ML20141H722: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,                                                                    o f}                                                fJJA- ' ' ,
      .e  -~
                                              /      {f d
                                      / I i                                /          !/      /
f.
I v/ {/ '
UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY
 
==SUMMARY==
 
v ,/          /
                                                        )          ,
                                                                  )
                                                              .,/
October 1996 Prepared by:
Operations Staff
                                                  \tll1ll111155.111!I1111
                                                          '90\
        ;W?a8R 8u8L6                                        0 e        een    -                                          m
 
October 1996 i
The reactor operated continuously in October with the following exceptions: four shutdowns for l  scheduled maintenance and refueling.
l Major maintenance items for the month included: replacing the bottom sealing gasket on the south back-up isolation door (505); performing the biennial change-out of control blade offset "D";
repairing a small leak on the primary pump 501B discharge pressure gauge and seal water line; replacing the slow speed drive motor on the intermediate range monitor chart; replacing the
(  :alibration feedback module for intermediate range monitor (NI) channel #3.
i l
OPERATION
 
==SUMMARY==
 
HOURS OPERATED THIS PERIOD                                    690 TOTAL HOURS OPERATED                                  199,520 HOURS AT FULL POWERTHIS PERIOD                                684 TOTAL HOURS AT FULL POWER                              196,480 I                    INTEGRATED POWER THIS PERIOD                                  285 MWD              .
TOTAL INTEGRATED POWER                                    76,016 MWD i
l MAINTENANCE ACTIVITIES l
10/7/96        Refueled - removed core 96-43, loaded core 96-44. Rep' aced bottom sealing gasket on l south back-up isolation door (505).
10/14/96 Refueled removed core 96-44, loaded core 96-45. Performed biennial change-out of            l l                    control blade offset "D".                                                            j l
10/21/96 Refueled removed core 96-45, loaded core 96-46. Repaired primary pump 501B discharge pressure gauge and seal water line. Replaced slow speed drive motor on intermediate range monitor chart.
10/28/96 Refueled - removed core 96-46, loaded core 96-47. Replaced calibration feedback module for intermediate range monitor channel #3.
l t
1 4
              .                            -                            - - . -}}

Latest revision as of 23:44, 21 July 2020

Monthly Operating Rept for Univ of Missouri Research Reactor for Oct 1996
ML20141H722
Person / Time
Site: University of Missouri-Columbia
Issue date: 10/31/1996
From:
MISSOURI, UNIV. OF, COLUMBIA, MO
To:
References
NUDOCS 9708010105
Download: ML20141H722 (2)


Text

, o f} fJJA- ' ' ,

.e -~

/ {f d

/ I i /  !/ /

f.

I v/ {/ '

UNIVERSITY OF MISSOURI RESEARCH REACTOR OPERATIONS MONTHLY

SUMMARY

v ,/ /

) ,

)

.,/

October 1996 Prepared by:

Operations Staff

\tll1ll111155.111!I1111

'90\

W?a8R 8u8L6 0 e een - m

October 1996 i

The reactor operated continuously in October with the following exceptions: four shutdowns for l scheduled maintenance and refueling.

l Major maintenance items for the month included: replacing the bottom sealing gasket on the south back-up isolation door (505); performing the biennial change-out of control blade offset "D";

repairing a small leak on the primary pump 501B discharge pressure gauge and seal water line; replacing the slow speed drive motor on the intermediate range monitor chart; replacing the

( :alibration feedback module for intermediate range monitor (NI) channel #3.

i l

OPERATION

SUMMARY

HOURS OPERATED THIS PERIOD 690 TOTAL HOURS OPERATED 199,520 HOURS AT FULL POWERTHIS PERIOD 684 TOTAL HOURS AT FULL POWER 196,480 I INTEGRATED POWER THIS PERIOD 285 MWD .

TOTAL INTEGRATED POWER 76,016 MWD i

l MAINTENANCE ACTIVITIES l

10/7/96 Refueled - removed core 96-43, loaded core 96-44. Rep' aced bottom sealing gasket on l south back-up isolation door (505).

10/14/96 Refueled removed core 96-44, loaded core 96-45. Performed biennial change-out of l l control blade offset "D". j l

10/21/96 Refueled removed core 96-45, loaded core 96-46. Repaired primary pump 501B discharge pressure gauge and seal water line. Replaced slow speed drive motor on intermediate range monitor chart.

10/28/96 Refueled - removed core 96-46, loaded core 96-47. Replaced calibration feedback module for intermediate range monitor channel #3.

l t

1 4

. - - - . -