| title = Wolf Creek Generating Station - Request for Information (Inspection Report 05000482-11-003) Related to TI 2515/177
| title = Request for Information (Inspection Report 05000482-11-003) Related to Ti 2515/177
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Sunseri M W
| addressee name = Sunseri M
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000482/2011003]]
See also: [[see also::IR 05000482/2011003]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
                                  NUC LE AR RE G ULATO RY C O M M I S S I O N
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
                                            AR LI N GTON , TEXAS 76011-4125
                                          February 10, 2011
Matthew W. Sunseri, President and
  Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION
                (INSPECTION REPORT 05000482/2011003) RELATED TO TI 2515/177
Dear Mr.Sunseri:
On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion
of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and
Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station.
This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive both for NRC inspectors and
your staff. In order to minimize the impact to your onsite resources and to ensure a productive
inspection, we have enclosed a request for documents needed for this inspection. The
documents have been divided into two groups.
* The first group lists information necessary for our initial inspection scoping and in-office
    preparation activities. This information should be separated by information request number,
    especially if provided electronically (e.g., folder with the information request number). This
    information should be available to the inspector no later than March 21, 2011. Any
    documents mailed to the inspector should be shipped to his attention at the Region IV
    address. Upon review of these documents, the inspectors will select additional
    documentation for review upon arrival. By April 8, 2011, the inspector will communicate the
    initial selected samples.
* The second group of documents requested is needed to support our onsite inspection
    activities. This set of documents should be available to the inspector on May 2, 2011. It is
    also requested that corrective action documents and responses to questions developed
    during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Bill Muilenburg of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
 
Wolf Creek Nuclear Operating Corporation        -2-
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                                /RA/
                                              Thomas R. Farnholtz, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket: 50-482
License: NPF-42
cc w/encl:
Site Vice President
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Washington, DC 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Road
Topeka, KS 66604-4027
Office of the Governor
State of Kansas
Topeka, KS 66612-1590
 
Wolf Creek Nuclear Operating Corporation -3-
Attorney General
120 S.W. 10th Avenue, 2nd Floor
Topeka, KS 66612-1597
Chairman
Coffey County Courthouse
110 South 6th Street
Burlington, KS 66839
Chief, Radiation and Asbestos
Control Section
Bureau of Air and Radiation
Kansas Department of Health and
Environment
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Chief, Technological Hazards
  Branch
FEMA, Region VII
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372
 
Wolf Creek Nuclear Operating Corporation      -4-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Senior Resident Inspector (Chris.Long@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
WC Administrative Assistant (Shirley.Allen@nrc.gov)
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
Only inspection reports to the following:
OEDO RIV Coordinator (James.Trapp@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\REACTORS\WC 2011003 RFI-TI77-GAP                                ADAMS ML
ADAMS:        No    ; Yes        ; SUNSI Review Complete        Reviewer Initials: TRF
                                  ; Publicly Available          ; Non-Sensitive
                                    Non-publicly Available        Sensitive
DRS\EB2:SRI                                                            EB1:C
G. Pick                                                                T. Farnholtz
/RA/                                                                  /RA/
2/10/11                                                                  2/10/11
OFFICIAL RECORD COPY                                    T=Telephone      E=E-mail      F=Fax
 
    MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
  HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
                                        DOCUMENT REQUEST
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector, and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By March 28, 2011
    1. List of corrective action program documents (with a short description) associated with
        Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous
        3 years.
    2. List of changes (with a short description and tracking number) to the final safety
        evaluation report (FSAR), technical specifications, technical specification bases, and
        technical requirement manual associated with the resolution of GL 2008-01.
    3. List of calculations associated with GL 2008-01, including calculations that have been
        changed or created in response to GL 2008-01 (with a short description of the
        calculation and the change).
    4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
        affected system locations (e.g. identify the source, conditions, and expected void
        locations).
    5. List of the suction piping sections identified as susceptible to gas accumulation (the list
        should identify the corresponding system).
    6. List of the discharge piping sections identified as susceptible to gas accumulation (the
        list should identify the corresponding system).
    7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A
        and B, and High Pressure Coolant Injection systems (hard-copies are preferred).
    8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,
        Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-
        copies are preferred).
    9. Copies of program documents and procedures developed to implement the resolution of
        GL 2008-01.
                                              -1-                                        Enclosure
 
    10. List of actions that were completed in response to GL 2008-01.
    11. Copies of the modification packages for hardware modifications as part of the resolution
        of GL 2008-01.
    12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,
        and High Pressure Coolant Injection systems.
    13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat
        Removal A and B, and High Pressure Coolant Injection systems.
    14. System walkdown reports associated with the resolution of GL 2008-01.
    15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core
        Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection
        systems have not been completed. Include an explanation of why each area is
        considered inaccessible.
    16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
        results of the last two surveillances for the Core Spray A and B, Residual Heat
        Removal A and B, and High Pressure Coolant Injection systems.
    17. Copies of procedures used for detecting and determining void volumes.
    18. Copies of procedures used for filling and venting.
    19. Copies of trends of periodic venting results.
    20. Copies of the engineering evaluations performed for all identified voids.
    21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
        justification for any deviation from the void acceptance criteria established by the Office
        of Nuclear Reactor Regulation (NRR).
    22. Copy of any void transport analyses.
    23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
    24. Copies of self-assessments associated with the implementation of the GL 2008-01
        program.
II. Information Requested By May 16, 2011
    25. Copies of the selected corrective action program documents.
    26. Copies of the selected licensing and design basis document changes.
    27. Copies of the selected calculations.
                                                -2-                                          Enclosure
 
28. Copies of training documents that ensure that personnel are aware of gas-related
    concerns.
29. Copies of corrective action program implementing procedures.
30. Electronic copies of the current technical specifications, technical specification bases,
    final safety analysis report, and technical report manual.
                                          -3-                                          Enclosure
}}
}}

Latest revision as of 03:35, 13 November 2019

Request for Information (Inspection Report 05000482-11-003) Related to Ti 2515/177
ML110410603
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/10/2011
From: Thomas Farnholtz
Operations Branch IV
To: Matthew Sunseri
Wolf Creek
References
IR-11-003, TI 2515/177
Download: ML110410603 (7)


See also: IR 05000482/2011003

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

February 10, 2011

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION

(INSPECTION REPORT 05000482/2011003) RELATED TO TI 2515/177

Dear Mr.Sunseri:

On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion

of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and

Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station.

This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.

Experience has shown that this inspection is resource intensive both for NRC inspectors and

your staff. In order to minimize the impact to your onsite resources and to ensure a productive

inspection, we have enclosed a request for documents needed for this inspection. The

documents have been divided into two groups.

  • The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. This information should be separated by information request number,

especially if provided electronically (e.g., folder with the information request number). This

information should be available to the inspector no later than March 21, 2011. Any

documents mailed to the inspector should be shipped to his attention at the Region IV

address. Upon review of these documents, the inspectors will select additional

documentation for review upon arrival. By April 8, 2011, the inspector will communicate the

initial selected samples.

  • The second group of documents requested is needed to support our onsite inspection

activities. This set of documents should be available to the inspector on May 2, 2011. It is

also requested that corrective action documents and responses to questions developed

during the inspection be provided to the inspector as the documents are generated.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Bill Muilenburg of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

Wolf Creek Nuclear Operating Corporation -2-

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of

Practice, a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-482

License: NPF-42

cc w/encl:

Site Vice President

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N Street, NW

Washington, DC 20037

Supervisor Licensing

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Road

Topeka, KS 66604-4027

Office of the Governor

State of Kansas

Topeka, KS 66612-1590

Wolf Creek Nuclear Operating Corporation -3-

Attorney General

120 S.W. 10th Avenue, 2nd Floor

Topeka, KS 66612-1597

Chairman

Coffey County Courthouse

110 South 6th Street

Burlington, KS 66839

Chief, Radiation and Asbestos

Control Section

Bureau of Air and Radiation

Kansas Department of Health and

Environment

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Chief, Technological Hazards

Branch

FEMA, Region VII

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Wolf Creek Nuclear Operating Corporation -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

WC Administrative Assistant (Shirley.Allen@nrc.gov)

Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

Only inspection reports to the following:

OEDO RIV Coordinator (James.Trapp@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\REACTORS\WC 2011003 RFI-TI77-GAP ADAMS ML

ADAMS: No  ; Yes  ; SUNSI Review Complete Reviewer Initials: TRF

Publicly Available  ; Non-Sensitive

Non-publicly Available Sensitive

DRS\EB2:SRI EB1:C

G. Pick T. Farnholtz

/RA/ /RA/

2/10/11 2/10/11

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector, and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the inspector as soon as possible.

I. Information Requested By March 28, 2011

1. List of corrective action program documents (with a short description) associated with

Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous

3 years.

2. List of changes (with a short description and tracking number) to the final safety

evaluation report (FSAR), technical specifications, technical specification bases, and

technical requirement manual associated with the resolution of GL 2008-01.

3. List of calculations associated with GL 2008-01, including calculations that have been

changed or created in response to GL 2008-01 (with a short description of the

calculation and the change).

4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the

affected system locations (e.g. identify the source, conditions, and expected void

locations).

5. List of the suction piping sections identified as susceptible to gas accumulation (the list

should identify the corresponding system).

6. List of the discharge piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A

and B, and High Pressure Coolant Injection systems (hard-copies are preferred).

8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,

Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-

copies are preferred).

9. Copies of program documents and procedures developed to implement the resolution of

GL 2008-01.

-1- Enclosure

10. List of actions that were completed in response to GL 2008-01.

11. Copies of the modification packages for hardware modifications as part of the resolution

of GL 2008-01.

12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,

and High Pressure Coolant Injection systems.

13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat

Removal A and B, and High Pressure Coolant Injection systems.

14. System walkdown reports associated with the resolution of GL 2008-01.

15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core

Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection

systems have not been completed. Include an explanation of why each area is

considered inaccessible.

16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the

results of the last two surveillances for the Core Spray A and B, Residual Heat

Removal A and B, and High Pressure Coolant Injection systems.

17. Copies of procedures used for detecting and determining void volumes.

18. Copies of procedures used for filling and venting.

19. Copies of trends of periodic venting results.

20. Copies of the engineering evaluations performed for all identified voids.

21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the Office

of Nuclear Reactor Regulation (NRR).

22. Copy of any void transport analyses.

23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.

24. Copies of self-assessments associated with the implementation of the GL 2008-01

program.

II. Information Requested By May 16, 2011

25. Copies of the selected corrective action program documents.

26. Copies of the selected licensing and design basis document changes.

27. Copies of the selected calculations.

-2- Enclosure

28. Copies of training documents that ensure that personnel are aware of gas-related

concerns.

29. Copies of corrective action program implementing procedures.

30. Electronic copies of the current technical specifications, technical specification bases,

final safety analysis report, and technical report manual.

-3- Enclosure