|
|
Line 18: |
Line 18: |
| {{#Wiki_filter:Form 2.3-4 Written Examination Quality Checklist | | {{#Wiki_filter:Form 2.3-4 Written Examination Quality Checklist |
|
| |
|
| Facility: Date of Exam: Exam Level: RO SRO | | Facility: Date of Exam: Exam Level: RO SRO |
|
| |
|
| Item Description (Y)es / (N)oa b* c# | | Item Description (Y)es / (N)oa b* c# |
| : 1. Questions and answers are technically accurate and applicable to the facility. Each question Y includes a technical reference. | | : 1. Questions and answers are technically accurate and applicable to the facility. Each question Y includes a technical reference. |
| : 2. a. All questions reference NRC knowledge and abilities (K/As) requirements. | | : 2. a. All questions reference NRC knowledge and abilities (K/As) requirements. |
| : b. Facility learning objectives are referenced as available. Y | | : b. Facility learning objectives are referenced as available. Y |
| : c. All questions include an explanation of the correct answer explanation and a distractor analysis. | | : c. All questions include an explanation of the correct answer explanation and a distractor analysis. |
| : 3. Senior reactor operator (SRO) questions test at the SRO license level. Y | | : 3. Senior reactor operator (SRO) questions test at the SRO license level. Y |
| : 4. The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRC licensing exams, including full Y (100-question) retake examinations, consult the NRC Office of Nuclear Reactor Regulation operator licensing program office.) | | : 4. The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRC licensing exams, including full Y (100-question) retake examinations, consult the NRC Office of Nuclear Reactor Regulation operator licensing program office.) |
| : 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate: | | : 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate: |
| __ The audit exam was systematically and randomly developed. | | __ The audit exam was systematically and randomly developed. |
| __ The audit exam was completed before the license exam was started. Y | | __ The audit exam was completed before the license exam was started. Y |
| __ The examinations were developed independently. | | __ The examinations were developed independently. |
| __ The licensee certifies that there is no duplication. | | __ The licensee certifies that there is no duplication. |
| __ Other (explain): | | __ Other (explain): |
| : 6. Bank use meets limits (no more than 75% from the bank, at least Bank Modified New Y 10% new (at the comprehension/analysis level), and the rest new or modified); enter the actual RO/SRO-only question distribution > 29 / / / 1 / 016 Y | | : 6. Bank use meets limits (no more than 75% from the bank, at least Bank Modified New Y 10% new (at the comprehension/analysis level), and the rest new or modified); enter the actual RO/SRO-only question distribution > 29 / / / 1 / 016 Y |
| : 7. Between 38 and 45 questions of the questions on the RO exam and Memory C/A Y at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual 31 / / 0544 / 20 RO/SRO-only question distribution > Y | | : 7. Between 38 and 45 questions of the questions on the RO exam and Memory C/A Y at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual 31 / / 0544 / 20 RO/SRO-only question distribution > Y |
| : 8. References/handouts provided do not give away answers or aid in the elimination of distractors. Y | | : 8. References/handouts provided do not give away answers or aid in the elimination of distractors. Y |
| : 9. Question content conforms to specific K/A statements in the previously approved examination Y outline and is appropriate for the K/A statements assigned tier; deviations are justified. | | : 9. Question content conforms to specific K/A statements in the previously approved examination Y outline and is appropriate for the K/A statements assigned tier; deviations are justified. |
| : 10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2. Y | | : 10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2. Y |
| : 11. The exam contains the required number of one-point, multiple-choice items; the total is correct Y and agrees with the value on the cover sheet. | | : 11. The exam contains the required number of one-point, multiple-choice items; the total is correct Y and agrees with the value on the cover sheet. |
| Dh k.W'F rEW l /kr.&hWF 4r.WF r$ ,&.)ih 9999999999999999999999999999999999999999999999999999999999999F9999999999F | | Dh k.W'F rEW l /kr.&hWF 4r.WF r$,&.)ih 9999999999999999999999999999999999999999999999999999999999999F9999999999F |
| $ orm 2 .3FQWa W(WhFs! 9999999999999999999999999999999999999999999999999999999999999F9999999999F m$ Q-FQWa W(WhFs" 9999999999999999999999999999999999999999999999999999999999999F9999999999F Q-F-) WtFenrE kWhF 9999999999999999999999999999999999999999999999999999999999999F9999999999F Q-FQW/ ikr2Fl&cWha CihF 9999999999999999999999999999999999999999999999999999999999999F9999999999F | | $ orm 2.3FQWa W(WhFs! 9999999999999999999999999999999999999999999999999999999999999F9999999999F m$ Q-FQWa W(WhFs" 9999999999999999999999999999999999999999999999999999999999999F9999999999F Q-F-) WtFenrE kWhF 9999999999999999999999999999999999999999999999999999999999999F9999999999F Q-FQW/ ikr2Fl&cWha CihF 9999999999999999999999999999999999999999999999999999999999999F9999999999F |
| * The facility licensee signature is not applicable for NRC-developed tests. | | * The facility licensee signature is not applicable for NRC-developed tests. |
| # An independent NRC reviewer performs steps in column c. This may be the NRC Chief Examiner if he/she did not develop the written examination under review.}} | | # An independent NRC reviewer performs steps in column c. This may be the NRC Chief Examiner if he/she did not develop the written examination under review.}} |
|
---|
Category:License-Operator
MONTHYEARML24219A2082024-08-0606 August 2024 Ile Form 5.1-1 Postexamination Check Sheet IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 ML24173A1272024-06-12012 June 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter ML24173A1802024-06-12012 June 2024 Ile Post Exam Comments ML24173A1792024-06-12012 June 2024 Ile Form 2.1-1 Examination Prep Checklist ML24173A1782024-06-12012 June 2024 Ile Form 1.3-1 Examination Security Agreement ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 ML24173A1552024-05-14014 May 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24173A1562024-05-0202 May 2024 Ile Form 2.3-4 Written Examination Quality Checklist SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter ML24173A1262024-01-23023 January 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML24173A1252024-01-23023 January 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21281A1242021-10-0808 October 2021 GFE Results, September 2021 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO 2024-08-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24219A2082024-08-0606 August 2024 Ile Form 5.1-1 Postexamination Check Sheet IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 ML24173A1792024-06-12012 June 2024 Ile Form 2.1-1 Examination Prep Checklist SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter ML24173A1272024-06-12012 June 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24173A1782024-06-12012 June 2024 Ile Form 1.3-1 Examination Security Agreement ML24173A1802024-06-12012 June 2024 Ile Post Exam Comments ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 ML24173A1552024-05-14014 May 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24173A1562024-05-0202 May 2024 Ile Form 2.3-4 Written Examination Quality Checklist SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter ML24173A1252024-01-23023 January 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24173A1262024-01-23023 January 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist 2024-08-06
[Table view] |
Text
Form 2.3-4 Written Examination Quality Checklist
Facility: Date of Exam: Exam Level: RO SRO
Item Description (Y)es / (N)oa b* c#
- 1. Questions and answers are technically accurate and applicable to the facility. Each question Y includes a technical reference.
- 2. a. All questions reference NRC knowledge and abilities (K/As) requirements.
- b. Facility learning objectives are referenced as available. Y
- c. All questions include an explanation of the correct answer explanation and a distractor analysis.
- 3. Senior reactor operator (SRO) questions test at the SRO license level. Y
- 4. The sampling process was random and systematic. (If more than four reactor operator (RO) or two SRO questions were repeated from the last two NRC licensing exams, including full Y (100-question) retake examinations, consult the NRC Office of Nuclear Reactor Regulation operator licensing program office.)
- 5. Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
__ The audit exam was systematically and randomly developed.
__ The audit exam was completed before the license exam was started. Y
__ The examinations were developed independently.
__ The licensee certifies that there is no duplication.
__ Other (explain):
- 6. Bank use meets limits (no more than 75% from the bank, at least Bank Modified New Y 10% new (at the comprehension/analysis level), and the rest new or modified); enter the actual RO/SRO-only question distribution > 29 / / / 1 / 016 Y
- 7. Between 38 and 45 questions of the questions on the RO exam and Memory C/A Y at least 13 of the questions on the SRO-only portion of the exam are written at the comprehension/analysis level; enter the actual 31 / / 0544 / 20 RO/SRO-only question distribution > Y
- 8. References/handouts provided do not give away answers or aid in the elimination of distractors. Y
- 9. Question content conforms to specific K/A statements in the previously approved examination Y outline and is appropriate for the K/A statements assigned tier; deviations are justified.
- 10. Question psychometric quality and format meet the instructions and guidelines in ES-4.2. Y
- 11. The exam contains the required number of one-point, multiple-choice items; the total is correct Y and agrees with the value on the cover sheet.
Dh k.W'F rEW l /kr.&hWF 4r.WF r$,&.)ih 9999999999999999999999999999999999999999999999999999999999999F9999999999F
$ orm 2.3FQWa W(WhFs! 9999999999999999999999999999999999999999999999999999999999999F9999999999F m$ Q-FQWa W(WhFs" 9999999999999999999999999999999999999999999999999999999999999F9999999999F Q-F-) WtFenrE kWhF 9999999999999999999999999999999999999999999999999999999999999F9999999999F Q-FQW/ ikr2Fl&cWha CihF 9999999999999999999999999999999999999999999999999999999999999F9999999999F
- The facility licensee signature is not applicable for NRC-developed tests.
- An independent NRC reviewer performs steps in column c. This may be the NRC Chief Examiner if he/she did not develop the written examination under review.