UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRAIDWOOD STATION, UNITS 1 AND 2
Dear Mr. Pacilio:
On August 4, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of Braidwood Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the Security Cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Braidwood Station Unit 1 was within the Regulatory Response Cornerstone column of the NRCs Action Matrix, based on one inspection finding in the Mitigating Systems Cornerstone being classified as having low-to-moderate safety significance (White) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). The White finding involved the failure of the containment sump suction isolation valve to fully open. This finding caused Braidwood Unit 1 to transition from the Licensee Response column to the Regulatory Response column in the fourth quarter of 2009.
On July 22, 2010, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White finding. Therefore, we plan to conduct a supplemental inspection for Braidwood Unit 1 using Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, and we will notify your staff when it is scheduled. In addition to this supplemental inspection, we plan to conduct reactor oversight program (ROP) baseline inspections at Braidwood Unit 1.
Plant performance for the most recent quarter, as well as the first three quarters of the assessment period, at Braidwood Station Unit 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct ROP baseline inspections at Braidwood Unit 2.
M. Pacilio In our mid-cycle performance review letter [ML092440402] dated September 1, 2009, and the 2009 end-of-cycle assessment letter [ML100610223] dated March 3, 2010, we discussed a substantive cross-cutting issue in the area of human performance (HP) with a cross-cutting aspect of conservative decision-making (H.1.(b)). During this period, you had implemented a number of corrective actions, and the number of findings within the cross-cutting area of HP was reduced. Additionally, we have assessed the corrective actions taken in response to the substantive cross-cutting issue and observed a positive improvement in the area of conservative decision-making. Based on the corrective actions taken by you and the decrease in the number of findings, this substantive cross-cutting issue is closed. Nonetheless, continued management oversight is warranted to ensure sustained performance regarding conservative decision-making.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2011. In addition to the baseline inspection activities, we also plan to conduct several special and infrequently performed IPs, which include inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Gary L. Shear for/
Steven West, Director Division of Reactor Projects Docket Nos. 50-456, 50-457 License Nos. NPF-72, NPF-77
Enclosure:
Braidwood Station Inspection/Activity Plan cc w/encl:
Distribution via ListServ
Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Braidwood SUP
- 95001 - SUMP SUCTION VALVE 2
IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 95001 10/25/2010 10/29/2010 ER SIT
- EVENT RESPONSE - SPECIAL INSPECTION TEAM 4
IP Special Inspection 93812 08/17/2010 09/03/2010 BI PI&R
- BIENNIAL PI&R INSPECTION 4
IP Identification and Resolution of Problems 71152B 08/30/2010 09/17/2010 BI ENG
- INSERVICE INSPECTION 1
IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/04/2010 10/29/2010 IP Inservice Inspection Activities - PWR 7111108P 10/04/2010 10/29/2010 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 10/18/2010 10/22/2010 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/18/2010 10/22/2010 IP Occupational ALARA Planning and Controls 71124.02 10/18/2010 10/22/2010 IP Occupational Exposure Control Effectiveness 71151-OR01 10/18/2010 10/22/2010 TI
- TI 2515/177 GAS ACCUMULATION 2
IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 11/15/2010 12/03/2010 ISFSI
- ISFSI INSPECTION. - SCHEDULE DEPENDENT 2
IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 01/01/2011 06/30/2011 IP Review of 10 CFR 72.212(b) Evaluations at Operating Plants 60856.1 04/01/2011 06/30/2011 IP Review of 10 CFR 72.212(b) Evaluations 60856 05/01/2011 06/30/2011 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2011 08/31/2011 BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION 2
IP Alert and Notification System Testing 7111402 01/31/2011 02/04/2011 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 01/31/2011 02/04/2011 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 01/31/2011 02/04/2011 IP Drill/Exercise Performance 71151-EP01 01/31/2011 02/04/2011 IP ERO Drill Participation 71151-EP02 01/31/2011 02/04/2011 IP Alert & Notification System 71151-EP03 01/31/2011 02/04/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTI 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/28/2011 04/01/2011 IP Occupational Dose Assessment 71124.04 03/28/2011 04/01/2011 IP Reactor Coolant System Activity 71151-BI01 03/28/2011 04/01/2011 BI ENG
- INSERVICE INSPECTION - UNIT 2 1
IP Inservice Inspection Activities - PWR 7111108P 04/18/2011 05/05/2011
Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates Start End Inspection Activity Title No. of Staff on Site Braidwood BI RP
- RADIATION PROTECTION BASELINE INSPECTI 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/23/2011 05/27/2011 IP Performance Indicator Verification 71151 05/23/2011 05/27/2011 OL PREP
- BRAIDWOOD INIT PREP - 05/2011 2
OL - INITIAL EXAM - JUN 2011 - BRAI W90226 05/30/2011 06/03/2011 OL EXAM
- BRAIDWOOD INIT EXAM - 06/2011 2
OL - INITIAL EXAM - JUN 2011 - BRAI W90226 06/20/2011 07/01/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTI 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/11/2011 07/15/2011 IP Occupational ALARA Planning and Controls 71124.02 07/11/2011 07/15/2011 BI OL
- BIENNIAL REQUAL PROGRAM INSPECTION 2
IP Licensed Operator Requalification Program 7111111B 08/08/2011 08/12/2011 BI ENG
- TRIENNIAL HEAT SINK INSPECTION 1
IP Heat Sink Performance 7111107T 08/22/2011 08/26/2011 BI ENG
- MODIFICATIONS / 50.59 INSPECTION 4
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 10/24/2011 11/10/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTI 1
IP Radiological Environmental Monitoring Program 71124.07 11/14/2011 11/18/2011 BI RP
- RADIATION PROTECTION BASELINE INSPECTI 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/05/2011 12/09/2011 IP Occupational ALARA Planning and Controls 71124.02 12/05/2011 12/09/2011 IP Performance Indicator Verification 71151 12/05/2011 12/09/2011
M. Pacilio In our mid-cycle performance review letter [ML092440402] dated September 1, 2009, and the 2009 end-of-cycle assessment letter [ML100610223] dated March 3, 2010, we discussed a substantive cross-cutting issue in the area of human performance (HP) with a cross-cutting aspect of conservative decision-making (H.1.(b)). During this period, you had implemented a number of corrective actions, and the number of findings within the cross-cutting area of HP was reduced. Additionally, we have assessed the corrective actions taken in response to the substantive cross-cutting issue and observed a positive improvement in the area of conservative decision-making. Based on the corrective actions taken by you and the decrease in the number of findings, this substantive cross-cutting issue is closed. Nonetheless, continued management oversight is warranted to ensure sustained performance regarding conservative decision-making.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2011. In addition to the baseline inspection activities, we also plan to conduct several special and infrequently performed IPs, which include inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Gary L. Shear for/
Steven West, Director Division of Reactor Projects Docket Nos. 50-456, 50-457 License Nos. NPF-72, NPF-77
Enclosure:
Braidwood Station Inspection/Activity Plan cc w/encl:
Distribution via ListServ DOCUMENT NAME: G:\\Branch TSS\\ALL MOC\\midcycle 2010 to 2011\\midcycle letters\\Braidwood 2010 MOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RSkokowski:dtp SWest*GLS for DATE 08/21/2010 08/24/10 OFFICIAL RECORD COPY
Letter to M. Pacilio from S. West dated September 1, 2010.
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRAIDWOOD STATION, UNITS 1 AND 2 DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Steven Reynolds Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPreports Resource