IR 05000293/2021002: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML21222A149 | | number = ML21222A149 | ||
| issue date = 08/10/2021 | | issue date = 08/10/2021 | ||
| title = | | title = NRC Innspection Report No. 05000293/2021002 | ||
| author name = Dimitriadis A | | author name = Dimitriadis A | ||
| author affiliation = NRC/RGN-I/DRSS | | author affiliation = NRC/RGN-I/DRSS | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 10, 2021 | ||
==SUBJECT:== | |||
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT NO. 05000293/2021002 | |||
==Dear Ms. Cowan:== | |||
On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shutdown Pilgrim Nuclear Power Station (PNPS). An on-site inspection was performed from June 7 - 11, 2021. Additional inspection activities (in office reviews) were conducted remotely as a consequence of the COVID-19 public health emergency (PHE) during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with site personnel, a review of procedures and records, and plant walk-downs. The results of the inspection were discussed with Mr. John Moylan, Site Vice President, and other members of the PNPS staff on July 14, 2021, and are described in the enclosed report. | |||
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if any, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. | |||
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's Website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Harold (Harry) Anagnostopoulos at 610-337-5322 if you have any questions regarding this matter. | |||
Sincerely, Digitally signed by Anthony M. Anthony M. Dimitriadis Date: 2021.08.10 Dimitriadis 14:33:16 -04'00' | |||
Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Radiological Safety and Security Docket No. 05000293 License No. DPR-35 Enclosure: Inspection Report 05000293/2021002 w/Attachment cc w/encl: Distribution via ListServ | |||
=EXECUTIVE SUMMARY= | |||
Holtec Decommissioning International, LLC (HDI) | |||
Pilgrim Nuclear Power Station (PNPS) | |||
NRC Inspection Report No. 05000293/2021002 An announced routine decommissioning inspection of Pilgrim Nuclear Power Station (PNPS)was completed on June 30, 2021. An on-site focused topical inspection using three inspection procedures was conducted from June 7 - 11, 2021. Additional inspection activities were conducted remotely during the inspection period as a consequence of the COVID-19 public health emergency (PHE). The inspection included a review of the results of routine radiological effluent and environmental monitoring, inspection of radioactive waste processing and storage equipment & areas, changes to the Offsite Dose Calculation Manual (ODCM), inspection of the 10 CFR Part 37 security program, and an observation of Onsite Safety Review Committee activities. The inspection consisted of observations by the inspector, interviews with site personnel, a review of procedures and records, and plant walk-downs. The U.S Nuclear Regulatory Commissions (NRC's) program for overseeing the safe operation of a shutdown nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, | |||
Decommissioning Power Reactor Inspection Program." | |||
Based on the results of this inspection, no violations of NRC requirements were identified. | |||
ii Inspection Report No. 05000293/2021002 | |||
=REPORT DETAILS= | |||
1.0 Background On June 10, 2019, Entergy Nuclear Operations, Inc. (ENOI) certified cessation of power operations and the permanent removal of fuel from the PNPS reactor vessel (ADAMS Accession Number: ML19161A033). This met the requirements of 10 CFR 50.82(a)(1)(i)and 50.82(a)(1)(ii). On June 11, 2019, the NRC notified PNPS that the NRC would no longer perform its oversight activities in accordance with the Operating Reactor Assessment Program and that oversight would be conducted under the provisions outlined in IMC 2561 Decommissioning Power Reactor Inspection Program (ADAMS Accession No. ML19162A033). On August 27, 2019 an amendment was issued transferring the license from ENOI to Holtec International, LLC., (HDI) (ADAMS Accession No. ML19235A050). PNPS is in the active decommissioning phase with fuel in the spent fuel pool as described in IMC 2561. | |||
2.0 Decommissioning Performance and Status Review | |||
====a. Inspection Scope==== | |||
[Inspection Procedures 84750, 86750, 87137] | |||
The inspector performed a walk-down of selected waste processing systems to verify that the system configurations and operations were in agreement with the descriptions in the Decommissioning Safety Analysis Report (DSAR), the Offsite Dose Calculation Manual (ODCM), and the Process Control Program (PCP). | |||
The inspector reviewed the most recent radiological surveys of radioactive waste storage and processing areas to assess their radiological conditions, and then entered a selection of these areas to observe their material condition. | |||
The inspector reviewed any changes made to the ODCM, PCP, and the radioactive waste system design and operation. | |||
The inspector observed the condition of the liquid effluent radioactive waste radiation monitor, its associated valves, and walked-down the exposed portions of the discharge piping. The inspector reviewed the results of a recent pressure-drop test of the liquid radioactive waste discharge line, which was performed to verify the integrity of the piping and its connections. | |||
The inspector selected a sample of effluent radiation monitors and to determine if they were appropriately calibrated. | |||
The inspector performed a walk-down of the Reactor Building and Turbine Building roof areas. The inspector toured the accessible portions of the reactor containment (drywell 23 foot elevation), and observed the storage of control rod drive mechanisms in a storage area of the main turbine deck. The inspector performed direct observations of the conditions of the turbine building air effluent radiation monitors. | |||
The inspector reviewed the Annual Radioactive Effluent Release Report and the Annual Radiological Environmental Operating Report for any anomalous results to verify that reported doses were below regulatory requirements. | |||
Inspection Report No. 05000293/2021002 | |||
The inspector observed a selection of environmental sampling stations to evaluate their location, placement, and material condition. The inspector reviewed the implementation of the Groundwater Protection Initiative program, attended a meeting of the Onsite Safety Review Committee to observe management processes, and reviewed the results of the Phase 1 site characterization effort. | |||
Using inspection procedure 86750 (and portions of 87137 as a technical reference), the inspector evaluated implementation of the licensees security plan associated with 10 CFR 37, walked-down the storage areas, and discussed the security strategies for these areas with the Security Manager. | |||
====b. Observations and Findings==== | |||
The inspector verified that HDI had identified problems associated with radioactive waste storage, processing, and transportation activities, entered them into the corrective action program, and had implemented appropriate corrective actions. | |||
The inspector determined that recent changes to the Radiological Environmental Monitoring Program (REMP) were appropriate to the change in plant status and plant conditions following permanent cessation of operations (and the associated decay of short-lived radionuclides). | |||
The inspector determined that the air effluents from the turbine building were minimal (following permanent cessation of operations) and appropriately accounted for by the reactor building ventilation monitor. The turbine building gaseous effluent monitoring system has been removed from service. | |||
The inspector observed the wind-related damage to the turbine building roof membrane and verified that the damage was not likely to cause any immediate challenge to the ability to manage water infiltration or the safe storage of radioactive materials. The planned timeline for repairs was determined to be adequate. | |||
The inspector determined the Onsite Safety Review Committees activities to be intrusive, challenging, and an effective management tool to ensure safe and compliant decommissioning activities. | |||
====c. Conclusions==== | |||
Based on the results of this inspection, no violations of NRC requirements were identified. | |||
3.0 | |||
=====Exit Meeting Summary===== | |||
On July 14, 2021, the inspector presented the inspection results to Mr. John Moylan, Site Vice President, and other members of the HDI staff. No proprietary information was retained by the inspector or documented in this report. | |||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | |||
Inspection Report No. 05000293/2021002 | |||
SUPPLEMENTAL INFORMATION | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
: [[contact::J. Moylan]], Site Vice President | |||
: [[contact::J. McDonough]], Operations Manager | |||
: [[contact::D. Noyes]], Senior Compliance Manager | |||
: [[contact::M. Lawson]], Radiation Protection Manager | |||
: [[contact::F. McGinnis]], Regulatory Assurance Specialist | |||
J. ODonnel - Operations Shift Manager | |||
: [[contact::M. Thornhill]], Certified Health Physicist | |||
ITEMS OPEN, CLOSED, AND DISCUSSED | |||
None | |||
LIST OF DOCUMENTS REVIEWED | |||
CFR Part 37 Security Plan | |||
CFR Part 37 security program annual reviews for 2019 and 2020 | |||
Air Station Location Study at the Pilgrim Nuclear Power Station Based on 2016 - 2019 | |||
Meteorological Data, Holian Environmental, LLC, May 2020 | |||
Annual Radioactive Effluent Release Report, January 1 through December 31, 2020, dated | |||
5/6/2021 | |||
Annual Radiological Environmental Operating Report, January 1 through December 31, 2020, | |||
dated 5/6/2021 | |||
Comparison Study of Meteorological Data from the 220-Foot Primary and 160-Foot Backup | |||
Towers at the Pilgrim Nuclear Power Station, Holian Environmental, LLC, August 2019. | |||
EN-NS-101, Unescorted Access Authorization Program, Revision 26 | |||
EN-NS-101-03, Processing Individuals for UAA/UA and SGI Access, Revision 4 | |||
EN-NS-101-06, Terminating, Denial and Appeal of Unescorted Access | |||
Authorization/Unescorted Access, Revision 4 | |||
EN-NS-224, SOCA Access Controls, Revision 3 | |||
EN-RW-105, Process Control Program, Revision 6 | |||
Issue Reports PIL-01595, 01907, 01915, 02301, 02312, 02397, 02425, 02512, 02600, 02636, | |||
2783, 02877, 03165 | |||
Photographs, overboard discharge line effluent flange | |||
Procedure 2.01, Station Access Control, Revision 54 | |||
Process Radiation Monitor Calibration Package, RBV A, dated 7/28/2020 | |||
Process Radiation Monitor Calibration Package, RBV B, dated 3/19/2020 | |||
Process Radiation Monitor Calibration Package, Liquid Radwaste, dated 6/12/2019 | |||
Pilgrim Nuclear Power Station Defueled Safety Analysis Report, Revision 1 | |||
PNPS Groundwater Tritium Results, spreadsheet | |||
PNPS-ODCM, Pilgrim Nuclear Power Station Offsite Dose Calculation Manual, Revision 14. | |||
PNPS Radiological Support Group 1st Half 2020 Self Assessment Report, dated 7/31/2020 | |||
Presentation, Amended Environmental Site Assessment Work Plan Briefing, dated 5/24/2021 | |||
Radiological Evaluation 21-051, Basis for Removing the Turbine Building GEMS from Service | |||
and Removing it from the ODCM in Revision 14, Revision 0 | |||
Radiological survey map #100, dated 10/30/2020 | |||
Radiological survey map #100, dated 6/8/2021 | |||
Radiological survey map #103A, dated 4/26/2021 | |||
Inspection Report No. 05000293/2021002 | |||
Radiological survey map #113, dated 10/6/2020 | |||
Radiological survey map #115, dated 4/20/2021 | |||
Radiological survey map #117, dated 6/2/2021 | |||
Radiological survey map #118, dated 6/2/2021 | |||
Radiological survey map #118, dated 6/16/2021 at 0900 | |||
Radiological survey map #118, dated 6/16/2021 at 1400 | |||
Radiological survey map #125, dated 9/11/2019 | |||
Radiological survey map #125, dated 2/7/2020 | |||
Radiological survey of the monitor pump room, dated 8/22/2019 | |||
Radiological survey of the treated water pump and tank rooms, dated 8/22/2019 | |||
Radiological survey PNP-1709-0152 | |||
Radiological survey PNP-1711-0112 | |||
Radiological survey PNP-1906-00089 | |||
Report, PNPS Waste Focus Meeting, dated 6/10/2021 | |||
Work order PIL-WR-2869-15, Confirm buried portion of liquid radwaste discharge piping | |||
between valve 20-HO-316 and discharge canal outlet diffuser is leak tight. | |||
LIST OF ACRONYMS USED | |||
ADAMS Agency-wide Document and Access Management System | |||
CFR Code of Federal Regulations | |||
DOE U.S. Department of Energy | |||
DSAR Decommissioning Safety Analysis Report | |||
ENOI Entergy Nuclear Operations, Inc | |||
GPO Government Printing Office | |||
HDI Holtec Decommissioning International, LLC | |||
IMC Inspection Manual Chapter | |||
IP Inspection Procedure | |||
IR Issue Report | |||
NRC U.S. Nuclear Regulatory Commission | |||
ODCM Offsite Dose Calculation Manual | |||
PHE Public Health Emergency | |||
PCP Process Control Program | |||
PNPS Pilgrim Nuclear Power Station | |||
REMP Radiological Environmental Monitoring Program | |||
SFP Spent Fuel Pool | |||
SNM Special Nuclear Material | |||
TI Transport Index | |||
Inspection Report No. 05000293/2021002 | |||
}} | }} |
Latest revision as of 02:36, 6 April 2022
ML21222A149 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 08/10/2021 |
From: | Anthony Dimitriadis Decommissioning, ISFSI, and Reactor Health Physics Branch |
To: | Cowan P Holtec Decommissioning International |
References | |
IR 2021002 | |
Download: ML21222A149 (9) | |
Text
August 10, 2021
SUBJECT:
HOLTEC DECOMMISSIONING INTERNATIONAL, LLC, PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT NO. 05000293/2021002
Dear Ms. Cowan:
On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shutdown Pilgrim Nuclear Power Station (PNPS). An on-site inspection was performed from June 7 - 11, 2021. Additional inspection activities (in office reviews) were conducted remotely as a consequence of the COVID-19 public health emergency (PHE) during the inspection period. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with site personnel, a review of procedures and records, and plant walk-downs. The results of the inspection were discussed with Mr. John Moylan, Site Vice President, and other members of the PNPS staff on July 14, 2021, and are described in the enclosed report.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if any, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's Website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Harold (Harry) Anagnostopoulos at 610-337-5322 if you have any questions regarding this matter.
Sincerely, Digitally signed by Anthony M. Anthony M. Dimitriadis Date: 2021.08.10 Dimitriadis 14:33:16 -04'00'
Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Radiological Safety and Security Docket No. 05000293 License No. DPR-35 Enclosure: Inspection Report 05000293/2021002 w/Attachment cc w/encl: Distribution via ListServ
EXECUTIVE SUMMARY
Holtec Decommissioning International, LLC (HDI)
Pilgrim Nuclear Power Station (PNPS)
NRC Inspection Report No. 05000293/2021002 An announced routine decommissioning inspection of Pilgrim Nuclear Power Station (PNPS)was completed on June 30, 2021. An on-site focused topical inspection using three inspection procedures was conducted from June 7 - 11, 2021. Additional inspection activities were conducted remotely during the inspection period as a consequence of the COVID-19 public health emergency (PHE). The inspection included a review of the results of routine radiological effluent and environmental monitoring, inspection of radioactive waste processing and storage equipment & areas, changes to the Offsite Dose Calculation Manual (ODCM), inspection of the 10 CFR Part 37 security program, and an observation of Onsite Safety Review Committee activities. The inspection consisted of observations by the inspector, interviews with site personnel, a review of procedures and records, and plant walk-downs. The U.S Nuclear Regulatory Commissions (NRC's) program for overseeing the safe operation of a shutdown nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561,
Decommissioning Power Reactor Inspection Program."
Based on the results of this inspection, no violations of NRC requirements were identified.
ii Inspection Report No. 05000293/2021002
REPORT DETAILS
1.0 Background On June 10, 2019, Entergy Nuclear Operations, Inc. (ENOI) certified cessation of power operations and the permanent removal of fuel from the PNPS reactor vessel (ADAMS Accession Number: ML19161A033). This met the requirements of 10 CFR 50.82(a)(1)(i)and 50.82(a)(1)(ii). On June 11, 2019, the NRC notified PNPS that the NRC would no longer perform its oversight activities in accordance with the Operating Reactor Assessment Program and that oversight would be conducted under the provisions outlined in IMC 2561 Decommissioning Power Reactor Inspection Program (ADAMS Accession No. ML19162A033). On August 27, 2019 an amendment was issued transferring the license from ENOI to Holtec International, LLC., (HDI) (ADAMS Accession No. ML19235A050). PNPS is in the active decommissioning phase with fuel in the spent fuel pool as described in IMC 2561.
2.0 Decommissioning Performance and Status Review
a. Inspection Scope
[Inspection Procedures 84750, 86750, 87137]
The inspector performed a walk-down of selected waste processing systems to verify that the system configurations and operations were in agreement with the descriptions in the Decommissioning Safety Analysis Report (DSAR), the Offsite Dose Calculation Manual (ODCM), and the Process Control Program (PCP).
The inspector reviewed the most recent radiological surveys of radioactive waste storage and processing areas to assess their radiological conditions, and then entered a selection of these areas to observe their material condition.
The inspector reviewed any changes made to the ODCM, PCP, and the radioactive waste system design and operation.
The inspector observed the condition of the liquid effluent radioactive waste radiation monitor, its associated valves, and walked-down the exposed portions of the discharge piping. The inspector reviewed the results of a recent pressure-drop test of the liquid radioactive waste discharge line, which was performed to verify the integrity of the piping and its connections.
The inspector selected a sample of effluent radiation monitors and to determine if they were appropriately calibrated.
The inspector performed a walk-down of the Reactor Building and Turbine Building roof areas. The inspector toured the accessible portions of the reactor containment (drywell 23 foot elevation), and observed the storage of control rod drive mechanisms in a storage area of the main turbine deck. The inspector performed direct observations of the conditions of the turbine building air effluent radiation monitors.
The inspector reviewed the Annual Radioactive Effluent Release Report and the Annual Radiological Environmental Operating Report for any anomalous results to verify that reported doses were below regulatory requirements.
Inspection Report No. 05000293/2021002
The inspector observed a selection of environmental sampling stations to evaluate their location, placement, and material condition. The inspector reviewed the implementation of the Groundwater Protection Initiative program, attended a meeting of the Onsite Safety Review Committee to observe management processes, and reviewed the results of the Phase 1 site characterization effort.
Using inspection procedure 86750 (and portions of 87137 as a technical reference), the inspector evaluated implementation of the licensees security plan associated with 10 CFR 37, walked-down the storage areas, and discussed the security strategies for these areas with the Security Manager.
b. Observations and Findings
The inspector verified that HDI had identified problems associated with radioactive waste storage, processing, and transportation activities, entered them into the corrective action program, and had implemented appropriate corrective actions.
The inspector determined that recent changes to the Radiological Environmental Monitoring Program (REMP) were appropriate to the change in plant status and plant conditions following permanent cessation of operations (and the associated decay of short-lived radionuclides).
The inspector determined that the air effluents from the turbine building were minimal (following permanent cessation of operations) and appropriately accounted for by the reactor building ventilation monitor. The turbine building gaseous effluent monitoring system has been removed from service.
The inspector observed the wind-related damage to the turbine building roof membrane and verified that the damage was not likely to cause any immediate challenge to the ability to manage water infiltration or the safe storage of radioactive materials. The planned timeline for repairs was determined to be adequate.
The inspector determined the Onsite Safety Review Committees activities to be intrusive, challenging, and an effective management tool to ensure safe and compliant decommissioning activities.
c. Conclusions
Based on the results of this inspection, no violations of NRC requirements were identified.
3.0
Exit Meeting Summary
On July 14, 2021, the inspector presented the inspection results to Mr. John Moylan, Site Vice President, and other members of the HDI staff. No proprietary information was retained by the inspector or documented in this report.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
Inspection Report No. 05000293/2021002
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
- J. Moylan, Site Vice President
- J. McDonough, Operations Manager
- D. Noyes, Senior Compliance Manager
- M. Lawson, Radiation Protection Manager
- F. McGinnis, Regulatory Assurance Specialist
J. ODonnel - Operations Shift Manager
- M. Thornhill, Certified Health Physicist
ITEMS OPEN, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED
CFR Part 37 Security Plan
CFR Part 37 security program annual reviews for 2019 and 2020
Air Station Location Study at the Pilgrim Nuclear Power Station Based on 2016 - 2019
Meteorological Data, Holian Environmental, LLC, May 2020
Annual Radioactive Effluent Release Report, January 1 through December 31, 2020, dated
5/6/2021
Annual Radiological Environmental Operating Report, January 1 through December 31, 2020,
dated 5/6/2021
Comparison Study of Meteorological Data from the 220-Foot Primary and 160-Foot Backup
Towers at the Pilgrim Nuclear Power Station, Holian Environmental, LLC, August 2019.
EN-NS-101, Unescorted Access Authorization Program, Revision 26
EN-NS-101-03, Processing Individuals for UAA/UA and SGI Access, Revision 4
EN-NS-101-06, Terminating, Denial and Appeal of Unescorted Access
Authorization/Unescorted Access, Revision 4
EN-NS-224, SOCA Access Controls, Revision 3
EN-RW-105, Process Control Program, Revision 6
Issue Reports PIL-01595, 01907, 01915, 02301, 02312, 02397, 02425, 02512, 02600, 02636,
2783, 02877, 03165
Photographs, overboard discharge line effluent flange
Procedure 2.01, Station Access Control, Revision 54
Process Radiation Monitor Calibration Package, RBV A, dated 7/28/2020
Process Radiation Monitor Calibration Package, RBV B, dated 3/19/2020
Process Radiation Monitor Calibration Package, Liquid Radwaste, dated 6/12/2019
Pilgrim Nuclear Power Station Defueled Safety Analysis Report, Revision 1
PNPS Groundwater Tritium Results, spreadsheet
PNPS-ODCM, Pilgrim Nuclear Power Station Offsite Dose Calculation Manual, Revision 14.
PNPS Radiological Support Group 1st Half 2020 Self Assessment Report, dated 7/31/2020
Presentation, Amended Environmental Site Assessment Work Plan Briefing, dated 5/24/2021
Radiological Evaluation 21-051, Basis for Removing the Turbine Building GEMS from Service
and Removing it from the ODCM in Revision 14, Revision 0
Radiological survey map #100, dated 10/30/2020
Radiological survey map #100, dated 6/8/2021
Radiological survey map #103A, dated 4/26/2021
Inspection Report No. 05000293/2021002
Radiological survey map #113, dated 10/6/2020
Radiological survey map #115, dated 4/20/2021
Radiological survey map #117, dated 6/2/2021
Radiological survey map #118, dated 6/2/2021
Radiological survey map #118, dated 6/16/2021 at 0900
Radiological survey map #118, dated 6/16/2021 at 1400
Radiological survey map #125, dated 9/11/2019
Radiological survey map #125, dated 2/7/2020
Radiological survey of the monitor pump room, dated 8/22/2019
Radiological survey of the treated water pump and tank rooms, dated 8/22/2019
Radiological survey PNP-1709-0152
Radiological survey PNP-1711-0112
Radiological survey PNP-1906-00089
Report, PNPS Waste Focus Meeting, dated 6/10/2021
Work order PIL-WR-2869-15, Confirm buried portion of liquid radwaste discharge piping
between valve 20-HO-316 and discharge canal outlet diffuser is leak tight.
LIST OF ACRONYMS USED
ADAMS Agency-wide Document and Access Management System
CFR Code of Federal Regulations
DOE U.S. Department of Energy
DSAR Decommissioning Safety Analysis Report
ENOI Entergy Nuclear Operations, Inc
GPO Government Printing Office
HDI Holtec Decommissioning International, LLC
IMC Inspection Manual Chapter
IP Inspection Procedure
IR Issue Report
NRC U.S. Nuclear Regulatory Commission
ODCM Offsite Dose Calculation Manual
PHE Public Health Emergency
PNPS Pilgrim Nuclear Power Station
REMP Radiological Environmental Monitoring Program
SFP Spent Fuel Pool
TI Transport Index
Inspection Report No. 05000293/2021002