| number = ML20054G302
| number = ML20054G302
| issue date = 06/11/1982
| issue date = 06/11/1982
| title = Advises That 11 Position Papers Provided in D Holtzscher 820517 Ltr Incorporated Into OL Application
| title = Advises That 11 Position Papers Provided in D Holtzscher Incorporated Into OL Application
| author name = Wuller G
| author name = Wuller G
| author affiliation = ILLINOIS POWER CO.
| author affiliation = ILLINOIS POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8206210400
| document report number = NUDOCS 8206210400
| title reference date = 05-17-1982
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project =
| stage = Other
}}
}}


Line 20: Line 23:
==Dear Mr. Bernard:==
==Dear Mr. Bernard:==


Clinton Power Station Unit 1 Docket No. 50-461 By the letter dated May 17, 1982, Mr. Dale Holtzscher, Chairman of the LRG-II Working Group, provided you with position papers on eleven of the fifty-six presently identified LRG-II issues. As you know, Illinois Power Company is a member of the LRG-II. We would like to advise you, in accordance with the practices developed by NRR and the LRG-II, that Illinois Power Company hereby incorporates those eleven position papers provided in Mr. Holtzscher's May 17, 1982 letter into the Clinton Power Station OL application.
Clinton Power Station Unit 1 Docket No. 50-461 By the {{letter dated|date=May 17, 1982|text=letter dated May 17, 1982}}, Mr. Dale Holtzscher, Chairman of the LRG-II Working Group, provided you with position papers on eleven of the fifty-six presently identified LRG-II issues. As you know, Illinois Power Company is a member of the LRG-II. We would like to advise you, in accordance with the practices developed by NRR and the LRG-II, that Illinois Power Company hereby incorporates those eleven position papers provided in Mr. Holtzscher's {{letter dated|date=May 17, 1982|text=May 17, 1982 letter}} into the Clinton Power Station OL application.
For specificity, the May 17, 1982 letter provides infor-mation on the LRG-II issues identified in the following manner:
For specificity, the {{letter dated|date=May 17, 1982|text=May 17, 1982 letter}} provides infor-mation on the LRG-II issues identified in the following manner:
1-RSB, Rev. 1      6-CPB                      2-ASB 8-RSB, Rev. 1      1-ICSB, Rev. 1              2-HFS 9-RSB              2-ICSB                      3-CHEB 3-CPB, Rev. 1      2-CSB When subsequent LRG-II position papers are developed and provided to NRR, we intend to incorporate them in similar fashion.
1-RSB, Rev. 1      6-CPB                      2-ASB 8-RSB, Rev. 1      1-ICSB, Rev. 1              2-HFS 9-RSB              2-ICSB                      3-CHEB 3-CPB, Rev. 1      2-CSB When subsequent LRG-II position papers are developed and provided to NRR, we intend to incorporate them in similar fashion.
Sincerely, G. E. Wuller 8206210400 820611                            Supervisor-Licensing PDRADOCK05000$$$
Sincerely, G. E. Wuller 8206210400 820611                            Supervisor-Licensing PDRADOCK05000$$$
A                                            Nuclear Station Engineering GEW/lt                                                                          j3t>O f cc:  J. H. Williams, NRC Clinton Project Manager H. H. Livermore NRC Resident Inspector H. F. Faulkner , ,NRC LRG-II Proj ect Manager Illinois Dept. of Nuclear Safety
A                                            Nuclear Station Engineering GEW/lt                                                                          j3t>O f cc:  J. H. Williams, NRC Clinton Project Manager H. H. Livermore NRC Resident Inspector H. F. Faulkner , ,NRC LRG-II Proj ect Manager Illinois Dept. of Nuclear Safety
                                 -                  -.      _ _}}
                                 -                  -.      _ _}}

Latest revision as of 12:21, 14 November 2023

Advises That 11 Position Papers Provided in D Holtzscher Incorporated Into OL Application
ML20054G302
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/11/1982
From: Wuller G
ILLINOIS POWER CO.
To: Bernard H
Office of Nuclear Reactor Regulation
References
NUDOCS 8206210400
Download: ML20054G302 (1)


Text

U-0501 ILLINDIS POWER COMPANY 17 L30-82(06-11)-6 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 June 11, 1982 Mr. Harold Bernard, Acting Chief Standardization & Special Projects Branch Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Bernard:

Clinton Power Station Unit 1 Docket No. 50-461 By the letter dated May 17, 1982, Mr. Dale Holtzscher, Chairman of the LRG-II Working Group, provided you with position papers on eleven of the fifty-six presently identified LRG-II issues. As you know, Illinois Power Company is a member of the LRG-II. We would like to advise you, in accordance with the practices developed by NRR and the LRG-II, that Illinois Power Company hereby incorporates those eleven position papers provided in Mr. Holtzscher's May 17, 1982 letter into the Clinton Power Station OL application.

For specificity, the May 17, 1982 letter provides infor-mation on the LRG-II issues identified in the following manner:

1-RSB, Rev. 1 6-CPB 2-ASB 8-RSB, Rev. 1 1-ICSB, Rev. 1 2-HFS 9-RSB 2-ICSB 3-CHEB 3-CPB, Rev. 1 2-CSB When subsequent LRG-II position papers are developed and provided to NRR, we intend to incorporate them in similar fashion.

Sincerely, G. E. Wuller 8206210400 820611 Supervisor-Licensing PDRADOCK05000$$$

A Nuclear Station Engineering GEW/lt j3t>O f cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore NRC Resident Inspector H. F. Faulkner , ,NRC LRG-II Proj ect Manager Illinois Dept. of Nuclear Safety

- -. _ _