 PKJ03A AUXILIARY LUBE-OIL (KEEP-WARM) DG Yes Yes RC PC IC DHR CF PUMP FOR KKJO1A 488 PKJ03B AUXILIARY LUBE-OIL (KEEP-WARM) DG Yes Yes RC PC IC DHR CF PUMP FOR KKJOIB 489 RLOO REACTOR COOLANT AND SUPT SYS CB Yes Yes RC PC IC DHR CF CONSOLE WCAP-17678-NP November 2012 Revision 0

E-31 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support~'()

490 RL002 REACTOR COOLANT AND SUPT SYS CB Yes Yes RC PC IC DHR CONSOLE 491 RL003 REACTOR OPERATOR'S CONSOLE CB Yes Yes RC DHR 492 RL004 REACTOR OPERATOR'S CONSOLE CB Yes Yes RC DHR 493 RL005 TURBOGENERATOR AND FW CONSOLE CB Yes Yes PC DHR 494 . RL006 TURBOGENERATOR AND FW CONSOLE -CB - Yes Yes RC PC DHR 495 RL013 SITE-RELATED SECTION MCB CB Yes Yes RC PC IC DHR CF 496 RL014 SITE-RELATED SECTION MCB CB Yes Yes RC PC IC DHR CF 497 RL015 STATION ELECTRICAL DIST MCB CB Yes Yes RC PC IC DHR CF 498 RL016 STATION ELECTRICAL DIST MCB CB Yes Yes RC PC IC DHR CF 499 RL017 ESF MCB CB Yes Yes RC PC IC DHR CF 500 RL018 ESF MCB CB Yes Yes RC PC IC DHR CF 501 RL019 ESF MCB CB Yes Yes RC PC IC DHR CF 502 RL020 ESF MCB CB Yes Yes RC PC IC DHR CF 503 RL021 REACTOR AUXILIARIES PANEL CB Yes Yes RC PC IC DHR CF 504 RL022 REACTOR AUXILIARIES PANEL CB Yes Yes RC PC IC DHR CF 505 RP040 PROCESS CONTROL GROUP 3 CB Yes Yes RC PC IC DHR 506 RP043 PROCESS CONTROL GROUP 1 CB Yes Yes RC PC IC DHR 507 RP044 PROCESS CONTROL GROUP 4 CB Yes Yes RC PC IC DHR 508 RP047 PROCESS CONTROL GROUP 2 CB Yes Yes RC PC IC DHR WCAP-17678-NP November 2012 Revision 0

E-32 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"'*)

509 RP068 MISC BOP PANEL CB Yes Yes RC PC IC DHR 510 RP080 RPV LEVEL INSTR SYS PROC PROT SYS CB Yes Yes IC 511 RP08 I A/B SUBCOOLING MONITORING CABINET CB Yes Yes DHR 512 RP118A AUX SHUTDOWN PANEL AUX Yes Yes RC PC IC DHR CF 513 RPI18B AUX SHUTDOWN PANEL AUX Yes Yes RC PC IC DHR CF 514 RP290 DC DISTRIBUTION AUX Yes Yes RC PC IC DHR CF 515 SA036A ESFAS CHI TERM CB/CC Yes Yes RC PC IC DHR CF 516 SA036B ESFAS CH4 TERM CB/CC Yes Yes RC PC IC DHR CF 517 SA036C ESFAS CH2 LOGIC/TERM CABINET CB/CC Yes Yes RC PC IC DHR CF 518 SA036D ESFAS CHI LOGIC CABINET CB/CC Yes Yes RC PC IC DHR CF 519 SA036E ESFAS CH4 LOGIC CABINET CB/CC Yes Yes RC PC IC DHR CF 520 SA075A CONT MN STM & FW ISO ACT CB/CC Yes Yes DHR 521 SA075B CONT MN STM & FW ISO ACT CB/CC Yes Yes DHR 522 SB029A W SS PROT SYS INPUT TRN CB/CC Yes Yes RC PC IC DHR CF 523 SB029B W SS PROT SYS LOGIC TRN CB/CC Yes Yes RC PC IC DHR CF 524 SB029C WSS PROT SYS OUT I TRN CB/CC Yes Yes RC PC IC DHR CF 525 SB029D W SS PROT SYS OUT 2 TRN CB/CC Yes Yes RC PC IC DHR CF 526 SB032A W SS PROT SYS INPUT TRN CB/CC Yes Yes RC PC IC DHR CF 527 SB032B W SS PROT SYS LOGIC TRN CB/CC Yes Yes RC PC IC DHR CF 528 SB032C W SS PROT SYS OUT 1 TRN CB/CC Yes Yes RC PC IC DHR CF WCAP-17678-NP November 2012 Revision 0

E-33 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

529 SB032D W SS PROT SYS OUT 2 TRN CB/CC Yes Yes RC PC IC DHR CF 530 SB037 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-03 531 SB038 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-01 532 SB041 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-04 533 SB042 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-02 534 SB046 CONTROL BOARD DEMULTIPLEXER CB Yes Yes RC PC IC DHR CF 535 SB078 RPV LEVEL INSTR SYS PROC PROT SYS CB Yes Yes IC 536 SB079 RPV LEVEL INSTR SYS PROC PROT SYS CB Yes Yes IC 537 SBI02A W CABINET FOR REACTOR TRIP SWG AUX Yes Yes RC TRAIN-A 538 SBI02B W CABINET FOR REACTOR TRIP SWG AUX Yes Yes RC TRAIN-B 539 SB148A WEST. PROCESS PROTECTION CB/CC Yes Yes RC 540 SB148B WEST. PROCESS PROTECTION CB/CC Yes Yes RC 541 SE031 SOURCE RANGE CHANNEL 1 PREAMP AUX Yes Yes RC 542 SE032 SOURCE RANGE CHANNEL 2 PREAMP AUX Yes Yes RC 543 SE054A W NUC INSTM NIS I CB/CC Yes Yes RC 544 SE054B W NUC INSTM NIS 2 CB/CC Yes Yes RC WCAP- 17678-NP November 2012 Revision 0

E-34 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

545 SE054C W NUC INSTM NIS 3 CB/CC Yes Yes RC 546 SE054D W NUC INSTM NIS 4 CB/CC Yes Yes RC 547 SENE031 SOURCE RANGE NUCLEAR INSTRUMENT RB Yes Yes RC 548 SENE032 SOURCE RANGE NUCLEAR INSTRUMENT RB Yes Yes RC 549 SENE035 INTERMEDIATE RANGE NUCLEAR RB Yes Yes RC INSTRUMENT 550 SENE036 INTERMEDIATE RANGE NUCLEAR RB Yes Yes RC INSTRUMENT 551 SENE060 EXCORE NEUTRON DETECTOR RB Yes Yes RC 552 SENE061 EXCORE NEUTRON DETECTOR RB Yes Yes RC 553 SENY060A EXCORE NEUTRON DETECTOR AMPLIFIER AUX Yes Yes RC 554 SENY060B PROCESSOR AUX Yes Yes RC 555 SENY061A EXCORE NEUTRON DETECTOR AMPLIFIER AUX Yes Yes RC 556 SENY061B PROCESSOR AUX Yes Yes RC 557 SGF02A AUX FW PUMP ROOMCOOLER AUX Yes Yes PC DHR 558 SGF02B AUX FW PUMP ROOMCOOLER AUX Yes Yes PC DHR 559 SGK04A CONTROL ROOM A/C UNITS AUX Yes Yes RC PC IC DHR CF 560 SGK04B CONTROL ROOM A/C UNITS AUX Yes Yes RC PC IC DHR CF 561 SGK05A CLASS IE ELEC. EQUIP. A/C UNIT CB/CC Yes Yes RC PC IC DHR CF 562 SGK05B CLASS IE ELEC. EQUIP. A/C UNIT CB/CC Yes Yes RC PC IC DHR CF 563 SGL09A SAFETY INJECTION PUMP ROOM COOLER AUX Yes Yes IC DHR WCAP- 17678-NP November 2012 Revision 0

E-35 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

564 SGL09B ROOM COOLER FOR PEMO 1B AUX Yes Yes RC IC DHR 565 SGL1OA RHR PUMP ROOM COOLER AUX Yes Yes IC DHR 566 SGL1OB RHR PUMP ROOM COOLER AUX Yes Yes IC DHR 567 SGL11A CCW PUMP A ROOM COOLER AUX Yes Yes RC PC IC DHR CF 568 SGLI lB CCW PUMP B ROOM COOLER AUX Yes Yes RC PC IC DHR CF 569 SGL12A ROOM COOLER FOR PBG05A AUX Yes Yes RC IC 570 SGL12B ROOM COOLER FOR PBG05B AUX Yes Yes RC IC 571 SGL13A CTMT SPRAY PUMP ROOM COOLER AUX Yes Yes CF 572 SGL13B CTMT SPRAY PUMP ROOM COOLER AUX Yes Yes CF 573 SGL15A PENETRATION ROOMCOOLER AUX Yes Yes CF 574 SGL15B PENETRATION ROOM COOLER AUX Yes Yes CF 575 SGNO1A CONTAINMENT COOLER RB Yes Yes CF 576 SGNO1B CONTAINMENT COOLER RB Yes Yes CF 577 SGNO1C CONTAINMENT COOLER RB Yes Yes CF 578 SGNO1D CONTAINMENT COOLER RB Yes Yes CF 579 SKJ02A D/G A EXHAUST SILENCER DGB Yes Yes RC PC IC DHR CF 580 SKJ02B D/G B EXHAUST SILENCER DGB Yes Yes RC PC IC DHR CF 581 TALOlA TURBINE DRIVEN AUXILIARY AUX Yes Yes PC DHR FEEDWATER STANDY TANK (CONDENSATE)

November 2012 WCAP- 17678-NP WCAP- I17678-NP November 2012 Revision 0

E-36 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

582 TALOIB TURBINE DRIVEN AUXILIARY AUX Yes Yes PC DHR FEEDWATER STANDY TANK (CONDENSATE) 583 TALOIC TURBINE DRIVEN AUXILIARY AUX Yes Yes PC DHR FEEDWATER STANDY TANK (CONDENSATE) 584 TEFO0A ESW PUMP PRELUBESTORAGE TANK YARD Yes Yes IC DHR 585 TEFOIB ESW PUMP PRELUBESTORAGE TANK YARD Yes Yes IC DHR 586 TEGOIA CCW SURGE TANK A AUX Yes Yes RC PC IC DHR CF 587 TEGO1B CCW SURGE TANK B AUX Yes Yes RC PC IC DHR CF 588 TEMO0 BORON INJECTION TANK AUX Yes Yes IC 589 TJEO1A EMERGENCY FUEL OIL TANK YRD Yes Yes RC PC IC DHR CF 590 TJEO1B EMERGENCY FUEL OIL TANK YRD Yes Yes RC PC IC DHR CF 591 TJE02A EMERGENCY FUEL OIL DAY TANK DGB Yes Yes RC PC IC DHR CF 592 TJE02B EMERGENCY FUEL OIL DAY TANK DGB Yes Yes RC PC IC DHR CF 593 TKA02 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 594 TKA03 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 595 TKA04 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 596 TKA05 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 597 TKJO1A D/G A JACKET WATER EXPANSION TANK DGB Yes Yes RC PC IC DHR CF 598 TKJO1B D/G B JACKET WATER EXPANSION TANK DGB Yes Yes RC PC IC DHR CF 599 TKJ02A START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF 600 TKJ02B START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-37 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"l))

601 TKJ02C START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF 602 TKJ02D START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF 603 TKJ04A D/G A AUX LUBE OIL TANK DGB Yes Yes RC PC IC DHR CF 604 TKJ04B D/G B AUX LUBE OIL TANK DGB Yes Yes RC PC IC DHR CF 605 XNGO1 CLASS 1E LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 606 XNG02 CLASS I E LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 607 XNG03 CLASS I E LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 608 XNG04 CLASS IE LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 609 XNG05 FEED MCC NG05E ESW Yes Yes IC DHR 610 XNG06 FEEDS MCC NG06E ESW Yes Yes IC DHR 611 XPN07A 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes RC IC DHR 612 XPN07B 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes RC IC DHR 613 XPN07C 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes RC IC DHR 614 XPN08A 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR 615 XPN08B 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR 616 XPN08C 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR Notes:

I RC= Reactivity Control, PC= Reactor Coolant Pressure Control, IC = Reactor Coolant Inventory Control, DHR = Decay Heat Removal (including Ultimate Heat Sink),

and CF = Containment Function 2 AUX= Auxiliary Building, CB= Control Building, CC=Communication Corridor, DGB= Diesel Generator Building, ESW= Essential Service Water Building, RB=

Reactor Building, YARD= Yard WCAP- 17678-NP November 2012 Revision 0

F-1 APPENDIX F SWEL 1 WCAP-17678-NP November 2012 Revision 0

F-2 SWEL 1 Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, 'F) enhancement? Outage?

I ABHV0014 LOOP-I MAIN AUX Yes Yes PC DHR POV (7) AB X hot/dry STEAM ISOLATION VALVE 2 ABPT0002 STM GEN B AUX Yes Yes PC DHR Inst. Racks (18) AB mild/dry STEAMLINE PRESSURE 3 ABPV0002 SG B ATMOSPHERIC AUX Yes Yes PC DHR POV (7) AB hot/dry RELIEF VLV 4 AEFV0039 EBBOIA AUX Yes Yes PC DHR POV (7) AE X hot/dry FEEDWATER

. ISOLATION VALVE I. .

5 AELT0502 STM GEN B WIDE RB Yes Yes PC DHR Inst. Racks (18) AE hot/humid Yes RANGE 6 AELT0519 STM GEN LEVEL A RB Yes Yes PC DHR Inst. Racks (18) AE hot/humid Yes NARROW RANGE 7 ALHV0030 ESW TO MDAFW AUX Yes Yes PC DHR VALVE (8) AL PUMP B 6" BTFL VLV W/LIMITQ 8 BBLIS1321 RV SUBCOOLING AUX Yes Yes RC Inst. Racks (18) BB mild/dry MONITOR TRN B 9 BBPT0456 PRESSURIZER RB Yes Yes PC Inst. Racks (18) BB Yes PRESSURE 10 BGFCV0121 CENTRIFUGAL CHG AUX Yes Yes RC PC IC POV (7) BG hot/dry PMP FLOW CONTROL II BGHV8105 CHARGING PUMPS AUX Yes Yes PC IC CF MOV (8) BG mild/dry TO REGEN HX/CTMT ISO 12 BGHV8152 LETDOWN SYSTEM AUX Yes Yes IC CF POV (7) BG mild/dry CONTAINMENT ISO VLV 13 BLHV8047 REACTOR M/U AUX Yes Yes IC CF POV (7) BL mild/dry WATER CONTAINMENT ISO WCAP- 17678-NP November 2012 Revision 0

F-3 SWEL I (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, OF) enhancement? Outage?

14 BMHV0002 SG B BLOWDOWN AUX Yes Yes PC IC CF POV (7) BM hot/dry AFAS ISO I5 BNHV0003 RWST SUPPLY TO AUX Yes Yes CF MOV (8) BN hot/dry CTMT SPRAY PUMP B

16 BNLT0931 RWST LEVEL YRD Yes Yes RC IC Inst. Racks (18) BN hot/humid TRANSMITTER (2) DHR 17 BNV00I I RWST OUTLET ISO AUX Yes Yes RC IC (8) BN VALVE DHR 18 CGMOIB DIESEL GENERATOR DGB Yes Yes RC PC IC Fans (9) GM hot/humid BLDG SUPPLY FAN DHR 19 EEG0IB COMPONENT COOL AUX Yes Yes RC PC IC Heat EG mild/dry WATER HEAT DHR Exchangers (21)

EXCHANGER 20 EF156 ESW CONTROL ESW Yes Yes RC PC IC Control Panel EF hot/dry PANEL DHRCF (20) 21 EFHV0024 ESW B/SERVICE CB/CC Yes Yes RC PC IC MOV (8) EF X mild/dry WATER CROSS DHR CF CONNECT VALVE 22 EFHV0040 ESW TRAIN B TO SW CB/CC Yes Yes RC PC IC MOV (8) EF X mild/dry CROSS CONNECT DHR CF VALVE 23 EFHV0052 ESW B TO CCW HX B AUX Yes Yes RC PC IC MOV (8) EF DHRCF 24 EFHV0098 ESW PUMP B ESW Yes Yes RC PC IC MOV (8) EF hot/humid DISCHARGE AIR DHR CF RELEASE VALVE 25 EFTE0062 ESW B TEMPT TO CB/CC Yes Yes RC PC IC Temp. Sensor EF mild/dry POWER BLOCK DHRCF (19) 26 EGHV0016 CCW TRAIN B AUX Yes Yes DHR MOV (8) EG X mild/dry RETURN ISO VALVE 27 EGHVO102 CCW TO RHR HX B AUX Yes Yes DHR MOV (8) EG mild/dry ISO 28 EGLT0002 CCW SURGE TK B AUX Yes Yes DHR Inst. Racks (18) EG mild/dry WCAP-17678-NP November 2012 Revision 0

F-4 SWEL 1 (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, *F) enhancement? Outage?

29 EGTE0032 CCW HX B OUTLET AUX Yes Yes RC DHR Temp. Sensor EG mild/dry TEMP (19) 30 EGTV0030 CCW HX B TEMP CV AUX Yes Yes RC DHR POV (7) EG mild/dry WAFER BTTFLY VLV 31 EJFCV0611 RHRPUMP1B AUX Yes Yes DHR MOv (8) EJ hot/dry MINIFLOW VALVE 32 EJFIS0611 RHR PMP PEJ0IB AUX Yes Yes DHR Inst. Racks (18) EJ mild/dry MINIFLOW CONTROL DISCHARGE 33 EJHV8809B RHR TO ACCUM INJ AUX Yes Yes DHR MOV (8) EJ mild/dry LOOPS 3 & 4 ISO VLV 34 EKJ03B INTERCOOLER OGB Yes Yes RC PC IC Heat KJ X hot/humid HEATEXCHANGER DHRCF Exchangers (21) 35 EKJ04B LUBE OIL COOLER DGB Yes Yes RC PC IC Heat KJ X hot/humid DHR CF Exchangers (2 1) 36 EKJ06B DIESEL JACKET DGB Yes Yes RC PC IC Heat KJ X hot/humid WATER HEAT DHR CF Exchangers (2 )

EXCHANGER 37 EMFT0917B CCP B TO BIT FLOW AUX Yes Yes RC IC Inst. Racks (18) EM mild/chemical TRANSMITTER DHR 38 EMHV8814B SI PUMP B RETURN AUX Yes Yes RCIC MOV (8) EM hot/dry TO RWST ISO DHR VALVE 39 EMHV8923B SAFETY INJECTION AUX Yes Yes IC DHR MOV (8) EM hot/dry PUMP B SUCT ISO VLV 40 EPHV8808B ACCUMULATOR RB Yes Yes DHR MOV (8) EP hot/humid Yes TANK B OUTLET ISO VALVE 41 FC0219 LOCAL CONTROL AUX Yes Yes PC DHR Control Panel FC X hot/dry PANEL FOR TD AFW (20)

PUMP WCAP- 17678-NP November 2012 Revision 0

F-5 SWEL I (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, IF) enhancement? Outage?

42 FCHV0312 AUX FW PUMP AUX Yes Yes PC DHR MOV (8) FC hot/dry TURBINE MECH TRIP/THROT VLV 43 FEF02B ESW SELF-CLEAN ESW Yes Yes RC PC IC Other (0) EF X hot/dry STRAIN. (MTR OP.-IN DHR CF MOV PROG.)

44 FKJ02C KKJOI B AIR INTAKE DGB Yes Yes RC PC IC Other (0) KJ hot/humid FILTER DHR CF 45 GKV0766 SGK04B WATER CB Yes Yes RC PC IC MOV (8) GK mild/dry REGULATING DHR CF VALVE 46 GKV0768 SGK05B WATER CB Yes Yes RC PC IC MOV (8) GK cool/dry Yes REGULATING DHR CF VALVE 47 GMHZ0019 DSL GEN RM EXH DGB Yes Yes RC PC IC Other (0) GM hot/humid DMPR B, GMDOO10 DHR CF 48 GMTE001 I DIESEL GEN VENT DGB Yes Yes RC PC IC Temp. Sensor GM hot/humid SUPPLY FAN IB DHR CF (19) 49 GMTZO0I I B ACT FOR DG VENT DGB Yes Yes RC PC IC Other (0) GM hot/humid SUPPLY FAN DHR CF DAMPER GMD0007 50 GNPT0934 CONTAINMENT RB Yes Yes CF Inst. Racks (18) GN mild/dry Yes ATMOSPHERE 51 GNVO002 CTMT COOLER B RB Yes Yes CF POV (7) GN X hot/humid Yes ESW OUTLET FLOW CONTROL VLV 52 GSHV0021 H2 PURGE OUTER AUX Yes Yes CF MOV (8) GS mild/dry CTMT ISO BUTT VLV 53 GTRE031 CTMT ATMOSHERE AUX Yes Yes CF Inst. Racks (18) GT mild/dry RADIATION MONITOR 54 HBHV7176 RCDT PUMPS DISCH RB Yes Yes CF POV (7) HB Yes HDR INSIDE CTMT ISO 55 JELT0021 EMER FUEL OIL DGB Yes Yes RC PC IC Inst. Racks (18) JE hot/humid DAY TK B LEV DHR CF WCAP-17678-NP November 2012 Revision 0

F-6 SWEL I (cont.)

Screen #1 Screen #3 Screen #4 Sample Considerations SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, 'F) enhancement? Outage?

56 KAPCV0I03 TKA05 OUTLET AUX Yes Yes DHR POV (7) KA mild/dry PRESSURE CONTROL VALVE 57 KJ0122 GAUGE PANEL DGB Yes Yes RC PC IC Control Panel KJ hot/humid DHR CF (20) 58 KKJ,01B STANDBY DIESEL DGB Yes Yes RC PC IC Eng. Gen. (17) KJ hot/humid (GENERATOR) DHR CF 59 LFFV0096 CTMT NOR SUMPS AUX Yes Yes CF POV (7) LF mild/dry TO FLR DRN TK OUTSIDE CTMT ISO 60 NB002 4.16 KV BUS # CB Yes Yes RC PC IC Med. Volt NB cool/dry Yes DHR CF Swgr. (3) 61 NB00213 CTRL BLDG LC NG02 CB Yes Yes RC PC IC Med. Volt NB Yes SWGR BRKR DHR CF Swgr. (3) 62 NE002 STANDBY #2 DGB Yes Yes RC PC IC Eng. Gen. (17) NE hot/humid DHR CF 63 NF039B CONT SHED/SEQ CH CB Yes Yes RC PC IC Control Panel NF cool/dry 4 LOGIC DHR CF (20) 64 NG002 480 VAC CB/CC Yes Yes RC PC IC Low Volt Swgr. NG cool/dry X Yes DHR CF (2) 65 NG00201 MAIN BREAKER CB Yes Yes RC PC IC Low Volt Swgr. NG cool/dry Yes DHR CF (2) 66 NG00206 NG02A FDR BRKR CB Yes Yes RC PC IC Low Volt Swgr. NG cool/dry Yes DHR CF (2) 67 NG002B 480 VAC MOTOR AUX Yes Yes RC PC IC MCC (I) NG mild/dry Yes CONTROL CENTER DHR CF 68 NG004C 480 VAC AUX Yes Yes RC PC IC MCC (1) NG mild/dry Yes DHR CF 69 NG006E 480 VAC ESW Yes Yes RC PC IC MCC (1) NG hot/dry Yes DHR CF 70 NK004 125 VDC BUS CB/CC Yes Yes RC PC IC Dist. Panel (14) NK cool/dry Yes SWITCHBOARD DHR CF 71 NK012 125-VDC NO.2 60- CB/CC Yes Yes RC PC IC Battery Rack NK cool/dry CELL BATTERY DHR CF (15)

WCAP- 17678-NP November 2012 Revision 0

F-7 SWEL 1 (cont.)

Screen #1 Screen #3 Screen #4 Sample Considerations SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to 0

Number Equipment Description - Building Basis?) In?) Support) Class Type equipment? (Temp, F) enhancement? Outage?

72 NK014 125-VDC NO.4 60- CB/CC Yes Yes RC PC IC Battery Rack NK cool/dry CELL BATTERY DHR CF (15) 73 NK024 125 VDC NO 4 CB/CC Yes Yes RC PC IC Battery Chg NK cool/dry Yes DHRCF (16) 74 NK044 DIST 125 VDC CB/CC Yes Yes RC PC IC Dist. Panel (14) NK cool/dry Yes DHR CF 75 NK054 D1ST 125 VDC CB/CC Yes Yes RC PC IC Dist. Panel (14) NK cool/dry Yes DHR CF 76 NN014 7.5 KVA CB/CC Yes Yes RC PC IC Battery Chg NN cool/dry Yes DHRCF (16) 77 PALO lB AUX FEEDWATER AUX Yes Yes PC DHR Horz. Pumps AL hot/dry PUMP (5) 78 PAL02 AFW PUMP-- AUX Yes Yes PC DHR Horz. Pumps AL hot/dry TURBINE DRIVEN (5) 79 PBG02B BORIC ACID AUX Yes Yes RC Horz. Pumps BG X hot/dry TRANSFER PUMP (5)

MOTOR 80 PBG04 NORMAL AUX Yes Yes RC IC Horz. Pumps BG hot/dry CHARGING PUMP (5) 81 PBG05B CENTRIFUGAL AUX Yes Yes RC PC IC Horz.*Pumps BG hot/dry CHARGING PUMP DHR (5) 82 PEGOIB COMPONENT COOL. AUX Yes Yes RC PC IC Horz. Pumps EG mild/dry WATER PUMP DHR CF (5) 83 PEJO0B RESIDUAL HEAT AUX Yes Yes IC DHR Vert. Pump (6) EJ X hot/dry REMOVAL PUMP 84 PENOIB Containment Spray AUX Yes Yes CF Vert. Pump (6) EN hot/dry Pump B 85 PKJ03B AUXILIARY LUBE- DG Yes Yes RC PC IC Horz. Pumps KJ X hot/humid OIL (KEEP-WARM) DHR CF (5)

PUMP FOR KKJOIB 86 RL017 ESF MCB CB Yes Yes RC PC IC Control Panel RL cool/dry DHR CF (20) 87 RL020 ESF MCB CB Yes Yes RC PC IC Control Panel RL cool/dry DHRCF (20)

WCAP-17678-NP November 2012 Revision 0

F-8 SWEL 1 (cont.)

Screen #1 Screen #3 Screen #4 Sample Considerations SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to 0

Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, F) enhancement? Outage?

88 RL021 REACTOR CB Yes Yes RC PC IC Control Panel RL cool/dry AUXILIARIES PANEL DHR CF (20) 89 RPOSIA/B SUBCOOLING CB Yes Yes DHR Control Panel RP cool/dry MONITORING (20)

CABINET 90 RP290 DC DISTRIBUTION AUX Yes Yes RC PC IC Control Panel RP mild/dry DHR CF (20) 91 SA036E ESFAS CH4 LOGIC CB/CC Yes Yes RC PC IC Control Panel SA cool/dry CABINET DHRCF (20) 92 SBO32C W SS PROT SYS OUT CB/CC Yes Yes RC PC IC Control Panel SB cool/dry I TRN DHRCF (20) 93 SB032D W SS PROT SYS OUT CB/CC Yes Yes RC PC IC Control Panel SB cool/dry 2 TRN DHRCF (20) 94 SB041 W PROCESS CB/CC Yes Yes RC PC IC Control Panel SB cool/dry ANALOG DHR CF (20)

PROTECTION SET CAB-04 95 SB079 RPV LEVEL INSTR CD Yes Yes IC Control Panel SB cool/dry SYS PROC PROT SYS (20) 96 SE032 SOURCE RANGE AUX Yes Yes RC Control Panel SE mild/dry Yes CHANNEL 2 PREAMP (20) 97 SE054B W NUC INSTM NIS 2 CB/CC Yes Yes RC Control Panel SE cool/dry Yes (20) 98 SENY061A EXCORE NEUTRON AUX Yes Yes RC Control Panel SE mild/dry Yes DETECTOR (20)

AMPLIFIER 99 SGK04B CONTROL ROOM AUX Yes Yes RC PC IC AHU (10) GK X mild/dry X A/C UNITS DHR CF 100 SGK05B CLASS IE ELEC. CB/CC Yes Yes RC PC IC AHU (10) GK X cool/dry X Yes EQUIP. A/C UNIT DHR CF 101 SGL09B ROOM COOLER FOR AUX Yes Yes RC IC AHU (10) GL hot/dry PEMOIB DHR 102 SGLlOB RHR PUMP ROOM AUX Yes Yes IC DHR AHU (10) GL hot/dry COOLER WCAP- 17678-NP November 2012 Revision 0

F-9 SWEL I (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to 0

Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, F) enhancement? Outage?

103 SGL15B PENETRATION AUX Ycs Yes CF AHU (10) GL mild/dry ROOM COOLER 104 TEGOIB CCW SURGE TANK B AUX Yes Yes RC PC IC Tank(21) EG mild/dry DHR CF 105 TJE02B EMERGENCY FUEL DGI3 Yes Yes RC PC IC Tank (21) JE hot/humid OIL DAY TANK DHR CF 106 TKA04 AFW CTRL/MAIN AUX Yes Yes PC DHR Tank (21) KA mild/dry STEAM ARV ACCUM 107 TKJOIB D/G B JACKET DGB Yes Yes RC PC IC Tank (21) KJ hot/humid WATER EXPANSION DHR CF TANK 108 TKJ02C START AIR TANK DGB Yes Yes RC PC IC Tank (21) KJ hot/humid D/G DHR CF 109 TKJ04B D/G B AUX LUBE DGB Yes Yes RC PC IC Tank (21) KJ hot/humid OIL TANK DHR CF 110 XNG02 CLASS I E LOAD CB/CC Yes Yes RC PC IC Transformer (4) NG cool/dry Yes CENTER DHR CF TRANSFORMER 1H1 XNG06 FEEDS MCC NG06E ESW Yes Yes IC DHR Transformer (4) NG hot/dry Yes 112 XPN08B 120 V INSTRUMENT CB/CC Yes Yes IC DHR Transformer (4) PN cool/dry AC TRANSFORMER Note:

The Walkdown Deferred to Outage column was populated at the time of the SWEL development site visit on August 27-28, 2012, and was later modified depending on component accessibility during the at-power walkdowns in September, 2012.

WCAP-17678-NP November 2012 Revision 0

G-1 APPENDIX G WOLF CREEK COMPOSITE SWEL TRANSMITTAL WCAP-17678-NP November 2012 Revision 0

G-2 O Westinghouse Seismic Walkdown Equipment List, Revision 0 In Response to NTTF Recommendation 2.3:

Seismic Wolf Creek Generating Station DAVID BERSIE.

Equipment Selection Personny1 Lead date DEREK SEAMAN ý 'ý .

Equipment Selection Personihel date ERIC CARLSON ( c' 7 9/612012 Station Operations date Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 1 WCAP-17678-NP November 2012 Revision 0

G-3 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-1l-12-083 NT'TF Recommendation 2.3: Seismic Walkdown Wolf Creek Generating Station Seismic Walkdown Equipment List (SWEL)

A listing of structures, systems, and components (SSCs) that will be viewed during the walkdown, the Seismic Walkdown Equipment List (SWEL), has been prepared in advance of the walkdown effort.

The selection of SSCs process described in EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012 {Reference 1}, was utilized to develop the SWEL for Wolf Creek.

The SWEL is comprised of two groups of items:

  • . SWEL 1 (Attachment 1) is a sample of items to safely shut down the reactor and maintain containment integrity.
  • . SWEL 2 (Attachment 2) is a list of spent fuel pool related items. Note that no rapid drain down items have been identified for Wolf Creek Generating Station, however, it is recommended that an area walk-by of the spent fuel building instrument air be conducted to ensure gate seal integrity.

Wolf Creek Operations and Engineering Staff Members participated in the selection of SSCs compiling the SWEL and provided direct input to the Equipment Selection Personnel during the SWEL development process. This input included:

" Confirmation of the equipment information retrieved from the Wolf Creek Seismic Category I documentation.

  • Discussions with the Equipment Selection Personnel to identify upgrades, modifications, and replacements of equipment which might be pertinent to the selection of the SWEL.

" Input into the selection of the SWEL using operational experience relevant to equipment classifications, safety function support, and environmental considerations.

" Approval of the components selected for the SWEL.

The process detailed in Reference 1 for the Selection of SSCs to produce the SWEL was discussed with the Wolf Creek Operations and Engineering Staff Members during the site visit August 2 7 th through 28 nd, 2012. The details describing the process for Selection of SSCs to produce the SWEL will be provided in the "Selection of SSCs" section of the Submittal Report.

Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 2 WCAP- 17678-NP November 2012 Revision 0

G4 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-II-12-083 NTTF Recommendation 2.3: Seismic Walkdown Wolf Creek Generating Station References

1) EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012.

Attachments

1) Seismic Walkdown Equipment List 1
2) Seismic Walkdown Equipment List 2 Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 3 WCAP-17678-NP November 2012 Revision 0

G-5 SeismiC Walkdown Equipenent List, Rev. 0 Attachment to LTR-RAM-I-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL I Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations Screen______Walkdown SWEL Walkdown 2 Major new Deferred Item Equipment Description Building (SC- 1 (Screens (Safety Equipment System or Environment IPEEE Comments Number Ucensing In?) Function Class Type replacement (remp,°F) vulnerability Ot Basis?) support) equipment? enhancement?

I ABHVOO14 LOOP-1 MAINSTEAMISOLATIONVALVE AUX Yes Yes PC DHR POV (7) AB x hot/dry 2 ABPTO002 STM GEN BSTEAMUNE PRESSURE

3 ASPVO02 SGBATMOSPHERIC REUEFVLV AUX Yes Yes PC OHR POV (7) AB hot/dry 4 AEFVOO39 EBROLAFEEDWATER ISOLATIONVALVE AUX Yes Yes PCDHR POV (7) AE a hot/dry Inst Racks S AELTOS02 STM GEN BWIDE RANGE RB Yes Yes PCOHR AE hot/humid Yes Inst Racks S AELT0519 STMGEN LEVELA NARROW RANGE RB Yes Yes PCDHR AE hot/humid Yes (18)

ESW TO MOAFW PUMP B56STEL VLV 7 ALHV0030 WTUMIJQ AUX Yes Yes PCOHR VALVE (8) AL Ins. Racks 8 B.1S1321 RVSUBCODOUNG MONITORTRN B AUX Yes Yes RC SB mild/dry Inst. Racks 9 BOPT0456 PRESSURIZER PRESSURE RB Yes Yes PC (18) SB Yes CENTRIFUGAL CHG PMP FLOW CONTROL 10 BGFCV012L <CAT2 AOV PROGRAM VALVE>

11CHARGING PUMPSTOREGENHX/CTMT AUX Yes Yes PCICCF MOV(8) BG mild/dry ISO LETDOWN SYSTEM CONTAINMENT ISO 12 BGHV8152 AUX Yes Yes ICCF POV (7) BG mild/dry VLV REACTOR MAI WATER CONTAINMENT 13 BMHVSO47 AUX Yes Yes ICCF POV (7) 8L mild/dry ISO Wolf Creek Seismic Walkdown Equipment Ust September7, 2012 Page 4 WCAP-17678-NP November 2012 Revision 0

G-6 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-1I.12-083 NTrFRecommendation 2.3: Seismic Walkdowm Attachment I -SWEL I Wolf Creek Generating Station Sceree c Screen Screen R4 Sample Considerations Screen Walkdown SWEL #1 63 Wldw Waldown 1 32 Major new Deferred Item WakonDsrpinBidn Equipment S 2 (safety escpion -1 (Screens Equipment System or Environment Cmet Comments Number Licensing In?) Function Support) Ca Clss Typ replacement (Temp, "F) e vulnerability hne et to uae Basis?)

BSequipment? enhancement?

14 BMHVO002 SG B BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF POV (7) BM hot/dry 15 BNHVOOO3 RWST SUPPLY TO CTMT SPRAY PUMP B AUX Yes Yes CF MOV (B) BN hot/dry RC IC Inst. Racks 16 BNLTO931 RWST LEVEL TRANSMITTER (2) YRD Yes Yes BN hot/humid DHR (18)

RC IC 17 RNVOO11 RWST OUTLET ISO VALVE AUX Yes Yes DHR (8) BN RC PC IC 18 CGMOB DIESELGENERATOR BLDG SUPPLY FAN DGB Yes Yes Fans (9) GM hot/humid DHR Heat COMPONENTCOOL WATER HEAT RC PC IC 19 EEG01B EXCHANGER AUX Yes Yes DHR Exchangers EG mild/dry (21)

RC PC IC Control 20 EF156 ESW CONTROL PANEL ESW Yes Yes DHR CF Panel (20) EF hot/dry 21 EFHVO0G24 ESW B/SERVICE WATER CROSS CONNECT VLECR/CC Yes YesMO(8 RC PC IC EFml/y VALVE DHRCF V ESW TRAIN B TO SW CROSS CONNECT PC PC IC 22 EFHV0040 CB/CC Yes Yes MOV (8) EF X mild/dry VALVE DHR CF RCPCIC 23 EFHVOO52 ESW B TO CCW HX B AUX Yes Yes RCI DHR CF MOV MOg) (8) EF E

ESW PUMP B DISCHARGE AIR RELEASE RC PC IC 24 EFHVD098 ESW Yes Yes MOV (8) EF hot/humid VALVE DHRCF RC PC IC Temp.

25 EFTE0062 ESW B TEMPT TO POWER BLOCK CB/CC Yes Yes EF mild/dry DHR CF Sensor (19) 26 EGHVOO16 CCW TRAIN B RETURN ISO VALVE AUX Yes Yes DHR MOV (8) EG X mild/dry Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 5 WCAP- 17678-NP November 2012 Revision 0

G-7 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL 1 Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations SWLScreen Walkdown Walkdown #2 #3 Major new Deferred Item Equipment Description Building (SC- 1 (Screens (Safety Equipment System or Environment toEComments NumberEquipment ~~~Licensing In?)

Function Class setSsm Type or replacement Evon (Temp, *F) nt ulraity vulnerability t o

Basis?) Support) equipment? enhancement? Outage?

27 EGHV0102 CCW TO RHRHX BISO AUX Yes Yes DHR MOV(8) EG mild/dry Inst. Racks 28 EGLTO002 CCW SURGE TKB AUX Yes Yes DHR EG mild/dry (18)

Temp.

29 EGTEO032 CCW HXB OUTLETTEMP AUX Yes Yes RCDHR EG mild/dry Sensor (19) 30 EGTVO030 CCW HXR TEMP CV WAFER BTTFLY VLV AUX Yes Yes RCDHR POV(7) EG mild/dry 31 EJFCV0611 RHRPUMP B MINIFLOW VALVE AUX Yes Yes DHR MOV)8) El hot/dry RHRPMP PEJO1B MINIFLOW CONTROL Inst. Racks 32 EJFIS0611 DISCHARGE

Heat IC RCPC 36 EK06B DIESELJACKETWATER HEATEXCHANGER DGB Yes Yes Exchangers KJ X hotthumid DHR CF Ecagr o/ui 121)

RC IC Inst. Racks 37 EMFTO917B CCP BTO BIT FLOWTRANSMITTER AUX Yes Yes EM mild/chemical DHR (18)

BC IC 38 EMHV8814B SI PUMP B RETURNTO RWST ISOVALVE AUX Yes Yes MOV(g) EM hot/dry DHR 39 EMHV8923B SAFETYINJECTIONPUMP B SUCTISO VLV AUX Yes Yes ICDHR MOV (8) EM hot/dry Wolf Creek Seismic Walkdown Equipment List September7, 2012 Page 6 WCAP- 17678-NP November 2012 Revision 0

G-8 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL1 Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations Screen Walkdown SWEL l~l l#3 Walkdown 1 12 Major new Deferred Item Equipment Description Building (SC -1 (Screens (Safety Equipment System or Environment lEEE rComments Number Licensing ln?(

Suppry)

Function Class Type replacement (Temp, °F) nacmnt vulnerability uae ta Basis?) Support) equipment? enhancement?

ACCUMULATOR TANK B OUTLET ISO 40 EPHV8808B VALVE

LOCALCO NTROL PANEL FDORTDAFW Control 41 FC0219 AUX Yes Yes PC DHR PC X hot/dry PUMP Panel (20)

AUX PW PUMPTURBINE MECH 42 FCHV0312 TRFPUTR VLV T AUX Yes Yes PC DHR MOV (8) FC hot/dry High attention level item TRIP/THROT VLV 43 PEP02B ESW SELF-CLEANSTRAIN. (MTR OP.-IN Yes Yes BC PC IC R

MOV PROG.) DHR CF BC PC IC 44 FKJ02C KKJOSBAIR INTAKE FILTER DGB Yes Yes Other (5) KJ hot/humid DHR CP BC PC IC 45 GKV0766 SGK04B WATER REGULATING VALVE CB Yes Yes MOV (8) GK mild/dry DHRCF BC PC IC 46 GKV0768 SGK05BWATER REGULATING VALVE CB Yes Yes MOV (8) GK coo/dry Yes DHRCF BC PC IC 47 GMHZO019 DSLGEN RM EXH DMPR B, GMDO010 DGB Yes Yes Other(0) GM hot/humid DHRCF BC PC IC Temp.

48 GMTEO011 DIESELGEN VENT SUPPLY FAN 1B DGB Yes Yes GM hot/humid DHRCF Sensor (19) 49 GMTZD001B ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC Ohr() G o/ui GMDO007 DHRCF Inst. Racks SD GNPT0934 CONTAINMENT ATMOSPHERE RB Yes Yes CF GN mild/dry Yes (18)

CTMT CODLER B tOW3OUTLET FLOW 51 GNVO002 RB Yes Yes CF POV (7) GN X hot/humid Yes CONTROL VLV 52 GSHV0021 H2 PURGE OUTER CTMT ISO BUTT VLV AUX Yes Yes CF MOV (8) GS mild/dry Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 7 WCAP- 17678-NP November 2012 Revision 0

G-9 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-II-12-083 NT-F Recommendation 2.3: Seismic Walkdown Attachment 1 - SWEL1 Wolf Creek Generating Station Screen Screen Screen 84 Sample Considerations Screen 43Walkdown SWEL SE #11 83 Walkdown P2 Major new Deferred Item Equipment Description Building [SC - 1 (Screens (Safety Equipment System or Environment to NubeULcensing Functionvunrblt Iasing in?) Class Type replacement (Temp, F) vulnerability Basis? Support) equipment? enhancement? Outage?

53 GTRE031 CTMT ATMOSHERE RADIATION AUX Yes Yes CFGT Inst. Racks mild/dry MONITOR (18)

RCDT PUMPS DISCH HDR INSIDE CTMT 54 HBHV7176 ISO RB Yes Yes CF POV (7) HB Yes 55 JELTOO21 EMER FUELOILDAYTTK B LEVuTIME DoG Yes Yes RC PC IC Inst. Racks JE hot/humid CRITICAL ACTION EQUIPMENT> DHRCE (18)

TKAOS OUTLET PRESSURE CONTROL 56 KAPCVO013 VALVE AUX Yes Yes DHR POV (7) KA mild/dry RC PC IC Control 57 KJO122 GAUGE PANEL DGB Yes Yes KJ hot/humid DHRCF Panel (20)

RC PC IC Eng. Gen.

58 KKIJO1B STANDBY DIESEL (GENERATOR) DGB Yes Yes KJ hot/humid DNRCF (17)

CTMT NOR SUMPS TO FLR DRN TK 59 LFFVO096 AUX Yes Yes CF POV (7) LF mild/dry OUTSIDE CTMT ISO 60 NBO02 4.16 KV BUS #2

RC PC IC Med. Volt 61 NB00213 CTRL BLDG LC NG02 SWGR BRKR CB Yes Yes NB Yes DHR CF Swgr. (3)

RC PC IC Eng. Gen.

62 NEO02 STANDBY #f2 DGB Yes Yes NE hot/humid DHR CF (17)

RC PCIC Control 63 NFO39B CONT SHED/SEQ CH 4 LOGIC CB Yes Yes NF cool/dry DHRCF Panel (20)

RC PCIC Low Volt 64 NGO02 480 VAC CB/CC Yes Yes NG cool/dry X Yes DHRCF Swgr. (2)

RC PC IC Low Volt 65 NG00201 MAIN BREAKER CB Yes Yes NG cool/dry Yes DHRCF Swgr. (2)

Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page8 WCAP-17678-NP November 2012 Revision 0

G- 10 Seismic Walkdown Equipment Ust, Rev. 0 Attachment to LTR-RAM-ll-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment I - SWEL 1 Wolf Creek Generating Station Scrcree r Screen Screen 44 Sample Considerations SWI 1 Screen 13Walkdown Item Walkdown 1 #2 Major new IPEEE Deferred Comments Equipment (Screens (Sty Equipment System or Environment to NumerLicensing Basis?) In?) Functionvunrbit Fuppon Class Type replacement (Temp, 'F) vulnerability Support) equipment? enhancement? Outage?

66 NG00206 NG02A FDR BRKR

RC PC IC 67 NG002B 480 VAC MOTOR CONTROL CENTER AUX Yes Yes DHRCF MCC (1)

MCS NG Oml/r mild/dry Yes RC PC IC 68 NGO04C 480 VAC AUX Yes Yes R MCC (1) NG mild/dry Yes DHRCF RC PC IC 69 NGOO6E 480 VAC ESW Yes Yes MCC (1) NG hot/dry Yes DHRCF MC() Nho/r SC PC IC Dist. Panel 70 NKO04 125 VDC BUS SWITCHBOARD CB/CC Yes Yes DHRCF (14) NK cool/dry Yes RC PC IC Buttery 71 NK012 125-VDC NO.2 60-CELL BATTERY CB/CC Yes Yes NK cool/dry OHRCF Rack (15)

RC PC IC Battery 72 NK014 125-VDC NO.4 60-CELL BATTERY CB/CC Yes Yes NK cool/dry DHRCF Rack (15)

RC PC IC Buttery Chg 73 NK024 125 VDC NO 4 CB/CC Yes Yes NK cool/dry Yes DHRCF (16)

SC PC IC Dist. Panel 74 NK044 DIST 125 VDC CB/CC Yes Yes NK cool/dry Yes DHRCF (14)

RC PC IC Dist; Panel 75 NK054 DIST 125 VDC CB/CC Yes Yes NK cool/dry Yes DHRCF (14)

RC PCIC Battery Chg 76 NNO14 7.5 KVA CB/CC Yes Yes NN cool/dry Yes DHRCF (16)

Horz.

77 PALOIB AUX FEEDWATER PUMP AUX Yes Yes PC DHR AL hot/dry Pumps (5)

Horz.

78 PAL02 AFW PUMP-TURBINE DRIVEN AUX Yes Yes PC DHR AL hot/dry Pumps (5)

Wolf Creek Seismic Walkdown Equipment Ust September 7, 2012 Page 9 WCAP- 17678-NP November 2012 Revision 0

G-11 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-lI-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL 1 Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations SWEL Screen Walkdown Rit R3 Walkdown #2 Major new Deferred Item Equipment Description Building (SC - 1 (Screens (Safety Equipment System or Environment to Comments Number acensing In?) Function Class Type replacement (Temp, 'F) vulnerability Outage?

Basis? Support) equipment? enhancement?

Honz.

79 PBG02B BORIC ACID TRANSFER PUMP MOTOR AUX Yes Yes RC BG X hot/dry Pumps (5)

Ho11.

80 PBG04 NORMAL CHARGING PUMP AUX Yes Yes RC IC BG hot/dry Pumps (5)

RC PC IC Horz.

81 PBG05B CENTRIFUGAL CHARGING PUMP AUX Yes Yes BG hot/dry DHR Pumps (5)

RC PC IC Hor.

82 PEGO1B COMPONENT COOL. WATER PUMP AUX Yes Yes EG mild/dry DHR CF Pumps (5)

Vert. Pump 83 PEJO1B RESIDUAL HEAT REMOVAL PUMP AUX Yes Yes IC DHR EJ u hot/dry (6)

Vert. Pump 84 PENO1B Containment Spray Pump B AUX Yes Yes CF EN hot/dry (B) 85 PKJO3B AUXILIARY LUBE-OIL (KEEP-WARM) DO Yes Yes RC PC IC Horz. It] hot/humid PUMP FOR KKJO1B DHRCF Pumps (5)

RC PC IC Control 86 RL017 ESF MCB CB Yes Yes RL cool/dry DHRCF Panel (20)

BC PC IC Control 87 RL020 ESF MCB CB Yes Yes RL cool/dry DHRCF Panel (20)

BC PC IC Control 88 RL021 REACTOR AUXILIARIES PANEL CB Yes Yes RL cool/dry DHR CF Panel (20)

Control 89 RPO81A/B SUBCOOLING MONITORING CABINET CB Yes Yes DHR RP cool/dry Panel (20)

BC PC IC Control 90 RP290 DC DISTRIBUTION AUX Yes Yes RP mild/dry DHRCF Panel (20)

RC PC IC Control 91 SA036E ESFASCH4 LOGIC CABINET CB/CC Yes Yes SA cool/dry DHRCF Panel (20)

Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 10 WCAP- 17678-NP November 2012 Revision 0

G-12 Seismic Walkdown Equipment Ust, Rev. 0 Attachment to LTR-RAM-I1-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment I - SWEL 1 Wolf Creek Generating Station Scrcree r Screen Screen #4 Sample Considerations SEN1 Screen #3Walkdown e Walkdown #2 Major new Deferred Nmer Equipment Description Building ( - (Safet Equipment System or Environment Coment Number Licensing In?) Function Class Type replacement (Temp, 'F) vulnerability ta Basis?) Support) equipment? enhancement? Outage?

RC PC IC Control 92 SB032C W SS PROT SYSOUT 1 TRN CB/CC Yes Yes RS cool/dry DHRCF Panel (20)

RC PC IC Control 93 SB032D W SS PROT SYSOUT 2 TRN CB/CC Yes Yes SB cool/dry DHRCF Panel (20) 94 SB041 ~ WB4CB/CC PROCESS ANALOGPROTECTION SET Yes Yes RCPC IC Control SB cool/dry CAB-04 DHRCF Panel (20)

Control 95 SB079 RPVLEVELINSTRSYSPROCPROTSYS CB Yes Yes IC SB cool/dry Panel (20)

Control 96 5E032 SOURCE RANGECCHANNEL 2 PREAMP AUX Yes Yes RC SE mild/dry Yes Panel (20)

Control 97 SE0S4B W NUC INSTM NIS2 CB/CC Yes Yes RC SE cool/dry Yes Panel (20)

Control 98 SENYO61A EXCORENEUTRON DETECTOR AMPLIFIER AUX Yes Yes RC SE mild/dry Yes Panel (20)

RC PC IC 99 SGKO4B CONTROL ROOM A/C UNITS AUX Yes Yes AHU(10) GK X mild/dry X DHRCF RC PC IC 100 SGKO5B CLASSIE ELEC.EQUIP. A/C UNIT CB/CC Yes Yes AHU(10) GK X cool/dry X Yes DHRCF 101 SGLO98 ROOM COOLERFOR PEMO1B AUX Yes Yes AHU(10) GL hot/dry OHR 102 SGLOB RHRPUMP ROOM COOLER AUX Yes Yes ICDHR AHU(10) GIL hot/dry 103 SGL158 PENETRATION ROOM COOLER AUX Yes Yes CF AHU(10) GL mild/dry RC PC IC 104 TEGOIB CCW SURGE TANKB AUX Yes Yes Tank (21) EG mid/dry DHRCF Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 11 WCAP- I 7678-NP November 2012 Revision 0

G- 13 Seismic Walkdown Equipment Ust, Rev. 0 Attachment to LTR-RAM-lI-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment I - SWEL 1 Wolf Creek Generating Station Screen Screen Screen Screen #4 Sample Considerations Walkdown SWEL Walkdown #2 H3 Major new Deferred Item Equipment Description Building (SC - 1 (Screens (Safety Equipment System or Environment IPEEE toComments Number Licensing In?) Function Class Type replacement (Temp, *F) vulnerability to Basis?) Support) equipment? enhancement? Outage?

RC PC IC 105 TJE02B EMERGENCY FUEL OIL DAY TANK DGB Yes Yes Tk DHR CF rn 2) )o J o/ui u 106 TKA04 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR Tank (21) KA mild/dry RC PC IC 107 TKJO1B D/G BJACKET WATER EXPANSION TANK DGB Yes Yes Tank (21) hot/humid DHR CF T RC PC IC 108 TKJ02C START AIR TANK D/G DGB Yes Yes Tank (21) hot/humid DHR CF RCPCIC 109 TKJO4B D/G B AUX LU BE OIL TANK DGB Yes Yes 'HRDHR CFCF Tank (21)

Tn 2) K hot/humid o/ui RC PC IC Transformer 110 XNG02 CLASS 1E LOAD CENTER TRANSFORMER CB/CC Yes Yes NG cool/dry Yes DHRCF (4)

Transformer 111 XNGO6 FEEDS MCC NG06E ESW Yes Yes IC DHR NG hot/dry Yes (4)

Transformer 112 XPNO8B 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR PN cool/dry (4)

- React Resctsly Cotnol (RRC)

Rector Coasnt Pressur Conrct (RCPC)

Rector Cotaant tenet0wyCteaol (RCIC)

PecayNeatRemova I(DHR)

Castalseet Funaoto (CF)

Wolf Creet Seismic Walkdown Equipment Ust September 7, 2012 Page 12 WCAP- 17678-NP November 2012 Revision 0

G- 14 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 2 -SWEL 2 Wolf Creek generating Station SWEL Screen #1 Associated Item Walkdown DsrpinBuilding Equipment System (Seismic Screen #2 with Rapid Comment Number Equipment Class Type Licensing (Screens In?) Draindown?

Basis?)

Heat 1 EEC001B FUELPOOLCOOUNG HEATEXCHANGER EC FR Yes Yes No EIchangers 2 SGG04B SFP PUMP ROOM COOLERB AHU GG GG Yes Yes No 3 PECOIB FUELPOOLCOOLING PUMP PUMP EC FB Yes Yes No 4 ECHV012 FUELPOOL HEATEXCHANGER SHELLSIDEOUTLETISO MOV EC FB Yes Yes No FUELPOOL COOLING PUMP DISCHARGE FLOW 5 ECFTO018 TRANSMITTER Inst. Racks EC FB Yes Yes No Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 13 WCAP- 17678-NP November 2012 Revision 0

H-1 APPENDIX H QUALIFICATIONS WCAP-17678-NP November 2012 Revision 0

H-2 Seismic Walkdown and SWEL Development Resumes David A. Bersi, P.E.

Thirty-seven years experience in Mechanical and Project Engineering design, analysis, construction support, and operating plant support in the Nuclear Power Generation and Petrochemical industries.

Education University of Arkansas, BS Mechanical Engineering, 1975 Registered Professional Engineer, Texas #48444 Westinghouse PM-2 Project Management Qualification Professional Experience Westinghouse (May 2006 - Present)

As Project Manager and Principal Engineer, participated inCPNPP support activities for Safety Injection System Check Valve Replacement, support of Plant and Systems Engineering for various Corrective Action Program issues, Outage Support, Condition Report Resolution, and Engineering Improvement Initiatives. Functioned as Acting Manager of the Dallas Core Design and Safety Analysis Group for 5 months. Supported an Equipment Reliability Kaizen, and led a Materials Management Program Self Assessment. Supported System reviews at Fort Calhoun Station and TVA Watts Bar plants. Provided Engineering support for Passive Containment Cooling System Storage Tank design and analysis and Modular Isometric reviews.

As Project Manager and Deputy Project Manager for the Waterford 3 Replacement Steam Generator Project, held responsible for overall project management, execution and customer satisfaction for the design, manufacture, shipment, and installation support activities relating to Waterford 3 Replacement Steam Generators by providing the schedule integration and task coordination to manage the project, the day to day project direction, the cost and schedule baseline control management, and the interface with the customer, fabricator, and installer, as well as internal organizations.

As Principal Project Engineer for CPNPP Replacement Steam Generator, Replacement Reactor Vessel Closure Head, and Head Assembly Upgrade Package Project, acted as the Project Engineer and Component Lead Engineer for the design and fabrication of the indicated components.

WCAP-17678-NP November 2012 Revision 0

H-3 David A. Bersi, P.E.

Page 2 Professional Experience (cont.)

TXU Electric (Sept 1987- May 2006)

As Consulting Project Engineer for CPNPP Replacement Steam Generator, Replacement Reactor Vessel Closure Head, and Head Assembly Upgrade Package Project, acted as the Project Engineer and Component Lead Engineer for the design and fabrication of the indicated components.

Acting Testing Group Supervisor for 5 months supporting testing activities for the refueling outage.

As System Engineer, performed duties for Reactor Coolant, Residual Heat Removal, Safety Injection, Liquid, Gaseous, and Solid Waste Processing, Steam Generator Blowdown, Boron Recycle, Station Service Water, Component Cooling Water, Chemical Feed, and Primary Plant Ventilation for Safeguards Building, Auxiliary Building, Primary Plant, and Fuel Building Ventilation Systems. Also, back-up System Engineer Auxiliary Feedwater, Post Accident Sampling, and Secondary Sampling.

Responsible for preparation of material and teaching of assigned Systems for the Plant Certification Class. 10CFR50.59 Evaluator Qualified and Subject Matter Expert, and CPSES Mechanical Equipment List Subject Matter Expert. Member ofEmergency Response Organization. Westinghouse Owner's Group System Engineering Representative. System Engineering ALARA committee representative. System Engineering representative to Reactor Coolant Pump and Motor Management Team. Site Safety Steering Committee representative.

Engineering duties during construction completion, initial start up, and operation phases at CPNPP.

Activities included system and modification reviews, testing reviews, licensing and FSAR reviews, calculation reviews, and procurement documentation reviews.

OTHER (May 1975 - Sept 1987)

Various Project Mechanical Engineering assignments in the Nuclear and Petrochemical Industries.

WCAP-17678-NP November 2012 Revision 0

H-4 Timothy S. Nealon Education 2010 - 2012 University at Buffalo, Buffalo, New York Master of Science, Civil Engineering (MSc) 2006- 2010 University at Buffalo, Buffalo, New York Bachelor of Science, Civil and Environmental Engineering (BSCE)

Professional Capabilities Structural analysis and design of steel, concrete, and masonry structures using IBC and UBC Dynamic analysis of structures for seismic, vibration, blast, fluid, and wind loads Competed the NTTF Recommendation 2.3 Plant Seismic Walkdown training course Finite element modeling and analysis including use of ABAQUS, and SAP2000 Professional History 2012 - Present Stevenson and Associates, Goodyear,Arizona Engineer Project Experience Summary Seismic FragilityProjects Mr. Nealon has performed seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments. Mr. Nealon has executed the seismic analyses of concrete foundations, masonry walls, large storage tanks, piping, and electrical and mechanical equipment anchorages. In addition, Mr. Nealon has performed seismic walkdowns of tank and their associated leakpath piping to assess loss of inventory in the event of beyond design basis seismic events. He has assessed piping systems for excessive stresses due to differential support movement and performed subsequent analyses using manual and finite element methods.

WCAP-1 7678-NP November 2012 Revision 0

2',~

1.~

I t :4-

'2 - ~. .

.1 __ Ft~

-a z A 4<..

  • S . / i Certificate of Completion Tim Nealon Successfulhlj Completed Training on Near Term Task Force Recommendation 2.3 - Plant Seismic Walkdowns Date: 06/26/12 Bruce M. Lor- Instructor NTTF 2.3 Seismic Walkdown Course z0

(~

1' C

C

H-6 Derek J. Seaman Education WP Carey School of Business at Arizona State University, Tempe, Arizona - May 2011 Master of Business Administration, Finance Emphasis Oregon State University, Corvallis,Oregon - December 2005 Bachelor of Science, Nuclear Engineering Professional Experience Senior Engineer, Westinghouse Electric Company, June 2009 - Present Major Responsibilities

  • Manage final-stage engineering projects as part of multi-million dollar nuclear fuel campaigns.

Includes attending senior management meetings and coordinating efforts of an 8 engineer team.

  • Quantify equipment risk by performing plant walkdowns and developing risk assessments.
  • Rotate through various plant outage positions to learn multiple aspects of refueling outages and work with systems hands on.

0 Conduct reload engineering analyses to ensure safe implementation of core designs.

0 Perform apparent cause analyses to correct plant issues and prevent recurrence.

Accomplishments 0 Authored, reviewed and mentored all aspects of the nuclear fuel reload process.

0 Successfully project managed multiple fuel reload campaigns with fuel valued over $100 million.

0 Modeled multiple reloads analyses in SIMULATE under customer's quality program.

0 Analyzed fuel CRUD load to support lowering plant operating pressure which helped result in saving an unnecessary plant shutdown.

  • Performed and implemented multiple corrective actions to correct quality and non conforming errors.

WCAP-17678-NP November 2012 Revision 0

H-7 Derek J. Seaman Page 2 Professional Experience (cont.)

Engineer, Westinghouse Electric Company, February2006 - June 2009 Major Responsibilities

  • Evaluate power increase proposals from a safety analysis perspective to enable power utilities to generate additional revenue.
  • Create monthly budgets and acquire necessary funding from management to resolve quality related rework within the engineering organization as part of customer focus.
  • Analyze system and human performance failures as an apparent cause investigator and provided innovative plans to prevent reoccurrence.

Accomplishments

  • Designed and implemented a quality assurance metrics system decreasing quality related costs saving nearly $ 1OOK in first year group implementation and improving customer relations.
  • Managed group's quality assurance and implemented corrective actions to reduce quality related errors by nearly 8% in the first year.

Professional and Community Relations Team Captain, American Cancer Society Climb to Conquer Cancer - 2008-Present Planned and organized 9 climbs raising over $40,000 to fight cancer.

0 Worked with company executives to improve company visibility in the community.

Volunteer, Phoenix Baptist Hospital -2007-2008 Policy Chairman, North American Young Generation in Nuclear (New England Chapter) - 2006-2007 WCAP-17678-NP November 2012 Revision 0

H-8 Timothy W. Solberg Education 2010 - 2011 Stanford University, Stanford, California Master of Science, Structural Engineering (MS) 2005- 2009 Rice University, Houston, Texas Bachelor of Science, Civil and Environmental Engineering (BSCE)

Professional Capabilities Earthquake hazard and risk analysis Seismic design of structural systems Structural design and analysis of steel and concrete structures Dynamic analysis of structures Completed EPRI Fundamentals of Equipment Seismic Qualification Training Competed NTTF Recommendation 2.3 Plant Seismic Walkdown Training Professional History 2012 - Present Wolf Creek Nuclear OperatingCorporation,Burlington,Kansas Design Engineer 2011 - 2012 Risk Management Solutions, Inc., Hoboken, New Jersey Risk Analyst Experience Summary Wolf Creek Nuclear OperatingCorporation Mr. Solberg has participated in various civil, structural, and seismic engineering tasks while at Wolf Creek. He has developed experience in civil/structural design and supports in addition to seismic analyses and evaluations of plant systems and components.

Risk Management Solutions, Inc.

Mr. Solberg worked with a risk assessment company to accurately predict building and casualty losses that would arise from natural and man-made catastrophes. He worked on using theory from the hazards of earthquakes, hurricanes, and other extreme events to quantify the potential vulnerability and damage to structures and their inhabitants, and interpreting these results to clients.

WCAP-1 7678-NP November 2012 Revision 0

ELETRC PWE Certificateof Completion Tim Solberg Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns July 11, 2012 Date Robert K. Kassawara EPRI Manager, Cz Structural Reliability & Integrity CD

H-10 Hunter A. Young, P.E.

Education 2008 - 2009 Massachusetts Institute of Technology, Cambridge,Massachusetts Master of Engineering, Structural Engineering (MEng) 2002 - 2006 University of Notre Dame, Notre Dame, IN Bachelor of Science, Civil and Environmental Engineering (BSCE)

Registration and Affiliations Registered Professional Engineer, California, No. C79404 Member of ASCE, ASME Professional Capabilities Structural analysis and design of steel, concrete, and masonry structures using IBC and UBC Dynamic analysis of structures for seismic, vibration, blast, fluid, and wind loads Competed SQUG training course for walkdown and fragility analysis of nuclear facilities and their components Finite element modeling and analysis including use ofANSYS, SOLVIA, GTStrudl, and SAP2000 Vehicle barrier design for the protection of plant facilities and personnel Project management including planning, scheduling, and preparing technical reports Risk and hazard analysis Construction support and inspection Professional History 2009 - Present Stevenson andAssociates, Woburn, Massachusetts Senior Engineer 2007- 2008 Hensel Phelps Construction Company, Washington, D.C.

Field Engineer WCAP-17678-NP November 2012 Revision 0

H-11 Hunter A. Young, P.E.

Page 2 Project Experience Summary Seismic FragilityProjects Mr. Young has managed and led seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments. On these projects, he has walked down both Safety Related and non-Safety Related structures, systems, and components in all areas of the power block. Mr. Young has executed the seismic analyses of braced steel frames, concrete foundations, masonry walls, large storage tanks, and electrical and mechanical equipment anchorages. In addition, Mr. Young has performed the walkdown and analysis of tank structures and their associated leakpath piping to assess loss of inventory in the event of beyond design basis seismic events. He has assessed piping systems for excessive stresses due to differential support movement and performed subsequent nonlinear analyses using manual and finite element methods.

Miscellaneous NuclearProjects Mr. Young has conducted seismic analysis of Safety Related structures with soil structure interaction using both response spectrum and nonlinear time history methodologies. He has analyzed and designed stilling wells for hydrodynamic loads in cask loading pit. He has evaluated penetration/cut reinforcement for cask loading pit concrete walls and assessed the modification of steel support frames for spent fuel cask. Mr. Young has performed structural evaluation of the rigging operation for the replacement of the main generating startup transformer. Additionally, he has developed risk analyses using contingency matrices for transformer replacement and rigging operations.

Security/Blast Loading Projects Mr. Young has performed blast analyses of existing structures for minimum safe standoff distances and subsequently designed passive vehicle barrier systems. He has conducted preliminary wind and seismic loading analysis for the conceptual design of a new security facility. Mr. Young has designed structural supports for equipment vulnerable to shock loading. He has designed foundations for new security structures.

WCAP-17678-NP November 2012 Revision 0

CD CD CD 0j

H-13 Peer Review Team Rksum s Todd A Bacon Education 1976 - 1980 University of Illinois - Urbana-Champaign Bachelor of Science - Civil Engineering Registration/Certification Professional Engineer: California License No. C-0336104 (Civil), Georgia License. No. 015562, Ohio License No. E-57497 Professional History 2012 - Present Stevenson & Associates, Charlotte, North Carolina, Senior Consultant and General Manager, Charlotte, NC Office 1980-2012 AREVA Inc., Charlotte, NC, Engineering Manager Professional Experience Mr. Bacon has thirty years of experience in the design and modification of mechanical and structural systems. His responsibilities as an Engineering Manager have included work from the conceptual design through to the installation support phases of projects. Mr. Bacon has served as Project Engineer and Project Manager for numerous work scope efforts, including coordination of personnel in multiple locations. The efforts have also included significant client and/or regulatory interface, as required. These activities have also included responsibility for budgets, schedules and the technical accuracy of work performed. In addition, he has extensive experience in proposal and report development, as well as personnel training activities.

Mr. Bacon's work has involved extensive use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, including various piping system related committees. These have included the design group for the HDPE buried pipe group of Section III, and the Flaw Analysis group of Section XI.

Other Code experience includes the American Institute of Steel Construction (AISC), American Concrete Institute (ACI), and ASME (ANSI) B3 1.1 and B331.3 codes. He serves on the AREVA College of Experts in the areas of structural and dynamic analysis and is also fluent in using numerous piping and finite element computer programs, as well as in typical frame analysis programs.

WCAP-17678-NP November 2012 Revision 0

H-14 Todd A Bacon Page 2 Professional Experience (cont.)

EngineeringManager,Civil and Layout Department ARE VA NP Inc.

Mr. Bacon served as an Engineering Manager in the Civil and Layout Department in Charlotte, North Carolina. In this role he was responsible for the efforts involving work on the 3D model for an AREVA US EPR plant being designed for the Calvert Cliffs site in Maryland. His areas of responsibility also included the balance of plant piping system design efforts for the plant. In this role, he was involved with interfaces with numerous groups utilizing the 3D model information, as well as consortium partner Bechtel Power, and AREVA offices throughout the US and Europe who served as subcontractors for various portions of the overall project scope of work. This included coordinating the efforts of approximately fifty individuals for these efforts involving technical resolution of issues, manpower planning, personnel issues, and development of the group.

In addition to the managerial responsibilities, he was a member of the AREVA College of Experts in the area of mechanics and fluid mechanics. This group was comprised of approximately one percent of the company worldwide which served as the technical leaders for the company, shfaring best practices and knowledge throughout the global organization.

In addition to the New Plants activities in the US, Mr. Bacon supported efforts involving current activities for the International Thermonuclear Experimental Reactor (ITER) effort in which AREVA had the responsibility for the Cooling System involving the piping system evaluations and development of Technical Guides and impact to the building resulting from the piping system.

He previously served as an Engineering Manager in the Structural and Engineering Mechanics Group, working on projects involving operating plants. As a Project Engineer and Manager, he helds responsibility for leading project teams in technical areas, as well as in budget and schedule item tracking functions.

Examples of typical projects include the following:

Mixed Oxide (MOX) Fuel FabricationFacility,Savannah River Site - Conducted third party review of overall project identifying ways to achieve efficiencies and improve production rates for the building design and construction effort. This resulted in numerous recommendations for the site to improve production in the areas of scheduling, group interfacing (engineering disciplines, construction, etc.),

procedural development as well as improvements through procedural revisions. This also included performing as the lead engineer on projects for the facility involving development of procedures for field routing of small bore piping systems, as well as conduit runs.

WCAP-1 7678-NP November 2012 Revision 0

H-15 Todd A Bacon Page 3 Professional Experience (cont.)

ECCS DebrisBlockage Issue, Tokyo Electric Power Company (TEPCO) - Established contact and led proposal efforts to obtain contracts for ECCS suction strainer replacements for first plant performing this scope in Japan. Subsequently won contracts for two additional TEPCO units as well, resulting in $ 8M in revenue for AREVA. This work involved extensive interface and oversight of the strainer hardware vendor during the design, fabrication an!d construction phases of the projects.

ASME BPVC Work, Various Facilities- Served in positions of increasing responsibility performing and reviewing ASME Boiler and Pressure Vessel Code work in the Structural and Engineering Mechanics Group. Work included Class 1 analyses of flued heads, mechanical equipment evaluations and numerous piping system analyses.

ECCS Debris Blockage Issue, involving numerous US B WR clients - Served in various roles including Project Engineer, Project Manager, and Technical Consultant. Had a significant amount of involvement with this issue including involvement with the BWR Owner's Group for this issue spanning numerous years.

GL 96-06 Operabilityand Design Basis Resolution, Oconee Nuclear Station, Duke Power - Served as the Project Engineer for the Operability Evaluation for the Oconee Nuclear Station in an effort to show all three units operable under the additional loadings resulting from the USNRC Generic Letter. This assessment included evaluation of the LPSW system, including piping, supports, equipment nozzles, as well as structural platforms and associated components. In addition, operability guidelines were developed for Oconee during this effort.

Reactor Cavity DrainLine Modifications, PalisadesNuclear Power Plant, Consumers Power - Project Manager for the Reactor Cavity Drain Line modifications and letdown piping support modifications at the Palisades Plant. Work scopes included both engineering functions and the generation of modification package paperwork.

NRC Bulletin 79-14 Large-BorePipingProject Evaluation,D. C. Cook Nuclear Power Plant, Indiana/MichiganPower - Work included serving as Project Engineer to evaluate the adequacy of D.C.

Cook's NRC Bulletin 79-14 Large-Bore Piping Project. The work scope involved supervising a project team performing piping and piping support evaluations. Conclusions drawn from this study have enabled the client to realize significant cost savings during recent maintenance outages through discrepancy trending and margin assessment studies.

ReactorPressure Vessel Bottom Head DrainLine Unplugging Project,Dresden Nuclear Generating Station Units 2 & 3, Commonwealth Edison. Included serving as Project Engineer responsible for unplugging reactor pressure vessel bottom head drain lines for Dresden Units 2 and 3. This project was successfully completed within schedule and budget constraints, and also was part of the Unit 2 critical path outage work.

WCAP-17678-NP November 2012 Revision 0

H-16 Todd A Bacon Page 4 Professional Experience (cont.)

HPCI System SpargerModification, Quad Cities Nuclear GeneratingStation, CornEd- Served as the Structural and Engineering Mechanics Project Engineer and Manager for Quad Cities Unit 1 and 2 high pressure coolant injection (HPCI) system modification, which resulted in the addition of a sparger assembly inside the torus. The project also included the addition of platforms to provide accessibility for personnel performing maintenance activities at both units.

Hardened Wetwell Vent Project Third PartyReviews, Dresden and Quad Cities Nuclear Generating Stations, CornEd- Led the third party reviews of the hardened wetwell vent projects for the Dresden and Quad Cities stations. These projects involved the evaluation of existing, as well as new, piping and auxiliary steel. Design codes used for the mechanical work included ASME Section III, Subsections NC, ND, NE and NF, as well as AISC and Uniform Building Code (UBC) standards for the structural evaluations.

StructuralProjects, Various Facilities- Past projects have included extensive structural experience, such as the Hope Creek Nuclear Generating Station's drywell inner water seal plate analysis, and also Mark I piping and pipe support evaluations. Previous work also included extensive experience working on various mechanical and structural design projects.

Licensing and Special Projects,Comanche Peak Steam Electric Station, TU Electric - Involved in licensing and special studies projects for the Comanche Peak Station.

SSFI Audit Responses, CoinEd - Participated in responding to concerns raised during safety system functional inspection (SSFI) audits.

Project Summary Reports and OperabilityGuidelines, CoinEdand AEPSC - Wrote numerous project summary reports and operability guidelines for Commonwealth Edison (ComEd) and American Electric Power Company (AEPC).

Piping,Piping Support andHVAC Modifications, Various Facilities- Served as Project Engineer for piping, piping support and HVAC modification work for various nuclear plants, including Dresden Units 2 and 3, Quad Cities Units 1 and 2, D. C. Cook Units 1 and 2, and Duane Arnold. Project Engineer responsibilities included coordinating schedule and budget issues, as well as addressing technical questions as they arose.

Control Rod Drive Frame Analysis, Browns FerryNuclear PowerPlant, Tennessee Valley Authority (TVA) - Involved in the analysis of the control rod drive frames for the Browns Ferry Plant.

WCAP-17678-NP November 2012 Revision 0

H-17 Gary L. Douglas Principal Engineer, Risk Applications & Methods Westinghouse Nuclear Services Division Education B.S. Oceanography U.S. Naval Academy Nuclear Power Program United States Navy M.Eng. Materials Science Cornell University Summary Mr. Douglas is a Principal Engineer in the Risk Applications and Methods Group of the Systems & Risk Applications Engineering Department of Westinghouse's Nuclear Services Division. He has 14 years of experience with PWR design, including qualifications in the Navy Nuclear Power Program. He has safety analysis experience in the Nuclear Power and Aerospace Industries. He worked as an engineer for 9 years at South Texas Project Electric Generating Station, with emphasis on root cause analysis, reliability engineering, systems engineering and PRA applications analysis. He worked as an engineer for 10 years at Hamilton Sundstrand, with emphasis on root cause analysis, FMEA, and safety hazards analysis ofjet engine controls and space & submarine life support systems.

Specifically, Mr. Douglas's prior engineering experience as an engineer in the Navy Nuclear Power Program and at South Texas Project Electric Generating Station has afforded him plant-wide hands-on experience with all safety and non-safety related equipment comprising military and commercial nuclear steam supply systems.

Mr. Douglas is presently involved in PSA applications activities for several plant sites, with emphasis on External Events and Internal Flooding PRA Modeling. He recently completed a site visit to Fort Calhoun Station for the purpose of performing verification walkdowns of systems supporting the station's PRA model.

Some of the recognitions Mr. Douglas has achieved over his career include the following: Distinguished Midshipman Award, 1983; Advanced Root Cause Analysis Certified, 1996; INPO Recognition as South Texas Project Plant Doctor, 1997; AS9 100 Certified Quality Engineer, 2005; NASA Environmental Controls & Life Support Systems Award, 2011 (for contributions to the Oxygen Generation System aboard the International Space Station).

November 2012 WCAP-1 7678-NP WCAP-17678-NP November 2012 Revision 0