{{#Wiki_filter:Richard Emch -VYNPS SAMA RAI Clarification Letter Page From: "Hamer, Mike" <mhamer@entergy.com>
{{#Wiki_filter:Richard Emch - VYNPS SAMA RAI Clarification Letter                                                                 Page I From:             "Hamer, Mike" <mhamer@entergy.com>
To: "Jessie Muir" <JMM7@nrc.gov>, <RLE@nrc.gov>
To:               "Jessie Muir" <JMM7@nrc.gov>, <RLE@nrc.gov>
Date: 11/06/2006 1:25:13 PM  
Date:               11/06/2006 1:25:13 PM


==Subject:==
==Subject:==
VYNPS SAMA RAI Clarification Letter Jessie, Attached is a letter to provide clarification for several SAMA issues that were discussed with the VY License Renewal Team and the NRC during a teleconference on 10/26/06.
VYNPS SAMA RAI Clarification Letter Jessie, Attached is a letter to provide clarification for several SAMA issues that were discussed with the VY License Renewal Team and the NRC during a teleconference on 10/26/06. Please contact me if you have any additional questions.
Please contact me if you have any additional questions.
Mike Hamer Licensing Specialist Entergy Nuclear Vermont Yankee (802) 258-4226 mhamer@entergy.com CC:               "Sullivan, Theodore A" <TSULLI2@entergy.com>, "Dreyfuss, John"
Mike Hamer Licensing Specialist Entergy Nuclear Vermont Yankee (802) 258-4226 mhamer@entergy.com CC: "Sullivan, Theodore A" <TSULLI2@entergy.com>, "Dreyfuss, John"<jdreyfu @ entergy.com>, "Mannai, David" <dmannai @ entergy.com>, "YOUNG, GARRY G"<GYOUNG4 @ entergy.com>, "Lach, David J" <DLach @ entergy.com>, "BUCKLEY, RICKY N"<RBUCKLE @ entergy.com>, "Yeh, Chaur Nan" <CYeh @ entergy.com>, "Palionis, Mark"<mpalion@entergy.com>, "COX, ALAN B" <ACOX@entergy.com>, "Metell, Mike"<hmetell @ entergy.com>, "Gill, Jeanne" <jgill2 @ entergy.com>, "Favara, John A" <J Favara @ entergy.com>
            <jdreyfu @entergy.com>, "Mannai, David" <dmannai @entergy.com>, "YOUNG, GARRY G"
I I c1\tempvvIuuuu1.
            <GYOUNG4 @entergy.com>, "Lach, David J" <DLach @entergy.com>, "BUCKLEY, RICKY N"
I MF .. Page_111 Mail Envelope Properties (454F7DFC.5AA:17
            <RBUCKLE @entergy.com>, "Yeh, Chaur Nan" <CYeh @ entergy.com>, "Palionis, Mark"
:1450)
            <mpalion@entergy.com>, "COX, ALAN B" <ACOX@entergy.com>, "Metell, Mike"
            <hmetell @entergy.com>, "Gill, Jeanne" <jgill2 @entergy.com>, "Favara, John A" <J Favara @entergy.com>
 
Ic1\tempvvIuuuu1. IMF    ..                                                               Page_111 Mail Envelope Properties     (454F7DFC.5AA:17 :1450)


==Subject:==
==Subject:==
Creation Date From: Created By: VYNPS SAMA RAI Clarification Letter 11/06/2006 1:24:02 PM"Hamer, Mike" <mhamer@entergy.com>
VYNPS SAMA RAI Clarification Letter Creation Date          11/06/2006 1:24:02 PM From:                  "Hamer, Mike" <mhamer@entergy.com>
mhamer@entergy.com Recipients nrc.gov TWGWPO01 .HQGWDOO1 JMM7 (Jessie Muir)nrc.gov OWGWPO02.HQGWDO01 RLE (Richard Emch)entergy.com JFavara CC (John A Favara)jgill2 CC (Jeanne Gill)hmetell CC (Mike Metell)ACOX CC (ALAN B COX)mpalion CC (Mark Palionis)CYeh CC (Chaur Nan Yeh)RBUCKLE CC (RICKY N BUCKLEY)DLach CC (David J Lach)GYOUNG4 CC (GARRY G YOUNG)dmannai CC (David Mannai)jdreyfu CC (John Dreyfuss)TSULLI2 CC (Theodore A Sullivan)Post Office TWGWPO01 .HQGWDO01 OWGWPO02.HQGWDO01 Files MESSAGE BVY 06-099 -VYNPS SAMA Mime.822 Options Expiration Date: Priority: Route nrc.gov nrc.gov entergy.com Size Date & Time 337 11/06/2006 1:24:02 PM RAI Clarification Letter.PDF 165229 229580 None Standard I C-\tflP\UW1UUUU1l.
Created By:            mhamer@entergy.com Recipients nrc.gov TWGWPO01 .HQGWDOO1 JMM7 (Jessie Muir) nrc.gov OWGWPO02.HQGWDO01 RLE (Richard Emch) entergy.com JFavara CC (John A Favara) jgill2 CC (Jeanne Gill) hmetell CC (Mike Metell)
I[Vl__Pag_ IJI ReplyRequested:
ACOX CC (ALAN B COX) mpalion CC (Mark Palionis)
No Return Notification:
CYeh CC (Chaur Nan Yeh)
None Concealed  
RBUCKLE CC (RICKY N BUCKLEY)
DLach CC (David J Lach)
GYOUNG4 CC (GARRY G YOUNG) dmannai CC (David Mannai) jdreyfu CC (John Dreyfuss)
TSULLI2 CC (Theodore A Sullivan)
Post Office                                                         Route TWGWPO01 .HQGWDO01                                                 nrc.gov OWGWPO02.HQGWDO01                                                 nrc.gov entergy.com Files                            Size           Date & Time MESSAGE                          337           11/06/2006 1:24:02 PM BVY 06-099 - VYNPS SAMA RAI Clarification Letter.PDF               165229 Mime.822                        229580 Options Expiration Date:                None Priority:                        Standard
 
IC-\tflP\UW1UUUU1l. I[Vl                                            __Pag_ IJI ReplyRequested:                 No Return Notification:           None Concealed  


==Subject:==
==Subject:==
No Security:
No Security:                       Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled  
 
*Entergy Entergy Nuclear Operations, Inc.Vermont Yankee P.O. Box 0500 185 Old Ferny Road Brattleboro, VT 05302-0500 Tel 802 257 5271 November 6, 2006 Docket No. 50-271 BVY 06-099 TAC No. MC 9670 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Entergy Nuclear Operations, Inc.
Vermont Yankee P.O. Box 0500
  *Entergy                                                            185 Old Ferny Road Brattleboro, VT 05302-0500 Tel 802 257 5271 November 6, 2006 Docket No. 50-271 BVY 06-099 TAC No. MC 9670 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Reference:==
==Reference:==
: 1. Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application," BVY 06-009, dated January 25, 2006.2. Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application, Amendment 7," BVY 06-071, dated August 01, 2006.3. Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application, Amendment 18, Response to Request for Clarification of SAMA RAI Responses," BVY 06-095, dated October 20, 2006.
: 1.     Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application," BVY 06-009, dated January 25, 2006.
: 2.     Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application, Amendment 7," BVY 06-071, dated August 01, 2006.
: 3.     Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application, Amendment 18, Response to Request for Clarification of SAMA RAI Responses," BVY 06-095, dated October 20, 2006.


==Subject:==
==Subject:==
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)License Renewal Application, Amendment 21 Response to Request for Clarification of SAMA RAIs On January 25, 2006, Entergy Nuclear Operations, Inc. and Entergy Nuclear Vermont Yankee, LLC (Entergy) submitted the License Renewal Application (LRA) for the Vermont Yankee Nuclear Power Station (VYNPS) as indicated by Reference
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
: 1. On October 26, 2006, a teleconference was conducted with Entergy License Renewal Team representatives and the Nuclear Regulatory Commission (NRC) Environmental Auditors.
License Renewal Application, Amendment 21 Response to Request for Clarification of SAMA RAIs On January 25, 2006, Entergy Nuclear Operations, Inc. and Entergy Nuclear Vermont Yankee, LLC (Entergy) submitted the License Renewal Application (LRA) for the Vermont Yankee Nuclear Power Station (VYNPS) as indicated by Reference 1. On October 26, 2006, a teleconference was conducted with Entergy License Renewal Team representatives and the Nuclear Regulatory Commission (NRC) Environmental Auditors. The NRC requested clarification for several of the responses provided in Reference 2 and 3. These issues are addressed Attachment 1 to this letter.
The NRC requested clarification for several of the responses provided in Reference 2 and 3. These issues are addressed Attachment 1 to this letter.This submittal does not contain new regulatory commitments.
This submittal does not contain new regulatory commitments.
Should you have any questions, please contact Mr. Dave Mannai at (802) 451-3304.
Should you have any questions, please contact Mr. Dave Mannai at (802) 451-3304. I declare under penalty of perjury that the foregoing is true and correct, executed on November 6, 2006.
I declare under penalty of perjury that the foregoing is true and correct, executed on November 6, 2006.Sincerely,-IV,, Ted A. Sulliva")Site Vice Prt1si~eit Vermont Yankee Nuclear Power Station Attachment 1 cc: See next page BVY 06-099 Docket No. 50-271 Page 2 of 2 cc: Mr. James Dyer, Director U.S. Nuclear Regulatory Commission Office O5E7 Washington, DC 20555-00001 Mr. Samuel J. Collins, Regional Administrator U.S. Nuclear Regulatory Commission, Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Jack Strosnider, Director U.S. Nuclear Regulatory Commission Office T8A23 Washington, DC 20555-00001 Mr. Jonathan Rowley, Senior Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike MS-O-1 1 F1 Rockville, MD 20853 Mr. Richard Emch U.S. Nuclear Regulatory Commission 11555 Rockville Pike MS-O-1 1 F1 Rockville, MD 20853 Mr. James J. Shea, Project Manager U.S. Nuclear Regulatory Commission Mail Stop O8G9A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 (for mail delivery)Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street -Drawer 20 Montpelier, Vermont 05620-2601 Diane Curran, Esq.Harmon, Curran, Spielberg  
Sincerely,
& Eisenberg, LLP 1726 M Street, N.W., Suite 600 Washington, D.C. 20036 BVY 06-099 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station License Renewal Application Amendment 21 VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION ATTACHMENT 1 10/26/2006 Teleconference Clarification Items A teleconference was held on 10/26/06 with the NRC and VYNPS License Renewal Team. During this call, the NRC requested additional information pertaining to fire and flood risk contributors to ensure that VYNPS evaluated each of the contributors for scenario-specific remedies, and did not find any that were cost effective (with exceptions as stated below).RAI 5.e Clarification The clarification of response to the request for additional information (RAI) RAI 5.e in Amendment 18 indicated that there are now only 9 risk significant terms involving internal flooding initiators.
                                                                                  -IV,,
As indicated in revised Environmental Report (ER) Table E.1-3, two of the flood scenarios are addressed by Phase II Severe Accident Mitigation Alternatives (SAMA) SAMA 47, "Shield injection system electrical equipment from potential water spray." Flood-specific improvements identified by the Individual Plant Examination for External Events (IPEEE) have already been implemented to address specific flood scenarios.
Ted A. Sulliva")
The flood scenarios were systematically reviewed as part of the 2002 Probabilistic Safety Assessment (PSA) model update (in which the internal flood events model was updated) to determine if additional improvements could be identified to reduce the internal flood Core Damage Frequency (CDF) contribution.
Site Vice Prt1si~eit Vermont Yankee Nuclear Power Station cc: See next page
With the exception of the improvement which has been included as Phase II SAMA 47, no additional cost-beneficial alternatives were identified.
 
RAI 5.q Clarification There are eight (8) dominant fire initiated events. All of the associated fire compartments are equipped with fire detection, and all except two (2) of the fire compartments are protected by an automatic fire suppression system. The exceptions are the control room (control bldg 272' elev.) and the Control Rod Drive (CRD) repair room (reactor bldg 252'-south elev.).The control room is continuously occupied.
BVY 06-099 Docket No. 50-271 Page 2 of 2 cc: Mr. James Dyer, Director U.S. Nuclear Regulatory Commission Office O5E7 Washington, DC 20555-00001 Mr. Samuel J. Collins, Regional Administrator U.S. Nuclear Regulatory Commission, Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Jack Strosnider, Director U.S. Nuclear Regulatory Commission Office T8A23 Washington, DC 20555-00001 Mr. Jonathan Rowley, Senior Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike MS-O-1 1 F1 Rockville, MD 20853 Mr. Richard Emch U.S. Nuclear Regulatory Commission 11555 Rockville Pike MS-O-1 1 F1 Rockville, MD 20853 Mr. James J. Shea, Project Manager U.S. Nuclear Regulatory Commission Mail Stop O8G9A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 (for mail delivery)
An auto-suppression system would need to be acceptable with regard to health risks associated with continued occupation of the space. Some thought was given to use of a fixed auto-suppression system for the control room utilizing FM-200 (a replacement for the ozone depleting Halon) for the suppression agent. However, the current fire detection system may or may not be usable for actuation.
Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601 Diane Curran, Esq.
In addition, some amount of sealing of the cabinets would be required.Also, migration of the suppression agent within the panel enclosure would need to be considered.
Harmon, Curran, Spielberg & Eisenberg, LLP 1726 M Street, N.W., Suite 600 Washington, D.C. 20036
For example, on the main bench-board, there may be undesirable consequences associated with filling the entire enclosure with suppression agent because non-fire affected electrical contacts and circuits could be damaged. For these reasons an auto-suppression system for this space was judged to be inappropriate.
 
Rerouting of cables or relocation of equipment out of the control room is not practical due the need for a centralized control location.Page 1 of 2 BVY 06-099 Docket 50-271 VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION ATTACHMENT 1 The CRD repair room is located on the south side of reactor building, on the 252'elevation.
BVY 06-099 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station License Renewal Application Amendment 21
A water suppression system would not be practical since the main steam tunnel communicates with this room through an open door. A High Energy Line Break (HELB) which occurred in this room would likely cause the water suppression system to discharge, resulting in a flooding hazard. Likewise a C02 suppression system would require sealing of the room, which would have undesirable consequences in that this path is credited for pressure relief for a HELB within the main steam tunnel. For these reasons an auto-suppression system for this space was judged to be inappropriate.
 
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION ATTACHMENT 1 10/26/2006 Teleconference Clarification Items A teleconference was held on 10/26/06 with the NRC and VYNPS License Renewal Team. During this call, the NRC requested additional information pertaining to fire and flood risk contributors to ensure that VYNPS evaluated each of the contributors for scenario-specific remedies, and did not find any that were cost effective (with exceptions as stated below).
RAI 5.e Clarification The clarification of response to the request for additional information (RAI) RAI 5.e in Amendment 18 indicated that there are now only 9 risk significant terms involving internal flooding initiators. As indicated in revised Environmental Report (ER) Table E.1-3, two of the flood scenarios are addressed by Phase II Severe Accident Mitigation Alternatives (SAMA) SAMA 47, "Shield injection system electrical equipment from potential water spray."
Flood-specific improvements identified by the Individual Plant Examination for External Events (IPEEE) have already been implemented to address specific flood scenarios.
The flood scenarios were systematically reviewed as part of the 2002 Probabilistic Safety Assessment (PSA) model update (in which the internal flood events model was updated) to determine if additional improvements could be identified to reduce the internal flood Core Damage Frequency (CDF) contribution. With the exception of the improvement which has been included as Phase II SAMA 47, no additional cost-beneficial alternatives were identified.
RAI 5.q Clarification There are eight (8) dominant fire initiated events. All of the associated fire compartments are equipped with fire detection, and all except two (2) of the fire compartments are protected by an automatic fire suppression system. The exceptions are the control room (control bldg 272' elev.) and the Control Rod Drive (CRD) repair room (reactor bldg 252'-
south elev.).
The control room is continuously occupied. An auto-suppression system would need to be acceptable with regard to health risks associated with continued occupation of the space. Some thought was given to use of a fixed auto-suppression system for the control room utilizing FM-200 (a replacement for the ozone depleting Halon) for the suppression agent. However, the current fire detection system may or may not be usable for actuation. In addition, some amount of sealing of the cabinets would be required.
Also, migration of the suppression agent within the panel enclosure would need to be considered. For example, on the main bench-board, there may be undesirable consequences associated with filling the entire enclosure with suppression agent because non-fire affected electrical contacts and circuits could be damaged. For these reasons an auto-suppression system for this space was judged to be inappropriate.
Rerouting of cables or relocation of equipment out of the control room is not practical due the need for a centralized control location.
Page 1 of 2 BVY 06-099 Docket 50-271
 
VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION ATTACHMENT 1 The CRD repair room is located on the south side of reactor building, on the 252' elevation. A water suppression system would not be practical since the main steam tunnel communicates with this room through an open door. A High Energy Line Break (HELB) which occurred in this room would likely cause the water suppression system to discharge, resulting in a flooding hazard. Likewise a C02 suppression system would require sealing of the room, which would have undesirable consequences in that this path is credited for pressure relief for a HELB within the main steam tunnel. For these reasons an auto-suppression system for this space was judged to be inappropriate.
Control cables for both emergency diesel generators and control cables for 2 of the 4 Safety Relief Valves (SRVs) are routed through this room. Since rerouting control cables would require extensive modifications, it was judged to be not cost beneficial.
Control cables for both emergency diesel generators and control cables for 2 of the 4 Safety Relief Valves (SRVs) are routed through this room. Since rerouting control cables would require extensive modifications, it was judged to be not cost beneficial.
Additional Clarification As noted in revised ER Table E.1-3, Phase I SAMAs including improvements to plant procedures, and installation of instrumentation to enhance the likelihood of success of operator action in response to accident conditions, have already been implemented.
Additional Clarification As noted in revised ER Table E.1-3, Phase I SAMAs including improvements to plant procedures, and installation of instrumentation to enhance the likelihood of success of operator action in response to accident conditions, have already been implemented. No additional Phase II SAMAs were recommended for this subject because potential improvements would involve major, and very costly, design changes. To automate these functions, significant design changes would be necessary to upgrade the Structures, Systems and Components (SSCs) relied upon for alternate injection from non-safety-class to safety-class. The firewater system components and support system relied upon for alternate injection would need to be upgraded to comply with seismic safety-class standards. Similarly, the John Deere diesel generator electrical switchgear would need to be upgraded to comply with electric safety-class standards. For these reasons, automation of the alternate injection system was judged to be not cost beneficial.
No additional Phase II SAMAs were recommended for this subject because potential improvements would involve major, and very costly, design changes. To automate these functions, significant design changes would be necessary to upgrade the Structures, Systems and Components (SSCs) relied upon for alternate injection from non-safety-class to safety-class.
The firewater system components and support system relied upon for alternate injection would need to be upgraded to comply with seismic safety-class standards.
Similarly, the John Deere diesel generator electrical switchgear would need to be upgraded to comply with electric safety-class standards.
For these reasons, automation of the alternate injection system was judged to be not cost beneficial.
Page 2 of 2 BVY 06-099 Docket 50-271}}
Page 2 of 2 BVY 06-099 Docket 50-271}}

Latest revision as of 12:42, 23 November 2019

Email: (PA-LR) VYNPS SAMA RAI Clarification Letter
ML063340222
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/06/2006
From: Hamer M
Entergy Nuclear Vermont Yankee
To: Emch R, Muir J
Office of Nuclear Reactor Regulation
References
TAC MD2297
Download: ML063340222 (8)


Text

Richard Emch - VYNPS SAMA RAI Clarification Letter Page I From: "Hamer, Mike" <mhamer@entergy.com>

To: "Jessie Muir" <JMM7@nrc.gov>, <RLE@nrc.gov>

Date: 11/06/2006 1:25:13 PM

Subject:

VYNPS SAMA RAI Clarification Letter Jessie, Attached is a letter to provide clarification for several SAMA issues that were discussed with the VY License Renewal Team and the NRC during a teleconference on 10/26/06. Please contact me if you have any additional questions.

Mike Hamer Licensing Specialist Entergy Nuclear Vermont Yankee (802) 258-4226 mhamer@entergy.com CC: "Sullivan, Theodore A" <TSULLI2@entergy.com>, "Dreyfuss, John"

<jdreyfu @entergy.com>, "Mannai, David" <dmannai @entergy.com>, "YOUNG, GARRY G"

<GYOUNG4 @entergy.com>, "Lach, David J" <DLach @entergy.com>, "BUCKLEY, RICKY N"

<RBUCKLE @entergy.com>, "Yeh, Chaur Nan" <CYeh @ entergy.com>, "Palionis, Mark"

<mpalion@entergy.com>, "COX, ALAN B" <ACOX@entergy.com>, "Metell, Mike"

<hmetell @entergy.com>, "Gill, Jeanne" <jgill2 @entergy.com>, "Favara, John A" <J Favara @entergy.com>

Ic1\tempvvIuuuu1. IMF .. Page_111 Mail Envelope Properties (454F7DFC.5AA:17 :1450)

Subject:

VYNPS SAMA RAI Clarification Letter Creation Date 11/06/2006 1:24:02 PM From: "Hamer, Mike" <mhamer@entergy.com>

Created By: mhamer@entergy.com Recipients nrc.gov TWGWPO01 .HQGWDOO1 JMM7 (Jessie Muir) nrc.gov OWGWPO02.HQGWDO01 RLE (Richard Emch) entergy.com JFavara CC (John A Favara) jgill2 CC (Jeanne Gill) hmetell CC (Mike Metell)

ACOX CC (ALAN B COX) mpalion CC (Mark Palionis)

CYeh CC (Chaur Nan Yeh)

RBUCKLE CC (RICKY N BUCKLEY)

DLach CC (David J Lach)

GYOUNG4 CC (GARRY G YOUNG) dmannai CC (David Mannai) jdreyfu CC (John Dreyfuss)

TSULLI2 CC (Theodore A Sullivan)

Post Office Route TWGWPO01 .HQGWDO01 nrc.gov OWGWPO02.HQGWDO01 nrc.gov entergy.com Files Size Date & Time MESSAGE 337 11/06/2006 1:24:02 PM BVY 06-099 - VYNPS SAMA RAI Clarification Letter.PDF 165229 Mime.822 229580 Options Expiration Date: None Priority: Standard

IC-\tflP\UW1UUUU1l. I[Vl __Pag_ IJI ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

Entergy Nuclear Operations, Inc.

Vermont Yankee P.O. Box 0500

  • Entergy 185 Old Ferny Road Brattleboro, VT 05302-0500 Tel 802 257 5271 November 6, 2006 Docket No. 50-271 BVY 06-099 TAC No. MC 9670 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Reference:

1. Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application," BVY 06-009, dated January 25, 2006.
2. Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application, Amendment 7," BVY 06-071, dated August 01, 2006.
3. Letter, Entergy to USNRC, "Vermont Yankee Nuclear Power Station, License No. DPR-28, License Renewal Application, Amendment 18, Response to Request for Clarification of SAMA RAI Responses," BVY 06-095, dated October 20, 2006.

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

License Renewal Application, Amendment 21 Response to Request for Clarification of SAMA RAIs On January 25, 2006, Entergy Nuclear Operations, Inc. and Entergy Nuclear Vermont Yankee, LLC (Entergy) submitted the License Renewal Application (LRA) for the Vermont Yankee Nuclear Power Station (VYNPS) as indicated by Reference 1. On October 26, 2006, a teleconference was conducted with Entergy License Renewal Team representatives and the Nuclear Regulatory Commission (NRC) Environmental Auditors. The NRC requested clarification for several of the responses provided in Reference 2 and 3. These issues are addressed Attachment 1 to this letter.

This submittal does not contain new regulatory commitments.

Should you have any questions, please contact Mr. Dave Mannai at (802) 451-3304. I declare under penalty of perjury that the foregoing is true and correct, executed on November 6, 2006.

Sincerely,

-IV,,

Ted A. Sulliva")

Site Vice Prt1si~eit Vermont Yankee Nuclear Power Station cc: See next page

BVY 06-099 Docket No. 50-271 Page 2 of 2 cc: Mr. James Dyer, Director U.S. Nuclear Regulatory Commission Office O5E7 Washington, DC 20555-00001 Mr. Samuel J. Collins, Regional Administrator U.S. Nuclear Regulatory Commission, Region 1 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Jack Strosnider, Director U.S. Nuclear Regulatory Commission Office T8A23 Washington, DC 20555-00001 Mr. Jonathan Rowley, Senior Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike MS-O-1 1 F1 Rockville, MD 20853 Mr. Richard Emch U.S. Nuclear Regulatory Commission 11555 Rockville Pike MS-O-1 1 F1 Rockville, MD 20853 Mr. James J. Shea, Project Manager U.S. Nuclear Regulatory Commission Mail Stop O8G9A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 (for mail delivery)

Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601 Diane Curran, Esq.

Harmon, Curran, Spielberg & Eisenberg, LLP 1726 M Street, N.W., Suite 600 Washington, D.C. 20036

BVY 06-099 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station License Renewal Application Amendment 21

VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION ATTACHMENT 1 10/26/2006 Teleconference Clarification Items A teleconference was held on 10/26/06 with the NRC and VYNPS License Renewal Team. During this call, the NRC requested additional information pertaining to fire and flood risk contributors to ensure that VYNPS evaluated each of the contributors for scenario-specific remedies, and did not find any that were cost effective (with exceptions as stated below).

RAI 5.e Clarification The clarification of response to the request for additional information (RAI) RAI 5.e in Amendment 18 indicated that there are now only 9 risk significant terms involving internal flooding initiators. As indicated in revised Environmental Report (ER) Table E.1-3, two of the flood scenarios are addressed by Phase II Severe Accident Mitigation Alternatives (SAMA) SAMA 47, "Shield injection system electrical equipment from potential water spray."

Flood-specific improvements identified by the Individual Plant Examination for External Events (IPEEE) have already been implemented to address specific flood scenarios.

The flood scenarios were systematically reviewed as part of the 2002 Probabilistic Safety Assessment (PSA) model update (in which the internal flood events model was updated) to determine if additional improvements could be identified to reduce the internal flood Core Damage Frequency (CDF) contribution. With the exception of the improvement which has been included as Phase II SAMA 47, no additional cost-beneficial alternatives were identified.

RAI 5.q Clarification There are eight (8) dominant fire initiated events. All of the associated fire compartments are equipped with fire detection, and all except two (2) of the fire compartments are protected by an automatic fire suppression system. The exceptions are the control room (control bldg 272' elev.) and the Control Rod Drive (CRD) repair room (reactor bldg 252'-

south elev.).

The control room is continuously occupied. An auto-suppression system would need to be acceptable with regard to health risks associated with continued occupation of the space. Some thought was given to use of a fixed auto-suppression system for the control room utilizing FM-200 (a replacement for the ozone depleting Halon) for the suppression agent. However, the current fire detection system may or may not be usable for actuation. In addition, some amount of sealing of the cabinets would be required.

Also, migration of the suppression agent within the panel enclosure would need to be considered. For example, on the main bench-board, there may be undesirable consequences associated with filling the entire enclosure with suppression agent because non-fire affected electrical contacts and circuits could be damaged. For these reasons an auto-suppression system for this space was judged to be inappropriate.

Rerouting of cables or relocation of equipment out of the control room is not practical due the need for a centralized control location.

Page 1 of 2 BVY 06-099 Docket 50-271

VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION ATTACHMENT 1 The CRD repair room is located on the south side of reactor building, on the 252' elevation. A water suppression system would not be practical since the main steam tunnel communicates with this room through an open door. A High Energy Line Break (HELB) which occurred in this room would likely cause the water suppression system to discharge, resulting in a flooding hazard. Likewise a C02 suppression system would require sealing of the room, which would have undesirable consequences in that this path is credited for pressure relief for a HELB within the main steam tunnel. For these reasons an auto-suppression system for this space was judged to be inappropriate.

Control cables for both emergency diesel generators and control cables for 2 of the 4 Safety Relief Valves (SRVs) are routed through this room. Since rerouting control cables would require extensive modifications, it was judged to be not cost beneficial.

Additional Clarification As noted in revised ER Table E.1-3, Phase I SAMAs including improvements to plant procedures, and installation of instrumentation to enhance the likelihood of success of operator action in response to accident conditions, have already been implemented. No additional Phase II SAMAs were recommended for this subject because potential improvements would involve major, and very costly, design changes. To automate these functions, significant design changes would be necessary to upgrade the Structures, Systems and Components (SSCs) relied upon for alternate injection from non-safety-class to safety-class. The firewater system components and support system relied upon for alternate injection would need to be upgraded to comply with seismic safety-class standards. Similarly, the John Deere diesel generator electrical switchgear would need to be upgraded to comply with electric safety-class standards. For these reasons, automation of the alternate injection system was judged to be not cost beneficial.

Page 2 of 2 BVY 06-099 Docket 50-271