February 7, 2023

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000352/2023402 AND 05000353/2023402

Dear David Rhoades:

On January 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Limerick Generating Station, Units 1 and 2 and discussed the results of this inspection with Matthew Bonanno, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000352 and 05000353

License Numbers:

NPF-39 and NPF-85

Report Numbers:

05000352/2023402 and 05000353/2023402

Enterprise Identifier: I-2023-402-0024

Licensee:

Constellation Energy Generation, LLC

Facility:

Limerick Generating Station, Units 1 and 2

Location:

Limerick, PA

Inspection Dates:

January 23, 2023 to January 25, 2023

Inspectors:

D. Caron, Senior Physical Security Inspector

T. Eck, Physical Security Inspector

S. McCarver, Physical Security Inspector

Approved By:

Daniel L. Schroeder, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Limerick Generating Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1)

  • Tier I: All Requirements
  • Tier II: 6 Requirements (02.05 a and b, 02.06 a - c, 02.07 a)
  • Tier III: 4 Requirements (02.09, 02.10 a and b, 02.11 a)

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 8 Requirements (02.06 a - d, 02.07 a - d)
  • Tier III: 2 Requirements (02.09, 02.10 a)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

===elements:

Fitness For Duty Program===

(1)

  • Tier I: All Requirements
  • Tier II: 29 Requirements (02.05 a - l, 02.06 a, b, d, e - g, 02.07 a - e, 02.08 a, b, 02.09 a, b, d, e)
  • Tier III: 9 Requirements (02.10, 02.11 a, 02.12 a, 02.13 a - d, 02.14 b, c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===procedure elements:

Security Plan Changes===

(1) The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) October 1, 2022 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 25, 2023, the inspectors presented the security baseline inspection results to Matthew Bonanno, Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.01

Corrective Action

Documents

29698

4537749

25842

0444675

4402100

Miscellaneous

Access

Authorization

Files for all

Categories

Audit VA22007

Callaway Energy Center (CEC) NEI Audit Pinnacle

Investigations

Nantel Generic

Fitness-for-Duty

and Behavior

Observation

Content

Document

(training)

June 2021

PSEG Audit

Number:

NOV2021-121

PSEG Nuclear, LLC Audit Report of Confidential Services

Inc.

7/19/2021

Procedures

SY-AA-103-500

Access Authorization Program

Revision 17

SY-AA-103-506

Utilizing the Personnel Access Data System (PADS)

Revision 17

SY-AA-103-507

Review Criteria for Determining Trustworthiness and

Reliability

Revision 9

71130.02

Corrective Action

Documents

04508554

04440568

04393794

04376806

04351799

04351395

04349764

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

04344535

04330356

04328722

Miscellaneous

NOSA-LIM-20-02

Security Programs Audit Report

2/12/2020

NOSA-LIM-21-01 Security Programs Audit Report

03/10/2021

Procedures

SY-AA-101-106

Control and Classification of Safeguards Information and

Sensitive Unclassified Non-Safeguards Information

Revision 22

SY-AA-101-110

Security Sealing Operations

Revision 13

SY-AA-101-112

Exelon Security Search Processes

Revision 38

SY-AA-101-112-

1004

Protected Area Search Processes

Revision 5

SY-AA-101-112-

1005

Owner Controlled Area Inspection Processes

Revision 4

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 34

SY-AA-101-120

Control of Security Access Control Devices

Revision 9

SY-AA-101-132

Security Assessment and Response to Unusual Activities

Revision 36

SY-LG-101-112

Limerick Generating Station Search Processes

Revision 9

SY-LG-101-116

Conducting Security Patrols

Revision 6

SY-LG-101-119

Control of Receiving Warehouse at Limerick Generating

Station

Revision 11

SY-LG-101-120

Governance for Security Keys in the OCA

Revision 2

SY-LG-101-124

Duties and Responsibilities of Security Control Centers and

Security Supervision at Limerick Generating Station

Revision 14

SY-LG-1016

Limerick Watch Standing Practices

Revision 15

71130.08

Corrective Action

Documents

04403906

04442177

04496297

04371583

Miscellaneous

MEDTOX Annual Statistical Report 01/01/2022 - 12/31/2022

Blind Sample Quarterly Reports 2020 - 2022

AR 2022-02994

MedTox Laboratory Inc. Audit

04/07/2022

N-AN-SY-FFD

LMS Training and Qualification Records

01/24/2023

N-AN-SY-FFD-

SpecimenColl

LMS Training and Qualification Records

01/24/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NE 2021-17

ELSohly Laboratories, Inc. Audit

11/17/2021

Procedures

SY-AA-102

Exelon Generation Fitness for Duty Program

Revision 22

SY-AA-102-202

Testing for Cause

Revision 21

SY-AA-102-203

Treatment Plan and Follow-Up Testing

Revision 09

SY-AA-102-204

Random Selection and Notification Process

Revision 14

SY-AA-102-205

Fitness for Duty Appeal Review

Revision 10

SY-AA-102-206

Reporting Use of Medication

Revision 11

SY-AA-102-208

Notification of Fitness for Duty Test Results

Revision 10

SY-AA-102-222

Handling and Storage of Fitness for Duty Records

Revision 13

SY-AA-102-223

Handling Suitable Inquiries Records

Revision 05

SY-AA-102-225

Fitness for Duty Screening Process

Revision 07

SY-AA-102-226

Test Results and MRO Response

Revision 11

SY-AA-102-230

Designated Collection Facility

Revision 09

SY-AA-102-240

Collection of Specimens for Testing in an Exelon Facility

Revision 16

SY-AA-102-242

Breath Alcohol Testing

Revision 12

SY-AA-102-245

Calibration of Alco Sensor Equipment

Revision 12

SY-AA-102-248

Laboratory Blind Performance Test Specimens

Revision 08

SY-AA-102-252

Fitness for Duty Training and Qualification Requirements

Revision 05