MONTHYEARML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 IR 05000456/20220062023-03-0101 March 2023 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2022006 and 05000457/2022006) IR 05000456/20220052022-08-22022 August 2022 Updated Inspection Plan for Braidwood Station Units 1 and 2 (Report 05000456/2022005; 05000457/2022005) ML22111A0752022-04-21021 April 2022 Information Request Letter for 2022 Problem Identification and Resolution Inspection at Braidwood Station IR 05000456/20210062022-03-0202 March 2022 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2021006 and 05000457/2021006) ML22034A9862022-02-0404 February 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000456/2022402 05000457/2022402 ML21350A4372021-12-16016 December 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) Inspection Report 05000456/2022010 and 05000457/2022010 IR 05000456/20210052021-09-0101 September 2021 Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2021005 and 05000457/2021005) ML21193A0942021-07-12012 July 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21057A1022021-02-25025 February 2021 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000456/2021010; 05000457/2021010 ML21020A1292021-01-20020 January 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2021002; 05000457/2021002 IR 05000456/20200052020-09-0101 September 2020 Updated Inspection Plan for Braidwood Station Units 1 and 2 (Report 05000456/2020005 and 05000457/2020005) ML20183A3912020-07-0101 July 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000456/2020012 and 05000457/2020012 IR 05000456/20190062020-03-0303 March 2020 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2019006 and 05000457/2019006) IR 05000456/20190052019-08-28028 August 2019 Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2019005; 05000457/2019005) ML19154A6152019-06-0303 June 2019 Ltr. 06/03/19 Braidwood Station, Unit 1 - Notification of NRC Inspection and Request for Information; Inspection Report 05000456/2019004; 05000457/2019004 (DRS-J.Bozga) ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000456/20180062019-03-0404 March 2019 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000457/2018006 and 05000456/2018006) ML18305A3542018-10-31031 October 2018 Ltr. 10/31/18 Braidwood Station, Units 1 and 2 - Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000456/2019010; 05000457/2019010 (DRS-J.CorujoSandin) IR 05000456/20180052018-08-28028 August 2018 Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2018005 and 05000457/2018005) IR 05000456/20170062018-03-0202 March 2018 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2017006 and 05000457/2017006) IR 05000456/20170052017-08-28028 August 2017 Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2017005 and 05000457/2017005) IR 05000456/20160062017-03-0101 March 2017 Annual Assessment Letter for Braidwood Station Units 1 and 2 (Report 05000456/2016006 and 05000457/2016006) ML16265A5772016-09-20020 September 2016 E-Mail; Braidwood Station, Unit 1 - Baseline Inservice Inspection Onsite Information Request (Msh) IR 05000456/20160052016-08-31031 August 2016 MID-CYCLE Assessment Letter for Braidwood Station Units 1 and 2 (Report 05000456/2016005; 05000457/2016005) ML16174A0852016-06-21021 June 2016 Notification of NRC Inspection and Request for Information 05000456/2016004; 05000457/2016004 IR 05000456/20150062016-03-0202 March 2016 Annual Assessment Letter for Braidwood Station Units 1 and 2 (Inspection Report 05000456/2015006 and 05000457/2015006) ML15328A5022015-11-24024 November 2015 Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000456/2016008; 05000457/2016008 (Bxj) IR 05000456/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Braidwood, Units 1 and 2 (Report 05000456/2015005; 05000457/2015005) ML15231A1492015-08-17017 August 2015 Ltr. 08/17/15 Braidwood Station, Unit 2 - Notification of NRC Inspection and Request for Information (Txb) IR 05000456/20140012015-03-0404 March 2015 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2014001; 05000457/2014001) ML15021A2322015-01-20020 January 2015 U1 ISI Request for Information ML14245A0692014-09-0202 September 2014 Mid-Cycle Assessment Letter for Braidwood Station, Units 1 and 2 ML14223B2132014-08-11011 August 2014 Heat Sink Request for Information IR 05000456/20130012014-03-0404 March 2014 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2013001; 05000457/2013001) IR 05000456/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter (IR 05000456-13-006 & 05000457-13-006) ML13120A5842013-04-29029 April 2013 Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000456-13-007 05000457-13-007 IR 05000456/20120012013-03-0404 March 2013 Annual Assessment Letter - Braidwood Station, Units 1 and 2, 05000456/2012001 and 05000457/2012001 ML12248A3062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Braidwood Station Units 1 and 2 IR 05000456/20110072012-03-0505 March 2012 Annual Assessment Letter for Braidwood Station, Units 1 & 2 (Report 05000456-11-007 and 05000457-11-007) IR 05000456/20110062011-09-0101 September 2011 Mid-Cycle Letter for Braidwood Station, Units 1 and 2, - 05000456/2011-006; 05000457/2011-006 ML1024401002010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Braidwood Nuclear Power Plant IR 05000456/20100012010-03-0303 March 2010 Braidwood Power Plant EOC Annual Assessment Letter (05000456-10-001; 05000457-10-001) ML0924404022009-09-0101 September 2009 Braidwood - Mid-Cycle Performance Review and Inspection Plan ML0906302842009-03-0404 March 2009 Annual Assessment Letter - Braidwood (05000456/2010-001; 05000457/2010-001) ML0824602282008-09-0202 September 2008 Braidwood, Units 1 & 2 - Mid-Cycle Performance Review and Inspection Plan IR 05000456/20080012008-03-0303 March 2008 Braidwood, EOC Annual Assessment Letter (Report 05000456-08-001; 05000457-08-001) ML0735402552007-12-19019 December 2007 Inspection Plan 1/1/08 - 12/31/08 ML0724303542007-08-31031 August 2007 8/31/07 Braidwood - Mid-Cycle Performance Review and Inspection Plan 2023-08-30
[Table view] |
Text
Part B Items (Onsite) - NRC Information Request (September 20, 2016) - IP 71111.08- Braidwood U1 - Documents Selected for Onsite Review.
Please provide a hard copy of the documents below to the Braidwood Resident Inspectors Office on or before 10:00 am on September 26, 2016. This list of documents compliments/supplements the existing list of information requested for the onsite review as identified in NRC request for information letter dated June 21, 2016. Additionally, provide the remainder of information identified in Section B of the NRC information request letter dated June 21, 2016. Please direct questions on this request to the lead inspector Mel Holmberg at msh@nrc.gov or 630-829-9748.
- 1) ITEM B.1 - See detailed list of information needed in the NRC information request letter- Welds Selected for review The following Code Class welding scheduled for the current Unit 1 outage.
Work Order Description/Topic Supporting Docs 01836557 CM REPLACEMENT OF FAC As stated in Item B.1 of request COMPONENT 1FW151 letter 01822647 Permanent Repair on As stated in Item B.1 of request 1SX27DB-10 letter The following Code Class welds completed during prior Unit 1 outage Work Order Description/Topic Supporting Docs 01722810- Reweld FW-3 Shop Welds for As stated in Item B.1 of request 02 Line 1AF03EB-4 letter
- 2) ITEM B.2 of NRC information request letter- ISI related corrective actions AR/IR Description/Topic Supporting Docs Number Nuclear Safety Advisory All documents that evaluated the Letter (NSAL)-16-1 Baffle- operating experience identified in Former Bolts. this vendor notification letter and assigned corrective actions.
02503332 Pipe and Valve Inspection Copy of AR and all CAs and Results SX Pipe Leak applicable evaluations including applicable nondestructive examination (NDE) reports.
02512836 UT 1SX27DB-10" Weld Copy of AR and all CAs and 02512989 Overlay and Extent of applicable evaluations including 02512991 Condition Exams applicable NDE reports.
02533755 Replace Elbow on 2SX27DB- Copy of AR and all CAs and 10 Downstream of 2SX057B applicable evaluations including In 2016 applicable NDE reports.
02571340 A2R18 ISI Examination Copy of AR and all CAs and Results applicable evaluations including applicable NDE reports.
02711378 ER-AA-335-031 UT Exam of Copy of AR and all CAs and Austenitic Piping Welds applicable evaluations including ADAMS Accession Number ML16265A577
applicable NDE reports.
02537300 LR - Verify Volumetric Copy of AR and all CAs and Procedure applicable evaluations.
02571599 PT Indications SG-B Copy of AR and all CAs and (2RC01BB) Channel Head applicable evaluations.
02603954 Piping Downstream of Copy of AR and all CAs and 1RH8729A has Through-wall applicable evaluations.
leak 02611707 Incorrect UTC on Weld Rod Copy of AR and all CAs and Slips applicable evaluations.
02488879 1CS020A Bolts Degraded by Copy of AR and all CAs and Leakage applicable evaluations including applicable NDE reports.
02625306 ANII QA/QC Process Copy of AR and all CAs and Monitoring Results applicable evaluations.
02510119 Wrong UTC Number on Weld Copy of AR and all CAs and Record (WO 1692235-29) applicable evaluations.
ATI 1RC8037A body-to-bonnet lk Copy of AR and all CAs and 2476265-02 identified during last U1 RFO applicable evaluations including Code Class 1 pressure test bolting and boric acid evaluations.
1RC8037C body-to-bonnet Copy of AR and all CAs and leak identified during last U1 applicable evaluations including RFO Code Class 1 pressure boric acid and bolting evaluation test 861305.
1RC8037B body-to-bonnet Copy of AR and all CAs and leak identified during last U1 applicable evaluations including RFO Code Class 1 pressure boric acid and bolting evaluation test 899596.
ATI 1CS05AB (1CS01SB) leak Copy of AR and all CAs and 1639774-02 identified during last Code applicable evaluations including and Class 2 pressure test. boric acid and bolting ATI evaluations.
1697658-02
- 3) Item B.3- Relevant Indications Component Exam Reports Supporting docs Unit 1- Provide the NDE Provide IRs, ARs and a copy of EC Degraded liner examinations that 402443. Additionally, provide below moisture support the most recent drawing and pictures (if available) barrier(Code two thickness readings that identify the location of the Category E-C- of the degraded liner degradation and locations selected Containment areas. for ultrasonic thickness monitoring.
Surfaces Requiring Provide a copy of the NDE Augmented procedure used to measure liner examination) thickness.
ADAMS Accession Number ML16265A577
- 4) Vendor Procedures for SG tube eddy current acquisition and analysis and site documents that perform owner review and acceptance of these procedures.
- 5) Copy of nondestructive examination procedure:
- a. Used to conduct ultrasonic (MRP-146 examinations) of 1RC-07-7-2 elbow to safe end weld.
- b. ER - AA-335-003.
- 6) Copy of the latest versions of the generic EPRI procedures PDI-UT-1, PDI-UT-2, and PDI-UT-8 and the EPRI procedure demonstration qualification records for vendor procedures EXE-PDI-UT-1, EXE-PDI-UT-2, EXE-PDI-UT-8.
- 7) Copy of the Inservice Inspection program document which identifies the specific components subject to volumetric weld examinations in each of the risk based component categories (e.g. R1.11, R1.15..) for the Braidwood Unit 1 risk based ISI program. Also provide the document which identifies the dates that volumetric examinations were completed for components within these examination categories.
- 8) Provide the dates that weld overlays were installed on Class 1 and 2 welds subject to volumetric examinations in the risk based ISI program for Unit 1.
Also, provide a copy of the revisions that were made to the Unit 1 ISI program as a result of these overlays.
- 9) Copy of EC 406306 and supplements that include the SG Degradation Assessment, Condition monitoring assessment, Operational assessment and the SG secondary side integrity assessment for the Unit 1 SGs.
- 10) SG Eddy Current Vendor - Examination Technique Examination Technique Specification Sheets (ETSS) and site records that confirm/validate and record acceptance of these records.
- 11) Documents needed to support review of Reactor Vessel Head Penetration Peening (IP 71111.18).
- a. Documents provided in first part of this inspection to include the current revisions of the vendor procedures that implement the vessel head peening modification (just need access to the electronic copies that were originally placed on site L drive).
- b. Documents (if available) that demonstrates the corrosion resistance of the Inconel 600 nozzle areas that will be subjected to electric discharge machining.
- c. Vendor procedures (and site review/approval records for these procedures) that will be used to perform the cavitation and rotary peening.
ADAMS Accession Number ML16265A577