{{#Wiki_filter:-ffi UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE lOO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 January 4,2013 LICENSEE:
{{#Wiki_filter:-ffi                                       UNITED STATES NUCLEAR REGULATORY COMMISSION REGION   I 21OO RENAISSANCE BOULEVARD,     SUITE lOO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 January 4,2013 LICENSEE: NextEra Energy Seabrook, LLC (NextEra)
NextEra Energy Seabrook, LLC (NextEra)FACILITY:
FACILITY:       Seabrook Station, Unit 1 (Seabrook)
Seabrook Station, Unit 1 (Seabrook)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 11,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML121254172).A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML123244218).
OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 11,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML121254172).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).The NRC presented poster boards during the open house and answered questions from individuals.
A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML123244218).
Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in f nspection Report No. 0500044312012009 (ADAMS Accession No. M112338A283).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC slides presented (ADAMS Accession No. ML12356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities.
The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in f nspection Report No. 0500044312012009 (ADAMS Accession No. M112338A283). The NRC slides presented (ADAMS Accession No. ML12356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implications related to Seabrook.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implications related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff.
There were no "take-away" actions from this meeting for the NRC staff.A,.A-J) ffiFo, James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety  
A,.A-J)
James M. Trapp, Chief ffiFo, Engineering Branch 1 Division of Reactor Safety


==Enclosures:==
==Enclosures:==
: 1) List of Attendees 2) CAL Response Status 3) List of References cc Mencl: Distribution via ListServ LICENSEE:
: 1) List of Attendees
NextEra Energy Seabrook, LLC (NextEra)FACILITY:
: 2) CAL Response Status
Seabrook Station, Unit 1 (Seabrook)
: 3) List of References cc Mencl: Distribution via ListServ
 
LICENSEE: NextEra Energy Seabrook, LLC (NextEra)
FACILITY:             Seabrook Station, Unit 1 (Seabrook)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 1 1,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML12125A172).A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. M1123244218).
OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 1 1,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML12125A172).
ADAMS is accessible from the NRC Web site at http://rruww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).The NRC presented poster boards during the open house and answered questions from individuals.
A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. M1123244218).
Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in Inspection Report No. 0500044312012009 (ADAMS Accession No. ML123384283).
ADAMS is accessible from the NRC Web site at http://rruww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC slides presented (ADAMS Accession No. M112356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities.
The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in Inspection Report No. 0500044312012009 (ADAMS Accession No. ML123384283). The NRC slides presented (ADAMS Accession No. M112356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implicaticlns related to Seabrook.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implicaticlns related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff.
There were no "take-away" actions from this meeting for the NRC staff./RN James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety  
                                                                                  /RN James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety


==Enclosures:==
==Enclosures:==
: 1) List of Attendees 2) CAL Response Status 3) List of References cc w/encl: Distribution via ListServ DOC NAME: c \DRS\SeabrooK Concrete\Media-Pub\For ShPt Pub Mtg 12-2012\Meeting Summary\SB Meeting Summary 12-11-2012.docx ADAMS Accession No.: ML130044178 tr SUNSI Review V Non-sensitive n Sensitive g D Publicly Available Non-Publicly Available OFFICE-RI/DRS-RYDRS RI/DRP RI/DRS NAME I\Fioyd-RConte DSchroeder JTrapp/RC DATE t2121t'12 12t27t12 1 /3/1 3 1t4113!AL COPY see previous concurrence OFFIC Distribution w/encl: (via E-mail)W. Dean, RA D. Lew, DRA D. Roberts, DRP P. Wilson, DRP C. Miller, DRS J. Clifford, DRS R. Conte, DRS J. Trapp, DRS D. Schroeder, DRP L. Cline, DRP R. Montgomery, DRP A. Turilin, DRP W. Raymond, DRP, SRI S. Rich, DRP, Acting SRI M. Jennerich, DRP, Rl A. Cass, DRP, AA C. Santos, Rl OEDO RidsNrrPMSeabrookResou rce RidsNrrDorlLpl 1 -2 Resource (RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)(RToRAMATL RESOURCE)
: 1) List of Attendees
ENCLOSURE 1$EABROOK STATION A$R PUBLIC MEETING DECEMBER 12,2A12 ATTENDANCE LIST Organization ft o nn a*-*-fa fu f,hf rrv1d 0R.rce s f'Jt Rr & r'':atle*/Jtycl e r*fuexkr *"-\Ji" LeK,me"t*-/o d,i*i &"4 s. &-{2 t.,l - ^A I Ir- /) a lV ! Aa t/r?&r/t\ tl tftttLK r It-/a\,H t rv tz.t-tt{/plrsn o{ futu.rned i flrh an ?'*oq, fiqtu-K*t" M f^{S $^{*\-T; rL"t*Enclosure 1
: 2) CAL Response Status
ENCLOSURE 1 Att*ndse Srgmni:*limr-r
: 3) List of References cc w/encl: Distribution via ListServ DOC NAME:   c \DRS\SeabrooK Concrete\Media-Pub\For ShPt Pub Mtg 12-2012\Meeting Summary\SB Meeting Summary 12-11-2012.docx ADAMS Accession No.: ML130044178 V     Non-sensitive                                 g     Publicly Available tr    SUNSI Review n                                                    D    Non-Publicly Available Sensitive
*s*x; T*ou& u**{&-.,'w$ Pa4ter*$D q,rt,. .{o74fg Itq*ry &g**Jk *terri*'{;- ---l --'---- - 't "*[l<u.Jt"r'*r*'-
                  -RI/DRS                     -RYDRS                   RI/DRP                   RI/DRS OFFICE NAME               I\Fioyd-                   RConte                     DSchroeder               JTrapp/RC DATE               t2121t'12                 12t27t12                 1 /3/1 3                   1t4113 see previous concurrence                           OFFIC !AL            COPY
SXd{.y $.&*+ u*{W S#d$nsd/s ro,ry#r$"f, tk'ds{ltfff frs"$r"cx# rr-ENCLOSURE 1 Organization
 
{,^6o*I ?, A S t t vnt-4, lf* t#5$*s"h#e"g,t*J,E R*r Ff Pt^*4*w*$t* #rn*A*E.,Yx&t*&*fr-ftsu,{}
Distribution w/encl: (via E-mail)
y'^o*##C*\t fluu*r*r h * .'* &*sry **.*5r{$t Ka",, K*k"r,tl e*izrrl; t.o_tt'q,"
W. Dean, RA           (RToRAMATL RESOURCE)
ENCLOSURE 1 Organization N*&1fise*u1) trf uu Vrl ll.Ld.W{.tu'l ft sf i.xnh*S*7 1 ,froul,l, v*y"*/l f\ l --F L-rO \V-v+lLeJsm S^nJeo &u*+u Sran 8"".&r${1 i{.58 l"i}tt aK LLv,\W rl'Uxrefl*
D. Lew, DRA           (RToRAMATL RESOURCE)
{)hut* GggsS L'nc\c* G"n" t*En"{RAl '*, ttA tcfing- U(SIlYi hlnv.a lileryi'*t{r;t"^
D. Roberts, DRP       (RToRAMATL RESOURCE)
ENCLOSURE 1 Attend*e*rgxn{xalion
P. Wilson, DRP         (RToRAMATL RESOURCE)
{","{* $,;e**Tb*#k*dr -{* r,{qoq *Jx^1H Scrt-F A.ff*- f,.., lqr.f$- tf Tgr qfu&o*f"/;t'i dsdt $dlk"h Enclosure 1
C. Miller, DRS         (RToRAMATL RESOURCE)
ENCLOSURE 1 Organization 51(e(pornclzP+lc I d*{t"il-d a-x/ ill//rt r r ?ttt oF A"^.treul
J. Clifford, DRS       (RToRAMATL RESOURCE)
+'{^o{4do'^
R. Conte, DRS J. Trapp, DRS D. Schroeder, DRP L. Cline, DRP R. Montgomery, DRP A. Turilin, DRP W. Raymond, DRP, SRI S. Rich, DRP, Acting SRI M. Jennerich, DRP, Rl A. Cass, DRP, AA C. Santos, Rl OEDO RidsNrrPMSeabrookResou rce RidsNrrDorlLpl 1 -2 Resource
An' U\"Y tfutnWr&*r,1
 
*,afu*J *w B u **Y?a {Zr L t TY (ourt.,l fl, k* tAltts 11 Ras,D*T-fi,A^ \re rs t basrJ"I r>t I l, //Ott"{ FaLflU1n ,f I"ob }JJ;\L Co^\,^- Co.L^n t{17{nGr*u A*l-ouu lrLT -f Enclosure 1
ENCLOSURE   1
ENCLOSURE 1 SEABROOK STATION ASR PUBLIC MEFTING DESHMBER 12,2012 ATTENDANCE LIST Attendee Organization I ilA ryLRB /Yto/t<5,fr f t*Drr-rr****)4/
                                  $EABROOK STATION A$R PUBLIC MEETING DECEMBER 12,2A12 ATTENDANCE LIST Organization 0R.rce s f'Jt                    ft o   nn a--
sh>",,, fit,' S, l4odwl Atxt e ru C^ &qc$i^'*--'"-
fa fu f,hf rrv1d
u\J C *ro ,/-'y -J/ ^-A- { rt rr*'\ (' -t--..-L-1o I t.;, k\,'q. N Ufr.'^\--{u&"'\-cl au rt\g. a tz"')tu"tq-e 11\' uL{'t<*?e-Pr f - T.ttrno's t{o*F*r^ So*:ar*'l,-
      &     r'':atle*           /Jtycl e r*
Ke{.nteen
Rr fuexkr       *"
()'Cmna--T:\,l*;{o,sscrc-ht*e-e*S S-+qJc*-FarSt **e:*14-f,)isfir*rC{
-\Ji"           LeK,me"t d,i*i &"4                           *-/o
  ,l        -a
: s. &-{2 t.
I Ir- /)
&r/t\            tllV ! Aa t/r?
                    ^AtftttLK r It-/a\,H     t rv tz.t-tt flrh an ?'oq,            {/plrsn o{ futu.rned i fiqtu-K*                         t"     M f^{
S $^{*\
-T;             rL"t*
Enclosure 1
Enclosure 1
ENCLOSURE 1 Organization
 
&1 H f{)c-t(/ Mr\*^ftr'r- ,/*,fr /'la/'"$b f,x'< {1"nry4 p Weuwv Ct.f \ ul f.l. t{ u4o"r* "-{Qw**,tal'*,*?r*,E 64s -sr'!f,.6r;,a, . rwr Q,aP.Pt,lz.,; Cos-re.Cu; g>f-r.r$-  
ENCLOSURE    1 Att*ndse        Srgmni:*limr-r
/ {4y^.,?o ,') t-ENCLOSURE 2 CAL Response Status 12t3t12 STATUS Sub-LEAD OTHER LICENSEE DOC.CAL ITEM CL RPT 1 EB1 Lic.Compl.AR 581434 Rev. 2 uploaded to internal file 5123112 1. Revise the prompt operability determination (POD) associated with AR581 434,'Reduced Concrete Properties Below Grade in "8" Electrical Tunnel Exterior Wall,'by May 25,2012. NextEra Energy Seabrook will notify the site NRC Resident Inspector upon completion of this action.CL/OP RPTl EB1 Licensee Planning to Revise Ltr 5124112 - ADAMs Accession No.M112151A396 Ltr &Encl. 1 2. Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012.CL RPTl DE/DLR Lic.Compl.ttr 5124112 - ADAMs Accession No.ML121514397 Encl. 2 3. Submit the evaluation, "lmpact of ASR on Concrete Structures and Attachments," (Foreign Print 1 0071 6)bv May 25,2012.Under NRC Review RPT2 DE/DLR Lic.Compl.Ltr 618112 - ADAMS Accession No.ML121714277 4 Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the affects of ASR, where warranted, by June 8, 2012.CL RPTl EB1 Lic.Compl.AR 01664399/AR 1757861 Rev. 2 uploaded to internal file6125112
*s*x;          T*ou& u**{
: 5. Revise the POD associated with AR1 664399,'Reduced Concrete Modulus of Elasticity Below Grade in Containment Enclosure Building, RHR Equipment Vaults, EFW Pump House, and Diesel Generator Fuel Oil Storage Rooms,' by June 30, 2012. The expanded scope buildings will be included in this POD. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.CL RPT 1 EB1 Lic.Compl.6129112FP 100734 uploaded to internal file.6. Complete short term aggregate expansion testing (ASTM C 1260 Mortar Bar Expansion Test) by June 30,2012. Results will be available for NRC review approximately 30 days after testinq is complete.Due June 2013 RPT 2 EB1 Licensee Planning to Revise NextEra discussed planned changes with inspection staff -Letter Revision, TBD 7. Complete long term aggregate expansion testing (ASTM C 1293 Concrete Prism Test) by June 30, 2013. Results will be available for NRC review approximately 30 days after testinq is comolete.Enclosure 2
  &-.,'w$ Pa4ter*$
ENCLOSURE 2 Re: Commitments made by NextEra in Letters, dated May 3 and May 10,2012 (Agencywide Documents and Management System (ADAMS) Accession Numbers ML121254022 and ML121314479, respectively), Report No. 1 (RPT 1): 050004432012009, Ended 1112112 - lssued 1213112 Report No. 2 (RPT 2): 050004432012010 to End - TBD STATUS BRANCH LEAD OTHER LICENSEE DOC.CAL ITEM Under NRC Review RPT2 DE/DLR Lic.Compl.ttr 6121112 - ADAMS Accession No.ML121794281 and Encl. ML 1217gAZBz 8. Submit the technical details of the testing planned at the contracted research and development facility by June 30.2012.Under NRC Review RPT 2 EB1 DLR issuing AMP questions related to this area by end of Aus2012 Lic.Compl.7116t12 EDS 36180 uploaded to internal file.9. Update the Maintenance Rule Structures Monitoring Program to include monitoring requirements for selected locations in areas that exhibit ASR by July 15, 2012. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.Under NRC Review RPT 112 EB1 Lic.Compl.7116112 FP 100738 uploaded to internal file.10. Perform the initial six-month interval crack measurements and crack indexing at 20 locations in areas that exhibit the highest crack indices by July 15,2012. Crack measurement will be performed at six-month intervals until a reliable trend of ASR progression is established.
D  q,rt,. .{o74fg Itq*ry      &g**
NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.Due Dec.2012 RPT 2 EB1 Licensee Planning to Revise At the FSEL -NextEra discussed planned changes with inspection staff -Letter Revision, TBD 11. Complete anchor test program by December 31. 2012. Results will be available for NRC review approximately 30 days after testing is complete.Under NRC Review.RPT,l/2 EB1 Ph I and ll Lic.Compl.Item in Phase lll Done last outaoe Walkdown Uploaded to internalfile as are Primary Containment Eng. Eval. & OD.Not a CAL item since it was assumed to be completed or new completion at the time of the management meeting of April 23,2012 - Phase lll was noted during the meeting a issue to be completed - this is where Primary Containment indications were noted and report to the ACRS.Enclosure 2
Jk *terri*
ENCLOSURE 3 Confirmatorv Action Letter for Alkali-silica Reaction Issue at Seabrook Related List of References and ML Nos.NRC Documents:
'{;-  ---l --'---- - 't "
: 1. NRC lnspection Report No. 050043312011010, issued March 26,2012 (ADAMS Accession No. M1120480066)
*[l<u.Jt"r'*r*'-
SXd{.y $.&*+ u*{
W    S#d$nsd              /s ro,ry#
r$"f, tk'ds{
ltfff frs"                $r"cx#    rr-
 
ENCLOSURE     1 Organization
{,^
6o*I ?, A            Stt vnt-4, lf*  t#5$*s"h      #e"g,t*
J,E R*r Ff Pt^      *4*w*
$t*    #rn*        AE.,Yx
&t*&*              fr-ftsu,{}
y'^o*
##C*\t            fluu*r*r h * .'* &*sry **.*  5r{$t Ka",, K*k"r,tl      e*izrrl;  t.o_tt'q,"
 
ENCLOSURE  1 Organization
    ) trf uu Vrl ll.Ld.W{.tu'l N*&1fise*u1 ft sf        i.xnh*          S*7 1 v*y"*
,froul,l,
                          /l    f\    l --F S^nJeo &u*+u L-rO \V-v+lLeJsm Sran 8"".&r                  ${1 i{.58 l"i}
tt aK LLv,\W              rl'Uxrefl*
{)hut* GggsS L'nc\c*      G"n" l            '*,
ttA tcfing- U(SIlYi      t*En"{RA hlnv.a lileryi'*        t{r;t"^
 
ENCLOSURE  1 Attend*e        *rgxn{xalion
"{*  $,;e**
Tb*#k*dr -      {* r,{qoq *Jx^1H Scrt-F A.
ff*- f,.., lqr.
f    $-   tf Tgr    qfu&o*    f"/;t'i dsdt $dlk"h
{",
Enclosure  1
 
ENCLOSURE      1 Organization 51(e(                  d{t"il-d pornclzP+lc I        a-x/ ill//rt r r ?ttt oF A"^.treul +'{^o{4do'^
An' U\"Y          tfutnWr&*r,1
,afu                  *J w B u *Y?a {Zr L t TY (ourt.,l fl, k tAltts 11        Ras,D*T
    -fi,A^   \re rs t  basrJ"I r>t  I l,      /
,f/Ott"{  FaLflU1n I"ob }JJ;\L Co^\,^- Co.L^n          t{17
{nGr*u        A*l-ouu  lrLT -f Enclosure 1
 
ENCLOSURE    1 SEABROOK STATION ASR PUBLIC MEFTING DESHMBER 12,2012 ATTENDANCE LIST Attendee                Organization I        ilA ryLRB /Yto/t<
5,fr f    t
*Drr-rr****)4/                 sh>",,,
fit,' S, l4odwl              Atxt e ru C^ &qc$i^'*--'"-
u\J                C  *ro
'y ,/-
/\ ^-A-(' -J { rt rr*'
                  -t--..-
L-1o I t.                        ;,
k\,'q.        N Ufr.'^        \--{u au rt    \g. a tz"')tu"tq-e 11\
&"'\-cl                    '        uL{'t<*
  ?e-Pr f - T.ttrno's      t{o*Fr^    So*:ar*'l,-
                          ;{o,sscrc-ht*e-e*S Ke{.nteen ()'Cmna- S-+qJc*-
                  -T:\,l*
FarSt e:14-f,)isfir*rC{
Enclosure 1
 
ENCLOSURE      1 Organization
  &1    H f{)c-t(    / Mr\*
                      ^ftr'r- ,
f,x'< {1"nry4
                      /*,fr /'la/'"$b p Weuwv   Ct.f \ ul f.l. t{ u4o"r* "-{
Qw**,tal'*,
Q,aP.                                      -sr'
                          ?r*,E     64s Pt,lz.,; Cos-re.Cu;
                                !f,.6r;,a, . rwr g>f-r.r$- / {4y^.,?o
                                        ,') t-
 
ENCLOSURE 2 CAL Response Status 12t3t12 STATUS   Sub-LEAD OTHER     LICENSEE DOC.         CAL ITEM CL       EB1     Lic.       AR 581434 Rev. 2       1. Revise the prompt operability Compl. uploaded to internal  determination (POD) associated with RPT  1                      file 5123112          AR581 434,'Reduced Concrete Properties Below Grade in "8" Electrical Tunnel Exterior Wall,'by May 25,2012. NextEra Energy Seabrook will notify the site NRC Resident Inspector upon completion of this action.
CL/OP   EB1     Licensee   Ltr 5124112 - ADAMs   2. Submit the root cause for the Planning  Accession No.          organizational causes associated with RPTl              to Revise  M112151A396 Ltr &      the occurrence of ASR at Seabrook Encl. 1                Station and related corrective actions by May 25,2012.
CL       DE/DLR   Lic.       ttr   5124112 - ADAMs 3. Submit the evaluation, "lmpact of Compl. Accession No.          ASR on Concrete Structures and RPTl                        ML121514397 Encl. 2    Attachments," (Foreign Print 1 0071 6) bv May 25,2012.
Under   DE/DLR   Lic.       Ltr 618112   - ADAMS 4 Submit the corrective action plan for NRC              Compl. Accession No.          the continued assessment of ASR in Review                      ML121714277            concrete structures at Seabrook Station including development of RPT2                                                remedial actions to mitigate the affects of ASR, where warranted, by June 8, 2012.
CL       EB1     Lic.       AR 01664399/AR         5. Revise the POD associated with Compl.      1757861 Rev. 2        AR1 664399,'Reduced Concrete RPTl                        uploaded to internal  Modulus of Elasticity Below Grade in file6125112            Containment Enclosure Building, RHR Equipment Vaults, EFW Pump House, and Diesel Generator Fuel Oil Storage Rooms,' by June 30, 2012. The expanded scope buildings will be included in this POD. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.
CL       EB1     Lic.       6129112FP 100734       6. Complete short term aggregate Compl. uploaded to internal  expansion testing (ASTM C 1260 RPT  1                      file.                  Mortar Bar Expansion Test) by June 30,2012. Results will be available for NRC review approximately 30 days after testinq is complete.
Due June EB1     Licensee   NextEra discussed     7. Complete long term aggregate 2013              Planning  planned changes with  expansion testing (ASTM C 1293 to Revise  inspection staff -    Concrete Prism Test) by June 30, RPT 2                        Letter Revision, TBD  2013. Results will be available for NRC review approximately 30 days after testinq is comolete.
Enclosure 2
 
ENCLOSURE 2 STATUS     BRANCH         OTHER       LICENSEE DOC.             CAL ITEM LEAD Under       DE/DLR         Lic.       ttr   6121112 - ADAMS     8. Submit the technical details of the NRC                        Compl.      Accession No.            testing planned at the contracted Review                                  ML121794281 and          research and development facility by Encl. ML 1217gAZBz        June 30.2012.
RPT2 Under       EB1             Lic.       7116t12 EDS 36180         9. Update the Maintenance Rule NRC                        Compl.      uploaded to internal      Structures Monitoring Program to Review      DLR issuing                file.                    include monitoring requirements for AMP                                                  selected locations in areas that exhibit questions                                            ASR by July 15, 2012. NextEra RPT 2      related to this                                      Energy Seabrook will notify the site area by end                                          NRC Resident lnspector upon of Aus2012                                            completion of this action.
Under       EB1             Lic.       7116112 FP 100738         10. Perform the initial six-month NRC                        Compl.      uploaded to internal      interval crack measurements and Review                                  file.                    crack indexing at 20 locations in areas that exhibit the highest crack indices by July 15,2012. Crack measurement RPT  112                                                          will be performed at six-month intervals until a reliable trend of ASR progression is established. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action.
Due Dec. EB1             Licensee   At the FSEL -             11. Complete anchor test program by 2012                        Planning    NextEra discussed        December 31. 2012. Results will be to Revise  planned changes with      available for NRC review RPT 2                                  inspection staff -        approximately 30 days after testing is Letter Revision, TBD      complete.
Under       EB1             Ph I and ll Walkdown Uploaded         Not a CAL item since it was assumed NRC                        Lic.        to internalfile as are    to be completed or new completion at Review.                    Compl.      Primary Containment      the time of the management meeting Eng. Eval. & OD.          of April 23,2012 - Phase lll was noted RPT,l/2                    Item in                              during the meeting a issue to be Phase lll                            completed - this is where Primary Done last                            Containment indications were noted outaoe                                and report to the ACRS.
Re: Commitments made by NextEra in Letters, dated May 3 and May 10,2012 (Agencywide Documents and Management System (ADAMS) Accession Numbers ML121254022 and ML121314479, respectively),
Report No. 1 (RPT 1): 050004432012009, Ended 1112112          - lssued 1213112 Report No. 2 (RPT 2): 050004432012010 to End - TBD Enclosure 2
 
ENCLOSURE 3 Confirmatorv Action Letter for Alkali-silica Reaction Issue at Seabrook Related List of References and ML Nos.
NRC Documents:
: 1. NRC lnspection Report No. 050043312011010, issued       March 26,2012 (ADAMS Accession No. M1120480066)
: 2. Management Meeting of April 23,2010, Meeting Notice (ADAMS Accession No. ML1132360175)
: 2. Management Meeting of April 23,2010, Meeting Notice (ADAMS Accession No. ML1132360175)
: 3. Management Meeting of April 23,2010, NRC Questions/Slides/Summary (ADAMS Accession Nos. ML1210401021Mt121 1 60333, ML121160433, and ML121220109)4. Confirmatory Action Letter No. 2012'002, dated May 16, 2012 (ADAMS Accession No. M1121254172)
: 3. Management Meeting of April 23,2010, NRC Questions/Slides/Summary (ADAMS Accession Nos. ML1210401021Mt121 1 60333, ML121160433, and ML121220109)
: 5. Transcript of Advisory Committee on Reactor Safety (ACRS) Plant License Renewal Subcommittee Meeting of July 10,2012, issued July 25, 2012 (ADAMS Accession No. M1122070401)
: 4. Confirmatory Action Letter No. 2012'002, dated May 16, 2012 (ADAMS Accession No. M1121254172)
: 6. NRC Staff Alkali-silica Reaction (ASR) Working Group Charter, issued July 9, 2012 (ADAMS Accession No. ML121250588, publicly available September 14,2012)7. NRC Staff Memorandum, issued September 5,2012, on Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction lssue at Seabrook (ADAMS Accession No. ML122424372)
: 5. Transcript   of Advisory Committee on Reactor Safety (ACRS) Plant License Renewal Subcommittee Meeting of July 10,2012, issued July 25, 2012 (ADAMS Accession No. M1122070401)
: 8. Letter to NextEra, issued September 12,2012, Transmitting the Memorandum Related to the Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station No. 1 (ADAMS Accession No. ML12242A363 (ADAMS Package))9. NRC Inspection Report No. 050043312012009, issued December 3,2012 (ADAMS Accession No. ML123384283)10. Letter to C-10, D. Grinnell, issued December 3,2012, Transmitting Answers to Questions Related to Seabrook ASR at Seabrook Station No. 1 (ADAMS Accession No.M1123394233) 1 1. Letter to C-10, S. Gavutis, issued December 3, 2012, Response to Letter of September 13, 2012 ( DAMS Accession No. ML123394204)
: 6. NRC Staff Alkali-silica Reaction (ASR) Working Group Charter, issued July 9, 2012 (ADAMS Accession No. ML121250588, publicly available September 14,2012)
: 7. NRC Staff Memorandum, issued September 5,2012, on Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction lssue at Seabrook (ADAMS Accession No. ML122424372)
: 8. Letter to NextEra, issued September 12,2012, Transmitting the Memorandum Related to the Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station No. 1 (ADAMS Accession No. ML12242A363 (ADAMS Package))
: 9. NRC Inspection Report No. 050043312012009, issued December 3,2012 (ADAMS Accession No. ML123384283)
: 10. Letter to C-10, D. Grinnell, issued December 3,2012, Transmitting Answers to Questions Related to Seabrook ASR at Seabrook Station No. 1 (ADAMS Accession No.
M1123394233) 1 1. Letter to C-10, S. Gavutis, issued December 3, 2012, Response to Letter of September 13, 2012 ( DAMS Accession No. ML123394204)
Enclosure 3
Enclosure 3
ENCLOSURE 3 12. Letter to Union of Concerned Scientists - D. Wright, issued December 3,2012, Response to Letter of September 13, 2012 (ADAMS Accession No. ML123394322)
 
Licens ee D ocuments (Publiely Available)
ENCLOSURE 3
: 13. Management Meeting of April 23, 2Q1A, NextEra/Consultant Slides (ADAMS Accession Nos. ML121160349, ML121160414, and ML121160422)14. NextEra letters, dated May 3, 2012, "Actions for Resolution of Alkali Silica Reaction (ASR)lssues" and, dated May 1 0, 2012, "Supplement to Actions for Resolution of Alkali Silica Reaction (ASR) lssues," (ADAMS Accession Nos. M112125A022 and M1121314479, respectively)
: 12. Letter to Union of Concerned Scientists - D. Wright, issued December 3,2012, Response to Letter of September 13, 2012 (ADAMS Accession No. ML123394322)
Licens ee D ocuments (Publiely Available)   :
: 13. Management Meeting of April 23, 2Q1A, NextEra/Consultant Slides (ADAMS Accession Nos. ML121160349, ML121160414, and ML121160422)
: 14. NextEra letters, dated May 3, 2012, "Actions for Resolution of Alkali Silica Reaction (ASR) lssues" and, dated May 1 0, 2012, "Supplement to Actions for Resolution of Alkali Silica Reaction (ASR) lssues," (ADAMS Accession Nos. M112125A022 and M1121314479, respectively)
: 15. NextEra Letter of May 24,2012, Letter and Enclosure 1 for CAL ltem 5, "Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012" (ADAMS Accession No. M1121514396)
: 15. NextEra Letter of May 24,2012, Letter and Enclosure 1 for CAL ltem 5, "Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012" (ADAMS Accession No. M1121514396)
: 16. NextEra Letter of May 24, 2012, Enclosure 2 tor CAL ltem 3, "Submit the evaluation, 'lmpact of ASR on Concrete Structures and Attachments' by May 25,2012" (Foreign Print 100716)by May 25,2012 (ADAMs Accession No. M112151A397)
: 16. NextEra Letter of May 24, 2012, Enclosure 2 tor CAL ltem 3, "Submit the evaluation, 'lmpact of ASR on Concrete Structures and Attachments' by May 25,2012" (Foreign Print 100716) by May 25,2012 (ADAMs Accession No. M112151A397)
: 17. NextEra Letter of June 8,2012, for CAL ltem 4, "Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the effects of ASR, where warranted, by June 8, 2012" (ADAMS Accession No. M112171A277)
: 17. NextEra Letter of June 8,2012, for CAL ltem 4, "Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the effects of ASR, where warranted, by June 8, 2012" (ADAMS Accession No. M112171A277)
: 18. NextEra Letter of June 21, 2012, for CAL ltem 8, "Submit the technical details of the testing planned at the contracted research and development facility by June 30,2012" (ADAMS Accession No. ML12179A281 and ML121794282).
: 18. NextEra Letter of June 21, 2012, for CAL ltem 8, "Submit the technical details of the testing planned at the contracted research and development facility by June 30,2012" (ADAMS Accession No. ML12179A281 and ML121794282).
Enclosure 3}}
Enclosure 3}}

Latest revision as of 17:46, 11 November 2019

December 11, 2012 Summary of Meeting Regarding Status of Degraded Concrete on Seabrook Station, Unit 1,
ML13004A178
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/04/2013
From: James Trapp
Engineering Region 1 Branch 1
To:
References
Download: ML13004A178 (15)


Text

{{#Wiki_filter:-ffi UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE lOO KING OF PRUSSIA, PENNSYLVANIA 1940G2713 January 4,2013 LICENSEE: NextEra Energy Seabrook, LLC (NextEra) FACILITY: Seabrook Station, Unit 1 (Seabrook)

SUBJECT:

SUMMARY

OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 11,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML121254172). A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. ML123244218). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in f nspection Report No. 0500044312012009 (ADAMS Accession No. M112338A283). The NRC slides presented (ADAMS Accession No. ML12356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities. Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implications related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff. A,.A-J) James M. Trapp, Chief ffiFo, Engineering Branch 1 Division of Reactor Safety

Enclosures:

1) List of Attendees
2) CAL Response Status
3) List of References cc Mencl: Distribution via ListServ

LICENSEE: NextEra Energy Seabrook, LLC (NextEra) FACILITY: Seabrook Station, Unit 1 (Seabrook)

SUBJECT:

SUMMARY

OF MEETING REGARDING STATUS OF DEGRADED CONCRETE HELD ON DECEMBER 1 1,2012 On December 11 ,2012, the U.S. Nuclear Regulatory Commission (NRC) conducted an open house, followed by a public meeting, at the One Liberty Lane Conference Center in Hampton, NH. The NRC conducted the open house and public meeting to discuss the safety implications and status of its review of NextEra's commitment actions related to the Alkali-Silica Reaction (ASR) conditions in safety-related structures at Seabrook Station. The commitments are documented in a May 16, 2012, Confirmatory Action Letter (CAL) No. 2012-002 (ADAMS Accession No. ML12125A172). A notice of the open house and public meeting was issued on November 19, 2012, and was posted on the NRC's external (public) web page (ADAMS Accession No. M1123244218). ADAMS is accessible from the NRC Web site at http://rruww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The NRC presented poster boards during the open house and answered questions from individuals. Following the open house, the NRC presented slides during the public meeting to discuss the results of its first CAL follow-up inspection related to the adequacy of NextEra's actions to address the impact of ASR on reinforced concrete structures, as documented in Inspection Report No. 0500044312012009 (ADAMS Accession No. ML123384283). The NRC slides presented (ADAMS Accession No. M112356A043) included a description of the ASR process, virtual tour of the plant, safety implications, inspection results to date, and future inspection activities. Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding NextEra's commitments and the safety implicaticlns related to Seabrook. There were no "take-away" actions from this meeting for the NRC staff.

                                                                                 /RN James M. Trapp, Chief Engineering Branch 1 Division of Reactor Safety

Enclosures:

1) List of Attendees
2) CAL Response Status
3) List of References cc w/encl: Distribution via ListServ DOC NAME: c \DRS\SeabrooK Concrete\Media-Pub\For ShPt Pub Mtg 12-2012\Meeting Summary\SB Meeting Summary 12-11-2012.docx ADAMS Accession No.: ML130044178 V Non-sensitive g Publicly Available tr SUNSI Review n D Non-Publicly Available Sensitive
                  -RI/DRS                     -RYDRS                    RI/DRP                    RI/DRS OFFICE NAME               I\Fioyd-                   RConte                     DSchroeder                JTrapp/RC DATE                t2121t'12                  12t27t12                  1 /3/1 3                   1t4113 see previous concurrence                           OFFIC !AL             COPY

Distribution w/encl: (via E-mail) W. Dean, RA (RToRAMATL RESOURCE) D. Lew, DRA (RToRAMATL RESOURCE) D. Roberts, DRP (RToRAMATL RESOURCE) P. Wilson, DRP (RToRAMATL RESOURCE) C. Miller, DRS (RToRAMATL RESOURCE) J. Clifford, DRS (RToRAMATL RESOURCE) R. Conte, DRS J. Trapp, DRS D. Schroeder, DRP L. Cline, DRP R. Montgomery, DRP A. Turilin, DRP W. Raymond, DRP, SRI S. Rich, DRP, Acting SRI M. Jennerich, DRP, Rl A. Cass, DRP, AA C. Santos, Rl OEDO RidsNrrPMSeabrookResou rce RidsNrrDorlLpl 1 -2 Resource

ENCLOSURE 1

                                 $EABROOK STATION A$R PUBLIC MEETING DECEMBER 12,2A12 ATTENDANCE LIST Organization 0R.rce s f'Jt                    ft o    nn a--

fa fu f,hf rrv1d

      &      r:atle*           /Jtycl  e r*

Rr fuexkr *" -\Ji" LeK,me"t d,i*i &"4 *-/o

 ,l        -a
s. &-{2 t.

I Ir- /)

&r/t\            tllV ! Aa t/r?
                    ^AtftttLK r It-/a\,H      t rv tz.t-tt flrh an ?'oq,            {/plrsn o{ futu.rned i fiqtu-K*                         t"      M f^{

S $^{*\

-T;             rL"t*

Enclosure 1

ENCLOSURE 1 Att*ndse Srgmni:*limr-r

  • s*x; T*ou& u**{
 &-.,'w$ Pa4ter*$

D q,rt,. .{o74fg Itq*ry &g** Jk *terri*

'{;-  ---l --'---- - 't "
*[l<u.Jt"r'*r*'-

SXd{.y $.&*+ u*{ W S#d$nsd /s ro,ry# r$"f, tk'ds{ ltfff frs" $r"cx# rr-

ENCLOSURE 1 Organization {,^ 6o*I ?, A Stt vnt-4, lf* t#5$*s"h #e"g,t* J,E R*r Ff Pt^ *4*w* $t* #rn* AE.,Yx &t*&* fr-ftsu,{} y'^o*

    1. C*\t fluu*r*r h * .'* &*sry **.* 5r{$t Ka",, K*k"r,tl e*izrrl; t.o_tt'q,"

ENCLOSURE 1 Organization

   ) trf uu Vrl ll.Ld.W{.tu'l N*&1fise*u1 ft sf         i.xnh*          S*7 1 v*y"*

,froul,l,

                         /l     f\    l --F S^nJeo &u*+u L-rO \V-v+lLeJsm Sran 8"".&r                  ${1 i{.58 l"i}

tt aK LLv,\W rl'Uxrefl* {)hut* GggsS L'nc\c* G"n" l '*, ttA tcfing- U(SIlYi t*En"{RA hlnv.a lileryi'* t{r;t"^

ENCLOSURE 1 Attend*e *rgxn{xalion "{* $,;e** Tb*#k*dr - {* r,{qoq *Jx^1H Scrt-F A. ff*- f,.., lqr. f $- tf Tgr qfu&o* f"/;t'i dsdt $dlk"h {", Enclosure 1

ENCLOSURE 1 Organization 51(e( d{t"il-d pornclzP+lc I a-x/ ill//rt r r ?ttt oF A"^.treul +'{^o{4do'^ An' U\"Y tfutnWr&*r,1 ,afu *J w B u *Y?a {Zr L t TY (ourt.,l fl, k tAltts 11 Ras,D*T

    -fi,A^   \re rs t  basrJ"I r>t   I l,      /
,f/Ott"{   FaLflU1n I"ob }JJ;\L Co^\,^- Co.L^n          t{17

{nGr*u A*l-ouu lrLT -f Enclosure 1

ENCLOSURE 1 SEABROOK STATION ASR PUBLIC MEFTING DESHMBER 12,2012 ATTENDANCE LIST Attendee Organization I ilA ryLRB /Yto/t< 5,fr f t

  • Drr-rr****)4/ sh>",,,

fit,' S, l4odwl Atxt e ru C^ &qc$i^'*--'"- u\J C *ro

'y ,/-
/\ ^-A-(' -J { rt rr*'
                 -t--..-

L-1o I t.  ;, k\,'q. N Ufr.'^ \--{u au rt \g. a tz"')tu"tq-e 11\ &"'\-cl ' uL{'t<*

  ?e-Pr f - T.ttrno's       t{o*Fr^     So*:ar*'l,-
                          ;{o,sscrc-ht*e-e*S Ke{.nteen ()'Cmna- S-+qJc*-
                  -T:\,l*

FarSt e:14-f,)isfir*rC{ Enclosure 1

ENCLOSURE 1 Organization

  &1    H f{)c-t(     / Mr\*
                      ^ftr'r- ,

f,x'< {1"nry4

                      /*,fr /'la/'"$b p  Weuwv    Ct.f \ ul  f.l. t{ u4o"r* "-{

Qw**,tal'*, Q,aP. -sr'

                         ?r*,E      64s Pt,lz.,; Cos-re.Cu;
                               !f,.6r;,a, . rwr g>f-r.r$- / {4y^.,?o
                                        ,') t-

ENCLOSURE 2 CAL Response Status 12t3t12 STATUS Sub-LEAD OTHER LICENSEE DOC. CAL ITEM CL EB1 Lic. AR 581434 Rev. 2 1. Revise the prompt operability Compl. uploaded to internal determination (POD) associated with RPT 1 file 5123112 AR581 434,'Reduced Concrete Properties Below Grade in "8" Electrical Tunnel Exterior Wall,'by May 25,2012. NextEra Energy Seabrook will notify the site NRC Resident Inspector upon completion of this action. CL/OP EB1 Licensee Ltr 5124112 - ADAMs 2. Submit the root cause for the Planning Accession No. organizational causes associated with RPTl to Revise M112151A396 Ltr & the occurrence of ASR at Seabrook Encl. 1 Station and related corrective actions by May 25,2012. CL DE/DLR Lic. ttr 5124112 - ADAMs 3. Submit the evaluation, "lmpact of Compl. Accession No. ASR on Concrete Structures and RPTl ML121514397 Encl. 2 Attachments," (Foreign Print 1 0071 6) bv May 25,2012. Under DE/DLR Lic. Ltr 618112 - ADAMS 4 Submit the corrective action plan for NRC Compl. Accession No. the continued assessment of ASR in Review ML121714277 concrete structures at Seabrook Station including development of RPT2 remedial actions to mitigate the affects of ASR, where warranted, by June 8, 2012. CL EB1 Lic. AR 01664399/AR 5. Revise the POD associated with Compl. 1757861 Rev. 2 AR1 664399,'Reduced Concrete RPTl uploaded to internal Modulus of Elasticity Below Grade in file6125112 Containment Enclosure Building, RHR Equipment Vaults, EFW Pump House, and Diesel Generator Fuel Oil Storage Rooms,' by June 30, 2012. The expanded scope buildings will be included in this POD. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action. CL EB1 Lic. 6129112FP 100734 6. Complete short term aggregate Compl. uploaded to internal expansion testing (ASTM C 1260 RPT 1 file. Mortar Bar Expansion Test) by June 30,2012. Results will be available for NRC review approximately 30 days after testinq is complete. Due June EB1 Licensee NextEra discussed 7. Complete long term aggregate 2013 Planning planned changes with expansion testing (ASTM C 1293 to Revise inspection staff - Concrete Prism Test) by June 30, RPT 2 Letter Revision, TBD 2013. Results will be available for NRC review approximately 30 days after testinq is comolete. Enclosure 2

ENCLOSURE 2 STATUS BRANCH OTHER LICENSEE DOC. CAL ITEM LEAD Under DE/DLR Lic. ttr 6121112 - ADAMS 8. Submit the technical details of the NRC Compl. Accession No. testing planned at the contracted Review ML121794281 and research and development facility by Encl. ML 1217gAZBz June 30.2012. RPT2 Under EB1 Lic. 7116t12 EDS 36180 9. Update the Maintenance Rule NRC Compl. uploaded to internal Structures Monitoring Program to Review DLR issuing file. include monitoring requirements for AMP selected locations in areas that exhibit questions ASR by July 15, 2012. NextEra RPT 2 related to this Energy Seabrook will notify the site area by end NRC Resident lnspector upon of Aus2012 completion of this action. Under EB1 Lic. 7116112 FP 100738 10. Perform the initial six-month NRC Compl. uploaded to internal interval crack measurements and Review file. crack indexing at 20 locations in areas that exhibit the highest crack indices by July 15,2012. Crack measurement RPT 112 will be performed at six-month intervals until a reliable trend of ASR progression is established. NextEra Energy Seabrook will notify the site NRC Resident lnspector upon completion of this action. Due Dec. EB1 Licensee At the FSEL - 11. Complete anchor test program by 2012 Planning NextEra discussed December 31. 2012. Results will be to Revise planned changes with available for NRC review RPT 2 inspection staff - approximately 30 days after testing is Letter Revision, TBD complete. Under EB1 Ph I and ll Walkdown Uploaded Not a CAL item since it was assumed NRC Lic. to internalfile as are to be completed or new completion at Review. Compl. Primary Containment the time of the management meeting Eng. Eval. & OD. of April 23,2012 - Phase lll was noted RPT,l/2 Item in during the meeting a issue to be Phase lll completed - this is where Primary Done last Containment indications were noted outaoe and report to the ACRS. Re: Commitments made by NextEra in Letters, dated May 3 and May 10,2012 (Agencywide Documents and Management System (ADAMS) Accession Numbers ML121254022 and ML121314479, respectively), Report No. 1 (RPT 1): 050004432012009, Ended 1112112 - lssued 1213112 Report No. 2 (RPT 2): 050004432012010 to End - TBD Enclosure 2

ENCLOSURE 3 Confirmatorv Action Letter for Alkali-silica Reaction Issue at Seabrook Related List of References and ML Nos. NRC Documents:

1. NRC lnspection Report No. 050043312011010, issued March 26,2012 (ADAMS Accession No. M1120480066)
2. Management Meeting of April 23,2010, Meeting Notice (ADAMS Accession No. ML1132360175)
3. Management Meeting of April 23,2010, NRC Questions/Slides/Summary (ADAMS Accession Nos. ML1210401021Mt121 1 60333, ML121160433, and ML121220109)
4. Confirmatory Action Letter No. 2012'002, dated May 16, 2012 (ADAMS Accession No. M1121254172)
5. Transcript of Advisory Committee on Reactor Safety (ACRS) Plant License Renewal Subcommittee Meeting of July 10,2012, issued July 25, 2012 (ADAMS Accession No. M1122070401)
6. NRC Staff Alkali-silica Reaction (ASR) Working Group Charter, issued July 9, 2012 (ADAMS Accession No. ML121250588, publicly available September 14,2012)
7. NRC Staff Memorandum, issued September 5,2012, on Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction lssue at Seabrook (ADAMS Accession No. ML122424372)
8. Letter to NextEra, issued September 12,2012, Transmitting the Memorandum Related to the Deviation from the Reactor Oversight Process Action Matrix for Seabrook Station No. 1 (ADAMS Accession No. ML12242A363 (ADAMS Package))
9. NRC Inspection Report No. 050043312012009, issued December 3,2012 (ADAMS Accession No. ML123384283)
10. Letter to C-10, D. Grinnell, issued December 3,2012, Transmitting Answers to Questions Related to Seabrook ASR at Seabrook Station No. 1 (ADAMS Accession No.

M1123394233) 1 1. Letter to C-10, S. Gavutis, issued December 3, 2012, Response to Letter of September 13, 2012 ( DAMS Accession No. ML123394204) Enclosure 3

ENCLOSURE 3

12. Letter to Union of Concerned Scientists - D. Wright, issued December 3,2012, Response to Letter of September 13, 2012 (ADAMS Accession No. ML123394322)

Licens ee D ocuments (Publiely Available)  :

13. Management Meeting of April 23, 2Q1A, NextEra/Consultant Slides (ADAMS Accession Nos. ML121160349, ML121160414, and ML121160422)
14. NextEra letters, dated May 3, 2012, "Actions for Resolution of Alkali Silica Reaction (ASR) lssues" and, dated May 1 0, 2012, "Supplement to Actions for Resolution of Alkali Silica Reaction (ASR) lssues," (ADAMS Accession Nos. M112125A022 and M1121314479, respectively)
15. NextEra Letter of May 24,2012, Letter and Enclosure 1 for CAL ltem 5, "Submit the root cause for the organizational causes associated with the occurrence of ASR at Seabrook Station and related corrective actions by May 25,2012" (ADAMS Accession No. M1121514396)
16. NextEra Letter of May 24, 2012, Enclosure 2 tor CAL ltem 3, "Submit the evaluation, 'lmpact of ASR on Concrete Structures and Attachments' by May 25,2012" (Foreign Print 100716) by May 25,2012 (ADAMs Accession No. M112151A397)
17. NextEra Letter of June 8,2012, for CAL ltem 4, "Submit the corrective action plan for the continued assessment of ASR in concrete structures at Seabrook Station including development of remedial actions to mitigate the effects of ASR, where warranted, by June 8, 2012" (ADAMS Accession No. M112171A277)
18. NextEra Letter of June 21, 2012, for CAL ltem 8, "Submit the technical details of the testing planned at the contracted research and development facility by June 30,2012" (ADAMS Accession No. ML12179A281 and ML121794282).

Enclosure 3}}