{{#Wiki_filter:March 5, 2012
{{#Wiki_filter:rch 5, 2012


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2 (REPORT 05000456/20 1 1 00 7 AND 05000457/20 1 1 00 7)
ANNUAL ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2 (REPORT 05000456/2011007 AND 05000457/2011007)


==Dear Mr. Paci l i o:==
==Dear Mr. Pacilio:==
On February 1 4, 20 1 2 , the Nuclear Regulatory Commission (N RC) staff completed its end-of-cycle performance review of Braidwood Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 201 1 , through December 31, 201 1. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
On February 14, 2012, the Nuclear Regulatory Commission (NRC) staff completed its end-of-cycle performance review of Braidwood Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.


The NRC determined that overall, Braidwood Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter, as well as the first three quarters of the assessment period, at Braidwood Station
The NRC determined that overall, Braidwood Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter, as well as the first three quarters of the assessment period, at Braidwood Station, Units 1 and 2, was within the Licensee Response column of the NRCs Reactor Oversight Process (ROP) Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).
, Units 1 and 2 , was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).


Therefore, the NRC plans to conduct ROP baseline inspections at Braidwood Station.
Therefore, the NRC plans to conduct ROP baseline inspections at Braidwood Station. We also plan to conduct infrequently performed and temporary instruction inspections at your facility.


We also plan to conduct infrequently performed and temporary instruction inspections at your facility. These inspections include a follow-up inspection using IP 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period ," to evaluate your corrective actions and extent of condition review related to a Steam Generator Margi n-to-Overfill Backfit [ML110320508] that was issued.
These inspections include a follow-up inspection using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Backfit [ML110320508] that was issued. Temporary Instruction 182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, will also be conducted at Braidwood Station. The enclosed inspection plan lists the inspections scheduled through June 30, 2013.


Temporary Instruction 182, "Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks,"
Routine inspections performed by resident inspectors are not included in the inspection plan.
will also be conducted at Braidwood Station
.
M. Pacilio-2-The enclosed inspection plan lists the inspections scheduled through June 30, 20 1 3. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


In accordance with 10 CFR 2.390 of the NRC
The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.
Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.


Sincerely,
Sincerely,
/RA/ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77 Enclosure: Braidwood Station Inspection/Activity Plan
/RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77 Enclosure: Braidwood Station Inspection/Activity Plan cc w/encl: Distribution via LIstServ


cc w/encl: Distribution via LIstServ
Page 1 of 2      Braidwood Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates        No. of Staff Start End Inspection Activity    Title  on Site FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW      1 01/02/2012 02/29/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S TI-182 - TI-2515/182 PHASE I - BURIED PIPING      1 02/27/2012 02/29/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI EPX - EP EXERCISE INSPECTION / PI VERIFICATION      2 03/05/2012 03/09/2012 IP 7111401 Exercise Evaluation 03/05/2012 03/09/2012 IP 71151 Performance Indicator Verification FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW      1 11/01/2012 12/20/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S BI RP - RADIATION PROTECTION BASELINE INSPECTION      1 04/16/2012 04/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/16/2012 04/20/2012 IP 71124.02 Occupational ALARA Planning and Controls BI ISI - INSERVICE INSPECTION - UNIT 1      2 04/16/2012 05/09/2012 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION      1 06/04/2012 06/08/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 06/04/2012 06/08/2012 IP 71124.04 Occupational Dose Assessment 06/04/2012 06/08/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness BI PI&R - BIENNIAL PI&R INSPECTION      4 06/11/2012 06/29/2012 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION      1 06/25/2012 06/29/2012 IP 71124.07 Radiological Environmental Monitoring Program 06/25/2012 06/29/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent INSP - OP EXP SS FY2007-03 POLAR CRANE SFP EQUI      1 06/25/2012 07/13/2012 IP 7111120 Refueling and Other Outage Activities BI FIRE - FIRE PROTECTION INSPECTION & BAG TRIP      3 07/23/2012 08/24/2012 IP 7111105T Fire Protection [Triennial]
BI RP - RADIATION PROTECTION BASELINE INSPECTION      1 08/20/2012 08/24/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 08/20/2012 08/24/2012 IP 71151-BI01 Reactor Coolant System Activity BI OLRQ - REQUALIFICATION PROGRAM INSPECTION      1 09/17/2012 09/21/2012 IP 7111111A Licensed Operator Requalification Program - Annual Review


Page 1 of 2 Planned Dates Start End Inspection Activity Title N
Page 2 of 2     Braidwood Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates       No. of Staff Start End Inspection Activity   Title on Site BI ISI - INSERVICE INSPECTION - UNIT 2    2 10/15/2012 11/02/2012 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION  2 10/22/2012 10/26/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/22/2012 10/26/2012 IP 71124.02 Occupational ALARA Planning and Controls BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION  2 02/11/2013 02/15/2013 IP 7111402 Alert and Notification System Testing 02/11/2013 02/15/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 02/11/2013 02/15/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/11/2013 02/15/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION  1 02/25/2013 03/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 02/25/2013 03/01/2013 IP 71151-PR01 RETS/ODCM Radiological Effluent OL PREP - BRAIDWOOD INIT PREP 03/2013    3 02/25/2013 02/28/2013 W90281 OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI CDBI - COMPONENT DESIGN BASIS INSPECTION    6 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection OL EXAM - BRAIDWOOD INIT EXAM 03/2013    3 03/25/2013 04/05/2013 W90281 OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI RP - RADIATION PROTECTION BASELINE INSPECTION  1 04/22/2013 04/26/2013 IP 71124.05 Radiation Monitoring Instrumentation 04/22/2013 04/26/2013 IP 71151-BI02 Reactor Coolant System Leakage
}}
}}

Latest revision as of 08:13, 12 November 2019

Annual Assessment Letter for Braidwood Station, Units 1 & 2 (Report 05000456-11-007 and 05000457-11-007)
ML12065A102
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/05/2012
From: Eric Duncan
Region 3 Branch 3
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
IR-11-007
Download: ML12065A102 (6)


Text

rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2 (REPORT 05000456/2011007 AND 05000457/2011007)

Dear Mr. Pacilio:

On February 14, 2012, the Nuclear Regulatory Commission (NRC) staff completed its end-of-cycle performance review of Braidwood Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Braidwood Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. Plant performance for the most recent quarter, as well as the first three quarters of the assessment period, at Braidwood Station, Units 1 and 2, was within the Licensee Response column of the NRCs Reactor Oversight Process (ROP) Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

Therefore, the NRC plans to conduct ROP baseline inspections at Braidwood Station. We also plan to conduct infrequently performed and temporary instruction inspections at your facility.

These inspections include a follow-up inspection using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12 Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Backfit [ML110320508] that was issued. Temporary Instruction 182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, will also be conducted at Braidwood Station. The enclosed inspection plan lists the inspections scheduled through June 30, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77 Enclosure: Braidwood Station Inspection/Activity Plan cc w/encl: Distribution via LIstServ

Page 1 of 2 Braidwood Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW 1 01/02/2012 02/29/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S TI-182 - TI-2515/182 PHASE I - BURIED PIPING 1 02/27/2012 02/29/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI EPX - EP EXERCISE INSPECTION / PI VERIFICATION 2 03/05/2012 03/09/2012 IP 7111401 Exercise Evaluation 03/05/2012 03/09/2012 IP 71151 Performance Indicator Verification FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW 1 11/01/2012 12/20/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/16/2012 04/20/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/16/2012 04/20/2012 IP 71124.02 Occupational ALARA Planning and Controls BI ISI - INSERVICE INSPECTION - UNIT 1 2 04/16/2012 05/09/2012 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/04/2012 06/08/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 06/04/2012 06/08/2012 IP 71124.04 Occupational Dose Assessment 06/04/2012 06/08/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness BI PI&R - BIENNIAL PI&R INSPECTION 4 06/11/2012 06/29/2012 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/25/2012 06/29/2012 IP 71124.07 Radiological Environmental Monitoring Program 06/25/2012 06/29/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent INSP - OP EXP SS FY2007-03 POLAR CRANE SFP EQUI 1 06/25/2012 07/13/2012 IP 7111120 Refueling and Other Outage Activities BI FIRE - FIRE PROTECTION INSPECTION & BAG TRIP 3 07/23/2012 08/24/2012 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/20/2012 08/24/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 08/20/2012 08/24/2012 IP 71151-BI01 Reactor Coolant System Activity BI OLRQ - REQUALIFICATION PROGRAM INSPECTION 1 09/17/2012 09/21/2012 IP 7111111A Licensed Operator Requalification Program - Annual Review

Page 2 of 2 Braidwood Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI ISI - INSERVICE INSPECTION - UNIT 2 2 10/15/2012 11/02/2012 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 10/22/2012 10/26/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/22/2012 10/26/2012 IP 71124.02 Occupational ALARA Planning and Controls BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 02/11/2013 02/15/2013 IP 7111402 Alert and Notification System Testing 02/11/2013 02/15/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 02/11/2013 02/15/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/11/2013 02/15/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 02/25/2013 03/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 02/25/2013 03/01/2013 IP 71151-PR01 RETS/ODCM Radiological Effluent OL PREP - BRAIDWOOD INIT PREP 03/2013 3 02/25/2013 02/28/2013 W90281 OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI CDBI - COMPONENT DESIGN BASIS INSPECTION 6 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection OL EXAM - BRAIDWOOD INIT EXAM 03/2013 3 03/25/2013 04/05/2013 W90281 OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/22/2013 04/26/2013 IP 71124.05 Radiation Monitoring Instrumentation 04/22/2013 04/26/2013 IP 71151-BI02 Reactor Coolant System Leakage