{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 12, 2013 Mr. Mano Nazar Executive Vice President and
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 12, 2013 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
 
Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT  
REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==


In a telephone conversation on June 5, 2013, Mr. Gerard Laska, NRC Senior Operations Examiner and Mr. Scott Feemster, Licensed Oper ator Continuing Training Supervisor, made arrangements for the NRC to inspect the licens ed operator requalification program at the St. Lucie Nuclear Plant. The inspection is planned for the week of August 26, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding your simulator is committed ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examinations.  
In a telephone conversation on June 5, 2013, Mr. Gerard Laska, NRC Senior Operations Examiner and Mr. Scott Feemster, Licensed Operator Continuing Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the St.
 
Lucie Nuclear Plant. The inspection is planned for the week of August 26, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding your simulator is committed ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examinations.
In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 19, 2013, the material as specified in paragraph "A" of the Enclosure, in order to support the NRC's  
In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 19, 2013, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Feemster has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.
inspection program needs. The NRC has further requested that you have all items as specified in paragraph "B" of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Feemster has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.  
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@NRC.GOV and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of  
 
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@NRC.GOV and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
M. Nazar 2 The NRC may neither conduct nor sponsor, and a person is not required to respond to an information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.  (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Gerard Laska at (404) 997-4626, (Internet E-mail:


M. Nazar                                      2 The NRC may neither conduct nor sponsor, and a person is not required to respond to an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice,  a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Gerard Laska at (404) 997-4626, (Internet E-mail:
Gerard.Laska@nrc.gov), or me at (404) 997-4550, (Internet E-mail:
Gerard.Laska@nrc.gov), or me at (404) 997-4550, (Internet E-mail:
Malcolm.Widmann@nrc.gov
Malcolm.Widmann@nrc.gov).
).       Sincerely,
Sincerely,
      /RA/             Malcolm T. Widmann, Chief Operations Branch 1       Division of Reactor Safety  
                                              /RA/
 
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16  


==Enclosure:==
==Enclosure:==


Materials Request List  
Materials Request List cc: (See page 3)
 
cc: (See page 3)  
 
_________________________ x SUNSI REVIEW COMPLETE x FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RA RA      NAME LASKA WIDMANN      DATE 6/12/2013 6/12/2013 6/    /2013 6/    /2013 6/    /2013 6/    /2013 6/    /2013 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO M. Nazar 3 cc: Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution
 
Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution
 
Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution
 
Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution
 
Daniel D. DeBoer
 
Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution
 
Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
 
Larry Nicholson
 
Director Licensing Florida Power & Light Company Electronic Mail Distribution
 
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
 
Cynthia Becker (Acting) Chief
 
Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
 
Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution
 
Donna Calabrese Emergency Preparedness Manager
 
St. Lucie Plant Electronic Mail Distribution J. Kammel
 
Radiological Emergency Planning
 
Administrator Department of Public Safety Electronic Mail Distribution


Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010  
_________________________      x    SUNSI REVIEW COMPLETE x  FORM 665 ATTACHED OFFICE            RII:DRS      RII:DRS SIGNATURE          RA            RA NAME              LASKA        WIDMANN DATE                  6/12/2013    6/12/2013    6/  /2013        6/  /2013      6/ /2013      6/ /2013      6/ /2013 E-MAIL COPY?        YES    NO  YES      NO  YES    NO      YES      NO    YES    NO    YES    NO    YES    NO M. Nazar                            3 cc:                                  Bryan Koon Joseph Jensen                        Director Site Vice President                  Florida Division of Emergency Management St. Lucie Nuclear Plant              Electronic Mail Distribution Electronic Mail Distribution Donna Calabrese Paul Freeman                          Emergency Preparedness Manager Vice President                        St. Lucie Plant Organizational Effectiveness          Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution          J. Kammel Radiological Emergency Planning Peter Wells                          Administrator Vice President                        Department of Public Safety Outage Support CFAM                  Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution          Senior Resident Inspector St. Lucie Nuclear Plant Robert J. Hughes                      U.S. Nuclear Regulatory Commission Plant General Manager                P.O. Box 6090 St. Lucie Nuclear Plant              Jensen Beach, FL 34957-2010 Electronic Mail Distribution Michael Baughman Daniel D. DeBoer                      Training Manager Operations Site Director              St. Lucie Nuclear Plant St. Lucie Nuclear Plant              Electronic Mail Distribution Electronic Mail Distribution Faye Outlaw Eric Katzman                          County Administrator Licensing Manager                    St. Lucie County St. Lucie Nuclear Plant              Electronic Mail Distribution Electronic Mail Distribution James Petro Larry Nicholson                      Managing Attorney-Nuclear Director                              Florida Power & Light Company Licensing                            Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution          Jack Southard Director Alison Brown                          Public Safety Department Nuclear Licensing                    St. Lucie County Florida Power & Light Company        Electronic Mail Distribution Electronic Mail Distribution Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution


Michael Baughman
Letter to Mano Nazar from Malcolm T. Widmann dated June 12, 2013
 
Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution
 
Faye Outlaw County Administrator
 
St. Lucie County Electronic Mail Distribution
 
James Petro
 
Managing Attorney-Nuclear
 
Florida Power & Light Company Electronic Mail Distribution Jack Southard
 
Director Public Safety Department
 
St. Lucie County Electronic Mail Distribution
 
Letter to Mano Nazar from Malcolm T. Widmann dated June 12, 2013  


==SUBJECT:==
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT DISTRIBUTION
REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT DISTRIBUTION:
: C. Evans, RII EICS (Part 72 Only)
C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
L. Douglas, RII EICS (Linda Douglas)
OE Mail (email address if applicable)
OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource  
RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource
 
Enclosure Materials Request List
 
The items listed below are necessary to support the Licensed Operator Requalification Program inspection (IP-71111.11) in August 2013 at St. Lucie. Items listed under "In-office inspection material" must be received in the NRC Region II office by August 19, 2013. Items listed under "On-site inspection material" should be ready for review upon arrival of the inspectors on August 26, 2013.


Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program inspection (IP-71111.11) in August 2013 at St. Lucie. Items listed under In-office inspection material must be received in the NRC Region II office by August 19, 2013. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on August 26, 2013.
A. In-office inspection material:
A. In-office inspection material:
: 1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions.
: 1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions.
: 2. Copy of an organizational chart for the training department including simulator staff.
: 2. Copy of an organizational chart for the training department including simulator staff.
: 3. Spreadsheets and/or test outlines which show the usage of written examination                                 questions, JPMs, and simulator scenarios (i.e. outlines/sample plans).
: 3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans).
: 4. Copy of the weekly examination schedules for the weeks that the 2013, annual operating exams will be administered, including a list of personnel scheduled for testing the week of August 26, 2013.
: 4. Copy of the weekly examination schedules for the weeks that the 2013, annual operating exams will be administered, including a list of personnel scheduled for testing the week of August 26, 2013.
: 5. Copies of the written examinations that were administered for the last biennial requalification examination (all weeks), including all biennial re-take exams.
: 5. Copies of the written examinations that were administered for the last biennial requalification examination (all weeks), including all biennial re-take exams.
: 6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of August 26, 2013, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test (exam security related item).
: 6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of August 26, 2013, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test (exam security related item).
: 7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from or concerning human  
: 7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from or concerning human performance errors, including any examination security issues.
 
performance errors, including any examination security issues.
: 8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security.
: 8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security.
: 9. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANS B 3.5-1998 requirements.
: 9. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1998 requirements.
: 10. Copy of the program evaluation of the previous biennial requalification cycle.  
: 10. Copy of the program evaluation of the previous biennial requalification cycle.
Enclosure


2 Enclosure B. On-site inspection material:
2 B. On-site inspection material:
: 1. Requalification training attendance records for the current biennial training cycle.
: 1. Requalification training attendance records for the current biennial training cycle.
: 2. Exam results since last requalification inspection (weekly operating & written examinations); copies of exams that had pass/failure rates outside the average.
: 2. Exam results since last requalification inspection (weekly operating & written examinations); copies of exams that had pass/failure rates outside the average.
Line 145: Line 79:
: 9. Medical records for all licensed (active and inactive) operators.
: 9. Medical records for all licensed (active and inactive) operators.
: 10. Simulator maintenance and testing records, including:
: 10. Simulator maintenance and testing records, including:
List of all open simulator discrepancies  
List of all open simulator discrepancies List of all simulator discrepancies closed within the last 12 months List of Simulator Performance tests Simulator performance testing records and associated documentation Enclosure}}
 
List of all simulator discrepancies closed within the last 12 months List of Simulator Performance tests Simulator performance testing records and associated documentation}}

Latest revision as of 04:53, 6 February 2020

Requalification Program Inspection - St. Lucie Nuclear Plant
ML13164A318
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/12/2013
From: Widmann M
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
Download: ML13164A318 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 12, 2013 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT

Dear Mr. Nazar:

In a telephone conversation on June 5, 2013, Mr. Gerard Laska, NRC Senior Operations Examiner and Mr. Scott Feemster, Licensed Operator Continuing Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the St.

Lucie Nuclear Plant. The inspection is planned for the week of August 26, 2013, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding your simulator is committed ANSI/ANS-3.5-1998, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examinations.

In accordance with 10 CFR 55.59, the NRC has requested that you submit by August 19, 2013, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Feemster has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@NRC.GOV and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

M. Nazar 2 The NRC may neither conduct nor sponsor, and a person is not required to respond to an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Gerard Laska at (404) 997-4626, (Internet E-mail:

Gerard.Laska@nrc.gov), or me at (404) 997-4550, (Internet E-mail:

Malcolm.Widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16

Enclosure:

Materials Request List cc: (See page 3)

_________________________ x SUNSI REVIEW COMPLETE x FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME LASKA WIDMANN DATE 6/12/2013 6/12/2013 6/ /2013 6/ /2013 6/ /2013 6/ /2013 6/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO M. Nazar 3 cc: Bryan Koon Joseph Jensen Director Site Vice President Florida Division of Emergency Management St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution Donna Calabrese Paul Freeman Emergency Preparedness Manager Vice President St. Lucie Plant Organizational Effectiveness Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution J. Kammel Radiological Emergency Planning Peter Wells Administrator Vice President Department of Public Safety Outage Support CFAM Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Senior Resident Inspector St. Lucie Nuclear Plant Robert J. Hughes U.S. Nuclear Regulatory Commission Plant General Manager P.O. Box 6090 St. Lucie Nuclear Plant Jensen Beach, FL 34957-2010 Electronic Mail Distribution Michael Baughman Daniel D. DeBoer Training Manager Operations Site Director St. Lucie Nuclear Plant St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution Faye Outlaw Eric Katzman County Administrator Licensing Manager St. Lucie County St. Lucie Nuclear Plant Electronic Mail Distribution Electronic Mail Distribution James Petro Larry Nicholson Managing Attorney-Nuclear Director Florida Power & Light Company Licensing Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Jack Southard Director Alison Brown Public Safety Department Nuclear Licensing St. Lucie County Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Cynthia Becker (Acting) Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Letter to Mano Nazar from Malcolm T. Widmann dated June 12, 2013

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - ST. LUCIE NUCLEAR PLANT DISTRIBUTION:

C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource

Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program inspection (IP-71111.11) in August 2013 at St. Lucie. Items listed under In-office inspection material must be received in the NRC Region II office by August 19, 2013. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on August 26, 2013.

A. In-office inspection material:

1. Complete list of all licensed individuals (active and inactive; RO and SRO), including license restrictions.
2. Copy of an organizational chart for the training department including simulator staff.
3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans).
4. Copy of the weekly examination schedules for the weeks that the 2013, annual operating exams will be administered, including a list of personnel scheduled for testing the week of August 26, 2013.
5. Copies of the written examinations that were administered for the last biennial requalification examination (all weeks), including all biennial re-take exams.
6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of August 26, 2013, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test (exam security related item).
7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from or concerning human performance errors, including any examination security issues.
8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security.
9. A copy of the governing site procedure(s) for the simulator fidelity which includes all the testing requirements used to fulfill ANSI/ANSB3.5-1998 requirements.
10. Copy of the program evaluation of the previous biennial requalification cycle.

Enclosure

2 B. On-site inspection material:

1. Requalification training attendance records for the current biennial training cycle.
2. Exam results since last requalification inspection (weekly operating & written examinations); copies of exams that had pass/failure rates outside the average.
3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam (exam security related item).
4. All training feedback forms since the last requalification inspection.
5. Documentation regarding all remedial training packages since the last requalification inspection.
6. A complete list of all personnel that reactivated their licenses since the last requalification inspection.
7. Records associated with license reactivation, including:
a. Documentation of time on shift under instruction.
b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
8. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
9. Medical records for all licensed (active and inactive) operators.
10. Simulator maintenance and testing records, including:

List of all open simulator discrepancies List of all simulator discrepancies closed within the last 12 months List of Simulator Performance tests Simulator performance testing records and associated documentation Enclosure