(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 12/11/2017 | | | issue date = 12/11/2017 |
| | title = Evaluated Emergency Preparedness Exercise Inspection Report 05000352/2017502 and 05000353/2017502 | | | title = Evaluated Emergency Preparedness Exercise Inspection Report 05000352/2017502 and 05000353/2017502 |
| | author name = McKinley R R | | | author name = Mckinley R |
| | author affiliation = NRC/RGN-I/DRS/PSB1 | | | author affiliation = NRC/RGN-I/DRS/PSB1 |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear |
| | docket = 05000352, 05000353 | | | docket = 05000352, 05000353 |
| | license number = NPF-039, NPF-085 | | | license number = NPF-039, NPF-085 |
| | contact person = McKinley R R | | | contact person = McKinley R |
| | document report number = IR 2017502 | | | document report number = IR 2017502 |
| | document type = Inspection Report, Letter | | | document type = Inspection Report, Letter |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., Suite 100 KING OF PRUSSIA, PA 19406 | | {{#Wiki_filter:UNITED STATES ber 11, 2017 |
| -2713 December 11, 2017 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LIMERICK GENERATING STATION
| | |
| - UNITS 1 AND 2 EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000 352/201 7 50 2 AND 05000353/2017502 Dear Mr. Hanson | | ==SUBJECT:== |
| : On November 16, 201 7, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the November 14, 201 7 , evaluated emergency preparedness exercise at the Limerick Generating Statio On November 16, 2017, the NRC inspectors discussed the results of this inspection with M Frank Sturniolo, Plant Manager, and other members of your staf The results of this inspection are documented in the enclosed repor The NRC inspectors did not identify any finding or violation of more than minor significanc This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
| | LIMERICK GENERATING STATION - UNITS 1 AND 2 EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000352/2017502 AND 05000353/2017502 |
| -rm/adams.html and the NRC's Public Document Room , in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | | |
| | ==Dear Mr. Hanson:== |
| | On November 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the November 14, 2017, evaluated emergency preparedness exercise at the Limerick Generating Station. On November 16, 2017, the NRC inspectors discussed the results of this inspection with Mr. Frank Sturniolo, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report. |
| | |
| | The NRC inspectors did not identify any finding or violation of more than minor significance. |
| | |
| | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket No and 50 | | /RA/ |
| -353 License No NPF-39 and NPF | | Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 |
| -85 B. Hanson 2 Enclosure: | |
| NRC Inspection Report No. 05000352/2017502 and 05000353/2017502 cc w/encl:
| |
| RFlinn, Jr., Director, PA Emergency Management Agency (PEMA)
| |
| TScardino, RAC Chair, FEMA Region III
| |
|
| |
|
| ML17345A714 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME JAmbrosini ECarfang RMcKinley DATE 12/5/17 12/7/17 12/11/17 1 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket No and 50-353 License No NPF-39 and NPF
| | ===Enclosure:=== |
| -85 Report No /2017502 and 05000353/2017502 Licensee: Exelon Generation Company, LLC Facility: Limerick Generating Station, Units 1 & 2 Location: Sanatoga, PA Dates: November 13
| | NRC Inspection Report No. 05000352/2017502 and 05000353/2017502 |
| - 16, 201 7 Inspectors:
| |
| J. Ambrosini, Sr. Emergency Preparedness Inspector Division of Reactor Safety (DRS
| |
| ) J. DeBoer, Emergency Preparedness Inspector, DRS M. Fannon, Resident Inspector D. Silk , Senior Operations Engineer, DRS Approved By:
| |
| Raymond McKinley, Chief Plant Support Branch Division of Reactor Safety
| |
|
| |
|
| 2 | | REGION I== |
| | Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Report Nos. 05000352/2017502 and 05000353/2017502 Licensee: Exelon Generation Company, LLC Facility: Limerick Generating Station, Units 1 & 2 Location: Sanatoga, PA Dates: November 13 - 16, 2017 Inspectors: J. Ambrosini, Sr. Emergency Preparedness Inspector Division of Reactor Safety (DRS) |
| | J. DeBoer, Emergency Preparedness Inspector, DRS M. Fannon, Resident Inspector D. Silk, Senior Operations Engineer, DRS Approved By: Raymond McKinley, Chief Plant Support Branch Division of Reactor Safety Enclosure |
|
| |
|
| =SUMMARY= | | =SUMMARY= |
| Inspection Report 05000 352/201 7 502 and 05000353/2017502 | | Inspection Report 05000352/2017502 and 05000353/2017502; 11/13-16, 2017; |
| ; 11/13-16, 201 7; Limerick Generating Station | |
| ; Exercise Evaluation, Exercise Evaluation- Scenario Review, Performance Indicator Verification.
| |
|
| |
|
| This was an announced inspection conducted by three Region I-based inspectors and one resident inspector. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6. | | Limerick Generating Station; Exercise Evaluation, Exercise Evaluation - Scenario Review, |
| | Performance Indicator Verification. |
| | |
| | This was an announced inspection conducted by three Region I-based inspectors and one resident inspector. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6. |
|
| |
|
| ===Cornerstone: Emergency Preparedness=== | | ===Cornerstone: Emergency Preparedness=== |
|
| |
|
| No findings were identified. | | No findings were identified. |
|
| |
| 3
| |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
Line 58: |
Line 57: |
| ==REACTOR SAFETY== | | ==REACTOR SAFETY== |
|
| |
|
| ===Cornerstone: Emergency Preparedness=== | | ===Cornerstone: Emergency Preparedness=== |
|
| |
|
| 1 EP 1 Exercise Evaluation (71114.01
| | {{a|1EP1}} |
| - 1 sample)
| | ==1EP1 Exercise Evaluation== |
| | {{IP sample|IP=IP 71114.01|count=1}} |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| On November 14, 2017, Exelon conducted a biennial emergency preparedness exercise at the Limerick Generating Station. The NRC inspectors evaluated the adequacy of Exelon's conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. | | On November 14, 2017, Exelon conducted a biennial emergency preparedness exercise at the Limerick Generating Station. The NRC inspectors evaluated the adequacy of Exelons conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. |
| | |
| T o evaluate the exercise, t he inspectors reviewed
| |
| : The adequacy of Exelon's performance in the biennial full
| |
| -participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b)(4), (5), (9), and (10), which are: emergency classification, offsite notification, radiological assessment, and onsite and public protective action recommendations, respectively.
| |
| | |
| The overall adequacy of Exelon's emergency response facilities with regard to Limerick emergency plan commitments. The inspectors assessed the following facilities: the simulator control r oom, the technical support center, the operations support center, and the emergency operations facility.
| |
|
| |
|
| Exelon's performance in other areas, such as: the emergency response organization's (ERO) recognition of abnormal plant conditions, command and control, communications both within and between facilities, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the Limerick emergency plan and its implementing procedures.
| | To evaluate the exercise, the inspectors reviewed: |
| | * The adequacy of Exelons performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b)(4), (5), (9), and (10), which are: emergency classification, offsite notification, radiological assessment, and onsite and public protective action recommendations, respectively. |
| | * The overall adequacy of Exelons emergency response facilities with regard to Limerick emergency plan commitments. The inspectors assessed the following facilities: the simulator control room, the technical support center, the operations support center, and the emergency operations facility. |
| | * Exelons performance in other areas, such as: the emergency response organizations (ERO) recognition of abnormal plant conditions, command and control, communications both within and between facilities, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the Limerick emergency plan and its implementing procedures. |
| | * A review of past performance issues from the last biennial exercise inspection report and Exelons emergency preparedness drill reports, to determine the effectiveness of corrective actions as demonstrated during the November 14, 2017, exercise and to ensure compliance with 10 CFR 50.47(b)(14), which requires licensees to conduct periodic drills and exercises and to correct any deficiencies identified. |
| | * The post-exercise critiques, to evaluate Exelons self-assessment of its ERO performance during the November 14, 2017, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. |
|
| |
|
| A review of past performance issues from the last biennial exercise inspection report and Exelon's emergency preparedness drill reports, to determine the effectiveness of corrective actions as demonstrated during the November 14, 2017, exercise and to ensure compliance with 10 CFR 50.47(b)(14), which requires licensees to conduct periodic drills and exercises and to correct any deficiencies identified
| | Documents reviewed for each section of this inspection report are listed in the |
| . | | . |
|
| |
| The post-exercise critiques, to evaluate Exelon's self
| |
| -assessment of its ERO performance during the November 14, 2017, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
| |
|
| |
| Documents reviewed for each section of this inspection report are listed in the Attachment.
| |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings were identified. | | No findings were identified. |
|
| |
|
| 1 EP 8 Exercise Evaluation
| | {{a|1EP8}} |
| - Scenario Review (71114.08 | | ==1EP8 Exercise Evaluation - Scenario Review== |
| - 1 sample)
| | {{IP sample|IP=IP 71114.08|count=1}} |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| Prior to the November 14, 2017, emergency preparedness exercise, the NRC inspectors conducted an in | | Prior to the November 14, 2017, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Limerick emergency plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. |
| -office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Limerick emergency plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. | |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
Line 97: |
Line 90: |
|
| |
|
| ==OTHER ACTIVITIES (OA)== | | ==OTHER ACTIVITIES (OA)== |
| 4 OA 1 Performance Indicator Verification (71151 - 3 Samples)
| | {{a|4OA1}} |
| | ==4OA1 Performance Indicator Verification (71151 - 3 Samples)== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors reviewed data for the Limerick emergency preparedness performance indicators: | | The inspectors reviewed data for the Limerick emergency preparedness performance indicators: |
| : (1) Drill and Exercise Performance (DEP) | | : (1) Drill and Exercise Performance (DEP) (EP01); |
| (EP01);
| |
| : (2) ERO Drill Participation (EP02); and | | : (2) ERO Drill Participation (EP02); and |
| : (3) Alert and Notification System (ANS) Reliability (EP03). The inspectors conducted the last NRC emergency preparedness inspection at Limerick in the fourth calendar quarter of 201 6, so the inspectors reviewed supporting documentation from emergency preparedness drills and tests from the fourth calendar quarter of 201 6 through the third calendar quarter of 201 7, to verify the accuracy of the reported PI data. The inspectors conducted this review in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 7 | | : (3) Alert and Notification System (ANS) Reliability (EP03). The inspectors conducted the last NRC emergency preparedness inspection at Limerick in the fourth calendar quarter of 2016, so the inspectors reviewed supporting documentation from emergency preparedness drills and tests from the fourth calendar quarter of 2016 through the third calendar quarter of 2017, to verify the accuracy of the reported PI data. |
| . This inspection activity represented the completion of three samples.
| | |
| | The inspectors conducted this review in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7. |
| | |
| | This inspection activity represented the completion of three samples. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings were identified. | | No findings were identified. |
| | {{a|4OA6}} |
| | ==4OA6 Meetings, including Exit== |
| | |
| | On November 16, 2017, the inspectors presented the results of this inspection to Frank Sturniolo, Plant Manager, and other members of Exelons staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. |
|
| |
|
| 4 OA 6 Meetings, including Exit On November 16, 201 7, the inspectors presented the results of this inspection to Frank Sturniolo, Plant Manager, and other members of Exelon's staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report
| |
| .
| |
| ATTACHMENT | | ATTACHMENT |
|
| |
|
Line 120: |
Line 118: |
| ===Licensee Personnel=== | | ===Licensee Personnel=== |
| : [[contact::F. Sturniolo]], Limerick Plant Manager | | : [[contact::F. Sturniolo]], Limerick Plant Manager |
| : [[contact::V. Cwietniewicz ]], Exelon Mid-Atlantic Emergency Planning Manager | | : [[contact::V. Cwietniewicz]], Exelon Mid-Atlantic Emergency Planning Manager |
| : [[contact::A. Hightower ]], Limerick Emergency Planning Manager | | : [[contact::A. Hightower]], Limerick Emergency Planning Manager |
|
| |
|
| ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== |
|
| |
|
| None | | None |
| | |
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| ==Section 1EP1: Exercise Evaluation:==
| |
| : EP-AA-1000, Exelon Nuclear Standardized Emergency Plan, Revision 028
| |
| : EP-AA-10 08, Radiological Emergency Plan Annex for Limerick Generating Station, Revision 29
| |
| : Limerick Emergency Plan implementing procedures Limerick November 14, 2017, Emergency Exercise Scenario Package
| |
| ===Condition Reports===
| |
| : 2730920
| |
| : 2731035
| |
| : 2697459
| |
| : 2699307
| |
| : 2708412
| |
| : 4013634
| |
| : 4013614
| |
| : 4019370
| |
| : 4013624
| |
| : 3950707
| |
| : 3950702
| |
| : 3950703
| |
| : 3950864
| |
| : 3951911
| |
| : 3954739
| |
| : 3954742
| |
| : 3951911
| |
| : 3954739
| |
| : 4066798
| |
| : 4066887
| |
| : 4066844
| |
| : 4066867
| |
| : 4066717
| |
| : 4066786
| |
| : 4066788
| |
| : 4066789
| |
| : 4066803
| |
| : 4066818
| |
| : 4066829
| |
| : 4066838
| |
| : 4066842
| |
| : 4066855
| |
| : 4066859
| |
| : 4066881
| |
| : 4066885
| |
| : 4066912
| |
| : 4066913
| |
| : 4066919
| |
| : 4066930
| |
| : 4066946 4066955
| |
|
| |
| ==Section 1EP8: Exercise Evaluation==
| |
|
| |
| - Scenario Review
| |
| : EP-AA-1000, Exelon Nuclear Standardized Emergency Plan, Revision 028
| |
| : EP-AA-1008, Radiological Emergency Plan Annex for Limerick Generating Station, Revision 29
| |
| : Limerick Emergency Plan implementing procedures Limerick November 14, 2017, Emergency Exercise Scenario Package
| |
|
| |
|
| ==Section 4OA1: Performance Indicator (PI) Verification==
| |
| : EP-AA-125-1001, EP Performance Indicator Guidance
| |
| : ANS PI data, October 2016 - September 2017 DEP PI data, October 2016
| |
| - September 2017
| |
| : ERO Drill Participation PI data, October 2016
| |
| - September 2017
| |
| ==LIST OF ACRONYMS==
| |
| : [[ADAMS]] [[Agencywide Documents Access and Management System]]
| |
| : [[ANS]] [[Alert Notification System]]
| |
| : [[CFR]] [[Code of Federal Regulations]]
| |
| : [[DEP]] [[Drill and Exercise Performance]]
| |
| : [[ERO]] [[Emergency Response Organization]]
| |
| NEI Nuclear Energy Institute
| |
| : [[NRC]] [[Nuclear Regulatory Commission]]
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 IR 05000352/20240102024-03-18018 March 2024 Biennial Problem Identification and Resolution Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20230062024-02-28028 February 2024 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2023006 and 05000353/2023006) IR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) IR 05000352/20230012023-04-28028 April 2023 Integrated Inspection Report 05000352/2023001 and 05000353/2023001 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220042023-02-13013 February 2023 Integrated Inspection Report 05000352/2022004 and 05000353/2022004 IR 05000352/20234022023-02-0707 February 2023 Security Baseline Inspection Report 05000352/2023402 and 05000353/2023402 IR 05000352/20233012023-01-26026 January 2023 Initial Operator Licensing Examination Report 05000352/2023301 and 05000353/2023301 IR 05000352/20220032022-11-0707 November 2022 Integrated Inspection Report 05000352/2022003 and 05000353/2022003 IR 05000352/20224022022-10-18018 October 2022 Security Baseline Inspection Report 05000352/2022402 and 05000353/2022402 IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20224012022-08-0303 August 2022 Material Control and Accounting Inspection Report 05000352/2022401 and 05000353/2022401 (Cover Letter Only) IR 05000352/20220022022-08-0101 August 2022 Integrated Inspection Report 05000352/2022002 and 05000353/2022002 IR 05000352/20220112022-06-30030 June 2022 Triennial Fire Protection Inspection Report 05000352/2022011 and 05000353/2022011 IR 07200065/20210012022-06-0909 June 2022 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200065/2021001 and Exercise of Enforcement Discretion IR 05000352/20220012022-05-0404 May 2022 Integrated Inspection Report 05000352/2022001 and 05000353/2022001 IR 05000352/20220102022-03-0909 March 2022 Biennial Problem Identification and Resolution Inspection Report 05000352/2022010 and 05000353/2022010 IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20214012022-02-15015 February 2022 Security Baseline Inspection Report 05000352/2021401 and 05000353/2021401 IR 05000352/20210042022-02-0909 February 2022 Integrated Inspection Report 05000352/2021004 and 05000353/2021004 IR 05000352/20215012021-11-29029 November 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2021501 and 05000353/2021501 IR 05000352/20210032021-11-0404 November 2021 Integrated Inspection Report 05000352/2021003 and 05000353/2021003 IR 05000352/20214202021-10-0404 October 2021 NRC Inspection Report 05000352/2021420 and 05000353/2021420 IR 05000352/20213012021-09-16016 September 2021 Initial Operator Licensing Examination Report 05000352/2021301 and 05000353/2021301 IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20214022021-08-24024 August 2021 Security Baseline Inspection Report 05000352/2021402 and 05000353/2021402 IR 05000352/20210022021-08-10010 August 2021 Integrated Inspection Report 05000352/2021002 and 05000353/2021002 IR 05000352/20210012021-04-30030 April 2021 Integrated Inspection Report 05000352/2021001 and 05000353/2021001 IR 05000352/20210102021-03-0909 March 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) IR 05000352/20200042021-02-0202 February 2021 Integrated Inspection Report 05000352/2020004 and 05000353/2020004 and Independent Spent Fuel Storage Installation Inspection Report 07200065/2020002 IR 05000352/20200152021-01-0404 January 2021 Temporary Instruction 2515/194 Inspection Report 05000352/2020015 and 05000353/2020015 IR 05000352/20200032020-11-0404 November 2020 Integrated Inspection Report 05000352/2020003 and 05000353/2020003 2024-09-04
[Table view] Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit 2024-09-06
[Table view] |
Text
UNITED STATES ber 11, 2017
SUBJECT:
LIMERICK GENERATING STATION - UNITS 1 AND 2 EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000352/2017502 AND 05000353/2017502
Dear Mr. Hanson:
On November 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the November 14, 2017, evaluated emergency preparedness exercise at the Limerick Generating Station. On November 16, 2017, the NRC inspectors discussed the results of this inspection with Mr. Frank Sturniolo, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room, in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85
Enclosure:
NRC Inspection Report No. 05000352/2017502 and 05000353/2017502
REGION I==
Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Report Nos. 05000352/2017502 and 05000353/2017502 Licensee: Exelon Generation Company, LLC Facility: Limerick Generating Station, Units 1 & 2 Location: Sanatoga, PA Dates: November 13 - 16, 2017 Inspectors: J. Ambrosini, Sr. Emergency Preparedness Inspector Division of Reactor Safety (DRS)
J. DeBoer, Emergency Preparedness Inspector, DRS M. Fannon, Resident Inspector D. Silk, Senior Operations Engineer, DRS Approved By: Raymond McKinley, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
Inspection Report 05000352/2017502 and 05000353/2017502; 11/13-16, 2017;
Limerick Generating Station; Exercise Evaluation, Exercise Evaluation - Scenario Review,
Performance Indicator Verification.
This was an announced inspection conducted by three Region I-based inspectors and one resident inspector. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6.
Cornerstone: Emergency Preparedness
No findings were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
Main article: IP 71114.01
a. Inspection Scope
On November 14, 2017, Exelon conducted a biennial emergency preparedness exercise at the Limerick Generating Station. The NRC inspectors evaluated the adequacy of Exelons conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
To evaluate the exercise, the inspectors reviewed:
- The adequacy of Exelons performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b)(4), (5), (9), and (10), which are: emergency classification, offsite notification, radiological assessment, and onsite and public protective action recommendations, respectively.
- The overall adequacy of Exelons emergency response facilities with regard to Limerick emergency plan commitments. The inspectors assessed the following facilities: the simulator control room, the technical support center, the operations support center, and the emergency operations facility.
- Exelons performance in other areas, such as: the emergency response organizations (ERO) recognition of abnormal plant conditions, command and control, communications both within and between facilities, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the Limerick emergency plan and its implementing procedures.
- A review of past performance issues from the last biennial exercise inspection report and Exelons emergency preparedness drill reports, to determine the effectiveness of corrective actions as demonstrated during the November 14, 2017, exercise and to ensure compliance with 10 CFR 50.47(b)(14), which requires licensees to conduct periodic drills and exercises and to correct any deficiencies identified.
- The post-exercise critiques, to evaluate Exelons self-assessment of its ERO performance during the November 14, 2017, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
Documents reviewed for each section of this inspection report are listed in the
.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
Main article: IP 71114.08
a. Inspection Scope
Prior to the November 14, 2017, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Exelon had submitted to the NRC, to determine if the exercise would test major elements of the Limerick emergency plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Limerick emergency preparedness performance indicators:
- (1) Drill and Exercise Performance (DEP) (EP01);
- (2) ERO Drill Participation (EP02); and
- (3) Alert and Notification System (ANS) Reliability (EP03). The inspectors conducted the last NRC emergency preparedness inspection at Limerick in the fourth calendar quarter of 2016, so the inspectors reviewed supporting documentation from emergency preparedness drills and tests from the fourth calendar quarter of 2016 through the third calendar quarter of 2017, to verify the accuracy of the reported PI data.
The inspectors conducted this review in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7.
This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On November 16, 2017, the inspectors presented the results of this inspection to Frank Sturniolo, Plant Manager, and other members of Exelons staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- F. Sturniolo, Limerick Plant Manager
- V. Cwietniewicz, Exelon Mid-Atlantic Emergency Planning Manager
- A. Hightower, Limerick Emergency Planning Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED