{{#Wiki_filter:A#4, EN Commonwealth Edison s
A#4, s      EN Commonwealth                 Edison
e
                      ) LaSalle County Nuclear Station e
) LaSalle County Nuclear Station
              -(
-(
v Rural Route #1, Box 220 Marseilles, Illinois 61341 Telephone 815/357 6761
Rural Route #1, Box 220 v
Marseilles, Illinois 61341 Telephone 815/357 6761
((G D1 & U n l a.:CyWj -&
((G D1 & U n l a.:CyWj -&
                                                                              +I M S [ D i   LWlW March 25, 1988 Mr. A. Bert Davis Acting Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn. IL 60137
+I M S [ D LWlW i
March 25, 1988 Mr. A. Bert Davis Acting Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn. IL 60137


==Subject:==
==Subject:==
EPP Annual Operating Report             W         '
EPP Annual Operating Report W
Appendix B to Facility License No. NPP-ll and No. NPF-18
Appendix B to Facility License No. NPP-ll and No. NPF-18


==Dear Mr. Davis:==
==Dear Mr. Davis:==
Attached is the Annual Operating Report for the year of 1987 for the Environmental Protection Plan as required by Section 5.4 of Appendix B to Facility License No. NPF-ll and No. NPF-18.
Attached is the Annual Operating Report for the year of 1987 for the Environmental Protection Plan as required by Section 5.4 of Appendix B to Facility License No. NPF-ll and No. NPF-18.
This report is contained in the following subsections:
This report is contained in the following subsections:
3.1           Plant Design and Operation.
3.1 Plant Design and Operation.
4.2.1         Vegetative Integrity on Coolir.g Pond Dike.
4.2.1 Vegetative Integrity on Coolir.g Pond Dike.
S.4.1         EPP Non-Compliances and The Corrective Actions Taken to Remedy Them.
S.4.1 EPP Non-Compliances and The Corrective Actions Taken to Remedy Them.
S.4.2         Non-Routine Reports.
S.4.2 Non-Routine Reports.
Section 3.2 of Appendix B was amended on June 18, 1986, deleting the requirement for submittal of NPDES noncompliance reports to the NRC.
Section 3.2 of Appendix B was amended on June 18, 1986, deleting the requirement for submittal of NPDES noncompliance reports to the NRC.
Therefore, this Annual Operating Report does not include a summary of the 1987 NPDES noncompliances.
Therefore, this Annual Operating Report does not include a summary of the 1987 NPDES noncompliances.
Section 4.2.2 of Appendix B was also a:nended on June 18, 1986, deleting the requirement for monitoring of fog and ice due to the cooling pond.
Section 4.2.2 of Appendix B was also a:nended on June 18, 1986, deleting the requirement for monitoring of fog and ice due to the cooling pond.
8804070326 071231 PDR J'
8804070326 071231 J'
ADOCK 05000344 R                           ppy                                                 y\
PDR ADOCK 05000344 R
Ch t
ppy y\\
QDqA     -
Ch QDqA
                                                                                            ~
~
DOCUMENT ID 0134h/0278A
t DOCUMENT ID 0134h/0278A
        ..~
..~


In accordance with Regulatory Guide 10.1, one copy of this report is provided for your use and 18 copies are being submitted directly to the Document Control Desk, U.S. Nuclear Regulatory Commission. Washington,   D.C., 20555.
In accordance with Regulatory Guide 10.1, one copy of this report is provided for your use and 18 copies are being submitted directly to the Document Control Desk, U.S. Nuclear Regulatory Commission. Washington, D.C., 20555.
Sincerely yours,
Sincerely yours,
                                                        .As
.As
                                              - G. J. Diederich Station Manager LaSalle County Station
- G. J. Diederich Station Manager LaSalle County Station GJD/LRA/psk Attachment xc.
,    GJD/LRA/psk Attachment xc. C. M. Allen, W/ attach.
C. M. Allen, W/ attach.
.          NRC Resident Inspector, w/ attach.
NRC Resident Inspector, w/ attach.
Environmental Affairs, w/ attach.
Environmental Affairs, w/ attach.
Document Control Desk (18 copies)
Document Control Desk (18 copies)
Line 59: Line 60:
4 I
4 I
DOCUMENT ID 0134h/0278A
DOCUMENT ID 0134h/0278A
 
:.y 3.1 Plant Design and Operation No changes in station design or operation, tests and experiments were made in accordance with subsection 3.1 which involve a potentially significant unreviewed environmental issue, i
            .y             ,
3.1       Plant Design and Operation No changes in station design or operation, tests and experiments were made in accordance with subsection 3.1 which involve a potentially significant unreviewed environmental issue, i
l l
l l
l i
l i
Line 68: Line 67:
l
l


o 4.2.1     Vggetative Integrity On Cooling Pond Dike The vegetative integrity of the cooling pond dike was inspected in accordance with LaSalle County Station Surveillance LTS-1000-5.
o 4.2.1 Vggetative Integrity On Cooling Pond Dike The vegetative integrity of the cooling pond dike was inspected in accordance with LaSalle County Station Surveillance LTS-1000-5.
Inspections were performed on March 10, 1987, April 28, 1987, May 26, 1987, June 30, 1987, July 29, 1987, September 28, 1987.
Inspections were performed on March 10, 1987, April 28, 1987, May 26, 1987, June 30, 1987, July 29, 1987, September 28, 1987.
October 28, 1987, and November 20, 1987.       The results of these inspections are as follows:
October 28, 1987, and November 20, 1987.
: 1. Ground cover integrity on the cooling lake dikes remained intact during the entire growing season of 1987. No bare spots were noted.
The results of these inspections are as follows:
: 2. Canadian Thistle was present on the cooling lake dike. The level of infestation was approximately the same as that seen in 1986. No application of herbicide was necessary to control this weed.
1.
Ground cover integrity on the cooling lake dikes remained intact during the entire growing season of 1987. No bare spots were noted.
2.
Canadian Thistle was present on the cooling lake dike. The level of infestation was approximately the same as that seen in 1986. No application of herbicide was necessary to control this weed.
There were no other items of concern during the 1987 cooling lake dike inspection.
There were no other items of concern during the 1987 cooling lake dike inspection.
l l
l l
Line 81: Line 83:
l l
l l
l l
l l
DOCUMENT ?D 0134h/0278A l
l DOCUMENT ?D 0134h/0278A l
l i
i


5.4.1     EPP noncompliances and corrective action taken to remedy them NONE i
5.4.1 EPP noncompliances and corrective action taken to remedy them NONE i
i I
i I
i DOCUMENT ID 0134h/0278A
i DOCUMENT ID 0134h/0278A


5.4.2     Nontoutine Reports NONE l
5.4.2 Nontoutine Reports NONE l
l l
l l
i i
i i
Line 96: Line 98:
(
(
l T 1D 0134h/027Bn
l T 1D 0134h/027Bn
                                                                                    ..}}
..}}

Latest revision as of 07:15, 11 December 2024

Environ Protection Plan Annual Operating Rept for 1987
ML20151A967
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/25/1988
From: Diederich G
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8804070326
Download: ML20151A967 (6)


Text

A#4, EN Commonwealth Edison s

e

) LaSalle County Nuclear Station

-(

Rural Route #1, Box 220 v

Marseilles, Illinois 61341 Telephone 815/357 6761

((G D1 & U n l a.:CyWj -&

+I M S [ D LWlW i

March 25, 1988 Mr. A. Bert Davis Acting Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn. IL 60137

Subject:

EPP Annual Operating Report W

Appendix B to Facility License No. NPP-ll and No. NPF-18

Dear Mr. Davis:

Attached is the Annual Operating Report for the year of 1987 for the Environmental Protection Plan as required by Section 5.4 of Appendix B to Facility License No. NPF-ll and No. NPF-18.

This report is contained in the following subsections:

3.1 Plant Design and Operation.

4.2.1 Vegetative Integrity on Coolir.g Pond Dike.

S.4.1 EPP Non-Compliances and The Corrective Actions Taken to Remedy Them.

S.4.2 Non-Routine Reports.

Section 3.2 of Appendix B was amended on June 18, 1986, deleting the requirement for submittal of NPDES noncompliance reports to the NRC.

Therefore, this Annual Operating Report does not include a summary of the 1987 NPDES noncompliances.

Section 4.2.2 of Appendix B was also a:nended on June 18, 1986, deleting the requirement for monitoring of fog and ice due to the cooling pond.

8804070326 071231 J'

PDR ADOCK 05000344 R

ppy y\\

Ch QDqA

~

t DOCUMENT ID 0134h/0278A

..~

In accordance with Regulatory Guide 10.1, one copy of this report is provided for your use and 18 copies are being submitted directly to the Document Control Desk, U.S. Nuclear Regulatory Commission. Washington, D.C., 20555.

Sincerely yours,

.As

- G. J. Diederich Station Manager LaSalle County Station GJD/LRA/psk Attachment xc.

C. M. Allen, W/ attach.

NRC Resident Inspector, w/ attach.

Environmental Affairs, w/ attach.

Document Control Desk (18 copies)

C. K. Sprunger i

i j-i-

4 I

DOCUMENT ID 0134h/0278A

.y 3.1 Plant Design and Operation No changes in station design or operation, tests and experiments were made in accordance with subsection 3.1 which involve a potentially significant unreviewed environmental issue, i

l l

l i

l l

DOCUMENT ID 0134h/0278A 1

l

o 4.2.1 Vggetative Integrity On Cooling Pond Dike The vegetative integrity of the cooling pond dike was inspected in accordance with LaSalle County Station Surveillance LTS-1000-5.

Inspections were performed on March 10, 1987, April 28, 1987, May 26, 1987, June 30, 1987, July 29, 1987, September 28, 1987.

October 28, 1987, and November 20, 1987.

The results of these inspections are as follows:

1.

Ground cover integrity on the cooling lake dikes remained intact during the entire growing season of 1987. No bare spots were noted.

2.

Canadian Thistle was present on the cooling lake dike. The level of infestation was approximately the same as that seen in 1986. No application of herbicide was necessary to control this weed.

There were no other items of concern during the 1987 cooling lake dike inspection.

l l

t I

l l

l l

l l

l l

l l

l DOCUMENT ?D 0134h/0278A l

i

5.4.1 EPP noncompliances and corrective action taken to remedy them NONE i

i I

i DOCUMENT ID 0134h/0278A

5.4.2 Nontoutine Reports NONE l

l l

i i

t r

I I

i

(

l T 1D 0134h/027Bn

..