ML110410603: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML110410603 | | number = ML110410603 | ||
| issue date = 02/10/2011 | | issue date = 02/10/2011 | ||
| title = | | title = Request for Information (Inspection Report 05000482-11-003) Related to Ti 2515/177 | ||
| author name = Farnholtz T | | author name = Farnholtz T | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Sunseri M | | addressee name = Sunseri M | ||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | | addressee affiliation = Wolf Creek Nuclear Operating Corp | ||
| docket = 05000482 | | docket = 05000482 | ||
Line 14: | Line 14: | ||
| page count = 7 | | page count = 7 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000482/2011003]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUC LE AR RE G ULATO RY C O M M I S S I O N | |||
R E GI ON I V | |||
612 EAST LAMAR BLVD , SU I TE 400 | |||
AR LI N GTON , TEXAS 76011-4125 | |||
February 10, 2011 | |||
Matthew W. Sunseri, President and | |||
Chief Executive Officer | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION | |||
(INSPECTION REPORT 05000482/2011003) RELATED TO TI 2515/177 | |||
Dear Mr.Sunseri: | |||
On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion | |||
of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and | |||
Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station. | |||
This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177. | |||
Experience has shown that this inspection is resource intensive both for NRC inspectors and | |||
your staff. In order to minimize the impact to your onsite resources and to ensure a productive | |||
inspection, we have enclosed a request for documents needed for this inspection. The | |||
documents have been divided into two groups. | |||
* The first group lists information necessary for our initial inspection scoping and in-office | |||
preparation activities. This information should be separated by information request number, | |||
especially if provided electronically (e.g., folder with the information request number). This | |||
information should be available to the inspector no later than March 21, 2011. Any | |||
documents mailed to the inspector should be shipped to his attention at the Region IV | |||
address. Upon review of these documents, the inspectors will select additional | |||
documentation for review upon arrival. By April 8, 2011, the inspector will communicate the | |||
initial selected samples. | |||
* The second group of documents requested is needed to support our onsite inspection | |||
activities. This set of documents should be available to the inspector on May 2, 2011. It is | |||
also requested that corrective action documents and responses to questions developed | |||
during the inspection be provided to the inspector as the documents are generated. | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Bill Muilenburg of your licensing | |||
organization. If there are any questions about this inspection or the material requested, please | |||
contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, control number | |||
Wolf Creek Nuclear Operating Corporation -2- | |||
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, | |||
a request for information or an information collection requirement unless the requesting | |||
document displays a currently valid Office of Management and Budget control number. | |||
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of | |||
Practice, a copy of this letter and its enclosure will be available electronically for public | |||
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) | |||
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web | |||
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket: 50-482 | |||
License: NPF-42 | |||
cc w/encl: | |||
Site Vice President | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
Jay Silberg, Esq. | |||
Pillsbury Winthrop Shaw Pittman LLP | |||
2300 N Street, NW | |||
Washington, DC 20037 | |||
Supervisor Licensing | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
Chief Engineer | |||
Utilities Division | |||
Kansas Corporation Commission | |||
1500 SW Arrowhead Road | |||
Topeka, KS 66604-4027 | |||
Office of the Governor | |||
State of Kansas | |||
Topeka, KS 66612-1590 | |||
Wolf Creek Nuclear Operating Corporation -3- | |||
Attorney General | |||
120 S.W. 10th Avenue, 2nd Floor | |||
Topeka, KS 66612-1597 | |||
Chairman | |||
Coffey County Courthouse | |||
110 South 6th Street | |||
Burlington, KS 66839 | |||
Chief, Radiation and Asbestos | |||
Control Section | |||
Bureau of Air and Radiation | |||
Kansas Department of Health and | |||
Environment | |||
1000 SW Jackson, Suite 310 | |||
Topeka, KS 66612-1366 | |||
Chief, Technological Hazards | |||
Branch | |||
FEMA, Region VII | |||
9221 Ward Parkway | |||
Suite 300 | |||
Kansas City, MO 64114-3372 | |||
Wolf Creek Nuclear Operating Corporation -4- | |||
Electronic distribution by RIV: | |||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Art.Howell@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | |||
DRP Deputy Director (Troy.Pruett@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Vacant) | |||
Senior Resident Inspector (Chris.Long@nrc.gov) | |||
Resident Inspector (Charles.Peabody@nrc.gov) | |||
WC Administrative Assistant (Shirley.Allen@nrc.gov) | |||
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov) | |||
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) | |||
Project Engineer, DRP/B (Greg.Tutak@nrc.gov) | |||
Project Engineer, DRP/B (Nestor.Makris@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Balwant.Singal@nrc.gov) | |||
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
OEMail Resource | |||
Inspection Reports/MidCycle and EOC Letters to the following: | |||
ROPreports | |||
Only inspection reports to the following: | |||
OEDO RIV Coordinator (James.Trapp@nrc.gov) | |||
DRS/TSB STA (Dale.Powers@nrc.gov) | |||
R:\REACTORS\WC 2011003 RFI-TI77-GAP ADAMS ML | |||
ADAMS: No ; Yes ; SUNSI Review Complete Reviewer Initials: TRF | |||
; Publicly Available ; Non-Sensitive | |||
Non-publicly Available Sensitive | |||
DRS\EB2:SRI EB1:C | |||
G. Pick T. Farnholtz | |||
/RA/ /RA/ | |||
2/10/11 2/10/11 | |||
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY | |||
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION | |||
DOCUMENT REQUEST | |||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the | |||
selection of specific items that will be reviewed during the onsite inspection week. The | |||
inspector will select specific items from the information requested below and then request from | |||
your staff additional documents needed during the onsite inspection weeks. Also, we request | |||
that you categorize the documents in your response with the numbered list below. Please | |||
provide requested documentation electronically if possible. If requested documents are large | |||
and only hard copy formats are available, please inform the inspector, and provide subject | |||
documentation during the first day of the onsite inspection. If you have any questions regarding | |||
this information request, please call the inspector as soon as possible. | |||
I. Information Requested By March 28, 2011 | |||
1. List of corrective action program documents (with a short description) associated with | |||
Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous | |||
3 years. | |||
2. List of changes (with a short description and tracking number) to the final safety | |||
evaluation report (FSAR), technical specifications, technical specification bases, and | |||
technical requirement manual associated with the resolution of GL 2008-01. | |||
3. List of calculations associated with GL 2008-01, including calculations that have been | |||
changed or created in response to GL 2008-01 (with a short description of the | |||
calculation and the change). | |||
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the | |||
affected system locations (e.g. identify the source, conditions, and expected void | |||
locations). | |||
5. List of the suction piping sections identified as susceptible to gas accumulation (the list | |||
should identify the corresponding system). | |||
6. List of the discharge piping sections identified as susceptible to gas accumulation (the | |||
list should identify the corresponding system). | |||
7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A | |||
and B, and High Pressure Coolant Injection systems (hard-copies are preferred). | |||
8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B, | |||
Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard- | |||
copies are preferred). | |||
9. Copies of program documents and procedures developed to implement the resolution of | |||
GL 2008-01. | |||
-1- Enclosure | |||
10. List of actions that were completed in response to GL 2008-01. | |||
11. Copies of the modification packages for hardware modifications as part of the resolution | |||
of GL 2008-01. | |||
12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B, | |||
and High Pressure Coolant Injection systems. | |||
13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat | |||
Removal A and B, and High Pressure Coolant Injection systems. | |||
14. System walkdown reports associated with the resolution of GL 2008-01. | |||
15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core | |||
Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection | |||
systems have not been completed. Include an explanation of why each area is | |||
considered inaccessible. | |||
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the | |||
results of the last two surveillances for the Core Spray A and B, Residual Heat | |||
Removal A and B, and High Pressure Coolant Injection systems. | |||
17. Copies of procedures used for detecting and determining void volumes. | |||
18. Copies of procedures used for filling and venting. | |||
19. Copies of trends of periodic venting results. | |||
20. Copies of the engineering evaluations performed for all identified voids. | |||
21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the | |||
justification for any deviation from the void acceptance criteria established by the Office | |||
of Nuclear Reactor Regulation (NRR). | |||
22. Copy of any void transport analyses. | |||
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01. | |||
24. Copies of self-assessments associated with the implementation of the GL 2008-01 | |||
program. | |||
II. Information Requested By May 16, 2011 | |||
25. Copies of the selected corrective action program documents. | |||
26. Copies of the selected licensing and design basis document changes. | |||
27. Copies of the selected calculations. | |||
-2- Enclosure | |||
28. Copies of training documents that ensure that personnel are aware of gas-related | |||
concerns. | |||
29. Copies of corrective action program implementing procedures. | |||
30. Electronic copies of the current technical specifications, technical specification bases, | |||
final safety analysis report, and technical report manual. | |||
-3- Enclosure | |||
}} | }} |
Latest revision as of 03:35, 13 November 2019
ML110410603 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 02/10/2011 |
From: | Thomas Farnholtz Operations Branch IV |
To: | Matthew Sunseri Wolf Creek |
References | |
IR-11-003, TI 2515/177 | |
Download: ML110410603 (7) | |
See also: IR 05000482/2011003
Text
UNITED STATES
NUC LE AR RE G ULATO RY C O M M I S S I O N
R E GI ON I V
612 EAST LAMAR BLVD , SU I TE 400
AR LI N GTON , TEXAS 76011-4125
February 10, 2011
Matthew W. Sunseri, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION
(INSPECTION REPORT 05000482/2011003) RELATED TO TI 2515/177
Dear Mr.Sunseri:
On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion
of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and
Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station.
This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive both for NRC inspectors and
your staff. In order to minimize the impact to your onsite resources and to ensure a productive
inspection, we have enclosed a request for documents needed for this inspection. The
documents have been divided into two groups.
- The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than March 21, 2011. Any
documents mailed to the inspector should be shipped to his attention at the Region IV
address. Upon review of these documents, the inspectors will select additional
documentation for review upon arrival. By April 8, 2011, the inspector will communicate the
initial selected samples.
- The second group of documents requested is needed to support our onsite inspection
activities. This set of documents should be available to the inspector on May 2, 2011. It is
also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Bill Muilenburg of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
Wolf Creek Nuclear Operating Corporation -2-
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-482
License: NPF-42
cc w/encl:
Site Vice President
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Washington, DC 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Road
Topeka, KS 66604-4027
Office of the Governor
State of Kansas
Topeka, KS 66612-1590
Wolf Creek Nuclear Operating Corporation -3-
Attorney General
120 S.W. 10th Avenue, 2nd Floor
Topeka, KS 66612-1597
Chairman
Coffey County Courthouse
110 South 6th Street
Burlington, KS 66839
Chief, Radiation and Asbestos
Control Section
Bureau of Air and Radiation
Kansas Department of Health and
Environment
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Chief, Technological Hazards
Branch
FEMA, Region VII
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372
Wolf Creek Nuclear Operating Corporation -4-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Senior Resident Inspector (Chris.Long@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
WC Administrative Assistant (Shirley.Allen@nrc.gov)
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
Only inspection reports to the following:
OEDO RIV Coordinator (James.Trapp@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\REACTORS\WC 2011003 RFI-TI77-GAP ADAMS ML
ADAMS: No ; Yes ; SUNSI Review Complete Reviewer Initials: TRF
- Publicly Available ; Non-Sensitive
Non-publicly Available Sensitive
DRS\EB2:SRI EB1:C
G. Pick T. Farnholtz
/RA/ /RA/
2/10/11 2/10/11
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector, and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By March 28, 2011
1. List of corrective action program documents (with a short description) associated with
Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous
3 years.
2. List of changes (with a short description and tracking number) to the final safety
evaluation report (FSAR), technical specifications, technical specification bases, and
technical requirement manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g. identify the source, conditions, and expected void
locations).
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A
and B, and High Pressure Coolant Injection systems (hard-copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,
Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-
copies are preferred).
9. Copies of program documents and procedures developed to implement the resolution of
-1- Enclosure
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,
and High Pressure Coolant Injection systems.
13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat
Removal A and B, and High Pressure Coolant Injection systems.
14. System walkdown reports associated with the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core
Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection
systems have not been completed. Include an explanation of why each area is
considered inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the Core Spray A and B, Residual Heat
Removal A and B, and High Pressure Coolant Injection systems.
17. Copies of procedures used for detecting and determining void volumes.
18. Copies of procedures used for filling and venting.
19. Copies of trends of periodic venting results.
20. Copies of the engineering evaluations performed for all identified voids.
21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the Office
of Nuclear Reactor Regulation (NRR).
22. Copy of any void transport analyses.
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
24. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By May 16, 2011
25. Copies of the selected corrective action program documents.
26. Copies of the selected licensing and design basis document changes.
27. Copies of the selected calculations.
-2- Enclosure
28. Copies of training documents that ensure that personnel are aware of gas-related
concerns.
29. Copies of corrective action program implementing procedures.
30. Electronic copies of the current technical specifications, technical specification bases,
final safety analysis report, and technical report manual.
-3- Enclosure